ML20140G245

From kanterella
Revision as of 17:13, 27 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
First Partial Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR
ML20140G245
Person / Time
Site: 05000231
Issue date: 05/05/1997
From: Racquel Powell
NRC OFFICE OF ADMINISTRATION (ADM)
To: Varady T
ARKANSAS, UNIV. OF, FAYETTEVILLE, AR
Shared Package
ML20140G249 List: ... further results
References
FOIA-97-34 ACRS-GENERAL, NUDOCS 9705080210
Download: ML20140G245 (8)


Text

. . .. .

.---.,....--..-r ~ .. -

N U.S. NUCLEAR RE ULATORY COMMISSION NHC FOIA HEOUEST NUMBE HIS)

. gg% FOIA - 97-0034 g

(

h RESPONSE TO FREEDOM OF W ORMATION ACT (FOIA) REQUEST l FINAL DATE pg RESPONSE TYPE d PARTIAL jq j DOCKET NUMBER (S)(!/apphcable)

- REQUESTER I

T. Scott Varady i I

l PART 1.-AGENCY RECORDS RELEASED OR NOT LOCATED /See checkedboxes/ k l

- I  :

w:_ No agency records subject to the request have been located.

1 No additional agency records subject to the request have been located.  ! l I

Requested records are available through another public distribution program, See Comments section, Agency records subject to the request that are identified in Append;x(es) are already available for public inspection and copying at the I

p y NRC Public Docun ent Room,2120 L Street, N.W., Washington, DC. '

l Agency records subject to the request that are identified in Appendix (es)

A are being made available for public inspection and copying M

at the NRC Public Document Room,2120 L Street, N.W., Washington, DC, in a folder under this FOlA number, n The nonproprietary version of the proposal (s) that you agreed to accept in a telephone conversation with a me:% of my staf f is now being made available l<

q for public inspection and copying at the NRC Public Document Room,2120 L Street, N.W., Washington, DC, in ' Ider under this Fot A number, y

I Agency records subject to the request that are identified in Appendix (es) may be inspected and copwd at the NRC Lccal Public Document

_ Room identified in the Comments section.

f

= Enclosed is mformation on how you rr.ay obtain access to and the charges for copying records located at the NRC Public Document Room,2120 L Street, N.W., Wa<hington, DC.

]f b

Agency records subject to the request are enclosed. Annoneli y A rorords are enclosed.

Records subject to tne request have been referred to another Federal agency (ies) for review and direct response to you. l j

Fees }I p y[y y

You will be billed by the NRC for fees totaling S I

You will receive a refund from the NRC in the amount of S i

- 1, In view of NRC's response to this request, no further action is being taken on appeal letter dated , No.

lla PART 11. A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE h

Certain information in the requested records is being withheld from public disclosure pursuant to the exemptions described in and for the reasons stated .[

In Part 11, B, C, and D. Any released porilons of the documents for which only par + of the record is being withheld are being made available for public

, j i d l

)

inspection and copying in the NRC Public Document Room,2120 L Street, N.W., Washington, DC in a folder under this FOl A number, i

  1. 1 COMMENTS I

" g JA The review of records subject to your request is continuing. We will contact you upon v completion of the review.

y l

k N

=

hbI, (0

l b fl)lIl.lfllfl[

s a i . k' y u

()?OSOSD 2IQ oiRECTO F F RE h

AMATION AND PUBLICATIONS SERVICES I Ji

\

An % f R1

b VARADY97-34

k. me ' y  ! u PDR $"NT.*NN - '

P -m m MbSN U

$$@MWWM h$hYkkh$N Y$ . - . khY .

1 g o o .

F r '#r e

~ l Re: FOIA-97-034  ;

e

-APPENDIX A i

RECORDS BEING RELEASED IN THEIR ENTIRETY (If copyrighted identify with *) c RL, DATE DES.QRIPTION/(PAGE' COUNT)

1. 10/9/64 Letter to USNRC from G. White, GE, ,

Re: Southwest Atomic Energy Associates -

("SAEA") and GE w/ enclosure (24 pages)'

2. 10/13/64 By TWX (fax) to USNRC from G. White, GE, Re: Letter dated 10/10 to GE -

Preliminary Hazards Summary Report "THSR" (1 page)

' 3. 10/16/64 Letter-to USNRC from G. White, GE,

, w/ enclosure (1 page)

4. '11/3/64 - Letter to USNRC from G. White, GE, Re: SAEA & GE, submit Amendment 1 to i joint application for Class 104(b) to
construct and permit SEFOR w/ enclosure
(6 pages) '
5. 11/23/64- Letter to USNRC from G. White, GE, ,

Re: Ref. made to your request dated 10/16/64, that info. contained in Part II of the PHSR for the SEFOR be withheld from inspection (1 page)

6. 11/23/64 Letter to GE from R. L. Doan Re: Ref.

- dated 10/16/64, Part II of Preliminary Hazards Summary Report for SEFOR be '

withheld from inspection (1 page)

7. 12/17/64 Letter to GE, from R. L. Doan Re: Ref.

made to file jointly by GE and SAEA for licenses to construct / operate the SEFOR w/ enclosure (7 pages)

8. 12/24/64 Letter to GE, from R. L. Doan w/ attachment 2/24/64 notice to USNRC (3 pages)  !
9. 12/24/64 Letter to Surgeon General, U.S. Public [

Health Services, fron'E. Case Re:

Understanding reached 8/1/61, between -

AEC and Dept. of Health, Education and  ;

Welfare (1 page) i

1

(

l i

L.  !

[ I e ,

Re: FOIA-97-034 i

[  !

i 10. 12/24/64 Letter to Dr. J. Herron,-Arkansas State. (

Board of Health, from E. Casa Re: ,

Licenses to construct and operate SEFOR ,

in Washington County, Arkansas (1 page) l

11. 1/14/65 Letter to USNRC from Juler Pearlman, GE Re: Docket No. 50-231 (1 page) l L

l

.12, 4/19/65 Letter to M. S. Levine, USNRC from l B. D. Wilson, GE Re: financial qualifications of SAEA and Gesellschaft

reply to Dr. Doan's letter of 12/24/64 l w/ enclosure (5 pages)

L 13. 5/28/65 Order of Notice of Prehearing Conference p to USNRC (4 pages)

14. 6/3/65 Letter to GE from R. L. Doan Re: Ref. I dated 3/9/65 Part II of Supplement No. 2 l to License Application for SEFOR be

! withheld (1 page) l 15 . - 6/11/65 Order and Notice of Change of Place of ,

l ~ Hearing to USNRC (2 pages) l

16. 6/17/65 AIR MAIL to Jules Pearlman, GE, l Mr. J. Welsh, SAEA and T.' Conner, USNRC

! (3 pages)

! 17. 8/5/65 Order Supplementing and closing Hearing Record to USNRC (4 pages)

18. 9/13/65 Initial Decision to USNRC (41 pages)
19. 9/21/65 Letter to GE from R. L. Doan Re:

l Provisional Construction Permit No.

CPPR-17 pursuant to Initial Decision L dated 9/10/65 (4 pages) l i 20. 9/23/65 Motion for Order extending time to L submit additional evidence and order l extending time to USNRC (3 pages) l L 21. 9/28/65 Brratum to USNRC (2 pages) -

fi l 22. 10/7/65 Order Extending time to USNRC (2 pages)

23. 11/19/65 Order to USNRC (4 pages)

.,r-w. - - - . r- - - -4

4 i

~,

j Re: FOIA-97-034 1

i i 24. 1/7/66 Supplemental Initial Decision to USNRC (16 pages)

)

1/10/66

25. Staff's Consent to Applicants' Motion for Stay to USNRC (1 page)
26. 1/11/66 Memorandum and Order to USNR (3 page) j- 27. 2/16/66 Memorandum and Order to USNRC (4 page)

I

] 28. 3/7/66 Decision to USNRC (10 pages)

~i

29. 3/18/66 Letter to GE from R. L. Doan Re:

Amendment No. 1 to Provisional

} Construction Permit No. CPPR-17 to the l

decision of USNRC dated 3/7/66 (4 pages) l t 1

! 30. 12/12/67 Letter to Southwest Atomic Energy  ;

i Associates from Dr. P. Morris Re: Order  !

] extending to 12/1/68 for Construction j 5

Permit Nc. CPPR-17 w/ enclosures ]

(3 Pages)

) 31. 10/1/68 Letter to GE from Dr.P. Morris Re:

3 Insert fuel rod elements into the SEFOR 5 (3 pages)

32. 10/21/68 Letter to GE from Dr. P. Morris Re:

Telephone inquiry from Mr. Henry Bose  ;

{ (1 page) ~

j' 33. 11/23/68 Letter to GE from Dr. P. Morris Re:

Order extending to 1/31/69 w/ enclosures

' (2 pages) l i

34. 1/14/69 Letter to Dr. P. Morris, USNRC from i B. D. Wilson, GE w/ enclosure Re: 3 Extension request of the construction '

completion dates for SEFOR (5 pages)

35. 1/24/69 Letter to Dr. P. Morris, from B. D. Wilson, Re: Amendment transmits >

Supplement 22 and Errata 5 to the SEFOR FDSAR, Supplement 18 (4 pages)

E

36. 1/29/69 Letter to GE from Dr. P. Morris Re: i; Order extending to 4/30/69 w/ enclosure -

(3 pages) i

f Re: FOIA-97-034

37. 2/20/69 Letter to Dr. P. Morris, from B. D. Wilson, Re: Amendment No. 28 to the License Application for SEFOR w/ enclosure (7 pages)
38. 3/4/69 Letter to GE from Dr. P. Morris Re:

Provisional Operating License No. DR-15 to possess, use, and operate SEFOR w/ enclosures (76 pages)

39. 3/27/69 Letter to Dr. P. Morris, from B. D. Wilson, Re: Amendment No. 29 to License Application for SEFOR w/ enclosure (3 pages)
40. 4/11/69 Letter to Dr. P. Morris, from K. Cohen, GE Tech Specs for SEFOR (1 page)
41. 5/16/69 Letter to Dr. P. Morris, from B. D. Wilson Re: Amendment No. 30 License Application for SEFOR (4 pages)
42. 8/21/69 Letter to GE from Dr. P. Morris Re:

Office of Federal Register forwarded a notd.ce relating to the proposed issuance of an amendment to Provisional Operating License No. DR-15 w/ enclosures (25 pages)

43. 1/2/70 Letter to GE from Dr. P. Morris Re:

USNRC issued Amendment No. 1 Provisional Operating License No. DR-15 w/ enclosures (150 pages)

44. 4/17/70 Letter to Dr. P. Morris, from K. Cohen, Re: Proposed change No. 1 to License DR-15 for SEFOR (21 pages)
45. 6/5/70 Letter to GE from Dr. P. Morris Re:

Letter dated 4/17/70 proposed change No. 1 to Tech Specs appended to License No. DR-15 for SEFOR w/ attachment A j, (12 pages) l l 46. 6/12/70 Letter to Dr. P. Morris from K. Cohen ,

Re: Proposed Change No. 2 to License DR-15 for SEFOR (21 pages) l

. - - . - . , - . . - . . . . . . - . - - .- .-~... .. _ ~. .-~ _-.- .

~

j Re: FOIA-97-034 l

47. 7/8/70 Letter to Dr. P. Morris from K. Cohen Re: Proposed Change No. 3 to License DRP-15 for SEFOR (16 pages) l -

]

! 48. 7/30/70 Letter to Dr. P. Morris from K. Cohen l Re: Proposed Change No. 2 t SEFOR Tech l Specs was submitted on 6/12/70 (3 pages) j i

49. 8/28/70 Letter to GE from Dr. P. Morris Re ,

Extending expiration date of Provisional Operating License No. DR-15 from 9/4/70 l to 3/4/72 w/ enclosure (3 pages) l

50. 9/3/70 Letter to Dr. P. Morris from K. Cohen Re: Proposed Change No. 4 to License ,

DR-15 for SEFOR w/snclosure (17 pages) 1 l 51. 9/4/70 TWX (fax) to Dr. P. Morris from K. Cohen l Re: Proposed Change No. 4 to License l DR-15 for SEFOR (24 pages) l l 52. 9/8/70 Letter to Dr. P. Morris from K. Cohen Re: Proposed Change No. 3 to the SEFOR Tech Specs submitted 7/8/70 (16 pages)

53. 12/11/70 Letter to Dr. P. Morris from K. Cohen

, Re: Revision 1 of Proposed Change No. 4 i License DR-15 for SEFOR w/ enclosure j l (2 pages)

(

54. 12/22/70 Letter to Dr. P. Morris from K. Cohen Re: Rev. 2 of Proposed Change No. 4 to '

, License DR-15 for SEFOR w/ enclosure l- (22 pages)  ;

55. 12/31/70 Letter Dr. P. Morris from K. Cohen Re

l Rev. 2 of Proposed Change No. 4 to License DR-15 for SEFOR was submitted t 12/22/70 (1 page)

56. 1/22/71 Outgoing Telecommunication Message to GE from Dr. P. Morris Re: Proceed to 20NWt Testing Phase for SEFOR-(2 pages) i
57. 1/28/71 Letter to Dr. P. Morris from K. Cohen i Re: Addendum No. 2 to Proposed Change

! No. 3 for License DR-15 w/ enclosure (24 .

pages) ,

! b li

L' l

Re: FOIA-97-034

58. 2/1/71 Letter to Dr. P. Morris from K. Cohen Re: Docket No. 50-231 License No. R-15 requiring additional information w/ attachments (11 pages) 59, 2/10/71 Letter to Dr. P. Morris from K. Cohen Re: Rev. 1 of Proposed Change No. 4 to SEFOR Tech Specs, correction needs to be made to page 4-9 w/ attachment (3 pages)
60. 2/12/71 Letter to GE from Dr. P. Morris Re:

Change No. 3 and 4 to Tech Specs appended to Provisional Operating License No. DR-15 for SEFOR w/ enclosures (49 pages)

61. 3/5/71 Letter to Dr. P. Morris from K. Cohen Re: Proposed Change No. 2 to SEFOR Tech Specs, submitted on 6/12/70 (1 page)
62. 4/12/71 Letter to GE from Dr. P. Morris Re:

Proposed Change No. 2 to Tech Specs attached to Provisional Operating License No. DR-15 for SEFOR w/ enclosure

.(11 Pages)

63. 4/28/71 Letter to Dr. P. Morris from K. Cohen Re: Proposed Change No. 5 to Tech Specs, submitted in partial response to request for additional information (RAI) in letter dated 4/19/71 (8 pages) ,
64. 8/4/71 Letter to GE from Dr. P. Morris Re:

Sub-prompt critical tests for Core I w/ enclosures (7 pages)

65. 8/6/71 Letter to Dr. P. Morris from D. S. Parsley Re: Proposed Change No. 6 to SEFOR Tech Specs (14 pages)
66. 8/16/71 Letter to GE from Dr. P. Morris Re:

Proposed Change 6 to Tech Specs for SEFOR w/ enclosure (6 pages)

67. 9/27/71 Letter to GE from Dr. P. Morris Re:

Proposed Change No. 5 to Tech Specs for i SEFOR w/ enclosures (10 pages) i I

. . _ . _ _m _. . - _ . . _ , _ _ . . _ _ .- .. ..- -... _. _ ..__ _ . _ __._. _ ___ _ _ .- , _.

l:

,.m l ,.

L..

3 Re: FOIA-97-034

68. 10/8/71 Letter to Dr. P. Morris from B. Wolfe,  !

GE Re: Proposed Change No. 7 to SEFOR Tecn Specs w/ enclosure (19.pages)

69. 10/16/71 Letter to'Dr. P. Morris from'B. Wolfe Re: Proposed Change No. 8 to SEFOR Tech -

Specs w/ enclosure (31 pages)  ;

l 11/12/71

~

I 70. Letter to GE from Donald Skovholt'Re*

Proposed Change No. 7 to Tech Specs for.

SEFOR w/ enclosure (28 pages)- 3

71. 11/12/71 _ Letter to GE.from Donald Skovholt Re:

Proposed Change No. 8 to Tech Specs for SEFOR w/ enclosure (20 pages)

72. 12/29/71 Letter to Dr. P. Morris from B. Wolfe L Re: Extend the SEFOR provisional operating license for another 18 months (2 pages)

'73. 12/2/71 Letcer Lo GE from Donald Skovholt Re:

Proposed Change No.f2 dated 6/12/70 '

w/ enclosure (3 pages) l

74. 1/19/72 Letter to GE from~Dr. P. Morris Re:

Extending the expiration date of l

Provisional Operating License DR-15 from l

3/4/72 to 9/4/73 w/ enclosure (3 pages) 75.. 2/28/72 Letter to GE from DorAld Skovholt Re:

Letter' dated 2/11/72 proposed changes to Tech Specs w/ enclosure (13 pages)

76. 7/21/72 Letter to GE from Donald Skovholt Re: l TWX (fax) dated 7/18/72 proposed change to Tech specs (1 page)
77. 10/3/72 Letter to GE from Donald Skovholt Re:

Letter dated 9/14/72 proposed changes to l

Tech Specs (2 pages)

78. 2/7/73 Letter to GE from Donald Skovholt Re:-

Letter dated 1/24/73 proposed change in Tech Specs (2 pages)

]

79. 5/14/74 Letter to GE from Karl Goller Re: An d I

i order terminating Facility License No. t i DR-15 for SEFOR is enclosed w/ enclosures  ;

i (4 Pages) i

?~

i i

4 .