Ack Receipt of 880519 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-193/88-01
ML20151E080
Person / Time
Site: Rhode Island Atomic Energy Commission
Issue date: 07/11/1988
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Dimeglio A
RHODE ISLAND, STATE OF
References
NUDOCS 8807250363
Download: ML20151E080 (2)


See also: IR 05000193/1988001

Text

-

. . . .

-

.. . . . '

"

* ^ ,

...

.

j.

I

JUL 111998

>

Docket No: 50-193

Rhode Island Atomic Energy Commission

~ ATTN: .Mr. A. Francis DiMeglio, Director

- Nuclear Science Center

Sout.h Ferry Road

Narragansett, Rhode Island 02882-

' Gentlemen:

Subject: Inspection Report No. 50-193/88-01

This refers to your letter dated May 19, 1988, in response to our letter dated

May 11,1988.

Thank you for informing us of the corrective and preventive actions documented in

your letter. These actions will be examined during a future inspection of your

licensed program.

Sincerely,

OHstaal signed 3ye

EM 5. Dettenhassee

Lee H. Bettenhausen, Chief'

Projects Branch No. 1

Division of Reactor Projacts

cc:

Professor George Seidel, Chairman, RIAEC

Dr. Stephen Mecca, Commissioner, RIAEC

John S. Pascalides, Commissioner, RIAEC

Dr. Vincent C. Rose, Commissioner, RIAEC

Dr. Stanley J. Pickart, Physics Department

Public Document Room (POR) (w/cy of May 19, 1988 Response Letter)

Local Public Document Room (LPDR) (w/cy of May 19, 1988 Response Letter)

Nuclear Safety Information Center (NSit) (w/cy of May 19, 1988 Response Letter)

State of Rhode Island (w/cy of May 19, 1988 Response Letter)

8807250363Ogh{93

PDR ADOCK O pg

G

OFFICIAL RECORD COPY DL50-193/88-01 REPLY - 0001.0.0

07/07/88

g/ [i j

.. . - - . _.

L . :: [*

'

~ .c..., '

' '

Rhode Island Atomic Energv Ccmission 2 JUL 11 O

p.

,,

bec w/cy of May 19, 1988 Response letter:

~ Region I Docket Room (with. concurrences)

-Management Assistant, ORMA (w/o enc 1)

Robert J. Bores, DRSS -

E. McCabe, Chief, RPS~38, ORP

.

J. Shedlosky, SRI (Millstone 3), ORP

Es Conner, Project Inspector, ORP-

RI: RP RI:DRP

onner meo

RIJ:0P

$UJV

McCabe

W

Bettenhausen

7/7/88 1//VSC ~7////M "

OFFICIAL RECORD COPY DL50-193/88-01 REPLY - 0002.0.0

07/07/88

.

, , . ,

Certification #P 389 790 238

,

. .

AR

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS

' Rhode Island Atomic Er.ergy Commitsion

NUCLEAR SCIENCE CENTER

South Ferry Road

Narragansett, R.I. 02882 !!97

May 19,-1988

Lee H. Bettenhausen, Chief

Projects Branch No. 1

Division of Reactor Projects

U. S. Nuclear Regulatory Commission

475 Allendale Road

King of Prussia,-PA 19406

License R-95

Docket 50-193

Dear Mr. Bettenhausen:

This letter is transmitf.'eFin response to the notice of

violation contained in inspection report 50-193/88-01 dated

May 11, 1988 concerning the failure to calculate quarterly

the fission density of all fuel elements which have burnup.

The notice was received on May 17, 1988.

At the beginning of the two periods listed in the notice,

predictive calculations were made based on our standard

operating schedule to show that no fuel elements would reach

the fission density limit during the time period.

Unfortunately these predictions were not documented and

therefore not available for inspection.

Full compliance with the technical specifications was

achieved with the calculations performed February 1988 and

calculations performed on April 28, 1988.

To avoid further violations, calculations will be performed

at least quarterly as required by the technical

specifications.

Very truly yours,

. t

'

vgh

A. Francis DiMeglio

Director

AFD:cd

cc: Rhode Island Atomic Energy Commission

Reactor Utill::ation Committee

h Y $ ff

'

. .

. .. _ - .- - _ . _ _ _ _ . .