Forwards EP Exercise Insp Rept 50-271/97-01 on 970318-20. No Violations Noted
ML20140E780
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 04/23/1997
From: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Reid D
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20140E785 List:
References
NUDOCS 9704290274
Download: ML20140E780 (3)


See also: IR 05000271/1997001

Text

.

k

.

April 23, 1997

Mr. Donald A. Reid

Vice President, Operations

Vermont Yankee Nuclear Power Corporation

RD 5, Box 169

Ferry Road

Brattleboro, Vermont 05301

SUBJECT: VERMONT YANKEE FULL-PARTICIPATION, EMERGENCY PREPAREDNESS

EXERCISE INSPECTION: NO. 50-271/97-01

Dear Mr. Reid:

This letter refers to the NRC-graded, biennial, emergency preparedness exercise inspection

led by Mr. J. Laughlin, at Vermont Yankee Nuclear Power Station, Vernon, Vermont,

during the period of March 18-20,1997. The inspection evaluated the performance of

your emergency response organization (ERO) during the March 19,1997, Vermont Yankee

full-participation emergency preparedness exercise. The inspectors discussed the findings

of this inspection with you (Mr. R. Barkhurst) and others of your staff on March 20,1997.

Based on our observation of the exercise, the overall onsite performance of the Vermont

Yankee ERO was very good. Simulated events were accurately diagnosed, proper

mitigation actions were performed, emergency declarations were timely and accurate, and

offsite agencies were notified within the required time period. No exercise weaknesses,

safety concerns, or violations of NRC requirements were identified.

However, two issues regarding the implementation of emergency operating procedure

(EOP) were identified. First, the ERO appeared to deviate from EOP procedural compliance

when flooding the primary containment by venting the reactor pressure vessel through the

safety relief valves instead of the prescribed flow path to the condenser. This item is

unresolved pending further NRC review. Second, there was an apparent conflict which

could result in exceeding the primary containment design pressure. These issues are

important to effective EOP implementation and should be resolved in a timely manner.

7 pg

9704290274 970423

PDR ADOCK 05000271

G PDR

.

I. I.l 1.1111.11!I.li, .I

. . - - - _ . . . . > _ _ . - . .._

.

k

.

'

Mr. Donald A. Reid ' 2

No response to this letter is necessary. In accordance with 10 CFR 2.790 of the NRC's

" Rules of Practice," a copy of this letter and its enclosures will be placed in the NRC Public

Document Room.

Sincerely,

~ ~

/

c

Richard R. Keimig, Chief

Emergency Preparedness and

Safeguards Branch

Division of Reactor Safety

Docket No. 50-271

Enclosure: Inspection Report No. 50-271/97-01

cc w/ encl:

R. McCullough, Operating Experience Coordinator - Vermont Yankee

R. Wanczyk, Director, Safety and Regulatory Affairs

G. Maret, Plant Manager

J. Duffy, Licensing Engineer, Vermont Yankee Nuclear Power Corporation

J. Gilroy, Director, Vermont Public Interest Research Group, Inc.

D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire

Chief, Safety Unit, Office of the Attorney General, Commonwealth of Massachusetts

R. Gad, Esquire

G. Bisbee, Esquire

T. Rapone, Massachusetts Executive Office of Public Safety

State of New Hampshire, SLO Designee

State of Vermont, SLO Designee

Commonwealth of Massachusetts, SLO Designee

-

. . . ... _. . . - . . - - . . . - . , - - -- - .. - - . . . - - - . . - - - -..

l

'

,

.

l

Mr. Donald A. Reid 3 l

'

!

'

Distribution w/ encl:

J. Wiggins, DRS

Region i Docket Room (with concurrences)

PUBLIC

Nuclear Safety information Center (NSIC)

NRC Resident inspector

W. Axelson, DRA

D. Screnci, PAO 1

L. Harrison, DRS

R. Conte, DRP l

H. Eichenholz, DRP

D. Beard, DRP

D. Barss, NRR

C. Miskey, DRS 1

I

DRS File

l

'

Distribution w/enci (VIA E-MAIL):

W. Dean, OEDO

V. Rooney, NRR

S. Bajwa, NRR .

R. Correia, NRR I

'

D. Taylor, NRR

Inspection Program Branch, NRR (IPAS)

DOCDESK

l

l

!

I

DOCUMENT NAME: G:\EP&SB\LAUGHLIN\VY9701. INS

Ts recobre a copy of this document,indhte in the box: "C" = Copy wit %ut attachment / enclosure "E" - Copy with attachment / enclosure "N" = No copy

0FFICE RI/DRS ///7lc RI/DRS /AA/ l l l

'

NAME JLAUGHLIN// /t RKEIMIG /

DATE 04/23/97 F /) 04/.23 /9V 04/ /97 04/ /97 04/ /97

/ OFFICIAL RECORD COPY

[/