g N Commonwealth Edison One Fird National Plan Chicago, Illinois
+
(
~ 'I Address R1 ply to: Post Offic] Box 767
/ Chicago, Illinois 60690 0767 g SEP 25 A 9 42 Septembc 22, 1987 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Zion Nuclear Power Station Units 1 and 2 proposed Amendment to Facility Operating License Nos. DpR-39 and DPR-48 j
Shock Suppressors (Snubbers)
NRC Docket Nos. 50-295 and 50-304 i
l Gentlemen: to this letter is a proposed amendment to Facility Operating License Nos. DPR-39 and DPR-48, Appendix A, Section 4.22.2-Shock Suppressors (Snubbers). This proposed amendment is a one-time request designed to allow the visual inspection of snubbers to be performed during planned refueling outages. provides a detailed description of the proposed 1
amendment and outlines the background associated with this request.
It demonstrates that this proposed amendment is requesting to take credit for a i
Unit 2 snubber inspection that was performed 40 days earlier than is l
currently allowed.
In addition, this change is requesting an approximate 30 i
day delay in an analogous Unit I snubber inspection. These schedule alterations are required to preclude an unnecessary shutdown on each of the Zion Units.
d contains Commonwealth Edison Company's demonstration that this proposed amendment does not involve a significant hazards consideration. This change has received On-site and off-site review and approval.
A $150.00 remittance is enclosed in accordance with 10 CFR 170. 'As provided by 10 CFR 50.91, the State of Illinois is being notified of this amendment request by transmittal of a copy of this letter and the attachments.
p P
Cd C
y 4
giso-o b li U
f i,
" US WhC S:ptembst 22, 1987-As discussed above, NRC approval of this proposed amendment is required to prevent a shutdown of each of the Zion Units.- The shutdown of Unit'2 will occur on November 23, 1987, upon expiration of the currently
. existing: allowable inspection period. Therefore, NRC approval of this proposed amendment.is requested prior to that date.
If you have any questions regarding this matter, please direct them
-to this office..
Very truly yours,
- p. C. LeBlond Nuclear Licensing Administrator Cs cc: Resident Inspector - Zion J. A. Norris - NRR
.M. C. Parker - IDNS
. Regional Office-- RIII l
SUBSCRlBED and SW RN to' i
beforej me day of JJJ vt inlyA, 1987 0}f
)46tery Pub 1ic'
{