|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217L7681999-10-19019 October 1999 Forwards Insp Rept 50-458/99-12 on 990822-1002.Four Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy RBG-45125, Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams1999-10-18018 October 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams ML20217J3751999-10-15015 October 1999 Informs That Applicable Portions of NEDC-32778P, Safety Analysis Rept for River Bend 5% Power Uprate, Marked as Proprietary Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) IR 05000458/19990071999-10-0505 October 1999 Refers to Util Ltr Re Apparent Violations Described in Insp Rept 50-458/99-07 Issued on 990804 & Forwards Nov.Insp Described Two Apparent Violations Related to River Bend Station Division I EDG RBG-45123, Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required1999-09-30030 September 1999 Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required RBG-45124, Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl1999-09-24024 September 1999 Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl RBG-45122, Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-471999-09-23023 September 1999 Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-47 RBG-45113, Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp1999-09-21021 September 1999 Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp ML20212D8901999-09-16016 September 1999 Discusses 6 Month Review of Plant Midcycle Ppr.Advises of Plans for Future Insp Activities.Forwards Historical Listing of Plant Issues,Referred to as PIM ML20216F7881999-09-15015 September 1999 Forwards Insp Rept 50-458/99-10 on 990830-990903.No Violations Noted.Insp Covered Licensed Operators Requalification Training Program & Observation of Requalification Activities 05000458/LER-1998-003, Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents1999-09-0909 September 1999 Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents ML20211Q7721999-09-0909 September 1999 Expresses Appreciation for ,In Response to NRC 990702 Re Denial of Notice of Violation Cited in Concerning Insp Rept 50-458/98-16.Reply Found to Be Responsive to Concerns Raised in NOV RBG-45109, Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted1999-09-0808 September 1999 Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted ML20211Q3921999-09-0808 September 1999 Forwards Insp Rept 50-458/99-08 on 990711-0821.One Violation Being Treated as Noncited Violation ML20211Q5541999-09-0808 September 1999 Discusses Meeting Conducted on 990830 in St Francisville,La Re Overall Performance Issues During 990403-0703 Refueling/ Maintenance Outage.Due to Proprietary Nature of Some Subject Matters,Meeting Closed to Public.Attendance List Encl ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) RBG-45095, Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status1999-09-0707 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status RBG-45097, Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves1999-08-31031 August 1999 Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves RBG-45094, Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation1999-08-25025 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation ML20211E2071999-08-23023 August 1999 Discusses Insp Rept 50-458/99-07 in Which 2 Violations Were Identified & Being Considered for Escalated Enforcement Action.Response Should Be Submitted Under Oath or Affirmation ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 RBG-45093, Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept1999-08-17017 August 1999 Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept ML20211A9291999-08-17017 August 1999 Forwards Insp Rept 50-458/99-11 on 990719-23.Areas Examined Included Portions of Licensee Physical Security Program. No Violations Noted ML20210T8881999-08-16016 August 1999 Forwards Replacement Pages 9-18 for Insp Rept 50-458/99-09, Issued on 990730 IR 05000458/19980101999-08-13013 August 1999 Forwards Summary of 990805 Mgt Meeting with Licensee in Arlington,Tx Re Radiological Control Problems Noted in Insp Repts 50-458/98-10 & 50-458/99-04.With Attendance List & Licensee Presentation ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210U3751999-08-12012 August 1999 Informs That Info Contained in Presentation, River Bend Station Fuel Recovery Project,Dtd 990622, Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20210Q7691999-08-11011 August 1999 Forwards Request for Addl Info Re Licensee River Bend Individual Plant Exam External Events,Under GL 88-20,suppl 4,dtd 910628 ML20210R4591999-08-10010 August 1999 Ack Receipt of Which Transmitted Plant Emergency Plan,Rev 20 Under Provisions of 10CFR50,App E,Section V.Nrc Approval Not Required,Based on Determination That Changes Does Not Decrease Effectiveness of EP ML20210N1641999-08-0404 August 1999 Forwards Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20210K4641999-08-0303 August 1999 Forwards SE Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Power-Operated Gate Valves, Issued on 950817 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K1351999-07-30030 July 1999 Forwards Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Three Violations Being Treated as Noncited Violations ML20210J9691999-07-30030 July 1999 Discusses 990719 Meeting with Util in Arlington,Tx Re Region IV Staff Findings of Root Cause Investigation Into Fuel Cladding Failures That Occurred During Recent Cycle 8 Operation.List of Attendees & Organization Chart Encl RBG-45072, Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL1999-07-23023 July 1999 Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL ML20210E9001999-07-23023 July 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev 1,Suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 RBG-45073, Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl1999-07-20020 July 1999 Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl RBG-45071, Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl1999-07-19019 July 1999 Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl 05000458/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 11999-07-15015 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 1 ML20196L0501999-07-0606 July 1999 Informs That NRC Insp Rept 50-458/99-03 Issued on 990519 with Errors in Tracking Numbers Assigned to Seven Noncited Violations & Error Re Actual Location of SRO During Refueling Activities.Revised Pages 2 & 4 Encl ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl ML20196K6851999-06-30030 June 1999 Ack Receipt of & Denial of NOV in Response to Transmitting NOV & Insp Rept 50-458/98-16.Listed Info Documents Results of Review of Response to Violation Re fire-induced Circuit Faults ML20196K0671999-06-30030 June 1999 Forwards Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations of NRC Requirements Occurred & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy.Meeting Scheduled for 990726 RBG-45048, Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept1999-06-29029 June 1999 Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept RBG-45047, Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output1999-06-29029 June 1999 Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output ML20196H5171999-06-21021 June 1999 Requests Withholding of Info Being Presented in Meeting of Entergy,General Electric & NRC Staff.Licensee Requested Meeting with NRC to Present Info on Recent Anomalous Conditions Found During Insp of Fuel Bundles.W/Affidavit 05000458/LER-1999-012, Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form1999-06-21021 June 1999 Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form RBG-45035, Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld1999-06-21021 June 1999 Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld ML20196E0601999-06-18018 June 1999 Forwards Insp Rept 50-458/99-05 on 990418-29.Four Violations Identified & Being Treated as Noncited Violations 05000458/LER-1999-011, Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-06-0909 June 1999 Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARRBG-45125, Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams1999-10-18018 October 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams RBG-45123, Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required1999-09-30030 September 1999 Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required RBG-45124, Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl1999-09-24024 September 1999 Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl RBG-45122, Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-471999-09-23023 September 1999 Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-47 RBG-45113, Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp1999-09-21021 September 1999 Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp 05000458/LER-1998-003, Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents1999-09-0909 September 1999 Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents RBG-45109, Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted1999-09-0808 September 1999 Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted RBG-45095, Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status1999-09-0707 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) RBG-45097, Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves1999-08-31031 August 1999 Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves RBG-45094, Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation1999-08-25025 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 RBG-45093, Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept1999-08-17017 August 1999 Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept RBG-45072, Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL1999-07-23023 July 1999 Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL RBG-45073, Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl1999-07-20020 July 1999 Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl RBG-45071, Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl1999-07-19019 July 1999 Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl 05000458/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 11999-07-15015 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 1 ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl RBG-45047, Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output1999-06-29029 June 1999 Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output RBG-45048, Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept1999-06-29029 June 1999 Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept ML20196H5171999-06-21021 June 1999 Requests Withholding of Info Being Presented in Meeting of Entergy,General Electric & NRC Staff.Licensee Requested Meeting with NRC to Present Info on Recent Anomalous Conditions Found During Insp of Fuel Bundles.W/Affidavit RBG-45035, Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld1999-06-21021 June 1999 Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld 05000458/LER-1999-012, Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form1999-06-21021 June 1999 Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form 05000458/LER-1999-011, Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-06-0909 June 1999 Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl 05000458/LER-1999-010, Forwards LER 99-010-00 for River Bend Station,Unit 1 IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-05-28028 May 1999 Forwards LER 99-010-00 for River Bend Station,Unit 1 IAW 10CFR50.73.Commitments Identified in Rept,Encl RBG-45021, Informs That Cycle 9 Operation Will Remain within MCPR Safety Limits Approved in Amend 105 to TS Issued by NRC in1999-05-26026 May 1999 Informs That Cycle 9 Operation Will Remain within MCPR Safety Limits Approved in Amend 105 to TS Issued by NRC in 05000458/LER-1999-009, Forwards LER 99-009-00 IAW 10CFR50.73.Commitments Contained in Ltr Are Identified on Commitment Identification Form1999-05-24024 May 1999 Forwards LER 99-009-00 IAW 10CFR50.73.Commitments Contained in Ltr Are Identified on Commitment Identification Form RBG-45017, Informs NRC of Addition of ASME Boiler & Pressure Vessel Code,Section Xi,Code Case N-496-1 to RBS Inservice Insp Program.Commitment Made by Util,Encl1999-05-14014 May 1999 Informs NRC of Addition of ASME Boiler & Pressure Vessel Code,Section Xi,Code Case N-496-1 to RBS Inservice Insp Program.Commitment Made by Util,Encl ML20206N1921999-05-10010 May 1999 Provides Revised Attachment 2 for Alternative Request IWE-02,originally Submitted 990429 Re Bolt Torque or Tension Testing of Class Mc pressure-retaining Bolting as Specified in Item 8.20 of Article IWE-2500,Table IWE-2500-1 05000458/LER-1999-007, Forwards LER 99-007-00 IAW 10CFR50.73.Commitments Identified in LER Are Noted in Attachment 11999-05-10010 May 1999 Forwards LER 99-007-00 IAW 10CFR50.73.Commitments Identified in LER Are Noted in Attachment 1 05000458/LER-1999-006, Forwards LER 99-006-00 Re Unplanned Automatic Standby Svc Water Initiation,Due to Procedure Inadequacy.Commitments Identified in Rept Noted in Attachment 11999-05-0606 May 1999 Forwards LER 99-006-00 Re Unplanned Automatic Standby Svc Water Initiation,Due to Procedure Inadequacy.Commitments Identified in Rept Noted in Attachment 1 05000458/LER-1999-005, Forwards LER 99-005-00 IAW 10CFR50.73(a)(2)(i).Commitments Identified in LER Are Noted in Attachment 11999-05-0303 May 1999 Forwards LER 99-005-00 IAW 10CFR50.73(a)(2)(i).Commitments Identified in LER Are Noted in Attachment 1 RBG-44993, Forwards RBS Annual Individual Monitoring Rept for Jan-Dec 1998,per Requirements of 10CFR20.2206(b).File Info Listed. Without Encl1999-04-30030 April 1999 Forwards RBS Annual Individual Monitoring Rept for Jan-Dec 1998,per Requirements of 10CFR20.2206(b).File Info Listed. Without Encl RBG-44998, Informs of Missing Documentation Re Examination Results Reported in RBS Owners Activity Report Forms Submitted to NRC on 9802241999-04-30030 April 1999 Informs of Missing Documentation Re Examination Results Reported in RBS Owners Activity Report Forms Submitted to NRC on 980224 ML20206E7811999-04-29029 April 1999 Proposes Alternatives to Requirements of ASME B&PV Code Section XI,1992 Edition,1992 Addenda,As Listed.Approval of Alternative Request on or Before 990915,requested 05000458/LER-1999-003, Forwards LER 99-003-00,per 10CFR50.73.Commitments Identified in Rept Are Noted in Attachment 11999-04-23023 April 1999 Forwards LER 99-003-00,per 10CFR50.73.Commitments Identified in Rept Are Noted in Attachment 1 RBG-44968, Submits Addl Info Re 981008 LAR 1998-02 Re Implementation of Bwrog/Ge Enhanced Option I-A (EI-A) Reactor Stability long- Term Solution.Clarifies Certain Aspects of Proposed Ts,Per 990406 Telcon with NRC1999-04-15015 April 1999 Submits Addl Info Re 981008 LAR 1998-02 Re Implementation of Bwrog/Ge Enhanced Option I-A (EI-A) Reactor Stability long- Term Solution.Clarifies Certain Aspects of Proposed Ts,Per 990406 Telcon with NRC RBG-44965, Responds to 990324 Telcon RAI Re SLMCPR Calculation Method for RBS Cycle 9 Slmcpr,Per LAR 1998-15 Re Change to TS 2.1.1.2, Reactor Core Safety Limits. Proposed TS Pages, Encl1999-04-0808 April 1999 Responds to 990324 Telcon RAI Re SLMCPR Calculation Method for RBS Cycle 9 Slmcpr,Per LAR 1998-15 Re Change to TS 2.1.1.2, Reactor Core Safety Limits. Proposed TS Pages, Encl RBG-44959, Withdraws 981120 LAR 1998-20,allowing Adjusting Control Pattern for Plant Startup If Outage Had Occurred Before Planned Refueling Outage.No Plant Outage Was Conducted & Plant Is Now in Eighth Refueling Outage1999-04-0808 April 1999 Withdraws 981120 LAR 1998-20,allowing Adjusting Control Pattern for Plant Startup If Outage Had Occurred Before Planned Refueling Outage.No Plant Outage Was Conducted & Plant Is Now in Eighth Refueling Outage ML20205F1781999-03-31031 March 1999 Forwards Consolidated Entergy Submittal to Document Primary & Excess Property Damage Insurance Coverage for Nuclear Sites of Entergy Operations,Inc,Per 10CFR50.54(w)(3) RBG-44939, Forwards Rbs,Unit 1 Annual Occupational Radiation Exposure Rept for 1998, Per TS 5.6.1.Rept Consists of Tabulation of Exposure for Personnel Receiving Exposures Greater than 100 Mrem Per Yr1999-03-31031 March 1999 Forwards Rbs,Unit 1 Annual Occupational Radiation Exposure Rept for 1998, Per TS 5.6.1.Rept Consists of Tabulation of Exposure for Personnel Receiving Exposures Greater than 100 Mrem Per Yr ML20196K7101999-03-26026 March 1999 Submits Reporting & Recordkeeping for Decommissioning Planning,Per 10CFR50.75(f)(1) RBG-44899, Provides Notification of Termination of Licensed Operator, AA Rouchon,License OP-42416-1,due to Resignation.Reactor Operator License Data,Listed1999-03-25025 March 1999 Provides Notification of Termination of Licensed Operator, AA Rouchon,License OP-42416-1,due to Resignation.Reactor Operator License Data,Listed ML20204G8701999-03-15015 March 1999 Responds to NOV Described in NRC Correspondance to Util ,expressing Disappointment in NRC Determination That AD Wells Deliberately Provided Incomplete & Inaccurate Info to NRC During Meeting on 971015 RBG-44925, Responds to NRC Re Violations Noted in Investigation Rept 4-97-059.Corrective Actions: Mgt Expectations for Communicating with NRC Issued to Site Personnel on 980212,by RBS Vice President,Operations1999-03-15015 March 1999 Responds to NRC Re Violations Noted in Investigation Rept 4-97-059.Corrective Actions: Mgt Expectations for Communicating with NRC Issued to Site Personnel on 980212,by RBS Vice President,Operations RBG-44924, Informs That Util Response to NOV Re Investigation Rept 4-97-059,will Be Issued by 990315,as Extended by NRC Ltr .Encl Check for $55,000 Is for Payment of Civil Penalty IAW Instructions in .Without Check1999-03-0505 March 1999 Informs That Util Response to NOV Re Investigation Rept 4-97-059,will Be Issued by 990315,as Extended by NRC Ltr .Encl Check for $55,000 Is for Payment of Civil Penalty IAW Instructions in .Without Check RBG-44912, Responds to Violations Noted in Insp Rept 50-458/98-13. Corrective Actions:Matls & Training Were Provided to Expedite Implementation of Existing Procedural Guidance to Supply Compressed Air1999-03-0303 March 1999 Responds to Violations Noted in Insp Rept 50-458/98-13. Corrective Actions:Matls & Training Were Provided to Expedite Implementation of Existing Procedural Guidance to Supply Compressed Air RBG-44904, Informs NRC of Date Change Re Commitment Made in Response to NOV 50-458/98-05-01.New Commitment Date 9912161999-02-25025 February 1999 Informs NRC of Date Change Re Commitment Made in Response to NOV 50-458/98-05-01.New Commitment Date 991216 RBG-44384, Submits Response to Fuel Cladding Defect Issues Raised in 10CFR2.206 Petition.Clear Technical Basis Exists in Info Provided by River Bend Station to Deny Petition1999-02-11011 February 1999 Submits Response to Fuel Cladding Defect Issues Raised in 10CFR2.206 Petition.Clear Technical Basis Exists in Info Provided by River Bend Station to Deny Petition ML20203C4201999-01-25025 January 1999 Submits Denial of NRC Request for Advance Info Re Concerns Raised by Ucs in 10CFR2.206 Petitions on River Bend & Perry Plants.Petitioners Were Not Required to Provide NRC with Info in Advance of Informal Public Hearings 1999-09-09
[Table view] Category:LEGAL/LAW FIRM TO NRC
MONTHYEARML20043G2321990-06-14014 June 1990 Advises That Licensee in Captioned Docket 50-458 Now Represented by Firm of Bishop,Cook,Purcell & Reynolds. Further Correspondence to Counsel for Licensee Should Now Be Forwarded to Author at Address Indicated on Letterhead ML20043B4871990-05-21021 May 1990 Forwards Endorsements 29,30,31,32,33,34,37,38,39,40,41 & 42 to Nelia Certificate NF-286 & Maelu Certificate MF-119 & Endorsements 10 & 11 to Nelia Certificate N-100 & Maelu Certificate M-100 ML20012E0021990-03-13013 March 1990 Forwards Schedule of Property Insurance Coverage Maintained by Util for Facility ML20006C0171990-01-0909 January 1990 Forwards Endorsement 9 to Nelia & Maelu Certificates N-100 & M-100,respectively,Endorsement 5 to Nelia & Maelu Certificates NW-178 & MW-89,respectively & Endorsement 36 to Nelia Policy NF-286.W/o Encls ML20244D9101989-04-0606 April 1989 Forwards Endorsements 25 & 33 to Maelu Policy MF-119 & Nelia Policy NF-286,respectively ML20235L1551989-01-11011 January 1989 Forwards Endorsements 31 & 32 & Endorsements 6 & 3 to Nelia Policy NF-286 & Certificates N-100 & NW-178,respectively & Endorsements 23 & 24 & Endorsements 6 & 33 to Maelu Policy MF-119 & Certificates M-100 & MW-178,respectively ML20207H1831988-07-25025 July 1988 Advises That Recipient to Senator J Breaux Does Not Address Question of Lag Time to Put Prompt Notification Sys Into Operation in Event of Emergency ML20154N1151988-05-27027 May 1988 Forwards Endorsement 28 to Nelia Policy NF-286 & Endorsement 20 to Maelu Policy MF-119 ML20154D7081988-05-12012 May 1988 Requests That NRC Take Immediate Action to Correct Listed Conditions Re Existence of Significant Hazard to Public Health & Safety in Connection W/Facility Operation.Util Unable to Maintain Prompt Notification Sys in Working Order ML20151G5111988-04-13013 April 1988 Forwards Endorsements 1 & 2 to Maelu Certificate MW-89 & Endorsements 1 & 2 to Nelia Certificate NW-178 ML20151H1531988-04-0808 April 1988 Forwards Endorsement 26 to Nelia Policy NF-286 & Endorsement 18 to Maelu Policy MF-119 ML20150E7701988-03-0909 March 1988 Forwards Schedule of Nuclear Property Coverages Maintained by Util for Facility ML20149M8981988-02-17017 February 1988 Forwards Endorsement 16 to Maelu Policy MF-119 & Endorsement 24 to Nelia Policy NF-286 ML20149D5081988-01-14014 January 1988 Forwards Endorsement 10 to Nelia Policy NF-286,Endorsement 17 to Maelu Policy MF-119,Endorsement 4 to Nelia Certificate N-100 & Endorsement 4 to Maelu Certificate M-100 ML20236X3151987-11-12012 November 1987 FOIA Request for Documents from 680101 to Present Re 740320 Agreement Between Us Dept of Justice,Aec & Gulf States, Cajun/Util Integrated Transmission Sys,Loan Guarantees Re Plant or Antitrust Review of Util or Plant ML20214E3161987-05-13013 May 1987 Forwards Endorsement 23 to Nelia Policy NF-286 & Endorsement 15 to Maelu Policy MF-119 ML20206E6921987-04-0101 April 1987 Forwards Schedule of Nuclear Property Coverages Maintained by Util for Facility Located in West Feliciana Parish,La ML20207T4261987-03-11011 March 1987 Forwards Endorsement 22 to Nelia Policy NF-286 ML20207M9291986-12-30030 December 1986 Forwards Endorsement 3 to Nelia Certificate N-100 & Maelu Certificate M-100 & Endorsement 21 to Nelia Policy NF-286 & Endorsement 14 to Maelu Policy MF-119 ML20211B9851986-04-29029 April 1986 Forwards Endorsements 20 & 13 to Nelia & Maelu Policies NF-286 & MF-119,respectively ML20210L3361986-03-13013 March 1986 Forwards Endorsements 19 & 12 to Nelia Policy NF-286 & Maelu Policy MF-119,respectively ML20205J0511986-01-14014 January 1986 Forwards Endorsements 18 & 11 to Nelia & Maelu Policies NF-286 & MF-119,respectively ML20136D0351985-12-23023 December 1985 Forwards Endorsements 2 & 18 to Nelia Policies N-100 & NF-286 & Endorsements 2 & 12 to Maelu Policies M-100 & MF-119,respectively ML20138Q2081985-12-17017 December 1985 Forwards Endorsement 17 to Nelia Policy NF-286 & Endorsement 11 to Maelu Policy MF-119 ML20138N3351985-10-29029 October 1985 Forwards Endorsement 1 to Nelia Certificate N-100 & Maelu Certificate M-100 ML20134M5141985-08-29029 August 1985 Forwards Endorsement 15 to Nelia Policy NF-286 & Endorsement 9 to Maelu Policy MF-119 ML20100E7281985-03-25025 March 1985 Forwards Endorsement 14 to Nelia Policy NF-286 & Endorsement 8 to Maelu Policy MF-19 ML20112F1011985-03-15015 March 1985 Informs of Withdrawal as Counsel to Ah Teunissen in Lawsuit Re Allegations Against Ebasco Svcs,Inc,Ebasco Plant Svcs, Inc,S&W & L Le Jeune.Numerous Attempts to Contact Client for Info Unsuccessful ML20099K8211985-03-13013 March 1985 Forwards Declarations to Maelu & Nelia Policies MF-119 & NF-286,respectively & Endorsements 6-10 & 12 to Nelia Policy NF-286 ML20099J8181985-03-13013 March 1985 Forwards Endorsements 11 & 13 to Nelia Policy NF-286 & Endorsements 6 & 8 to Maelu Policy MF-119 ML20111B9891985-03-0404 March 1985 Forwards Nelia Certificate N-100 & Maelu Certificate M-100 ML20106C1441985-02-0808 February 1985 Requests That City of Lafayette,La 830915 & s Re OL Application Be Withdrawn from Consideration in Antitrust Review Proceeding.City Has Entered Into Certain Arrangements W/Util Since Ltrs Submitted ML20098G8351984-10-0303 October 1984 Forwards Revised Page to Applicant Testimony on Asiatic Clams Reflecting Info Re Discovery of Asiatic Clams in Unit 1 of Big Cajun 2 Plant & Making Editorial Changes.Related Correspondence ML20096C4591984-08-30030 August 1984 Forwards Draft Preliminary Findings of Fact & Conclusions of Law on Contentions 1 & 2 in OL Proceeding,Per ASLB 840622 Memorandum.W/O Encl.Related Correspondence ML20092J3581984-06-0808 June 1984 Summarizes Evidence of Util Refusal to Transmit for Lafayette,La,Especially Through Louisiana Energy & Power Authority.Util Denied Transmission Between Town & Two Nongenerating Sys to Retain Sys as Customers ML20091J4801984-05-31031 May 1984 Notifies That,Per ASLB 840503 Memorandum & Order,Applicant Will Not File Motions on Two Contentions Re Asiatic Clams & Old River Control Structure.Related Correspondence ML20091B2141984-05-25025 May 1984 Requests ASLB Consideration of Hearing on Emergency Planning to Be Conducted in Dec 1984,based on Discussions W/Parties & Schedules of Parties to OL Proceeding.Related Correspondence ML20084K4151984-05-0707 May 1984 Forwards Further Pleadings in Response to Util 840326 Complaint Re 840326 Transmittals ML20084D0301984-04-26026 April 1984 Forwards Util 840416 Application for SNM License to Permit Receipt,Possession,Insp & Storage of Unirradiated Nuclear Fuel Bundles ML20087M3041984-03-26026 March 1984 Forwards Addl Matls Requested in NRC Re Antitrust Review.Util Attempting to Lock St Martinville Into Renewed long-term Commitment ML20081C3331984-03-0909 March 1984 Forwards Offsite Emergency Planning Contentions 1-12 ML20080M7031984-02-17017 February 1984 Informs That Raybunn of G&T,Inc Has Signed Agreement W/ Big Rivers Electric Cooperative to Purchase 100 MW of Firm Power & Energy ML20095J6501984-02-0303 February 1984 Forwards Updates & Suppls to Providing Info Showing Significant Changes Since CP Antitrust Review Which Render Info Provided by Util in 1981 Outdated & Deficient ML20086L2871984-02-0303 February 1984 Requests 2-wk Extension Until 840217 to File Comments in OL Application Antitrust Review,Per NRC 840104 Notice ML20080F9541984-02-0303 February 1984 Resubmits 800418 Comments & NRC 800505 Response Re Antitrust Review of Proposed Purchase of Facilities by Cajun Electric ML20083J4261984-01-0606 January 1984 Informs of Board of Directors Vote Not to Build Unit 2 ML20083F1231983-12-28028 December 1983 Forwards States of La & Ms Radiological Emergency Response Plans.Plans Have Been Submitted to FEMA for Review.W/O Encl ML20080G3361983-09-15015 September 1983 Requests That NRC Require Util to Submit Complete & Updated Antitrust Info & That Initial Finding Be Deferred or That Antitrust Review of OL Stage Be Required ML20076A9001983-08-15015 August 1983 Forwards Clearer Copies of Ltrs from State of La Dept of Corrections & Dept of Natural Resources Initially Forwarded to ASLB in ML20077J4921983-08-12012 August 1983 Forwards Two Ltrs from State of La Dept of Corrections & Dept of Natural Resources Re Contingency & Security Plans, Per 830805 Request 1990-06-14
[Table view] |
Text
n v arsh& l Vgennan l M & M Nuclear Consultants 2121 San J acinto 5treet i i
1300 San lacinto Tower Dallas, Teus 75201 Telephone 214 979-9900 l
April 13, 1988 Pr. Ira Dinitz l Senior Insurance Indemnity Analyst Office of Nuclear Reactor Regulation Pail Stop 12E4 U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Re: Master Worker Policy Gulf States Utilities Company ANI Certificate NW-178, End.1 & ?
PAELU Certificate MW-89, End.1 -& P
Dear Mr. Dinitz:
Enclosed are two certified copies of the captioned certificates and endorsements submitted in accordance with 10CFR140.15.
Please do not hesitate to call with any ouestions.
Sincerely
/
V John L. Samuels Nuclear Consultant
/pwp 789?X-?
Enclosures cc: B. Peiser - GSil P. Nadel - PAP Dallas
~
8804200020 880413 I l
POR ADOCK 05000458 l J DCD
s l .
Nuclear Energy Liability Insurance MUTUAL ATOMIC ENERGY LIABILITY UNDERWRITERS ADVANCE PREMIUM AND STANDARD PREMIUM ENDORSEMENT CALENDAR YEAR 1988
- 1. ADVANCE PREMIUM: It is agreed that the Advance Premium cue the companies for the period designated above is:
$ a.337.00 .
- 2. STANDARD PREMIUM AND RESERVE PREMIUM: In the absence of a cnange in the Advance Premium indicated above, it is agreed that, subject to the provisions of the Indus-try Retrospective Rating Plan, the Standard Premium is said Advance Premium and the estimated Reserve Premium element of the Standard Premium is:
\
$ 3,870.00 This is to cortify that this is a true copy of the original Enh . 'a - !
hwing the endorcement number and being maec ;:crt oi(N C'.+ fic - i of insurance bearing the number dos;gaated hueca for iro . nce I coverage "nder the Nucicer Enerr,y Llatsi;+y Policy (Facihti '.. >tW4 Form). NC Insurance is e" udcd hereur c. \
John L. ,. nro W % 'ulity Underwriting Amedcan Nuclear Insurers Effective Date of this Endorsement January 1, 1988 To form a part of Certificate No. MW-89 12:01 A.M. Standard Time Issued to_ Gulf States Utilities Comoany and Caiun Electric Power cnnnarativa Inc.
Date of Issue January 27. 1988 For the Subscribing Companies MUTUAL ATOMIC ENERGT LI18iLITY2
UNDERWRITERS
.'it ,:NI, By ,
w -.7 Countersigned by
'O '
a i ' .e Endorsement No. 2
%:d nt ..oea ! gent ME-W.2 (1/1/88)
.. . . j 1
1 y .
i -
l l
Nuclear Energy Liability Insurance MUTUAL ATOMIC ENERGY LIABILITY UNDERWRITERS INDUSTRY RETROSPECTIVE RATING PLAN PREMIUM ENDORSEMENT j It is agreed that:
- 1. DEFINITIONS l
With reference to the premium for the certificate of l which this endorsement forms a part: !
"Master Worker Policy" means the Master Worker Policy issued by MAELU; "Certificate Holder" means the first Named Insured in a Certificate issued to form a part of the Master Worker !
Policy; "advance premium", for any calendar year, is the esti- l mated standard premium for that calendar year; I "standard premium", for any calendar year, is the premium for that calendar year computed in accordance with the companies' rules, rates, rating plans (other than the Industry Retrospective Rating Plan), premiums and minimum premiums applicable to this insurance.
Standard premium includes elements for premium taxes, expenses, profit and contingencies, guaranteed cost insurarice and estimated reserve premium. The elements of standard premium, other than for premium taxes and estimated reserve premium, are not subject to retrospec-tive adjustment; "reserve premium" means that portion of the premium for a certificate (including reserve premium charges paid) that is specifically allocated under the Industry Retro-spective Rating Plan for ratable incurred losses; "industry reserve premium", for any period, is the sum of the reserve premiums for that period for all Certifi-cates issued to form a part of the Master Worker Policy; "retrospective adjustment ratio", for any period, is the ratio of the reserve premium for this certificate for that period to the industry reserve premium for the same period; "incurred losses" means the sum of all:
(1) losses and expenses paid by MAELU, and (2) reserves for losses and expenses as estimated by MAELU, ME-W-1 (1/1/88) Page 1
because of obligations assumed and expenses incurred in connection with such obligations by the members of MAELU under the Master Worker Policy; "ratable incurred losses" means 95% of incurred losses.
Ratable incurred losses are the portion of incurred losses which are not covered by the guaranteed cost insurance element of standard premiums; "non-ratable incurred losses" means 5% of incurred losses. Non-ratable incurred losses are the portion of incurred losses which are covered by the guaranteed cost insurance element of standard premiums; "reserve for refunds", as of any date, is the algebraic difference between:
(1) all industry reserve premium for the period from January 1, 1988 through such date, minus (2) the total for the same period of (a) all ratable incurred losses and (b) all industry reserve pre-mium refunds made under the Industry Retrospective Rating Plan by members of MAELU; "industry reserve premium charge", for any period, means the amount determined pursuant to the provisions of Section 4 of this endorsement for payment by the Named Insureds under Certificates; i
"reserve premium charge" means the portion of an indus- l try reserve premium charge payable by the Named Insureds under this Certificate; "industry reserve premium refund", for any period, means the amount determined pursuant to the provisions of !
Section 4 of this endorsement for return to the Named l Insureds under Certificates; "reserve premium refund" means the portion of an indus-try reserve premium refund returnable to the Named insureds under this Certificate.
- 2. PAYMENT OF ADVANCE AND STANDARD PREMIUMS The Named Insureds shall pay the companies the advance premium stated in the declarations, for the period from the effective date of this certificate through December 31 following. Thereafter, at the beginning of each calendar year while this certificate is in force, the Named Insureds shall pay the advance premium for such year to the companies.
ME-W-1 (1/1/88) Page 2
The advance premium for each calendar year shall be stated in the Advance and Standard Premium Endorsement for the year issued by the companies as soon as practic-able prior to or after the beginning of the year.
As soon as practicable after the end of a calendar year or the certificate coverage Period, the standard premium for the preceding year shall be finally determined and stated in the Advance and Standard Premium Endorsement for that year. If the standard premium exceeds the ad-vance premium paid for that year, the Named Insureds shall pay the excess to the companies; if less, the com-panies shall return to the Named Insureds the excess portion paid.
The Named Insureds shall maintain records of the inform-ation necessary for premium computation and shall send copies of such records to the companies as directed, at the end of each calendar year, at the end of the certi-ficate Coverage Period and at such other times as the companies may direct.
- 3. SPECIAL RESERVE ACCOUNT; USE OF RESERVE PREMIUMS MAELU shall maintain on behalf of its members a Special Reserve Account for holding collectively all reserve premiums paid for all Certificates issued to form a part of the Master Worker Policy. Such premiums, together with any undistributed net income realized thereon after taxes and investment expenses, shall be used for the following purposes only:
(1) to pay ratable incurred losses or, in the event ratable incurred losses are paid under the Master
, Worker Policy from funds advanced by the members of MAELU subscribing the policy, to reimburse such members as a matter of first priority for the funds advanced; (2) to refund any amounts so held to the Named Insureds, as provided in Section 4.
No members of MAELU and no Named Insureds shall have any individual interest in or claim upon amounts held in the Special Reserve Account, except to participate propor-tionally in any refund or reimbursement provided for above.
All reserve premiums paid or payable for this Certifi-cate may be used by MAELU to discharge the obligations of its members under the Master Worker Policy with re-spect to the above purposes and brising out of claims made under any Certificate issued to form a part of the Master Worker Policy.
ME-W-1 (1/1/88) Page 3
I
- 4. PAYMENT OF RESERVE PREMIUM CHARGES AND REFUNDS As soon as practicable af ter each December 31 the com-panies will review the status of the reserve for refunds and report their findings to all Certificate Holders.
If, at any time, the companies find that there is a negative balance in the reserve for refunds and that such condition is likely to prevail, they shall deter-mine an appropriate industry reserve premium charge.
Similarly, if the companies find that there is a surplus positive balance, they shall deternine an appropriate industry reserve premiun refund.
The portion of an industry reserve prcmium charge or an industry reserve premium refund that is:
(1) payable by the Named Insureds as a reserve premium charge, or (2) due such insureds as a reserve premium refund, shall be determined by multiplying the industry reserve premium charge or the industry reserve premium refund by the retrospective adjustment ratio applicable to this Certificate.
The amount of any reserve premium charge shall be stated in a Retrospective Reserve Premium Charge Endorsement.
The charge shall be paid promptly after receipt of the endorsement.
When all claims covered by the Master Worker Policy are closed the companies shall make a final review and report, and shall determine a final industry reserve premium charge or industry reserve premium refund equal to the amount of the balance.
- 5. FINAL PREMIUM The final premium for this Certificate shall be (a) the sum of the standard premiums for each calendar year, or portion thereof, during which the certificate remains in force plus (b) the sum of all reserve premiums, includ-ing all reserve premium charges, minus (c) the sum of all reserve premium refunds.
- 6. RESERVE PREMIUM CHARGE AGREEMENT In consideration of (a) the participation of Named Insureds in other Certificates subject to the Industry Retrospective Rating Plan, (b) the undertaking of such Named Insureds to pay their appropriate share of any industry reserve premium charge and (c) the obligations assumed by the members of MAELU under the Master Worker ME-W-1 (1/1/88) Page 4
1 Policy, the Named Insureds, by acceptance of the Master Worker Policy, agree:
(1) That the insurance provided by the Master Worker Policy applies collectively to all claims covered by the policy through any and all Certificates issued to form a part of the policy.
(2) That the right of each Named Insured under a Cert-ificate to receive reserve premium refunds and the obligation of each such insured to pay reserve premiums charges applies to all claims covered by the Master Worker Policy and continues until all such claims are closed, whether or not such claims were before the inception of the Certificate or after its termination.
(3) To pay all reserve premium charges due promptly after receipt of the Retrospective Reserve Premium Charge Endorsement, whether or not the Certificate is terminated. Any reserve premium charge shall be overdue if not paid within 60 days of the date of the invoice for the charge.
Overdue reserve premium charges shall bear interest from the due date until paid at an annual rate equal to the sum of (a) 3% plus (b) a rate of in-terest equal to Moody's Average Public Utility Bond Yield described in the issue of Moody's Bond survey current on the due date. Any reserve premium refund due to Named Insureds under a Certi- I ficate shall be used to pay any overdue reserve premium charges to such Named Insureds.
- 7. RESERVE PREMIUM REFUND AGREEMENT l
Each member of MAELU subscribing the Master Worker Policy for any calendar year, or portion thereof, with respect to which an industry reserve premium refund is determined to be payable thereby agrees for itself, severally and not jointly, and in the respective pro-portion of its liability assumed under the Master Worker Policy for that calendar year, to return promptly to the Named Insureds that portion of such refund due such Insureds, as determined in accordance with the provisions of this endorsement.
ME-W-1 (1/1/88) Page 5
Pago 6 Accepted and agreed by the first Named Insured in . behalf of itself and every other Named Insured stated in the Declara-tions of the Certificate of which this endorsement forms a part.
Gulf States Utilities Company (First Named Insured - Print or Type)
Date 12/15/87 By f A7 W (Signapre of Authoriz'ed Of ficer)
J. L. Donnelly, Senior Executive Vice President and Chief Financial Of ficer (Print or Type Name and Title of Officer)
This is to certify that this is a true copy of the original Endonem +
having the endorsemeninumber cnd being mado part cf the Cet J!(A of Insurance bearing inF; numbc r dr!cna:cd h>ren for Incow.a coverage under the Nuc!. .;r Ener;;y Ll '
' ty Fo: icy (Faci ity 'e'.'cd irt i
Form). N insurance is a ordud nercu ;r.
John L. w rb ,V 'lity Underwriting American clear Insurers l
l l
l Effective Date of To form a part of this Endorsement January 1. 1988 of Certificate No. MW-89 12:01 A.M. Standard Time Issued to Gulf States Utilities Comoany and Caiun Electric Power Conoprative. Inc.
Date of Issue October 19, 1987 For the Subscribing Companies MUTUAL ATOMIC ENERGY LIABILITT' ERWRITERS
)
By
.% , >%~
~w T
n -
Endorsement No. 1 Countersigned by '2- -- *
- Authorized.Represensacive ME-W-1 (1/1/88)
/ ,
b i
MUTUAL ATOMIC ENERGY LIABILITY UNDERWNITERS NUCLEAR ENERGY LIABILITY POLICY (Facility Worker Form) herein called the MASTER WORKER FOLICY CERTIFICATE OF INSURANCE Certificate No. MW-89 Date of Issue Jan. 27, 19 88 This is to certify that the insureds named in Item 1 of the Declarations hereof, hereinafter called the "Named Insureds", have obtained insurance under the Master Worker Policy issued by Mutual Atomic Energy Liability Underwriters on behalf of its members. The insurance is subject to all of the provisions of this "Certificate" and the Master Worker Policy.
1 DECLARATIONS Item 1. Named Insureds and Addresses:
Gulf States Utilities Company 350 Pine Street P.O. Box 2591 Beaumont, Texas 77704 Cajun Electric Power Cooperative, Inc. .
10719 Airline Highway '
Baton Rouge, Louisiana 70895 Item 2. Certificate Coverage Period:
Beginning at 12:01 a.m. January 1, 1988 and ending at the close of December 31, 1992, Eastern Standard Time, or at the time and date this Certificate is cancelled or terminated, whichever first occurs.
MMWPC-1 (1/1/88) Page 1
I ,
Item 3. Description of the Facili*y: ,
Location: All real and personal property known as the River Bend Station located in West Feliciana Parish on the east bank of the Mississippi River approximately 24 miles north-northwest of Baton-Rouge, Louisiana as indicated on Figure 2.1-3 of the FSAR amendment
- 19 dated May 1985 within the Restricted Area Boundary including the intake and discharge structure and associated piping.
Type: Power Reactor (0perating) operator of the Facility: Gulf States Utilities Company Item 4. Amount of Insurance Available:
The amount of insurance afforded by the Master Worker Policy through this Certificate shall be determined by Section VIII of the Master Worker Policy and all of the other previsions of the policy relating thereto.
Item 5. Advance Premium: $ 4,837.00 2
APPLICATION OF CERTIFICATE This Certificate applies only to bodily injury to a new worker (1) which is caused during the Certificate Coverage i Period by the nuclear energy hazard and (2) which is dis- l covered and for which written claim is first made against an '
I insured under the Certificate within the discovery period of the Master Worker Policy.
3 INDUSTRY RETROSPECTIVE RATING PLAN All insurance under the Master Worker Policy is subject to the Industry Retrospective Rating Plan in use by the compsnies. No insurance is provided under this Certificate ;
unless and until the first Named Insured has accepted in '
writing the Industry Retrospective Rating Plan Premium En-dorsement and a copy of the signed endorsement has been i issued by the companies to form a part of this certificate. I MMWPC-1 (1/1/88) Page 2 i
f.
t IN WITNESS WHEREOF, the companies subscribing the Master Worker Policy have caused this Certificate to be executed and attested on their behalf by the Manager of Mutual Atomic Energy Liablity Underwriters and duly countersigned by an authorized representative.
For the Subscribing Companies of MUTUAL ATOMIC ENERGY LIABILITY UNDERWRITERS J. Michael O'Connell Manacer ey sh ( Authoriaeci. Agent)
' 2'Li, inc.
1
,_.~ .
~+~
Countersigned by: -
( Authorit'e'd cReprbeentative) l 1
)
This is to certify that mis is a tru9 Copy Of the original Cortificate bearing the nurnty.a dQ;ne P d herec;n, " rinsurance coverage uader '
the Nuc. cr Ercrgy Un my Pgcy (Fe ty Workcrs Form) here in ca: led th*. Ya rFr iL ..
, Jcois af forded by this copy.
John L. t ttrocchi, Vice President - 'a 'llity Underwriting American Nuclear Insurers I
l, l
l 1
MMWPC-1 (1/1/88) Page 3
Nuclear Energy Liability Insurance NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION .
ADVANCE PREMIUM AND STANDARD PREMIUM ENDOR$EMENT CALENDAR YEAR 1988
- 1. ADVANCE PREMIUM: It is agreed that the Advance Premium cue tne companies for the period designated above is:
$ 16,663.00 .
- 2. STANDARD PREMIUM AND RESERVE PREMIUM: In the absence of a cnange in the Advance Premium indicated above, it is agreed that, subject to the provisions of the Indus-try Retrospective Rating Plan, the Standard Premium is said Advance Premium and the estimated Reserve Premium element of the Standard Premium is:
$ , 0.00 .
,is to certify that this is a true copy of the original Endorsement having the endorsement number and being made part of the Certificate of insurance bearing the number designated hereon for insurtnce coverag > under the Nuclear Energy Lla' tlity Policy (Facility W;rkerc Form). 'o I ce is 'tforM here der.
John L. lattrocchl, o mv ,
inbility Underwriting American Nuclear insurers Effective Date of this Endorsement January 1, 1988 To form a part of Certificate No. NW-178 12:01 A.M. Standard Time Issued to Gulf States Utilities Company and Cajun Electric Power Coooerativo. Inc-Date of Issue January 27, 1988 For the Su ribing Co anies
"' PRESIDENT
^
Endorsement No. 2 Countersigned by ~ ~ ~ ' -
. a .n x . . ,, ~ < e .,
NE-W-2 (1/1/88)
1 Nuclear Energy Liability Insurance NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION INDUSTRY RETROSPECTIVE RATING PLAN PREMIUM ENDORSEMENT It is agreed that:
- 1. DEFINITIONS With reference to the premium for the certificate of which this endorsement forms a part:
"Master Worker Policy" means the Master Worker Policy issued by NELIA; "Certificate Holder" means the first Named Insured in a certificate issued to form a part of the Master Worker Policy; "advance premium", for any calendar year, is the esti-mated standard premium for that calendar year; "standard premium", for any calendar year, is the pre-mium for that calendar year computed in accordance with the companies' rules, rates, rating plans (other than the Industry Retrospective Rating Plan), premiums end minimum premiums applicable to this insurance. Standard premium includes elements for premium taxes, expenses, profit and contingencies, guaranteed cost insurance and estimated reserve premium. The elements of standard premium, other than for premium taxes and estimated reserve premium, are not subject to retrospective adjustment; "reserve premium" means that portion of the premium for a certificate (including reserve premium charges paid) that is specifically allocated under the Industry Retro-spective Rating Plan for ratable incurred losses; "industry reserve premium", for any period, is the sum of the reserve premiums for that period for all Certifi-cates issued to form a part of the Master Worker Policy; "retrospective adjustment ratio", for any period, is the ratio of the reserve premium for this certificate for that period to the industry reserve premium for the same period; '
l "incurred losses" means the sum of all:
(1) losses and expenses paid by NELIA, and (2) reserves for losses and expenses as estimated by NELIA, NE-W-1 (1/1/88) Page 1
because of obligations assumed and expenses incurred in connection with such obligations by the members of NELIA under the Master Worker Policy; "ratable incurred losses" means 95% of incurred losses.
Ratable incurred losses are the portion of incurred losses which are not covered by the guaranteed cost insurance element of standard premiums; "non-ratable incurred losses" means 5% of incurred losses. Non-ratable incurred losses are the portion of incurred losses which are covered by the guaranteed cost insurance element of standard premiums; "reserve for refunds", as of any date, is the algebraic difference between:
(1) all industry reserve premium for the period from January 1, 1988 through such date, minus (2) the total for the same period of (a) all ratable incurred losses and (b) all industry reserve pre-mium refunds made under the Industry Retrospective Rating Plan by members of NELIA; "industry reserve premium charge", for any period, means the amount determined pursuant to the provisions of Section 4 of this endorsement for payment by the Named Insureds under Certificates; "reserve premium charge" means the portion of an indus-try reserve premium charge payable by the Named Insureds under this Certificate; "industry reserve premium refund", for any period, means the amount determined pursuant to the provisions of Section 4 of this endorsement for return to the Named Insureds under Certificates; "reserve premium refund" means the portion of an indus-try reserve premium refund returnable to the Named In-sureds under this certificate.
- 2. PAYMENT OF ADVANCE AND STANDARD PREMIUMS The Named Insureds shall pay the companies the advance ,
premium stated in the declarations, for the period from I the effective date of this certificate through December 1 31 following. Thereafter, at the beginning of each calendar year while this Certificate is in force, the Named Insureds shall pay the advance premium for such year to the companies.
The advance premium for each calendar year shall be stated in the Advance and Standard Premium Endorsement NE-W-1 (1/1/88) Page 2
i for the year issued by the companies as soon as practic-able prior to or after the beginning of the year.
As soon as practicable after the end of a calendar year or the Certificate Coverage Period, the standard premium for the preceding year shall be finally determined and stated in the Advance and Standard Premium Endorsement for that year. If the standard premium exceeds the ad-vance premium paid for that year, the Named Insureds shall pay the excess to the companies; if less, the com-panies shall return to the Named Insureds the excess portion paid.
The Named Insureds shall maintain records of the inform-ation necessary for premium computation and shall send copies of such records to the companies as directed, at the end of each calendar year, at the end of the Certi-ficate Coverage Period and at such other times as the companies may direct.
- 3. SPECIAL RESERVE ACCOUNT; USE OF RESERVE PREMIUMS NELIA shall maintain on behalf of its memners a Special Reserve Account for holding collectively all reserve premiums paid for all Certificates issued to form a part of the Master Worker Policy. Such premiums, together with any undistributed net income realized thereon after taxes and investment expenses, shall be used for the following purposes only:
(1) to pay ratable incurred losses or, in the event ratable incurred losses are paid under the Master Worker Policy from funds advanced by the members of NELIA subscribing the policy, to reimburse such members as a matter of first priority for the funds advanced; (2) to refund any amounts so held to the Named Insureds, as provided in Section 4.
No members of NELIA and no Named Insureds shall have any individual interest in or clain upon amounts held in the Special Reserve Account, except to participate propor-tionally in any refund or reimbursement provided for above. !
All reserve premiums paid or payable for this certifi-cate may be used by NELIA to discharge the obligations of its members under the Master Worker Policy with re-spect to the above purposes and arising out of claims made under any Certificate issued to form a part of the Master Worker Policy.
l l
l NE-W-1 (1/1/88) Page 3
- 4. PAYMENT OF RESERVE PREMIUM CHARGES AND REFUNDS As soon as practicable after each December 31 the com-panies will review the status of the reserve for refunds and report their findings to all Certificate Holders.
If, at any time, the companies find that there is a negative balance in the reserve for refunds and that such condition is likely to prevail, they shall deter-mine an appropriate industry reserve premium charge.
Similarly, if the companies find that there is a surplus positive balance, they shall determine an appropriate industry reserve premium refund.
The portion of an industry reserve premium charge or an industry reserve premium refund that is:
(1) payable by the Named Insureds as a reserve premium charge, or (2) due such insureds as a reserve premium refund, shall be determined by multiplying the industry reserve premium charge or the industry reserve premium refund by the retrospective adjustment ratio applicable to this Certificate.
The amount of any reserve premium charge shall be stated in a Retrospective Reserve Premium Charge Endorsement.
The charge shall be paid promptly af ter receipt of the endorsement.
When all claims covered by the Master Worker Policy are closed the companies shall make a final review and re- l port, and shall determine a final industry reserve '
premium charge or industry reserve premium refund equal to the amount of the balance.
- 5. FINAL PREMIUM The final premium for this Certificate shall be (a) the sum of the standard premiums for each calendar year, or portion thereof, during which the certificate remains in l force plus (b) the sum of all reserve premiums, includ-ing all reserve premium charges, minus (c) the sum of I all reserve premium refunds, l
- 6. RESERVE PREMIUM CHARGE AGREEMENT In consideration of (a) the participation of Named i Insureds in other Certificates subject to the Industry Retrospective Rating plan, (b) the undertaking of such Named Insureds to pay their appropriate share of any industry reserve premium charge and (c) the obligations assumed by the members of NELIA under the Master Worker NE-W-1 (1/1/88) Page 4
p e .
Policy, the Named Insureds, by acceptanco of the Master Worker Policy, agree:
(1) That the insurance provided by the Master Worker Policy applies collectively to all claims covered by the policy through any and all Certificates issued to form a part of the policy.
(2) That the right of each Named Insured under a Cert-ificate to receive reserve premium refunds and the obligation of each such insured to pay reserve premiums charges applies to all claims covered by the Master Worker Policy and continues until all such claims are closed, whether or not such claims were before the inception of the certificate or after its termination.
(3) To pay all reserve premium charges due promptly after receipt of the Retrospective Reserve Premium Charge Endorsement, whether or not the Certificate is terminated. Any reserve premium charge shall be overdue if not paid within 60 days of the date of the invoice for the charge.
Overdue reserve premium charges shall bear interest from the due date until paid at an annual rate equal to the sum of (a) 3% plus (b) a rate of in-terest equal to Moody's Average Public Utility Bond Yield described in the issue of Moody's Bond Survey current on the due date. Any reserve pre-mium refund due to Named Insureds under a certificate shall be used to pay any overdue reserve premium charges to such Named Insureds.
- 7. RESERVE PREMIUM REFUND AGREEMENT Each member of NELIA subscribing the Master Worker Policy for any calendar year, or portion thereof, with respect to which an industry reserve premium refund is determined to be payable thereby agrees for itself, severally and not jointly, and in the respective pro-portion of its liability assumed under the Master Worker Policy for that calendar year, to return promptly to the Named Insureds that portion of such refund due such Insureds, as determined in accordance with the provi-sions of this endorsement.
NE-W-1 (1/1/88) page 5
s.
, Paga 6 1
Accepted and agreed by the first Named Insured in behalf of itself and every other Named Insured stated in the Declara-tions of the certificate of which this endorsement forms a part.
Gulf States Utilities Company (First Named Insured - Print or Type)
Date 12/15/87 By s b4 ,
(Signapre of Authoriz6d Officer)
J. L. Donnelly, Senior Executive Vice President and Chief Financial Officer (Print or Type Name and Title of Officer)
This is to cortily the the is a true copy of the or ginal Endorse
.aenf having tne arricracment nu:ator and tdng madepart .cate of the C of insuranr' cHng the numLcr dsym.md hereon for insuraric covertNo'o er:dar Formt ence t% N :c'en Enco;j tihy Policy (Facility Woiker cF^ r'cd te ;ncer, John L )uattrocchi. . .w i . -
Amancan Nuclear !nsurers Liability Underwriting Effective Date of To form a part of this Endorsement danuary 1, 1988 of Certificate No. IM-178 12:01 A.M. Standard Time Issued to Gulf States Utilities Company and Cajun Electric Power Cooperative. Inc.
Date of Issue October 19, 1987 For the scribing companies r; p r e :.t . n-By ' #*
Ceneral Manager
a
.- 1 1 %, ' s I
~
Endorsement No. 1 Countersigned by
-: . .u w , e g ,-a NE-W-1 (1/1/88)
l NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION NUCLEAR ENERGY LIABILITY POLICY (Facility Worker For.3) herein called the MASTER WORKER POLICY.
CERTIFICATE' OF INSURANCE Certificate No. NW-178 Date of Issue Jan. 27, 19 88 This is to certify that the insureds named in Item 1 of the Declarations hereof, here i.na f ter called the "Named Insureds", have obtained insurance under the Master Worker Policy issued by Nuclear Energy Liability Insurance Associa-tion on behalf of itr, members. The insurance is subject to all of the provisions of this "Certificate" and the Master Worker Policy.
1 DECLARATIONS Item 1. Named Insureds and Addresses:
Gulf States Utilities Company 350 Pine Street P.O. Box 2591 Beaumont, Texas 77704 Cajun Electric Power Cooperative, Inc.
10719 Airline Highway Baton Rouge, Louisiana 70895 Item 2. Certificate Coverage Period:
Beginning at 12:01 a.m. January 1, 1988 and ending at the close of December 31, 1992, Eastern Standard Time, or at the time and date this Certificate is cancelled or terminated, whichever first occurs.
NMWPC-1 (1/1/88) Page 1
i Item 3. Description of the Facility:
Location: All real and personal oroperty known as the River Bend Station located in West Feliciana Parish on the east bank of the Mississippi River approximately 24 miles north-northwest of Baton-Rouge, Louisiana as indicated on Figure 2.1-3 of the FSAR amendment
- 19 dated May 1985 within the Restricted Area Boundary including the intake and discharge structure and associated piping.
Type: Power Reactor (Operating)
Operator of the Facility: Gulf States Utilities Company Item 4. Amount of Insurance Available:
The amount of insurance afforded by the Master Worker Policy through this Certificate shall be determined by Section VIII of the Master Worker Policy and all of the other provisions of the policy relating tLetetc.
Item 5. Advance Premium: S 16,663.00 2
APPLICATIOli 0F CERTIFICATE This Certificate applies only to bodily injury to a new worker (1) which is caused during the certificate Coverage Period by the nuclear energy hazard and (2) which is dis-covered and for which written claim is first made against an insured under the certificate within the discovery period of the Master Worker Policy.
3 I!!DUSTRY RETROSPECTIVE RATIliG PLAli All insurance under the Master Worker Policy is subject to the Industry Retrospective Rating Plan in use by the companies, tio insurance is provided under this Certificate unless and until the first flamed Insured has accepted in writing the Industry Retrospective Rating Plan Premium En-dorsement and a copy of the signed endorsement has been :
issued by the companies to form a part of this Certificate. l l
tiMWPC-1 (1/1/88) Page 2
IN WITNESS WHEREOF, the companies subscribing the Master Worker Policy have caused this certificate to be executed and attested on their behalf by the President of Nuclear Energy Liability Insurance Association and duly counter-signeo by an authorized representative.
For the Subscribing Companies of NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION Burt C. Pros , Preside
.% , >NEA' By '
' ~ ~ mh (Authorized Agent)
Countersignea:
t/W.* AC AGENCY, INC.
Countersigned by: __ By [C db'f '# -
(Au@g4#AnEmpatesentative)
This is to certify that this is a truo copy of the original Certificato bearing the nurntx r dc3!0nated herecn, fo 'insuranco coverage urder the Nuc: at Energy L:abuity Palicy (Fa ty Workers Form) herein 1:
called 'hc 'Acs'R"rkc , ,K V,anceis af forded by this copy, John L ittrocchi, Vwe PrEido ility Underwriting American Nuclear insurers i
i l
l 1
l l
NMWPC-1 (1/1/88) Page 3 )
i
,