ML20248E369

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses DPR-39 & DPR-48,changing Administration Control Section 6.0,per Generic Ltr 88-06
ML20248E369
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 03/22/1989
From: Chrzanowski R
COMMONWEALTH EDISON CO.
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20248E372 List:
References
5598K, GL-88-06, GL-88-6, NUDOCS 8904120223
Download: ML20248E369 (3)


Text

.

j ee a

L..:

f-

  • 77 ' Commonwealth Edison C i) Ona First Natiortti Pina, Chicigo, Illinois

./

C 1..

Address Reply to: Post Office Box 767 -

'I

-(

c.

( / - Chicago, Illinois 60690

]

M f

Qi March 22, 1989 Dr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC-20555 Attn Document Control Desk

Subject:

Zion Station Units 1 and 2 Application for Amendment to Facility l Operating Licenses DPR-39 and DPR-48 NRC Docket Nos. 50-295 and 50-304 References (a) February 22, 1989, letter from R.A. Chrzanowski to D. Muller i

1

Dear'D'r. Murley:

In reference (a), pursuant to 10CFR 50.90, Commonwealth Edison proposed to amend Appendix A, Technical Specifications of Facility Operating Licenses, DPR-39 and DPR-48.

The proposed amendment requested changes to the Administrative Controls Section 6.0 made in accordance with Generic Letter 88-06, several position title changes, and a clarification to the distribution requirements for Onsite Reviews.

In Attachment A to reference (a), the revised Technical Specification pages were provided. The purpose of this letter is to provide corrections to information contained on those pages.

In Attachment A, section 6.1, the responsibilities of the Station Manager and Senior Vice President-Nuclear Operations are delegatable to "or his designee". These words are not annotated in the generic letter, therefore, these words have been removed.

In section 6.1.7.B.4, the reports, reviews, investigations and recommendations prepared and performed for specification 6.1.7.B.2' should be provided to the Vice President PWR Operations, the Superintendent of Offsite Review and Investigative Function, and the AVP Quality Program and Assessment.

.In addition, the AVP Quality Program and Assessment title was erroneously stated in specification 6.1.7.A.2.

These oversights have been corrected.

(

\\

890412O223 890322 gDR ADOCK 05000295 PDC hh__mm__. _ _ _ _ _ _ _

______.__._._____.m.

  • l l

The attachment to this letter provides the revised Technical Specification pages to replace those affected from reference (a).

Please direct any questions you may have concerning this matter to I

this office.

Very Truly yours,I'

'/ '

R.A. C zanowski Nuclea Licensing Administrator rf/5598k