ML20147D426
ML20147D426 | |
Person / Time | |
---|---|
Site: | Seabrook |
Issue date: | 10/06/1978 |
From: | Brenner L NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD) |
To: | Buck J, Mike Farrar, Rosenthal A NRC ATOMIC SAFETY & LICENSING APPEAL PANEL (ASLAP) |
References | |
NUDOCS 7810140065 | |
Download: ML20147D426 (2) | |
Similar Documents at Seabrook | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M8771999-10-25025 October 1999
[Table view]Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217C7321999-10-0808 October 1999 Forwards Copy of Seabrook Station Videotape Entitled, Completion of Seal Barrier Installation. Videotape Documents Process of Selecting,Designing & Installing Seal Deterrent Barrier to Preclude Entrapment of Seals ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20212B5021999-09-14014 September 1999 Forwards Licensee Responses to EPA Questions Re Plant Seal Deterrent Barrier.Util Completed Installation of Subject Barriers on All Three Station Offshore Intake Structures on 990818.Barriers Will Preclude Entrapment of Seals ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License ML20211J2171999-08-23023 August 1999 Expresses Disappointment with Lack of Enforcement Action Against Seabrook Station Despite Repeated Safety Violations ML20211J4971999-08-21021 August 1999 Submits Comments Re Violations Cited in Early Mar & 990509 Insps ML20211H8361999-08-19019 August 1999 Submits Concerns Re Violations at Seabrook Station ML20211F2681999-08-19019 August 1999 Discusses Former Chairman Jackson & 990602 Predecisional Enforcement Conference Re Findings of Ofc of Investigations Involving Allegations Raised by Contract Electrician.Determined That Allegations Not Supported ML20211J3241999-08-15015 August 1999 Expresses Disappointment in Apparent Failure of NRC to Cite Seabrook Station NPP for Recent Violations of Safety Regulations Uncovered During Recent Insps in Mar & May ML20211J1831999-08-15015 August 1999 Submits Concerns Over Serious Deficiencies at Seabrook Station That NRC Has Declined to Take Enforcement Actions Against ML20210T1601999-08-13013 August 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev,supp1 1, Reactor Vessel Structural Integrity, NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20211J2071999-08-13013 August 1999 Expresses Concerns Re Violations Occurring Recently at Seabrook Nuclear Power Station.Requests Effort to See That Measures Taken to Stop Flagrant,Continuing Violations That Hold Danger to Workers & Community ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210S2001999-08-12012 August 1999 Forwards NRC Forms 398 & 396 in Support of Applications for Renewal of Operator Licenses for Individuals Listed Below. Without Encls ML20210R8401999-08-11011 August 1999 Forwards Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20210S7331999-08-11011 August 1999 Submits Third Suppl to 980423 Application to Renew NPDES Permit NH0020338 for Seabrook Station.Suppl Provides Addl Info on Input Streams & Requests Increased Permit Limit for Chemical Used in Makeup Water Treatment Sys ML20210R9581999-08-11011 August 1999 Forwards ISI Exam Rept of Seabrook Station, for RFO 6, Period 3,for Insps Conducted Prior to & During Sixth Refueling Outage Concluded on 990510 ML20210Q7441999-08-11011 August 1999 Forwards Order Approving Indirect Transfer of Control of Canal Interest in Seabrook Station Unit 1 as Requested in Application & SER ML20210R7931999-08-10010 August 1999 Forwards Cycle 7 Startup Rept for Seabrook Station, IAW Requirements of TS 6.8.1.1 ML20210N9421999-08-0505 August 1999 Informs That North Atlantic Suggests Listed Revisions to 990730 Draft Revisions to Committee Rept & Order.Further Revs Consistent with What North Atlantic Proposed at 990608 Hearing ML20210N5721999-08-0303 August 1999 Discusses Investigations Rept 1-98-005 Conducted by OI at Naesco,Seabrook Station & Forwards NOV & Proposed Imposition of Civil Penalty - $55,000.Violation Re Failure to Promptly Correct Incorrectly Terminated Cables of Control Bldg Air ML20210P3361999-08-0303 August 1999 Discusses Investigation Rept 1-98-005 Conducted by Region I OI at Naesco,Seabrook Station & Forwards Nov.Violations Re Electrical Wiring in Control Panel for Control Bldg Air Conditioning Sys ML20210P3161999-08-0303 August 1999 Discusses Investigation Rept 1-98-005,conducted Between 980129 & 0527 at Seabrook Station & Forwards Nov.Violation Re Discrimination of Williams Power Corp,Contractor of Naesco,Against Electrician for Raising Safety Issues 1999-09-08 Category:INTERNAL OR EXTERNAL MEMORANDUM MONTHYEARML20217N4611999-10-22022 October 1999
[Table view]Forwards Revised Pages 11,14 & 71 of Rept & Order Dtd 990608.Revs Are Textual Changes to Clarify & Confirm Action Taken by Nuclear Decommissioning Financing Committee ML20216F5061999-09-16016 September 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petitions as of 990831.During August,Director'S Decision (DD-99-10) on Seabrook Issued & Petition Closed.Six Petitions Open,Five in NRR & One in Nmss.Attachment 2 Withheld ML20210K4141999-08-0404 August 1999 Forwards Signed Originals of DD Issued Under 10CFR2.206. Without Encl ML20210C1631999-07-19019 July 1999 Forwards Monthly Rept Which Gives Status of 10CFR2.206 Petitions as of 990630.Six Open NRR,1 OE & 2 NMSS Petitions Available.Attachment 2 Withheld ML20206U9631999-05-18018 May 1999 Notification of Significant Licensee Meeting 99-27 with Util on 990602 to Discuss Predecisional Enforcement Conference - NRC Investigation ML20206R1691999-05-0707 May 1999 Rev 1 to Notification of 990602 Significant Licensee Meeting with Listed Attendees in King of Prussia,Pa Re Predecisional Enforcement Conference Concerning NRC Investigation.Rev Sighted Date Change ML20207G5681999-03-0808 March 1999 Informs That Commission Memorandum & Order (CLI-99-06), Issued on 990305,appointed TS Moore as Presiding Officer for Seabrook License Transfer Proceeding.With Certificate of Svc.Served on 990309 ML20197H1211998-12-0808 December 1998 Forwards Exam Rept with as Given Written Exam for Test Administered at Facility on 981019-23 ML20195C7641998-11-13013 November 1998 Forwards Pages That Were Faxed to J Peschel on 981113 in Preparation for Telcon That Will Be Scheduled Wk of 981116. Info in Attached Pages Based on Info Obtained from Licensee & Includes Specific Subjects to Be Discussed with Licensee ML20153E4211998-09-24024 September 1998 Informs That Ofc of Secretary Experienced Problems with Listed e-mail Address.Alternate Mailbox Has Been Created in Effort to Maintain Electronic Mailbox for Parties Filing by e-mail.With Certificate of Svc.Served on 980924 ML20153G0231998-09-24024 September 1998 Informs That Office of Secretary Experienced Problems with Dedicated e-mail Address.In Effort to Maintain Electronic Mailbox for Parties Filing by e-mail,alternate Mailbox Created.With Certificate of Svc.Served on 980924 ML20239A3361998-09-0404 September 1998 Forwards Request for Hearing & Submitted by RA Backus on Behalf of Seacoast Anti-Pollution League & New England Coalition on Nuclear Pollution Re Proposed License Amend for Seabrook Unit 1 ML20249A6691998-06-15015 June 1998 Forwards Request for Hearing, & Submitted by RA Backus on Behalf of Seacoast Anti-Pollution League. Petition Was Filed in Response to Notice of Proposed Determination by Staff ML20217M7161998-04-0303 April 1998 Notification of 980219 Meeting W/North Atlantic Energy Svc Corp in Rockville,Md to Discuss Great Power Corp Response to RAI Re Decommissioning Funding Assurance ML20216G5891998-03-0606 March 1998 Notification of Significant Licensee Meeting 98-25 W/Util on 980324 Predecisional Enforcement Conference to Discuss Apparent Violation in Insp Rept 50-443/97-08 (EA-98-073) ML20198S4161998-02-26026 February 1998 Submits Impact of New Decommissioning Funding Rule on Great Bay.Staff Intends to Propose Some Addl Mechanisms That Appear to Offer Assurance Equivalent to What Existing Mechanisms Provide ML20203B9021998-02-0909 February 1998 Notification of 980219 Meeting W/North Atlantic Energy Service Corp in North Bethesda,Md to Discuss Proposed License Amends to Support Current Operating Cycle & Plans for Conversion to Improved Standard TSs ML20199E8881998-01-23023 January 1998 Notification of 980204 Mgt Meeting W/North Atlantic Energy Svc Corp in Rockville,Maryland to Discuss SALP for Period Covering 960505-971206 as Documented in SALP Rept 50-443/97-99 ML20198N0191998-01-0909 January 1998 Forwards Draft Rept, ,to Docket for Seabrook Station,Unit 1.Draft Rept Provides Licensee Preliminary Root Cause Analysis for Leaks in Piping of B Train of RHR System.Leakage Reported by Licensee on 971205 ML20203D2971997-12-0909 December 1997 Notification of 971216 Meeting W/Utils in Rockville,Md to Discuss Decommissioning Funding Assurance ML20211E7301997-09-23023 September 1997 Notification of 971028 Meeting W/North Atlantic Energy Service Corp in Rockville,Md to Discuss Approach for Extending Surveillances to 24-month Intervals ML20217B0471997-09-11011 September 1997 Notification of 970924 Meeting W/Eastern Utility Associates & North Atlantic Energy Service Corp in Rockville,Md to Discuss Proposed Electric Generating Asset Divestiture Plan ML20141D8191997-06-26026 June 1997 Forward 970624 Memo from P Milano to C Hehl Re Response to TIA Concerning Vantage 5H ZIRLO Fuel Problems at Plant,To Be Placed on Docket 50-443 & Made Publicly Available ML20141C9921997-06-24024 June 1997 Responds to 970605 TIA Re VANTAGE-5H ZIRLO Fuel Problems at Seabrook.Staff Has Not Identified Any Restart Concerns Re Reloading of VANTAGE-5H ZIRLO Fuel Used During Cycle 5 & W/Fresh VANTAGE-5H ZIRLO Fuel for Cycle 6 at Plant ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20134H7931996-11-0606 November 1996 Partially Deleted Memo Re 950502 Meeting W/Northeast Utilities Re Listed Topics ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20129C0271996-10-11011 October 1996 Notification of 961030 Public Meeting of Nuclear Decommissioning Committee ML20129E2011996-09-25025 September 1996 Notification of 960930 Meeting W/Util in Rockville,Md to Discuss Status of Great Bay Power Corp as Electric Util ML20147J3281996-07-10010 July 1996 Discusses Staff Response to SRM M960612, Briefing on Part 100 Final Rule on Reactor Site Criteria. Staff Believes That Draft Final Rule Language May Be Misinterpreted as Implicity Overruling in Conflict W/Seabrook Decision ML20129D1831996-07-10010 July 1996 Informs of 960716 Visit W/B Patricelli,Cm Cleveland & Gw Davis of Northeast Utilities,Inc Re Introductions & Discussions of Millstone Point & Haddam Neck Issues ML20134B6681995-10-13013 October 1995 Forwards Briefing Package on Status of Listed Plant Units,As Background for Visit by Northeast Utils on 951018-19 ML20087B8531995-07-25025 July 1995 Forwards State of Nh Nuclear Decommissioning Finance Committee Third Supplemental Order Approving Revised Funding Schedule by North Atlantic Energy Svc Corp ML20134B5861995-06-0101 June 1995 Forwards Briefing Package on Status of Plants as Background for Util Visit on 950608 ML20134B5721995-04-26026 April 1995 Forwards Briefing Package on Status of Listed Plants,As Background for Visit by Util on 950502.Supporting Documentation Encl ML20078S9391994-12-23023 December 1994 Forwards State of Nh Nuclear Decommissioning Finance Committee (Ndfc) Ndfc 93-1, Brief of Nh Public Utilities Commission Staff NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20134B4931994-02-16016 February 1994 Forwards Updated Briefing Package for Visit by Util Officials W/Nrc Chairman,Commission,Edo,Director OI & Director Oe.Requests Replacement of Encls 1 & 2 in 940215 Package,Retaining Supporting Attachment 1 Documentation ML20059J8371994-01-0606 January 1994 Notification of Significant Licensee Meeting 94-05 W/Util Emergency Preparedness Mgt Working Group on 940210 ML20058L9281993-12-15015 December 1993 Notification of 931221 Meeting W/North Atlantic Energy Svc Corp,Yaec & Intl Tech Svcs,Inc in Rockville,Md to Discuss Application of YAEC-1856P Methodology to Plant ML20058C9681993-11-19019 November 1993 Notification of Significant Licensee Meeting 93-147 W/Util on 931208 Re SALP Mgt Meeting for Period of 920301-930828 ML20059J2321993-11-0505 November 1993 Forwards Safety Evaluation Accepting LAR 92-14,submitted Via for TS Changes to Allow Independent Fixed Incore Detector Sys at Facility to Be Used for Periodic in-core Power Distribution TS SRs ML20128K8601993-02-0202 February 1993 Notification of Significant Licensee Meeting 93-13 W/Util on 930210 to Discuss General Engineering Programs ML20126K1461993-01-0505 January 1993 Notification of 930106 Meeting W/Util in Rockville,Md to Discuss Transfer of Control of Interest of Eua Power in Plant ML20126J6211992-12-24024 December 1992 Forwards LER 88-009-01 Issued on 921113,discussing Increased Thrust Bearing Loading for RHR Pumps When Pumps Run at Reduced Flows.Concern Raised That Inservice Testing May Not Detect Problem Soon Enough to Avoid Failure ML20125B4461992-11-30030 November 1992 Notification of 921203 Licensee Meeting in King of Prussia, PA to Discuss Auxiliary Operator re-licensing Plans ML20128C2131992-11-16016 November 1992 Notification of Postponement of 921124 Meeting W/Util in King of Prussia,Pa to Discuss Process for Reissuing Reactor Operator Licenses Terminated After Auxiliary Operator Performance Review ML20128C0271992-11-13013 November 1992 Notification of Significant Licensee Meeting 92-168 W/Util on 921124 to Discuss Process for Reissuing RO Licenses That Have Been Terminated After an AO Performance Review ML20097B5821992-05-27027 May 1992 Recommends That Methodology Specified in Order 20,475 Be Revised to Require Util to Include in Base Rates,Amounts Required by Nuclear Decommission Financing Committee 17th Supplemental Order 1999-09-16 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20217N4611999-10-22022 October 1999
[Table view]Forwards Revised Pages 11,14 & 71 of Rept & Order Dtd 990608.Revs Are Textual Changes to Clarify & Confirm Action Taken by Nuclear Decommissioning Financing Committee ML20217J8951999-10-21021 October 1999 Staff Requirements Memo Re Affirmation Session on 991021, Rockville,Md (Open to Public Attendance) ML20216F5061999-09-16016 September 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petitions as of 990831.During August,Director'S Decision (DD-99-10) on Seabrook Issued & Petition Closed.Six Petitions Open,Five in NRR & One in Nmss.Attachment 2 Withheld ML20210K4141999-08-0404 August 1999 Forwards Signed Originals of DD Issued Under 10CFR2.206. Without Encl ML20210C1631999-07-19019 July 1999 Forwards Monthly Rept Which Gives Status of 10CFR2.206 Petitions as of 990630.Six Open NRR,1 OE & 2 NMSS Petitions Available.Attachment 2 Withheld ML20206U9631999-05-18018 May 1999 Notification of Significant Licensee Meeting 99-27 with Util on 990602 to Discuss Predecisional Enforcement Conference - NRC Investigation ML20206R1691999-05-0707 May 1999 Rev 1 to Notification of 990602 Significant Licensee Meeting with Listed Attendees in King of Prussia,Pa Re Predecisional Enforcement Conference Concerning NRC Investigation.Rev Sighted Date Change ML20207G5681999-03-0808 March 1999 Informs That Commission Memorandum & Order (CLI-99-06), Issued on 990305,appointed TS Moore as Presiding Officer for Seabrook License Transfer Proceeding.With Certificate of Svc.Served on 990309 ML20207F5021999-03-0505 March 1999 Staff Requirements Memo Re 990305 Affirmation Session, Rockville,Md (Open to Public Attendance).Commission Approved Memo & Order Which Granted Util Intervention Petition & Request for Hearing ML20197H1211998-12-0808 December 1998 Forwards Exam Rept with as Given Written Exam for Test Administered at Facility on 981019-23 ML20195C7641998-11-13013 November 1998 Forwards Pages That Were Faxed to J Peschel on 981113 in Preparation for Telcon That Will Be Scheduled Wk of 981116. Info in Attached Pages Based on Info Obtained from Licensee & Includes Specific Subjects to Be Discussed with Licensee ML20153G0231998-09-24024 September 1998 Informs That Office of Secretary Experienced Problems with Dedicated e-mail Address.In Effort to Maintain Electronic Mailbox for Parties Filing by e-mail,alternate Mailbox Created.With Certificate of Svc.Served on 980924 ML20153E4211998-09-24024 September 1998 Informs That Ofc of Secretary Experienced Problems with Listed e-mail Address.Alternate Mailbox Has Been Created in Effort to Maintain Electronic Mailbox for Parties Filing by e-mail.With Certificate of Svc.Served on 980924 ML20239A3361998-09-0404 September 1998 Forwards Request for Hearing & Submitted by RA Backus on Behalf of Seacoast Anti-Pollution League & New England Coalition on Nuclear Pollution Re Proposed License Amend for Seabrook Unit 1 ML20249A6691998-06-15015 June 1998 Forwards Request for Hearing, & Submitted by RA Backus on Behalf of Seacoast Anti-Pollution League. Petition Was Filed in Response to Notice of Proposed Determination by Staff ML20217M7161998-04-0303 April 1998 Notification of 980219 Meeting W/North Atlantic Energy Svc Corp in Rockville,Md to Discuss Great Power Corp Response to RAI Re Decommissioning Funding Assurance ML20216G5891998-03-0606 March 1998 Notification of Significant Licensee Meeting 98-25 W/Util on 980324 Predecisional Enforcement Conference to Discuss Apparent Violation in Insp Rept 50-443/97-08 (EA-98-073) ML20198S4161998-02-26026 February 1998 Submits Impact of New Decommissioning Funding Rule on Great Bay.Staff Intends to Propose Some Addl Mechanisms That Appear to Offer Assurance Equivalent to What Existing Mechanisms Provide ML20203B9021998-02-0909 February 1998 Notification of 980219 Meeting W/North Atlantic Energy Service Corp in North Bethesda,Md to Discuss Proposed License Amends to Support Current Operating Cycle & Plans for Conversion to Improved Standard TSs ML20199E8881998-01-23023 January 1998 Notification of 980204 Mgt Meeting W/North Atlantic Energy Svc Corp in Rockville,Maryland to Discuss SALP for Period Covering 960505-971206 as Documented in SALP Rept 50-443/97-99 ML20198N0191998-01-0909 January 1998 Forwards Draft Rept, ,to Docket for Seabrook Station,Unit 1.Draft Rept Provides Licensee Preliminary Root Cause Analysis for Leaks in Piping of B Train of RHR System.Leakage Reported by Licensee on 971205 ML20203D2971997-12-0909 December 1997 Notification of 971216 Meeting W/Utils in Rockville,Md to Discuss Decommissioning Funding Assurance ML20211E7301997-09-23023 September 1997 Notification of 971028 Meeting W/North Atlantic Energy Service Corp in Rockville,Md to Discuss Approach for Extending Surveillances to 24-month Intervals ML20217B0471997-09-11011 September 1997 Notification of 970924 Meeting W/Eastern Utility Associates & North Atlantic Energy Service Corp in Rockville,Md to Discuss Proposed Electric Generating Asset Divestiture Plan ML20141D8191997-06-26026 June 1997 Forward 970624 Memo from P Milano to C Hehl Re Response to TIA Concerning Vantage 5H ZIRLO Fuel Problems at Plant,To Be Placed on Docket 50-443 & Made Publicly Available ML20141C9921997-06-24024 June 1997 Responds to 970605 TIA Re VANTAGE-5H ZIRLO Fuel Problems at Seabrook.Staff Has Not Identified Any Restart Concerns Re Reloading of VANTAGE-5H ZIRLO Fuel Used During Cycle 5 & W/Fresh VANTAGE-5H ZIRLO Fuel for Cycle 6 at Plant ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20134H7931996-11-0606 November 1996 Partially Deleted Memo Re 950502 Meeting W/Northeast Utilities Re Listed Topics ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20129C0271996-10-11011 October 1996 Notification of 961030 Public Meeting of Nuclear Decommissioning Committee ML20129E2011996-09-25025 September 1996 Notification of 960930 Meeting W/Util in Rockville,Md to Discuss Status of Great Bay Power Corp as Electric Util ML20147J3281996-07-10010 July 1996 Discusses Staff Response to SRM M960612, Briefing on Part 100 Final Rule on Reactor Site Criteria. Staff Believes That Draft Final Rule Language May Be Misinterpreted as Implicity Overruling in Conflict W/Seabrook Decision ML20129D1831996-07-10010 July 1996 Informs of 960716 Visit W/B Patricelli,Cm Cleveland & Gw Davis of Northeast Utilities,Inc Re Introductions & Discussions of Millstone Point & Haddam Neck Issues ML20134B6681995-10-13013 October 1995 Forwards Briefing Package on Status of Listed Plant Units,As Background for Visit by Northeast Utils on 951018-19 ML20087B8531995-07-25025 July 1995 Forwards State of Nh Nuclear Decommissioning Finance Committee Third Supplemental Order Approving Revised Funding Schedule by North Atlantic Energy Svc Corp ML20134B5861995-06-0101 June 1995 Forwards Briefing Package on Status of Plants as Background for Util Visit on 950608 ML20134B5721995-04-26026 April 1995 Forwards Briefing Package on Status of Listed Plants,As Background for Visit by Util on 950502.Supporting Documentation Encl ML20078S9391994-12-23023 December 1994 Forwards State of Nh Nuclear Decommissioning Finance Committee (Ndfc) Ndfc 93-1, Brief of Nh Public Utilities Commission Staff NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20134B4931994-02-16016 February 1994 Forwards Updated Briefing Package for Visit by Util Officials W/Nrc Chairman,Commission,Edo,Director OI & Director Oe.Requests Replacement of Encls 1 & 2 in 940215 Package,Retaining Supporting Attachment 1 Documentation ML20059J8371994-01-0606 January 1994 Notification of Significant Licensee Meeting 94-05 W/Util Emergency Preparedness Mgt Working Group on 940210 ML20058L9281993-12-15015 December 1993 Notification of 931221 Meeting W/North Atlantic Energy Svc Corp,Yaec & Intl Tech Svcs,Inc in Rockville,Md to Discuss Application of YAEC-1856P Methodology to Plant ML20058C9681993-11-19019 November 1993 Notification of Significant Licensee Meeting 93-147 W/Util on 931208 Re SALP Mgt Meeting for Period of 920301-930828 ML20059J2321993-11-0505 November 1993 Forwards Safety Evaluation Accepting LAR 92-14,submitted Via for TS Changes to Allow Independent Fixed Incore Detector Sys at Facility to Be Used for Periodic in-core Power Distribution TS SRs ML20128K8601993-02-0202 February 1993 Notification of Significant Licensee Meeting 93-13 W/Util on 930210 to Discuss General Engineering Programs ML20126K1461993-01-0505 January 1993 Notification of 930106 Meeting W/Util in Rockville,Md to Discuss Transfer of Control of Interest of Eua Power in Plant ML20126J6211992-12-24024 December 1992 Forwards LER 88-009-01 Issued on 921113,discussing Increased Thrust Bearing Loading for RHR Pumps When Pumps Run at Reduced Flows.Concern Raised That Inservice Testing May Not Detect Problem Soon Enough to Avoid Failure ML20125B4461992-11-30030 November 1992 Notification of 921203 Licensee Meeting in King of Prussia, PA to Discuss Auxiliary Operator re-licensing Plans ML20128C2131992-11-16016 November 1992 Notification of Postponement of 921124 Meeting W/Util in King of Prussia,Pa to Discuss Process for Reissuing Reactor Operator Licenses Terminated After Auxiliary Operator Performance Review 1999-09-16 Category:NRC TO ASLAP MONTHYEARML20056B1971990-08-0202 August 1990
[Table view]Corrects Error in 900321 Brief Submitted Upon Review of LBP-89-32.Staff 900713 & 25 Filings Indicate That American Red Cross Not Relied Upon to Provide Staffing at School Host Facility ML20056A4111990-07-31031 July 1990 Advises of Error in 900321 Brief Submitted Upon Review of LBP-89-32.American Red Cross Not Relied Upon to Provide Staffing at Holy Cross College School Host Facility Under Spmc ML20055G7371990-07-20020 July 1990 ALAB-933.* Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Appeal Board Decision Expired.Commission Declined Review.Decision Became Final on 900717.W/Certificate of Svc.Served on 900720 ML20055G9191990-07-12012 July 1990 ALAB-932.* Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Appeal Board Decision Expired.Commission Declined Review.Certificate of Svc Encl.Served on 900712 ML20246E4721989-08-23023 August 1989 Advises That Time for Commission to Review Decision ALAB-918 Expired.Commission Declined Review.Decision Became Final Agency Action on 890818.W/Certificate of Svc.Served on 890823 ML20246B9881989-08-17017 August 1989 Requests That Curran,Counsel for Necnp,Further Arguments in Be Rejected as Unauthorized Extension of Remarks Made at 881230 Oral Argument on Reception Ctr Contentions ML20247Q6031989-07-21021 July 1989 Advises That NRC Ofc of General Counsel Has Never in Past or in Future,Advised Board,Appeal Board or Commission to Disregard Mandatory Procedural Rules as Matter of Convenience in Order to Conserve Resources ML20247E0751989-07-17017 July 1989 Advises That Author Will Present Argument on Behalf of NRC Re Intervenors Appeal from Board Partial Initial Decision LBP-88-32,per Aslab 890711 Order ML20245A4341989-06-13013 June 1989 Advises That Author Will Represent NRC at Oral Argument to Be Held on 890712 ML20244C2561989-04-12012 April 1989 Advises That Author Will Represent NRC at 890421 Oral Argument ML20244C2371989-04-12012 April 1989 Forwards NRC Insp Rept Confirming That Old RG-58 Cables Determinated,Capped & spared,RG-59 Cables Installed in Place of RG-58 Cables & RG-59 Cables Were Black W/Red Stripe to Indicate That Cables Not Safety Grade.W/O Encl ML20236D6971989-03-21021 March 1989 Forwards Corrected First Page to NRC Staff Motion for Leave to File Out of Time,Filed on 890317.Corrected Motion Should Reflect Filing in Offsite Docket ML20236D6571989-03-20020 March 1989 Forwards Corrected Cover Page & Page 1 of NRC Staff Response in Opposition to ED Weinhold Appeal of LBP-89-03 Filed on 890317.Brief Should Reflect Filing in Offsite Docket ML20205R4671988-11-0202 November 1988 Forwards Corrected Pages to NRC Response to 881025 Aslab Order.Certificate of Svc Encl ML20196G7551988-06-27027 June 1988 Forwards NRC Info Notice 88-037, Flow Blockage of Cooling Water to Safety Sys Components. Document Re Matter Pending Before Appeal Board.W/O Encl ML20148C9971988-01-15015 January 1988 Requests That Encl Corrected Page 7 Be Substituted in Place of Present Page 7 of 880114 NRC Response to Contention of Atty General Jm Shannon & Motion to Admit late-filed Contention & Reopen Record ML20148C9901988-01-0101 January 1988 Requests Encl Corrected Page Be Substituted for Page 7 of NRC Staff Response to Joint Intervenors Motion to Enlarge Record on Appeal, Filed 880119 ML20236P8681987-11-16016 November 1987 Advises That Undersigned Will Represent NRC at Oral Argument Scheduled for 871208 Re Onsite Emergency Planning & Safety Issues ML20235H6171987-09-23023 September 1987 Informs That Parties Met in Boston,Ma on 870921 to Discuss Matters Raised in 870917 Telcon Re Offsite Emergency Planning.Designation of Lead Intervenor Will Be Provided No Later than 871005 ML20238F1751987-09-11011 September 1987 Advises of Results of Negotiations for Test of Plant Notification Sirens,Per .Util & Seacoast Anti- Pollution League Agreed That Test Under Alert Notification for Plant Emergency in Siren Procedures Proper Test ML20237L7061987-08-31031 August 1987 Informs That Staff Will Further Rept to Board within 2 Wks If Agreement Reached to Conduct Another Test of Emergency Alert Notifications W/East Kingston Sirens ML20235M1311987-07-11011 July 1987 Advises That Author Will Present Argument on Behalf of NRC in Matter Re Onsite Emergency Planning & Safety Issues,On 870724.Related Correspondence ML20235J0531987-07-10010 July 1987 Informs That Author Will Present Argument on Behalf of NRC Re Onsite Emergency Planning & Safety Issues on 870724. Related Correspondence ML20212D1291987-02-20020 February 1987 Advises That NRC Continues to Believe That Parties Will Have Opportunity to Respond Fully to Applicant Waiver Petition. ASLB 870203 Order Does Not Affect NRC Position in 870205 Pleading Before Appeal Board ML20147C5051978-12-0101 December 1978 Forwards Advance Photocopies of NRC Staff'S Direct Testimony in the Seabrook Alternate Site Analysis Remand Proc & Prof Qual of Experts Who Participated in Preparation of the Testimony.W/O Encl ML20150D2501978-11-0909 November 1978 Forwards Recent NRC Memos Re Problems Associated W/Pipe Support Base Plate Design Which Apply to Subj Facil.W/Encl ANO:7811020332,7811020343 & 7811020336 ML20147D4261978-10-0606 October 1978 Earlier Anticipated Date of 781020 for Filing Final Direct Testimony Is Delayed 3 Weeks,Due to Unavailability of Consultants' Analyses 1990-08-02 |
Text
___._______ _ _ _ _ _ __ _ _ _ _ _ _ .
- t jf % UNITED STATES gg k NUCLEAR REGULATORY COMMISSION j ,gM j WASHINGTON, D. C. 20555 o #
- N;*Ml
%% f October 6,19MC PUBLIC DOCUMENT %
Alan S. Rosenthal, Esq., Chairman Dr. John H. Buck Atomic Safety and Licensing Atomic Safety and Licensing Appeal Board Appeal Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Washington, D.C. 20555 Michael C. Farrar, Esq.
Atomic Safety and Licensing #
Appeal Board U.S. Nuclear Regulatory Commission gg$ g Washington, D.C. 20555 g@ 4 In the Matter of Public Service Company of New Hampshire, et a
%[M 4 /
M (Seabrook Station, Units 1 and 2) ~ -
Docket Nos. 50-443 and 50-444 % 4[
C .,, T j Gentlemen:
In its September 7,1978 status report, the NRC Staff estimated, subject to several uncertainties, that the Staff's final direct testimony could be filed on October 20, 1978. Unfortunately, it is no longer feasible for the Staff to meet this date.
As we had feared in our previous report to the Board, the availability of the analyses from consultants with the Department o' Energy and the Oak Ridge and Argonne National Laboratories will cause a slippage of approximately three weeks in the completion of important portions of the Staff interdisciplinary team's work. Some of the information from these outside sources is becoming available now, and it is expected that the rest of the information will be available over the course of the next two weeks. If all of the outside information is received by October 20, and if the information does not unexpectedly give rise to a need for further information, the Staff estimates that the final testimony will be filed on November 13,1978 (with the possible exception of certain pictorial exhibits which may not be ready until shortly after the testimony is
, filed).
This estimate provides time for making the Staff's information and analyses available to the parties in a meaningful way prior to the completion of the final direct testimony. Our expectation is to meet with the parties on or about November 6,1978. We will provide the parties with a draft of as much of the Staff's testimony as practicable approximately a week in advance of the meeting. As noted in our previous report, a possible outcome of such a meeting could be the need for alteration l of the Staff's testimony which could affect our ability to file it on November 13, 1978.
% \Y\%@pCS
2 .-
e The Staff regrets the necessity of departing from the previously esti-mated filing date. We appreciate the flexibility the Board has shown and ask the Board's indulgence in the fact that there are some continuing uncertainties in our present estimates. The magnitude of the task being performed by the Staff is large. It may be helpful for the Board to know at this time that the Staff's direct testimony probably will exceed five hundred pages. 6 I
The Staff wishes to assure the Board that its interdisciplinary team's j review for this proceeding continues to have the highest priority, along I with the very highest dedication to quality on the part of the team l members.
Sincerely, w huw (
Lawrence Brenner !
Counsel for NRC Staff cc: Ivan W. Smith, Esq.
Joseph F. Tubridy, Esq.
Dr. Marvin M. Mann Dr. Ernest 0. Salo Dr. Kenneth A. McCollom Robert A. Backus, Esq.
. Thomas G. Dignan, Jr. , Esq.
John A. Ritsher, Esq.
Norman Ross, Esq.
E. Tupper Kinder, Esq.
Laurie Burt, Esq.
Karin P. Sheldon, Esq.
Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Appeal Board Docketing and Service Section l
l