Provides Supplement to TS 6.1.C.5,changing Title of Site Quality Verification Director to Safety Assessment/Site Quality Verification Manager
ML20151K948
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 08/01/1997
From: Subalusky W
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20151K954 List:
References
NUDOCS 9708060195
Download: ML20151K948 (3)


Text

. - -

Commonwealth 141ison Company 1;6alle Generating Station 2601 North 21st Road Marseilles..ll. 613 41-9757 Tel HI 5-3574761 August 1,1997 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 4

Subject:

LaSalle County Nuclear Power Station Units 1 and 2 Supplement to Application for Amendment of Facility 1

Operating Licenses NPF-11 and NPF-18, Appendix A, Technical Specification Changes to Section 6, 4

1 Administrative Controls.

NRC Docket Nos. 50-373 and 50-374

Reference:

W. T. Subalusky to U.S. NRC letter dated May 27,1997, Application for Amendment of Facility Operating Licenses NPF-11 and NPF-18, and Appendix A, Technical Specifications, Section 5, Design Features, and Section 6, Administrative Controls.

Pursuant to 10 CFR 50.90, Commonwealth Edison Company submitted the Referenced letter to Amend Facility Operating Licenses NPF-11 and NPF-18, Appendix A, Technical Specification Changes to Section 5, Design Features, and Section 6, Administrative Controls. The purpose of this letter is to supplement the Referenced letter based on discussions during a conference call between the NRR Project Manager for LaSalle and Comed i

on July 15,1997.

The Referenced letter proposed to change the title of the Site Quality Verification Director in Specification 6.1.C.5 to the Safety Assessment / Site Quality Verification Manager. This supplement proposes to change that title to the Manager of Quality and Safety Assessment. No other changes are proposed to the Referenced.

3 ADO I

This proposed supplement to the amendment has been reviewed and approved by Comed On-Site and Off-Site Review in accordance with procedures.

9708060195 970001 PDR ADOCK 05000373 p

PDR

,,hff A Unicom Company

The original Significant Hazards Consideration, that was included in the Referenced letter, remains valid.

If there are any questions or comments conceming this letter, please refer them to Perry Barnes, Regulatory Assurance Supervisor, at (815) 357-6761, extension 2383.

Respectfully, 1

W. T. Subalusky Site Vice President LaSalle County Statio Enclosure cc:

A. B. Beach, NRC Region 111 Administrator M. P. Huber, NRC Senior Resident inspector - LaSalle l

D. M. Skay, Project Manager - NRR - LaSalle F. Niziolek, Office of Nuclear Facility Safety - IDNS i

m

STATE OF ILLINOIS

)

COUNTY OF LASALLE

)

Docket Nos. 50-373 50-374 IN THE MATTER OF

)

COMMONWEALTH EDISON COMPANY

)

LASALLE COUNTY STATION - UNITS 1 & 2

)

AFFIDAVIT 4

I affirm that the content of this transmittal is true and correct to the best of my knowledge, information and belief.

i

\\

~

' William T. Sub'alusky Site Vice President

)^

LaSalle County Station

/

Subscribed and swom to before me, a Notargyublic in and

/

day of for theAtate and County above named, this

/ lo nod 1997. My Commission expires on I0-/

2000 OFFICIAL.Bl.

CEIllA&MEIEY O

Lf unanyrusuc.swtoftimos o

A1, lot <L 4. A r m o gyrmamaanmEXPUIES1014000 Notarf Public

(

~