Provides Supplement to TS 6.1.C.5,changing Title of Site Quality Verification Director to Safety Assessment/Site Quality Verification Manager
ML20151K948
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 08/01/1997
From: Subalusky W
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20151K954 List:
References
NUDOCS 9708060195
Download: ML20151K948 (3)


Text

. - -

. Commonwealth 141ison Company

  • 1;6alle Generating Station 2601 North 21st Road Marseilles..ll. 613 41-9757 Tel HI 5-3574761 August 1,1997 United States Nuclear Regulatory Commission Attention: Document Control Desk 4

Washington, D.C. 20555

Subject:

LaSalle County Nuclear Power Station Units 1 and 2 1

Supplement to Application for Amendment of Facility Operating Licenses NPF-11 and NPF-18, Appendix A, 4 Technical Specification Changes to Section 6, 1 Administrative Controls.

NRC Docket Nos. 50-373 and 50-374

Reference:

W. T. Subalusky to U.S. NRC letter dated May 27,1997, Application for Amendment of Facility Operating ,

Licenses NPF-11 and NPF-18, and Appendix A, '

Technical Specifications, Section 5, Design Features, and Section 6, Administrative Controls.

Pursuant to 10 CFR 50.90, Commonwealth Edison Company submitted the Referenced letter to Amend Facility Operating Licenses NPF-11 and NPF-18, Appendix A, Technical Specification Changes to Section 5, Design Features, and Section 6, Administrative Controls. The purpose of this letter is to supplement the Referenced letter based on discussions during a conference call between the NRR Project Manager for LaSalle and Comed i on July 15,1997.

. The Referenced letter proposed to change the title of the Site Quality Verification Director in Specification 6.1.C.5 to the Safety Assessment / Site Quality Verification Manager. This supplement proposes to change that title to the Manager of Quality and Safety Assessment. No other changes are proposed to the Referenced. 3 I

This proposed supplement to the amendment has been reviewed and ADO approved by Comed On-Site and Off-Site Review in accordance with procedures.

9708060195 970001 PDR ADOCK 05000373 p PDR

! , ,,hff A Unicom Company

The original Significant Hazards Consideration, that was included in the Referenced letter, remains valid.

If there are any questions or comments conceming this letter, please refer ,

them to Perry Barnes, Regulatory Assurance Supervisor, at (815) 357-6761, I extension 2383. l l

Respectfully, 1 W. T. Subalusky Site Vice President LaSalle County Statio  :

Enclosure cc: A. B. Beach, NRC Region 111 Administrator l M. P. Huber, NRC Senior Resident inspector - LaSalle l D. M. Skay, Project Manager - NRR - LaSalle F. Niziolek, Office of Nuclear Facility Safety - IDNS i

l l

m ._ _ . - _ _.

STATE OF ILLINOIS )

COUNTY OF LASALLE )

Docket Nos. 50-373

50-374 IN THE MATTER OF )

COMMONWEALTH EDISON COMPANY )

LASALLE COUNTY STATION - UNITS 1 & 2 )

AFFIDAVIT 4

I affirm that the content of this transmittal is true and correct to the 1

best of my knowledge, information and belief.

1 I

i

\ ~

' William T. Sub'alusky Site Vice President LaSalle County Station /

)^

Subscribed and swom to before me, a Notargyublic in and for theAtate and County above named, this / day of

/ lo nod 1997 . My Commission expires on

  • I0-/ 2000 .

OFFICIAL.Bl.

CEIllA&MEIEY O o 4.Lf unanyrusuc.swtoftimos A1, lot <L ~

A r m o gyrmamaanmEXPUIES1014000 Notarf Public (