ML20129H276

From kanterella
Jump to navigation Jump to search
Amends 173 & 160 to Licenses DPR-39 & DPR-48,respectively, Incorporating Revised Installation Procedures for SG Tube Sleeves Designed by Abb/Ce
ML20129H276
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 10/29/1996
From: Shiraki C
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20129H264 List:
References
NUDOCS 9610310201
Download: ML20129H276 (6)


Text

l p*Uou l p 3 UNITED STATES

~ ,

g ,j t NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30866 4001 i

4 9..... .

l COMMONWEALTH EDISON COMPANY '

DOCKET NO. 50-295 ZION NUCLEAR POWER STATION. UNIT 1 ,

AMENDMENT TO FACILITY OPERATING LICENSE  !

l l

Amendment No. 173 i License No. DPR-39

1. The Nuclear Regulatory Commission (the Commission) has found that:

l A. The application for amendment by Commonwealth Edison Company (the licensee) dated September 3, 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; 4

B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that st:ch activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-39 is hereby amended to read as follows:

9610310201 961029 PDR ADOCK 05000295 P PDR

l (2) Technical Soecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 173 , are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of the date of its issuance and l shall be implemented within 30 days.

FOR THE NUCLEAR REGULATORY COMMISSION t

Clyd Y. Shiraki, Senior Project Manager Project Directorate III-2 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: October 29, 1996 i

l

km Eflu g 4 UNITED STATES g

j 2

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20066-0001 4

9 . . . . . ,o COMMONWEALTH EDIS0N COMPANY DOCKET NO. 50-304 ZION NUCLEAR POWER STATION. UNIT 2 RENDMENT TO FACILITY OPERATING LICENSE Amendment No.160 License No. DPR-48

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Commonwealth Edison Company (the licensee) dated September 3, 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be  ;

conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been sctisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-48 is hereby amended to read as follows:

1 l

l 1

)

(2) Technical Specifications l The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 160 , are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of the date of its issuance and shall be implemented within 30 days.

FOR THE NUCLEA REGULATORY COMMISSION Of  ;-

Clyd Y.Shiraki,SeniorProjectManager Project Directorate III-2 1 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation

Attachment:

1 Changes to the Technical Specifications Date of Issuance: October 29, 1996 i l

l

ATTACHMENT TO LICENSE AMENDMENT NOS.173 AND 160 FACILITY OPERATING LICENSE NOS. DPR-39 AND DPR-48 DOCKET NOS. 50-295 AND 50-304

, Revise the Appendix A Technical Specifications by removing the page identified below and inserting the attached page. The revised page is identified by the captioned amendment number and contains marginal lines indicating the area of change.

Remove Paae Insert Paae

. 74f3 74f3 4

1 i

4 2

e 1

l 1

l l

LIMITING CONDITION FOR OPERATION SURVEILLANCE REOUIREMENT

10. ReDaired Tube means a tube that has undergone a process that re-establishes its serviceability.

The sleeving process utilized shall be one of the following:

a. The Combustion Engineering welded sleeve process as described in Report CEN-331-P, Revision 1-P.** l
b. The Westinghouse Electric Corporation mechanical sleeve process as described in Report WCAP-Il669.
c. The Bechtel-KWU Alliance welded sleeve process as described in Report BKAT-01-P, Revision 1.
11. F* Distance is the length of undegraded tube required to resist pullout. This distance is measured from the bottom of the upper hardroll transition toward the bottom of the tubesheet and has been conservatively determined to be 1.05 inches (not including eddy current uncertainty).#
12. F* Tube is a tube with indications below the F*

Distance, equal to or greater than 40%, and no indications within the F* Distance.

    • The following sections of ABB/CE Report CEN-629-P Revision 00 shall be implemented in conjunction with Report CEN-331-P, Revision 1-P:

Section 4.5.3 - Tube Brushing-Cleaning Equipment Section 4.5.7 - Nondestructive Examination Section 5.0 - Sleeve Examination Program Section 9.3.1 - Cleaning Qualification

  1. Valid for ZIR14 and thru ZlC15.

74f3 Amendment Nos. 173 and 150

____-- __ ___-________.__-________________ ____-_ - --__ - __