Application for Amends to Licenses DPR-39 & DPR-48,allowing Steam Generator Tube Repair Utilizing Westinghouse or C-E Mechanical Sleeving Methodology.Proprietary WCAP-11669 & Nonproprietary WCAP-11670 Encl.Fee Paid
ML20149F138
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 12/24/1987
From: Leblond P
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20042D028 List:
References
3985K, NUDOCS 8801140167
Download: ML20149F138 (3)


Text

[

Ccemonwealth Edison i

[] One

_ g First National Plata, Chicago, Illinois 1 l -

Address Reply to: Post Office Box 767

,  % Chicago,!!Iinon 60690 0767 Decembe' 24, 1987 U.S. Nuclear Regulatory Commission Attn:

Subject:

Zion Nuclear power Station Units 1 and 2 Proposed Amendment to Facility Operating License Nos. DPR-39 and DpR-48 Steam Generator Tube Sleeving NRC Docket Nos. 50-295 and 50-304

Reference:

November 18, 1986 letter from J.A. Norris to D.L. Farrar Gentlemen:

Attachment 1 to this letter is a proposed amendment to Facility Operating License Nos. DPR-39 and DpR-48, Appendix A, Section 4.3, Reactor Coolant System. This change will allow Zion's steam generator tubes to be repaired, if needed, by utilizing the Westinghouse Electric Corporation mechanical sleeving methodology. This amendment request will result in Commonwealth Edison Company's ability to utilize either the sleeving methodology developed by Westinghouse Electric Corporation or that developed by Combustion Engineering, Inc. The Combustion Engineering sleeving

) methodology was approved for use at Zion Station in the referenced letter.

The creation of this flexibility will produce a more competitive atmosphere surrounding the procurement of sleeving services for Zion Station. These services may also be expanded to include integrated refueling outage coordination. This would allow both a more efficient refueling process and the reallocation of Commonwealth Edison's resources to place more emphasis on preventive maintenance.

Attachment 2 provides a brief description of the proposed amendment along with a technical justification. Attachment 3 to this letter is a

"* demonstration that the issue involves no significant ha:ards consideration.

The proposed amendment has received on-Site and off-Site revie'd and approval.

Attachment 4 contains one copy of WCAP 11669, Zion Units 1 and 2.

$A Steam Generator Sleeving Report (Mechanical Sleeves) and one copy of a UJ g nonproprietary version of the same report. This report is Commonwealth w Edison's proposed sleeving method for Zion Station to be utilized in conjunction with the previously approved Combustion Engineering process, hw Since Attachment 4 contains information proprietary to Westingnouse m

Electric Corporation, it is supported by an affidavit signed by Westinghouse, the owner of the information. The affidavit is contained in Attachment 5 to this letter. This affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses the considerations listed in paragraph (b)(4) of Section 2.*l90 of l

Commission's regulations. f l

W Yt,fl0 g g 4 ojs A ,p

  • A " M 'j'& g g5pi i iap
  • **o nM so n,adop-sce ,isso asic. 1

' i dr# )

DecOmber 24, 1987 US NRC l

l Accordingly, Commonwealth Edison Company requests that the l information which is proprietary to Westinghouse be withheld from public disclosure in accordance with 10 CFR Section 2.790 of the Commission's regulations. Correspondence with respect to the proprietary aspects of the Application for Withholding or the supporting Westinghouse affidavit should reference CAW-87-126 and should be addressed to R. A. Wiesemann, Manager Regulatory and Legislative Affairs, Westinghouse Electric Corporation P.O.

Box 355, Pittsburgh, Pennsylvania 15230-0355.

A $150.00 fee remittance is enclose 6 in accordance with 10 CFR 170. As provided by 10 CFR 50.91, the State of Illinois is being notified of this amendment request by transmittal of a copy of this letter and the atte.chments.

This amendment request solely addresses the installation of Westinghouse Electric Corporation mechanical sleeves at Zion Station. There will be no change in either the radiological or non-radiological effluents from those previously evaluated in the Final Environmental Statement.

Zion Unit I will undergo a scheduled refueling outage beginning on February 25, 1988. In order to exercise the flexibility described above during this Unit 1 outage, Commonwealth Edison Company has established a target date of March 18 1988 for obtaining NRC approval for this proposed amendment. Therefore, Commonwealth Edison personnel are available to meet with NRC staff members, if necessary, to expedite the review process.

In addition to the five Attachments discussed above, four copies of the proprietary and nine nonproprietary versions of WCAP 11669 are enclosed for NRC review. If there are any further questions regarding this matter, please contact this office. >

Very truly yours, P. C. LeBlond Nuclear Licensing Administrator Attachments cc: NRC Resident Inspector - Zion J. A. Norris - NRR M. C. Parker - IDNS w/o WCAP NRC Region III Office w/o WCAP SUBS yED and " gNto e this - day befo; of L_ /p///gl%_,,1987