Submits Required Annual Update of Projects Listed in Each Category (A,B & C) Defined by Lrpp Integrated Schedule
ML20134G580
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 11/05/1996
From: Maricondo P
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
6710-96-2343-1, B-96-55, B000-96-055, NUDOCS 9611130280
Download: ML20134G580 (16)


Text

_, ._m. _ _ . _ _ _ _ . . . - _ _ . _ . . . _ _ _ . . . . . _ _ _ _ . . -

m... _ . . . . . _ _ , s . . . . _ -

... n.

i

{ GPU Nuclear, Inc.

(-

One Upper Pond Road

. NUCLEAR Parsippany, NJ 07054-1095 Tel 201316-7000 l

l November 5,1996 B000-96-055

6710-96-2343-1 l

U. S. Nuclear Regulatory Commission Att: Document ControlDesk Washington, DC 20555 -

Gentlemen:

Subject:

Three Mile Island Nuclear Station, Unit No.1 (TMI-1)  !

Docket No. 50-289 Operating License No. DPR-50 Long Range Planning Program (LRPP)  !

Annual Update ofIntegrated Schedule I "ABC" Project Listing 1

Pursuant to License DPR-50 Condition No. 2.c.9, GPU Nuclear (GPUN) Inc. hereby submits the. l required annual update of projects listed in each category (A, B, and C) as defined by the LRPP l integrated schedule. The attachments to this letter include: 1) the ABC project listing; and,2) a j l- summary of changes since the last submittal forwarded by GPUN Letter No. C311-95-2436, dated l November 5,1995. An abstract of the attachments follows: i f

l. Attachment A - A new project listing of Category A, B, and C projects annotated by an l astedsk (*) to identify new projects and by a double asterisk (* *) to identify changes in l

! Budget Authorization (B/A) number assignments. Completed projects have been l removed from the schedule listing. Remaining projects are ongoing or are scheduled l-consistent with cycle / year commitments. ' Any changes in schedule are reflected on Attachments A and B. There are currently no Category A projects on the schedule.

l

. 9611130290-961105

~

40k

! PDR ADOCK 05000289 i y JO Ogr. P PDR g

\,

l i

B000-96-055

6710-96-2343-1 l Page 2 l

l 2. Attachment B - A summary listing of Category A and B projects which have been  !

completed, deferred, changed in scope, or otherwise changed with explanations, as

' appropriate. The listing also contains Category C project completions. Changes to the ,

Category C scope or schedule do not impact the Category A and B schedules. J l

Pursuant to the LRPP for TMI-1, GPU Nuclear will assume that the NRC is in agreement with the i above Category A and B changes, unless we are notified otherwise within 15 days ofreceipt.  !

Sincerely, j I

1 I

o ,

i l Peter E. Maricondo Vice President and Director l Financial & Planning Services l

l GMG/ l l

! 1 l

l

! I l

cc: Administrator, Region 1 I i TMI-l Senior Project Manager TMI Senior Resident Inspector

-- - " ~

e 8 3 9 ATTACHMENTA TMI-1 PROJECT LISTING INTEGRATED SCHEDULE ANNUAL UPDATE (NOVEMBER,1996) i

TMI-1 PROJECT LISTING LEGEND .

N R. C INTEGRATED SCHEDULE NEW PROJECS --------------------------------------------

l ** BA NUMBER CHANGE '

CATEGORY 'B' PROJECTS SORT BY CATEGORY / CYCLE /BA STA'IUS AS OF.11/04

.__.____....____..____.___.._-_-_-__._._____....______.._______...._____.___________._-__._-_____..__.--____...__..____....._./1996 ..___:

OBS BA DESCRIPTION CYCLE / CLASSIFICATION NUMBER YEARS 1 123321 REACTOR BLDG TENDON SURVEILLANCE PROG 12 NRR PROVIDE CONTRACTOR AND PLANT SUPPORT FOR SURVEILLANCE PROGRAM.

REF. NUREG 135.1;TS 4.4.2.1 2 123334 ILRT 12R NRR INTEGRATED REACTOR BUILDING LEAK RATE TEST PER TS 4.4.1.1.

3 123345 ** UTSG TUBE PLUGGING 12R NRR INSTALL NEW PLUGS AS NECESSARY. REPLACE 1/2 THE EXISTING I600 PLUGS (379).

REF. TS 4.19 4 123348

  • CRDM FLG GASKETS / THERM BARRIERS 12R MRC REPLACE LAST 30 THERMAL BARRIERS, INCL.

FLANGE GASKETS REQUIRING REPLACEMENT AND ONE GROUP 8 FLANGE GASKET. TS 4.7.1.1 5 128210 ** PIPE WALL THINNING MONITORING PROGRAM CY 12R NRR ALL THIS PROJECT CONTINUES IMPLEMENTATION OF THE LONG-TERM PROGRAM FOR SYSTEMATIC INSP OF SECONDARY PLANT PIPE FOR FAC 6 128211 ** ISI INSPECTIONS (12R) 12R NRR ASME SECT XI INSPECTIONS; AUGMENTED ISI TO COMPLY WITH 10CFR50.55A 7 128212 ** OTSG EDDY CURRENT TESTING 12R NRR 40%-INSERVICE TUBES; 50%-SLEEVES;21%-

KINETIC EXP. TUBES; 100%-I600 PLUGS (UPPER) PER TS 4.19 & EPRI GUIDELINES

TMI-1 PROJECT- L I S T I E6 G LEGEND -


NRC INTEGRATED SCHEDULE

  • NEW PROJECTS --------------------------------------------
    • BA NUMBER CHANGE CATEGORY 'B' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 11/04/1996 OBS BA DESCRIPTION CYCLE / CLASSIFICATION NUMBER YEARS 8 412552 MODIFICATIONS FOR SEISMIC QUALIFICATION 12R NRR ALL MODS TO COMPLY WITH SEISMIC QUAL TO RE-SOLVE USI-A46 AND GL 87-02.

9 123345 ** OTSG TUBE PLUGGING llR NRR INSTALL NEW PLUGS AS NECESSARY. REPLACE LAST 1/2 OF THE EXISTING I600 PLUGS-379.

REF. TS 4.19 10 126LL3 OTSG EDDY CURRENT TESTING - 13R 13R NRR ECT OF SAMPLE INSPECTION GROUP. 21% PER EPRI SG INSP GUIDELINES AND TS 4.19.

11 126LL6 ISI INSPECTIONS - 23R 13R NRR ASME SECT XI INSPECTIONS; AUGMENTED ISI TO COMPLY WITH 10CFR50.55A 12 128AEL PIPE WALL THINNING MONITORING 13R NRR AUGMENTED INSPECTIONS TO DETECT EROSION /

CORROSION DEGRADATICN OF SINGLE AND TWO PHASE SYSTEMS. REF GL 89-08 13 128108 TF SEISMIC QUAL OF EQUIPMENT (SQUG) 87-96 NRR SCOPE,WALKDOWNS AND EVALUATIONS FOR SQUG PROGRAM AS REQUIRED BY NRC GL 87-02 Ec LAI 87-9084.

14 128097 SQUG USERS GROUP PROGRAM 88-96 NRR SEISMIC QUALIFICATION UTILITY GROUP PARTICIPATION REF. USI-A46 , GL 87-02 I

TMI-1 PROJECT LISTING LEGEND ~

NRC INTEGRATED SCHEDULE NEW PROJECTS --------------------------------------------

    • BA NUMBER CHANGE
  • CATEGORY *B' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 11

_______.---........_._...._.......____....._-_--.______._-_-__---__....__-........_...__.__..._--__...__..._.___~_.../04/1996 OBS BA DESCRIPTION CYCLE / CLASSIFICATION NUMBER YEARS 15 412679 ** REPLICA PLANT FROCESS COMPUTER REPLACEME 96-00 NRR INSTALL A NEW RPPC TO INTERFACE WITH THE SIMULATOR AND PERFORM SIMILAR FUNCTIONS AS THE PPC (RG 1.149) 16 419292 ** SIMULATOR MODIFICATIONS 96-01 NRR UPGRADE SIMULATOR CONSISTENT WITH CNTRL ROOM MODS REF. 10 CFR 55.45 17 417109

  • THERMO-LAG BARRIER MODIFICATIONS 96-99 NRR CB R281 R308 R346 INSTALL MODS AS REQ *D TO BRING INSTALLED THERMO LAG 330-1 FIRE BARRIER SYSTEMS INTO COMPLIANCE W/10CFR50 APPENDIX R

TMI -1 PROJECT LISTING LEGEND -

N R-C INTEGRATED SCHEDULE

  • NEW PROJECTS --------------------------------------------
    • BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 11/04/1996 ,

OBS BA DESCRIPTION CYCLE / CLASSIFICATION -

NUMBER YEARS p

18 412664 ROOF REPLACEMENTS 11 MRC YARD TB

  • VARIOUS ROOF REPLACFMENTS

' 19 412690

  • CABLE DRIVE SYSTEM FOR FUEL TRANSFER 11 MRC i

INSTALL ONE FUEL TRANSFER CARRIAGE CABLE DRIVE SYSTEM.

20 418821 ** PLANT PRESERVATION BOP - 1996 11 MRC SCAFFOLDING, SURFACE PREPS, PAINT / COAT ,

OF APPROX 30,000 SQ FT IN TB PREVIOUSLY NOT PAINTED / COATED 21 418822 CONTROL TOWER RENOVATIONS - 4TH FLOOR 11 FAC UPGRADE FACIL FOR I&C MAINT & OPS INSIDE UNIT 1 CONTROL TOWER.EL 355' TO BE RENO-VATED & CONSTRUCT INTERMED FLR (365') ,

22 412664 ROOF REPLACEMENTS 12 MRC YARD TB

  • VARIOUS ROOF REPLACEMENTS 23 412690
  • CABLE DRIVE SYSTEM FOR FUEL TRANSFER 12 MRC INSTALL ONE EUEL TRANSFER CARRIAGE CAPLE DRIVE SYSTEM 24 123LLL CfrHER OUTAGE RELATED ACTIVITIES 12R ALL ALL OUTAGE RELATED ACTIVITIES SUCH AS INSPECTIONS, REPAIRS, SURVEILLANCES MINOR MODIFICATIONS, MOD SUPPORT, ETC. ,

TMI - 1 PROJECT LISTIMG LEGEND -


NRC INTEGRATED SCHEDULE

  • NEW PROJECTS ---------------------------------------~~---
    • BA NUMBER CHANGE CATEGORY *C' PROJECTS t SORT BY CATEGORY / CYCLE /BA STATUS AS OF 11/04/1996

.---...-- .-- - ..... ... .. ... -----------------------+-- ------------- ------------.--------------.------------------- ..----*

OBS BA DESCRDTION CYCLE / CLASSIFICATION NUMBER YEARS 25 123346 ** REACTOR REFUELING 12R MRC LOAD FUEL ASSEMBLIES FOR 650 EFPD i

26 123349 ** RX BUILDING PRESERVATION 12R MRC RB AB PAINT / COAT AREAS IN RB INCLUDE:IC&NS PI PE ; STEEL , WALLS HANDPJLILS ; FIDORS ; RB LINER. RU/RD=1200-1500FT IN AUXBLDG 27 412691

  • MAIN GENERATOR STATOR REWIND 12R REL TB PERFORM A COMPLETE REWIND OF THE MAIN GENERATOR. THIS WILL INCLUDE REPLACE-MENT OF 144 STATOR BARS.

28 418813 INCORE DETECTOR REPLACE 12R MRC 1

REPLACE 49/52 INCORE DETECIDRS THAT ARE PROJECTED TO REACH THE END OF LIFE. 3 ,

WILL LAST AS LONG AS THE NEW CNES.

29 418829 *

  • RC-P SEAL INSPECTION (2 CARTRIDGE KITS) 12R MRC INSPECT / REPLACE SEALS (CARTRIDGE AND #1 '

SEALS) AS NECESSARY. RCP 1A AND 1D.

30 123MMM OTHER OUTAGE RELATED ACTIVITIES 13R ALL f ALL OUTAGE RELATED ACTIVITIES SUCH AS INSPECTIONS, REPAIRS, SURVEILLANCES MINOR MODIFICATIONS, MOD SUPPORT, ETC. .

F 31 123335 REPLACE MAIN STEAM LINE INSUIATICN 13R MRC REPLACE DEGRADING INSULATION ON FAIN STEAM LINE i

i

. _ . . . _ _ _ _________________.______._______m_____ ___ _ _ _ . _ + ,- - , ..

. m . _ . . . . .- m. .~m . .._ - _ . . ___.. - . ~ ~ _ _m .. _ . ,

T'M I - 1 PROJECT LISTING LEGEND


NRC INTEGRATED SCHEDULE

  • NEW PROJECTS -------------------------------------------- .
    • BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA. STATUS AS OF 11/04/1996 OBS BA DESCRIPTION CYCLE / CLASSIFICATION '

NUMBER YEARS 32 123346 ** REACTOR REFUELING 13R MRC IDAD FUEL ASSEMBLIES FOR 650 EFPD 33 128114 EPRI STEAM GENERATOR RELIABILITY PROGRAM 88-98 MRC CO-FUNDING FCR EPRI SGRP TASK 404.

34 126223 TMI APPENDIX VIII QUALIFICATION 91-99 NRR SUBSCRIPTION FEE FOR PROGRAMS DEVEL BY EPRI & OTHERS FOR CONTRACTOR QUAL &

CERT OF "Jr NDE INSPECTORS PER APP VIII  !

35 128163 DRAWING ENHANCEMENTS 92-96 MRC REPLACE CABLE MANAGEMNT PROCESS FOR ELEC CABLES WITH ELECTRONICS. REDRAW MANUAL t FLOW DIAGRAMS IN CAD FORMAT.

36 412592 TNI CONFIGURATION MANAGEMENT - DBD 92-96 92-96 ERR DESIGN BASIS RECONSTITtrrION 37 419260 SIMULATOR COMPUTER UPGRADE 93-96 MRC ,.

4 UPGRADE THE TMI SIMULATOR COMPLEX TO EN-ABLE INTEGRATION OF FUTURE PLANT MODS 70 COMPLY WITH SIMULATOR CERT REQUIREML.VTS.

38 126109 BWOG GLRA PROGRAM 93-97 MRC PARTICIPATE IN AND PROVIDE SUPPORT FOR THE BWOG GENERIC LICENSE RENEWAL APPLICATION (GLRA) PROGRAM. ,

___..-.___._______.____.-___-_______________-2-._ _ _ - - . - - - y- v. e % w r

TMI -1 PROJECT 'LISTIEG LEGEND -

NRC INTEGRATED S CHEDULE NEW PROJECTS --------------------------------------------

    • BA NUMBER CHANGE ,

CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 11

__.________..______.____..___.._________.. ..__.________.__..______.....__________________ ____________..________ _________/04/1996_.____ __*

OBS BA DESCRIPTION CYCLE / CLASSIFICATION NUMBER YEARS 39 128175 ASSMNT & UPGRD OF UNDRG7tND TANKS / PIPING 93-97 ERR 1-ASSESS APPLIC TANK /P7 PE SYS. 2-INIATE TEST & MONITORING. 3-UPGRADE AS REQD.

(REF.40 CFR 112) 40 128177 THERMO-LAG FIRE BARRIMR EVALUATIONS 93-97 NRR SUPPORT EVALUATIONS C,F THERMO-LAG 330-1 FIRE BARRIER SYSTEMS TO ACHIEVE COMPLI-ANCE W/ 10CFR50 APPJR AT TMI-1 41 412619 CPU /IPU UPGRADE FOR PLANT PROCESS COMPUT 93-99 IOE CR OSF UPGRADE PLANT PROCFSS COMPUTERS CPU AND IPU BOARDS (18) WI'.11 A SINGLE BOARD.

42 128163 B&W OWNER'S GROUP 94-96 GWC PARTICIPATION IN!a&W OWNERS GROUP PROGRAM 43 126101 PLANT LIFE ASSURANCE / EXTENSION 94-99 REL SUPPORT OF STUD:'ES BY GPUN & BWOG FOR FEASIBILITY OF EXTENDING OPERATING LIFE.

44 412675 ** TMI-1 POWER UPf:ATING EVALUATION /LICENSIN 95-99 REL PERFORM ANALYSIS AND IDENTIFY MODS NECESSARY TO FELICENSE AND OPERATE THE TMI REACTUR AT 2772 MWT.

45 128228

  • B&W OWNERS GROUP 1996 (PARTIAL), 1997, 1 96-00 REL PARTICIPATION IN THE B&W ONNERS GROUP PROGRAM

TMI -1 PROJECT LISTING LEGEND


NRC INTEGRATED SCHEDULE

  • - NEW PROJECTS -------------------------------------------- .
    • BA NUMBER CHANGE CATEGORY *C' PROJECTS SORT BY CATEGCRY/ CYCLE /BA STATUS AS OF 11/04/1996 OBS BA DSSCRIPTION CYCLE / CLASSIFICATION NUMDER YEARS 46 128215 ** 'INI 12R REACTOR CAVITY DOSIMETRY ANALYSI 96-98 NRR REPLACE THE CAVITY DOSIMETRY DURING 12R.

TRANSPORT, ANALYZE AND REPORT RESULTS.

47 126L13 MAINTENANCEiTRAINING ANALYSIS 98 NRR DEVELOP ANALYSIS FOR INPO ACCREDITED PROGRAMS.

. . . - . .. .- . . - . . - - . - . - -.-.,- - ~ _..-- ._

l g ABC Classifications

i i
a) Meet NRC Reauirements (NRR) - Activities that a) must be carried out to fulfdl cpecific
NRC requirements or b) have been committed to the NRC by the Company or c) are such i that if not accomplished would result in an NRC non-compliance even though the specific ,

activityis not required by theNRC.

!f 2

b)' Meet Environmental Reauirements (ERR) - Activities that a) are specifically required by i environmental regulatory agencies (State and Federal) or b) have been committed to l environmental agencies by the Company or c) are such that if not accomplished would l

j. result in a regulatory non-compliance even though the specific activity is not required by an
environmental regulatory agency.

c) Meet Other Requirements (ORR) - Acti.ities not covered by the NRC or environmental l requirements but that are required by local, state, or federal ordinanc% codes, court order I '

! or lawsuit settlement, or other guidance to which the Company is committed or if not

{ accomplished would result in a violation of that ordinance, code or guidance, court order, '

etc. i i

. d) Increase Safety Maruins (ISM) - Activities that, ifimplemented, will improve nuclear plant' i or personnel safety but are neither required for regulatory compliance nor required by safety ,

1 regulations, codes or guidance.

e) Decrease Environmental Effects (E) - Activities that, if implemented, will result in an ,

c improved emironmental quality but are neither requhred for regulatory compliance nor l required by environmental regulations, cod:s ur guidance

{ f) - Jmprove Radioloscal Conditions (RAD) - Activities that, if implemented, will result in 3 i imommi Fadiological conditions, lower man-rem exposure rates, or radwaste  :

control / reduction but ~are neither required for regulatory compliance nor required by I

,' radiological regulations, codes or guidance.

)

g) Maintain ReliAD.ility/ Capability (MRC) - Activities that, ifimplemented, will nmintain power production at existing levels by preventing deterioration of plant systems or equipment.

Includes activities in response to national codes and standards, insurance policies, equipment vendor specifications or nuclear industry high unavailability equipment data without which the plant could not operate pmdently.

h) Improve Reliabilitv/Canability (REL) - Activities that, ifimplemented, will increase poweh generation by improving availability or capacity factor to maximize energy output.

i

i ABC Classifications (continued) l l i) Improve Operational Effectiveness (IOE) - Activities that, if implemented, will improve l staff efficiency or provide a direct economic payback in terms of reduced operating / maintenance costs.

I j) Improve Personnel Facilitigs (FAC)- Activities that, ifimplemented, will improve working l conditions and the usefulness ofpersonnel facilities.

k) Provide Contingency / Blanket (CUI) - - Activities that, if implemented, will proside management flexibility to respond in a timely manner to emergent work requirements or the l l' ongoing requirements to procure, replace or repair minor items essential to support routine )

operations. l l' ,

l 1) Improves Heat Rate Performance (HRP) - Activities, that, if implemented, will increase power production by enhancing the heat rate efficiency, i

m) General Working Conditions (GWC) - Activities, tools, and equipment that ifimplemented )

will improve working conditions, but will not demonstrate a direct economic payback.  :

)

i I f l i l

l l

l l

i

l .

i l

i r

1 l ATTACHMENT B 1

CHANGES TO TMI-l NUCLEAR GENERATING STATION INTEGRATED SCHEDULE j ANNUAL UPDATE (NOVEMBER 1996)  !

CATEGORY A PROJECTS l

Additions: None l

Completions: 412662 - TMI Security (LVI/DBX) Enhancements l l Deletior.s: None l

l Schedule Changes: None i l

1 t

l l

r f

i l

l 1

l l

l 67601157 .

. . 1 l

! l ATTACHMENT B (continued) )

CATEGdRY B PROJECTS l

l l Additions: As noted by

  • next to the project title in Attachment A.

Completions: 128152 MOV Program - This specific O&M project to develop an MOV Program has been completed.

Additional work required is being funded functionally.

419280 Simulator Mods - 1995.

412552 Modifications for Seismic Qualification (SQUG) -

Cycle 11 complete.

Deletions: None Schedule Changes: None B/A Number Changes: As noted by " next to project title.

i l

l l

l i

r 67601157

l

- , \

l

\

l ATTACHMENT B (continued)

CATEGORY C PROJECTS I

Additions: As denoted by

  • next to the project title.

Completions: 412612 Permanent Demin System / Misc. Waste Evap.

l 419754 Security Equirment - TMI.

Deletions: 419727 Provide Storage Capability - Cancelled.

419742 TMI Paving - Cancelled. Deferred to future.

123A3R CRDM Flange Gaskets / Therm Barriers - Changes to a Category B Project (123348).

128213 Configuration Management SSFI - Cancelled; was  ;

128ADV. ,

l l 4197SO Security Equipment - TMI. Cancelled and replaced I

by smaller annual bas.

412648 Radwaste Store.ge Capability Phase 2 - Cancelled.

412624 Core Monitoring System Upgrade - Cancelled.

417109 Thermo Lag Barrier Modifications - Changes to a Category B project.