ML20148B725

From kanterella
Jump to navigation Jump to search
Supplemental Application for Amends to Licenses DPR-39 & DPR-48,revising TS to Add Discussion of Position & Duties of Licensed Operators & Senior Licensed Operators to Section 5.3, Qualification
ML20148B725
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 05/08/1997
From: Mueller J
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20148B730 List:
References
NUDOCS 9705130297
Download: ML20148B725 (4)


Text

.. . - . -~ . -

Commonw ealth 1:dimn Compan)

Zion Generating Station

, 101 $1ulolilloglevard zion. N w #279:

Tel 8 67-742081 May 8,1997 l l

U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Document Control Desk ,

I

SUBJECT:

Zion Station Units 1 and 2

. Application for Amendment to Facility Operating Licenses DPR-39 and DPR-48 ,

Proposed Improved Technical Specifications '

NRC Docket Nos. 50-295 and 50-304 In previous submittals, Commonwealth Edison requested, pursuant to 10 CFR 50.90, a i proposed amendment to Facility Operating Licenses DPR-39 and DPR-48. The proposed amendment would completely revise the Technical Specifications (Appendix A to the Operating Licenses), using the guidance provided in NUREG-1431 (September 1992); " Standard Technical Specifications, Westinghouse Plants" to produce a set of Improved Technical Specifications (ITS) for Zion Station.

The purpose of this letter is to supplement Commonwealth Edison's previous submittals with a proposed change to Section 5.0, Administrative Controls. The purpose of the l proposed change is to add a discussion of the position and duties of licensed operators and senior licensed operators to Section 5.3, Oualification.

10 CFR Part 55 requires a discussion of the position and duties of licensed operators and senior licensed operators in the facility's technical specification. With the deletion of the minimum staffing tables under the generic Improved Technical Specifications, there is no longer any discussion in the Zion Improved Technical Specifications. Attachment 1 is a review package for proposed changes to Section 5.3, Oualification, that adds a reference

)/

to the 10 CFR 50.54(m) discussion of licensed and senior licensed operator duties.

){

This proposed supplement has been reviewed and approved by Commonwealth Edison Onsite and Offsite Review groups in accordance with Commonwealth Edison procedures.

There are no changes needed to the Significant Hazards Discussion or the

- Environmental Assessment Statement for ITS.

43e030 1 l.liI.l l.lLill.l!I.llll. l.l 9705130297 970508 PDR ADOCK 05000295 P PDR _

A l'nicom Lompan)

To the best of my knowledge and belief, the statements contained in this submittal are

, true and correct. In some instances these statements are not based on my personal l knowledge, but on information furnished by other Commonwealth Edison employees, contract employees, and consultants. Such information has been reviewed in accordance with company practices, and I believe it to be reliable.

I l

Commonwealth Edison is notifying the State of Illinois of this application for amendment '

by transmitting a copy of this letter and its attachments to the designated state official.

~ Please direct any questions you may have concerning this submittal to this office. I Respectfully,  !

)I -

. H. Mueller '

Site Vice President Zion Station Subscribed and Sworn to before me, a Notary Pub)jc in and for the State of UllW and County of oTd_/2L/ l this #+C day of TV/ dtL ,1997. - - - _ ___

f

'7

)f=THERESAI.SL4Y

- 0FFICIAL  % S 7

9 NotaryPublic,StateofIllinois

/h g/, yhn LMyCommissionExpires 7/13/99 Notary Public

(

l 1

Attachment I cc: Regional Administrator - RIII Zion Project Manager - NRR i Senior Resident Inspector - Zion Station  ;

Office of Nuclear Facility Safety - IDNS IDNS Resident Inspector Master Files Reg. Assurance File DCD Licensing Zion Station NIA 1;\ data \riontsip\subenital\spimnt10\tensitri.r24

i f

I ATTACHMENT 1 Review Package Proposed Changes to Section 5.0, Administrative Controls 1

i 1

i l

l

1 l

1 l

g e

,b 1

2 q

l 1

4

]

a J

4 1

1 k

i l J

1 I

4 4

4 b.

d i

MARK UP OF ITS CHANGE i

I 4

e 4

4 s

i

,I e

4 4

J i

i 1

.l