Application for Amends to Licenses DPR-39 & DPR-48,revising TSs Using Guidance in NUREG-1431 to Produce Improved TSs
ML20133D082
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 01/02/1997
From: Mueller J
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20133D085 List:
References
RTR-NUREG-1431 NUDOCS 9701090005
Download: ML20133D082 (6)


Text

Commormcalth lihum Compan)

/ ion Generating Station tol Shiloh lkmlevant zion, n. <mn2x Tei a m g> 20s i January 2.1997 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ,

Attn: Document Control Desk 1

SUBJECT:

Zion Station Units I and 2 Application for Amendment to Facility Operating Licenses DPR-39 and DPR-48 ,

Proposed improved Technical Specifications  !

NRC Docket Nos. 50-295 and 50-304 l

REFERENCE:

1) NUREG-1431 (September 1992); " Standard Technical Specifications, Westinghouse Plants" l
2) Leslie E. Holden to U.S. Nuclear Regulatory Commission letter, dated November 3,1995; transmitting Application for l Amendment to Facility Operating License to Incorporate I improved Technical Specifications
3) Leslie E. Holden to U.S. Nuclear Regulatory Commission letter, dated November 22,1995; transmitting proposed Section 3.7.8 for Amendment to Facility Operating License to incorporate Improved Technical Specifications
4) Leslie E. Holden to U.S. Nuclear Regulatory Commission letter, dated March 15,1996; transmitting Application for Amendment to Facility Operating License to Incorporate improved Technical Specitications
5) Richard P. Tuetken to U.S. Nuclear Regulatory Commission letter, dated April 30, 1996; transmitting Supplemental Information in Support of Zion Station's Conversion to the improved Technical Specifications

- 6) Richard P. Tuetken to U.S. Nuclear Regulatory Commission b U O O 4 'I letter, dated May 8,1996; transmitting Additional Information in Support of Zion Station's Conversion to the Improved Technical Specifications 1lCOI 9701090005 970102 /

PDR ADOCK 05000295 p PDR A i nicom Compan>

l l

l

7) Richard P. Tuetken to U.S. Nuclear Regulatory Commission letter, dated May 15, 1996; transmitting changes relative to the implementation of a Pressure Temperature Limits Report (PTLR) in Support of Zion Station's Conversion to the Improved Technical Specifications I
8) Richard P. Tuetken to U.S. Nuclear Regulatory Commission letter, dated July 17, 1996; transmitting Additional Information l in Support of Zion Station's Conversion to the Improved Technical Specifications
9) John Mueller to U.S. Nuclear Regulatory Commission letter, dated September 13, 1996; transmitting Additional Information in Support of Zion Station's Conversion to the Improved Technical Specifications
10) John Mueller to U.S. Nuclear Regulatory Commission letter, I dated November 2,1996; transmitting Additional Information in i Support of Zion Station's Conversion to the Improved Technical Specifications
11) John Mueller to U.S. Nuclear Regulatory Commission letter, dated December 11,1996; transmitting Additional Infonnation in Support of Zion Station's Conversien to the Improved Technical Specifications In References 2 through 11. Commonwealth Edison submitted, pursuant to 10 CFR 50.90, a proposed amendment to Facility Operating Licenses DPR-39 and DPR-48. The proposed amendment would completely revise the Technical Specifications (Appendix A to the Operating Licenses), using the guidance provided in Reference 1 to produce a set ofImproved Technical Specifications (ITS) for Zion Station.

The purpose of this letter is to supplement Commonwealth Edison's previous submittals to incorporate recently approved License Amendments (Amendment numbers through 177 for Unit I and through 164 for Unit 2). Attachment 1 is a summary of the recent amendments and the associated :onforming changes to the previously submitted ITS packages. In addition, Attachment 2 is a clarification to the Shift Supervisor responsibilities in regards to control room command authority is also being submitted. The purpose of this change is to correct an error in the previous submittals that would only allow a Unit Supervisor to be the Control Room SRO for both units if the second unit is in MODES 5,6 or defueled.

i 1

With this submittal, the License Amendment Request for Zion ITS conversion is complete.

This supplement provides a complete copy of the proposed ITS in both hard copy and electronic media for NRC use in issuing the license amendment.

l l

Zion Station's ITS were developed by first applying the Technical Specification Selection Criteria outlined in the NRC Final Policy Statement on Technical Specification Improvements of July 22,1993, and contained in 10 CFR 50.36 to the Zion Station current Technical Specifications, to determine which Specifications were to be retained in the ITS. The retained Specifications were rewritten based on the format and technical basis contained in NUREG i 1431. The rationale for relocated specifications was documented for every relocation.

Technical changes to the existing Technical Specifications were proposed where appropriate  !

and applicable based on Zion Station's design or licensing basis. These changes were l documented and a discussion or justification provided as to why the change was appropriate. )

In addition, any differences to the generic standard specifications in NUREG-1431 were l identified and a discussion or documentation of the change was provided. I Zion Station performed technical reviews of issues that were identified during the preparation i and submittal of the ITS. Zion Station has supplemented the ITS submittal to reflect clarification of the licensing basis as requested by the NRC (e.g., Service Water passive failure), in addition to changes based on recent understandings reached on system design, capabilities, and operation (e.g., shared systems such as Service Water, Component Cooling Water, Fuel Handling Building Ventilation). These supplements have all been reviewed and approved by the Commonwealth Edison Onsite and Offsite Review groups in accordance with Commonwealth Edison procedures. These changes were reviewed and discussed with the NRC.

Throughout this process, Zion Station performed technical reviews and assessments of the ITS implementation, which identified other required changes to the ITS. The changes made as a result of this assessment provide additional assurance that the ITS properly reflect Zion Station's design. With Supplement 9, the Zion ITS submittal is complete, and the ITS can be implemented as written upon receipt of the License Amendment.

Zion Station is requesting that the ITS be issued with an 90 day implementation period, allowing adequate time to complete an final implementation review prior to implementing the ITS.

This proposed supplement has been reviewed and approved by Commonwealth Edison Onsite and Offsite Review groups in accordance with Commonwealth Edison procedures.

To the best of my knowledge and belief, the statements contained in this submittal are true and correct. In some instances these statements are not based on my personal knowledge, but on information furnished by other Commonwealth Edison employees, contract employees, and consultants. Such information has been reviewed in accordance with company practices, and I believe it to be reliable.

. . . - . - - . . - . . . - - . . - - ~ . . - - . - _ . - - - , . - _ -

t l t i

Commonwealth Edison is notifying the State of Illinois of this application .for amendment by  ;

transmitting a copy of this letter and its attachments to the designated state official. .

Please direct any questions you may have concerning this submittal to this office.

Respectfully, s

< l t  : -

H. Mueller.

Site Vice President Zion Station l Subscribed an Sworn to before me, a Notary Public in and for i the State of I and County of r[A '

this 8rtol day of Q1Auu h ,1997.

O Q (Oa' 4>-- W Notary Public Attachment 1,=========,l '0FFICIAL SEAL' <

cc: Regional Administrator - RIII ) THERESA 1. SLAY [

Zion Project Manager - NRR j Notary Public, State ofIllino,s i L Sem.or Resident Inspector - Zion Station 1l= My= = Commission

= _ = -__z= Expires 7/13/99>D Office of Nuclear Facility Safety - IDNS IDNS Resident Inspector Master Files Reg. Assurance File DCD Licensing Zion Station NLA I

1:\ data \ziontsip\submital\splmnt8\trnsitrl .wp f l l

i i I

i I

l l

, . . ._- _ _ _- . _ . _ , _ _ _ _ _ . . . . . _ _ . _ . _ _ _ _ _ . _ . . _ - . , . _ _ _ . . ~ .

-_. m- - - -w- -e Is - _ M _ - ._ ,- -

4- + 8- -- *,-er. 4h A -.- - * &~---t^-*- *a in h4* aM- .M * -" *

  • 4 - k l

i i

A'ITACliMENT 1 l

l I

I 1

i i

l l

4 1

l l

-. .-- - _ .- --._