Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P3791999-10-21021 October 1999 Forwards NRC Form 396 & NRC Form 398 for Renewal of Licenses SOP-20607-1 & SOP-20610-1.Without Encls ML20217N2521999-10-20020 October 1999 Provides Supplemental Info Re 990405 Containment Insp Program Requests for Relief RR-L-1 & RR-L-2,in Response to 991013 Telcon with NRC ML20217K7541999-10-15015 October 1999 Forwards Rev 1 to Unit 1,Cycle 9 & Unit 2 Cycle 7 Colrs,Iaw Requirements of TS 5.6.5.Figure 5, Axial Flux Difference Limits as Function of Percent of Rated Thermal Power for RAOC, Was Revised for Both Units ML20217G6751999-10-13013 October 1999 Requests Withholding of Proprietary Info Contained in Application for Amend to OLs to Implement Relaxations Allowed by WCAP-14333-P-A,rev 1 ML20217D2901999-10-13013 October 1999 Forwards SER Accepting Licensee 990305 Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation ML20217G2631999-10-0707 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Hatch Plant & Did Not Identify Any Areas Where Performance Warranted More than Core Insp Program.Regional Initiative Insps to Observe Const Activities Will Be Conducted ML20217G0401999-10-0707 October 1999 Forwards Insp Repts 50-321/99-09 & 50-366/99-09 on 990607-11 & 0823-27.One Violation Occurred Being Treated as NCV ML20217G1071999-10-0707 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Vogtle & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Plans to Conduct Core Insps at Facility Over Next Six Months ML20216J9041999-10-0101 October 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20216J9161999-10-0101 October 1999 Forwards Response to NRC 990723 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20217B0141999-10-0101 October 1999 Forwards Insp Repts 50-424/99-06 & 50-425/99-06 on 990725- 0904 at Vogtle Units 1 & 2 Reactor Facilities.Determined That One Violation Occurred & Being Treated as non-cited Violation ML20216G0251999-09-24024 September 1999 Concludes That All Requested Info of GL 98-01 & Supplement 1 Provided & Licensing Action for GL 98-01 & Supplement 1 Complete for Plant ML20216H3641999-09-20020 September 1999 Forwards NRC Form 536 in Response to AL 99-03, Preparation & Scheduling of Operator Licensing Exams ML20212E7481999-09-20020 September 1999 Requests Approval Per 10CFR50.55a to Use Alternative Method for Determining Qualified Life of Certain BOP Diaphragm Valves than That Specified in Code Case N-31.Proposed Alternative,Encl ML20212E8751999-09-20020 September 1999 Forwards Response to NRC GL 99-02, Lab Testing of Nuclear Grade Activated Charcoal. Description of Methods Used to Comply with Std Along with Most Recent Test Results Encl ML20212C2191999-09-16016 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, Which Is Current Need for NRC Operator Licensing Exams for Years 2000 Through 2003 of Plant Vogtle,Per Administrative Ltr 99-03 ML20217B5271999-09-16016 September 1999 Forwards Insp Repts 50-321/99-05 & 50-366/99-05 on 990711-0821.No Violations Noted HL-5839, Forwards Three New & One Revised Relief Requests for Third 10-year Interval ISI Program for Plant,Developed to Clarify Documentation Requirements,To Propose Alternate Exam Requirements IAW ASME Code Cases N-598 & N-5731999-09-16016 September 1999 Forwards Three New & One Revised Relief Requests for Third 10-year Interval ISI Program for Plant,Developed to Clarify Documentation Requirements,To Propose Alternate Exam Requirements IAW ASME Code Cases N-598 & N-573 ML20212A6411999-09-13013 September 1999 Forwards Safety Evaluation of Relief Request RR-V-16 for Third Ten Year Interval Inservice Testing Program HL-5837, Informs That Recent Evaluation of Inservice Testing Program Activities Has Resulted in Requirement for Snoc to Revise Two Existing Requests for Relief,Withdraw One Request for Relief & Revise One Existing Cold SD Justification1999-09-13013 September 1999 Informs That Recent Evaluation of Inservice Testing Program Activities Has Resulted in Requirement for Snoc to Revise Two Existing Requests for Relief,Withdraw One Request for Relief & Revise One Existing Cold SD Justification ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl HL-5832, Submits Comments Concerning Reactor Vessel Integrity Database (Rvid),Version 2 for Plant Hatch,Per NRC1999-09-0101 September 1999 Submits Comments Concerning Reactor Vessel Integrity Database (Rvid),Version 2 for Plant Hatch,Per NRC ML20211J5291999-08-30030 August 1999 Forwards Snoc Copyright Notice Dtd 990825,re Production of Engineering Drawings Ref in VEGP UFSAR ML20211J5251999-08-30030 August 1999 Forwards Response to NRC 990727 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20211J7381999-08-27027 August 1999 Informs That Licensee Vessel Data Is Different than NRC Database Based on Listed Info,Per 990722 Request to Review Rvid ML20211E9251999-08-23023 August 1999 Forwards fitness-for-duty Performance Data for Jan-June 1999,as Required by 10CFR26.71(d).Data Reflected in Rept Covers Employees at Vogtle Electric Generating Plant HL-5825, Forwards Response to Informal NRC RAI Re Proposed Emergency Actions Levels Associated with Independent Spent Fuel Storage Operations1999-08-20020 August 1999 Forwards Response to Informal NRC RAI Re Proposed Emergency Actions Levels Associated with Independent Spent Fuel Storage Operations HL-5788, Forwards Owner Activity Repts,Form OAR-1 for Ei Hatch Nuclear Plant for First Period of Third 10-yr Interval ISI Program.Repts Are for Unit 2 Refueling Outages 13 & 141999-08-19019 August 1999 Forwards Owner Activity Repts,Form OAR-1 for Ei Hatch Nuclear Plant for First Period of Third 10-yr Interval ISI Program.Repts Are for Unit 2 Refueling Outages 13 & 14 HL-5827, Forwards Fitness for Duty Performance Data for six-month Reporting period,Jan-June 1999,as Required by 10CFR26.71(d)1999-08-19019 August 1999 Forwards Fitness for Duty Performance Data for six-month Reporting period,Jan-June 1999,as Required by 10CFR26.71(d) HL-5824, Requests Exemption from Expedited Implementation Requirements of Paragraph 10CFR50.55a(g)(6)(ii)(B) as Applicable to Containment General Visual Exams of Subsection Iwe,Table IWE-2500-1,Category E-A,Item E1.111999-08-18018 August 1999 Requests Exemption from Expedited Implementation Requirements of Paragraph 10CFR50.55a(g)(6)(ii)(B) as Applicable to Containment General Visual Exams of Subsection Iwe,Table IWE-2500-1,Category E-A,Item E1.11 ML20210T6421999-08-17017 August 1999 Discusses Licensee 950814 Initial Response to GL 92-01, Rev 1,Supp 1, Rv Structural Integrity (Rvid), Issued on 950519 to Plant.Staff Revised Info in Rvid & Being Released as Rvid Version 2 ML20210V0881999-08-16016 August 1999 Forwards Insp Repts 50-424/99-05 & 50-425/99-05 on 990620- 0724.No Violations Noted.Vogtle Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance Practices ML20210V3311999-08-13013 August 1999 Provides Synposis of NRC OI Report Re Alleged Untruthful Statements Made to NRC Re Release of Contaminated Matl to Onsite Landfill.Oi Unable to Conclude That Untruthful state- Ments Were Provided to NRC ML20210Q4821999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr,As Listed,Identifying Individual to Take Exam,Thirty Days Before Exam Date ML20210Q4611999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 for Vogtle.Requests Info Re Individuals Who Will Take Exam. Sample Registration Ltr Encl ML20210L7581999-08-0404 August 1999 Forwards Insp Repts 50-321/99-04 & 50-366/99-04 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20210J9501999-08-0202 August 1999 Forwards SER Finding Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210J9021999-08-0202 August 1999 Forwards SER Finding Licensee Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210N1191999-08-0202 August 1999 Discusses 990727 Telcon Between Rs Baldwin & R Brown Re Administration of Licensing Exam at Facility During Wk of 991213 ML20210L2181999-08-0202 August 1999 Forwards NRC Form 396 & Form 398 for Renewal of Listed Licenses,Iaw 10CFR55.57.Without Encl HL-5814, Forwards New Relief Requests for Third 10-year Interval Inservice Insp Program for Ei Hatch Nuclear Plant.New Relief Requests Were Developed to Propose Alternate Insps & to Allow Use of ASME Code Cases N-605,N-508-1,N-323-1 & N-5281999-07-30030 July 1999 Forwards New Relief Requests for Third 10-year Interval Inservice Insp Program for Ei Hatch Nuclear Plant.New Relief Requests Were Developed to Propose Alternate Insps & to Allow Use of ASME Code Cases N-605,N-508-1,N-323-1 & N-528 05000366/LER-1999-007, Forwards LER 99-007-00 Re Personnel Error & Inadequate Corrective Action Causing Automatic Reactor Shutdown1999-07-27027 July 1999 Forwards LER 99-007-00 Re Personnel Error & Inadequate Corrective Action Causing Automatic Reactor Shutdown ML20210G3351999-07-27027 July 1999 Forwards Second Request for Addl Info Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20210E0121999-07-23023 July 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20210D9341999-07-22022 July 1999 Discusses Closure of TACs MA0581 & MA0582,response to Requests for Info in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20210C8011999-07-21021 July 1999 Provides Response to NRC AL 99-02,which Requests That Addressees Submit Info Pertaining to Estimates of Number of Licensing Actions That Will Be Submitted for NRC Review for Upcoming Fy 2000 & 2001 ML20210E1601999-07-20020 July 1999 Forwards Insp Repts 50-321/99-10 & 50-366/99-10 on 990616-25.One Violation Noted Being Treated as Ncv.Team Identified Lack of Procedural Guidance for Identification & Trending of Repetitive Instrument Drift & Calibr Problems HL-5808, Forwards Ei Hatch Nuclear Plant,Unit 1 Extended Power Uprate Startup Test Rept for Cycle 19. Rept Summarizes Startup Testing Performed on Unit 1 Following Implementation of Extended Uprate During Eighteenth Refueling Outage1999-07-15015 July 1999 Forwards Ei Hatch Nuclear Plant,Unit 1 Extended Power Uprate Startup Test Rept for Cycle 19. Rept Summarizes Startup Testing Performed on Unit 1 Following Implementation of Extended Uprate During Eighteenth Refueling Outage HL-5810, Forwards Rev 17B to Ei Hatch FSAR & Rev 14B to Fire Hazards Analysis & Fire Protection Program, for Plant.Encls Reflect Changes Made Since Previous Submittal.With Instructions1999-07-15015 July 1999 Forwards Rev 17B to Ei Hatch FSAR & Rev 14B to Fire Hazards Analysis & Fire Protection Program, for Plant.Encls Reflect Changes Made Since Previous Submittal.With Instructions ML20210E0431999-07-15015 July 1999 Forwards Insp Repts 50-424/99-04 & 50-425/99-04 on 990502- 0619.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy 1999-09-24
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217P3791999-10-21021 October 1999 Forwards NRC Form 396 & NRC Form 398 for Renewal of Licenses SOP-20607-1 & SOP-20610-1.Without Encls ML20217N2521999-10-20020 October 1999 Provides Supplemental Info Re 990405 Containment Insp Program Requests for Relief RR-L-1 & RR-L-2,in Response to 991013 Telcon with NRC ML20217K7541999-10-15015 October 1999 Forwards Rev 1 to Unit 1,Cycle 9 & Unit 2 Cycle 7 Colrs,Iaw Requirements of TS 5.6.5.Figure 5, Axial Flux Difference Limits as Function of Percent of Rated Thermal Power for RAOC, Was Revised for Both Units ML20217G6751999-10-13013 October 1999 Requests Withholding of Proprietary Info Contained in Application for Amend to OLs to Implement Relaxations Allowed by WCAP-14333-P-A,rev 1 ML20216J9161999-10-0101 October 1999 Forwards Response to NRC 990723 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20216J9041999-10-0101 October 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20212E7481999-09-20020 September 1999 Requests Approval Per 10CFR50.55a to Use Alternative Method for Determining Qualified Life of Certain BOP Diaphragm Valves than That Specified in Code Case N-31.Proposed Alternative,Encl ML20212E8751999-09-20020 September 1999 Forwards Response to NRC GL 99-02, Lab Testing of Nuclear Grade Activated Charcoal. Description of Methods Used to Comply with Std Along with Most Recent Test Results Encl ML20216H3641999-09-20020 September 1999 Forwards NRC Form 536 in Response to AL 99-03, Preparation & Scheduling of Operator Licensing Exams HL-5839, Forwards Three New & One Revised Relief Requests for Third 10-year Interval ISI Program for Plant,Developed to Clarify Documentation Requirements,To Propose Alternate Exam Requirements IAW ASME Code Cases N-598 & N-5731999-09-16016 September 1999 Forwards Three New & One Revised Relief Requests for Third 10-year Interval ISI Program for Plant,Developed to Clarify Documentation Requirements,To Propose Alternate Exam Requirements IAW ASME Code Cases N-598 & N-573 ML20212C2191999-09-16016 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, Which Is Current Need for NRC Operator Licensing Exams for Years 2000 Through 2003 of Plant Vogtle,Per Administrative Ltr 99-03 HL-5837, Informs That Recent Evaluation of Inservice Testing Program Activities Has Resulted in Requirement for Snoc to Revise Two Existing Requests for Relief,Withdraw One Request for Relief & Revise One Existing Cold SD Justification1999-09-13013 September 1999 Informs That Recent Evaluation of Inservice Testing Program Activities Has Resulted in Requirement for Snoc to Revise Two Existing Requests for Relief,Withdraw One Request for Relief & Revise One Existing Cold SD Justification HL-5832, Submits Comments Concerning Reactor Vessel Integrity Database (Rvid),Version 2 for Plant Hatch,Per NRC1999-09-0101 September 1999 Submits Comments Concerning Reactor Vessel Integrity Database (Rvid),Version 2 for Plant Hatch,Per NRC ML20211J5291999-08-30030 August 1999 Forwards Snoc Copyright Notice Dtd 990825,re Production of Engineering Drawings Ref in VEGP UFSAR ML20211J5251999-08-30030 August 1999 Forwards Response to NRC 990727 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20211J7381999-08-27027 August 1999 Informs That Licensee Vessel Data Is Different than NRC Database Based on Listed Info,Per 990722 Request to Review Rvid ML20211E9251999-08-23023 August 1999 Forwards fitness-for-duty Performance Data for Jan-June 1999,as Required by 10CFR26.71(d).Data Reflected in Rept Covers Employees at Vogtle Electric Generating Plant HL-5825, Forwards Response to Informal NRC RAI Re Proposed Emergency Actions Levels Associated with Independent Spent Fuel Storage Operations1999-08-20020 August 1999 Forwards Response to Informal NRC RAI Re Proposed Emergency Actions Levels Associated with Independent Spent Fuel Storage Operations HL-5788, Forwards Owner Activity Repts,Form OAR-1 for Ei Hatch Nuclear Plant for First Period of Third 10-yr Interval ISI Program.Repts Are for Unit 2 Refueling Outages 13 & 141999-08-19019 August 1999 Forwards Owner Activity Repts,Form OAR-1 for Ei Hatch Nuclear Plant for First Period of Third 10-yr Interval ISI Program.Repts Are for Unit 2 Refueling Outages 13 & 14 HL-5827, Forwards Fitness for Duty Performance Data for six-month Reporting period,Jan-June 1999,as Required by 10CFR26.71(d)1999-08-19019 August 1999 Forwards Fitness for Duty Performance Data for six-month Reporting period,Jan-June 1999,as Required by 10CFR26.71(d) HL-5824, Requests Exemption from Expedited Implementation Requirements of Paragraph 10CFR50.55a(g)(6)(ii)(B) as Applicable to Containment General Visual Exams of Subsection Iwe,Table IWE-2500-1,Category E-A,Item E1.111999-08-18018 August 1999 Requests Exemption from Expedited Implementation Requirements of Paragraph 10CFR50.55a(g)(6)(ii)(B) as Applicable to Containment General Visual Exams of Subsection Iwe,Table IWE-2500-1,Category E-A,Item E1.11 ML20210L2181999-08-0202 August 1999 Forwards NRC Form 396 & Form 398 for Renewal of Listed Licenses,Iaw 10CFR55.57.Without Encl HL-5814, Forwards New Relief Requests for Third 10-year Interval Inservice Insp Program for Ei Hatch Nuclear Plant.New Relief Requests Were Developed to Propose Alternate Insps & to Allow Use of ASME Code Cases N-605,N-508-1,N-323-1 & N-5281999-07-30030 July 1999 Forwards New Relief Requests for Third 10-year Interval Inservice Insp Program for Ei Hatch Nuclear Plant.New Relief Requests Were Developed to Propose Alternate Insps & to Allow Use of ASME Code Cases N-605,N-508-1,N-323-1 & N-528 05000366/LER-1999-007, Forwards LER 99-007-00 Re Personnel Error & Inadequate Corrective Action Causing Automatic Reactor Shutdown1999-07-27027 July 1999 Forwards LER 99-007-00 Re Personnel Error & Inadequate Corrective Action Causing Automatic Reactor Shutdown ML20210C8011999-07-21021 July 1999 Provides Response to NRC AL 99-02,which Requests That Addressees Submit Info Pertaining to Estimates of Number of Licensing Actions That Will Be Submitted for NRC Review for Upcoming Fy 2000 & 2001 HL-5810, Forwards Rev 17B to Ei Hatch FSAR & Rev 14B to Fire Hazards Analysis & Fire Protection Program, for Plant.Encls Reflect Changes Made Since Previous Submittal.With Instructions1999-07-15015 July 1999 Forwards Rev 17B to Ei Hatch FSAR & Rev 14B to Fire Hazards Analysis & Fire Protection Program, for Plant.Encls Reflect Changes Made Since Previous Submittal.With Instructions HL-5808, Forwards Ei Hatch Nuclear Plant,Unit 1 Extended Power Uprate Startup Test Rept for Cycle 19. Rept Summarizes Startup Testing Performed on Unit 1 Following Implementation of Extended Uprate During Eighteenth Refueling Outage1999-07-15015 July 1999 Forwards Ei Hatch Nuclear Plant,Unit 1 Extended Power Uprate Startup Test Rept for Cycle 19. Rept Summarizes Startup Testing Performed on Unit 1 Following Implementation of Extended Uprate During Eighteenth Refueling Outage HL-5807, Estimates That Seventeen (17) Submittals Will Be Made During Fy 2000 & Two (2) Submittals Will Be Made During Fy 2001,in Response to Administative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-14014 July 1999 Estimates That Seventeen (17) Submittals Will Be Made During Fy 2000 & Two (2) Submittals Will Be Made During Fy 2001,in Response to Administative Ltr 99-02, Operating Reactor Licensing Action Estimates ML20209H3881999-07-14014 July 1999 Forwards Revs 1 & 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Unit 1 & 2 ML20210J1091999-07-10010 July 1999 Submits Suggestions & Concerns Re Y2K & Nuclear Power Plants HL-5804, Informs NRC That on or After 991018,SNOC Plans to Begin Storing Spent Fuel in Ei Hatch ISFSI IAW General License Issued,Per 10CFR72.2101999-07-0909 July 1999 Informs NRC That on or After 991018,SNOC Plans to Begin Storing Spent Fuel in Ei Hatch ISFSI IAW General License Issued,Per 10CFR72.210 HL-5796, Forwards Response to NRC 990331 Request for Supplemental Info Re SNC Earlier GL 95-07 Responses.Gl 95-07 Evaluation Sheets for Units 1 & 2 RHR Torus Spray Isolation Valves Are Encl1999-07-0909 July 1999 Forwards Response to NRC 990331 Request for Supplemental Info Re SNC Earlier GL 95-07 Responses.Gl 95-07 Evaluation Sheets for Units 1 & 2 RHR Torus Spray Isolation Valves Are Encl HL-5801, Forwards New Relief Requests for Third 10-Yr Interval ISI Program for Ei Hatch Nuclear Plant.New Relief Requests RR-25 & RR-26 Were Developed to Propose Alternate Repair Techniques IAW ASME Code N-562 & N-561,respectively1999-07-0909 July 1999 Forwards New Relief Requests for Third 10-Yr Interval ISI Program for Ei Hatch Nuclear Plant.New Relief Requests RR-25 & RR-26 Were Developed to Propose Alternate Repair Techniques IAW ASME Code N-562 & N-561,respectively ML20209C4041999-07-0101 July 1999 Forwards Rev 29 to VEGP Units 1 & 2 Emergency Plan.Rev 29 Incorporates Design Change Associated with Consolidation of Er Facilities Computer & Protues Computer.Justifications for Changes & Insertion Instructions Are Encl ML20196F9171999-06-21021 June 1999 Forwards Owner Rept for ISI for Vogtle Electric Generating Plant,Unit 1 Eighth Maint/Refueling Outage. Separate Submittal Will Not Be Made to NRC on SG Tubes Inspected During Subj Outage ML20212J2521999-06-21021 June 1999 Responds to NRC RAI Re Yr 2000 Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701 HL-5790, Responds to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants1999-06-21021 June 1999 Responds to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20195F8031999-06-11011 June 1999 Forwards Changes to VEGP Unit 1 Emergency Response Data Sys (ERDS) Data Point Library.Changes Were Completed on 990308 While Unit 1 Was SD for Refueling Outage HL-5763, Informs That Util Is Changing Responsibility for Periodic Concerns Program Review,Per Insp Repts 50-321/95-12 & 50-366/95-12.Reviews Will Now Be Performed Under Direction of Vice President & Corporate Counsel1999-05-20020 May 1999 Informs That Util Is Changing Responsibility for Periodic Concerns Program Review,Per Insp Repts 50-321/95-12 & 50-366/95-12.Reviews Will Now Be Performed Under Direction of Vice President & Corporate Counsel HL-5785, Forwards New Relief Requests RR-V-16 for Third 10-yr Interval Inservice Testing Program for Ei Hatch Nuclear Plant.Relief Request Was Developed to Propose Alternate Schedule for Replacement of HPCI Rupture Disks1999-05-18018 May 1999 Forwards New Relief Requests RR-V-16 for Third 10-yr Interval Inservice Testing Program for Ei Hatch Nuclear Plant.Relief Request Was Developed to Propose Alternate Schedule for Replacement of HPCI Rupture Disks 05000424/LER-1998-006, Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Exi1999-05-10010 May 1999 Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Existed ML20206D5881999-04-29029 April 1999 Forwards Rept Which Summarizes Effects of Changes & Errors in ECCS Evaluation Models on PCT for 1998,per Requirements of 10CFR50.46(a)(3)(ii).Rept Results Will Be Incorporated Into Next FSAR Update ML20206D6411999-04-29029 April 1999 Forwards Vogtle Electric Generating Plant Radiological Environ Operating Rept for 1998 & Vogtle Electric Generating Plant Units 1 & 2 1998 Annual Rept Annual Radioactive Effluent Release Rept ML20206D6951999-04-28028 April 1999 Provides Update of Plans for VEGP MOV Periodic Verification Program Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs HL-5777, Notifies NRC That Exam Coverage for One Weld Exceeded Criteria for Plant.Reasons for Exam Coverage Being Less than Initially Estimated as Listed1999-04-26026 April 1999 Notifies NRC That Exam Coverage for One Weld Exceeded Criteria for Plant.Reasons for Exam Coverage Being Less than Initially Estimated as Listed ML20206C2241999-04-21021 April 1999 Forwards Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2.Page E2-2 Was Iandvertently Omitted from Previously Submitted Rept on 990413 HL-5758, Forwards Response to NRC 990129 RAI Re GL 96-05 Program at Ei Hatch Nuclear Plant1999-04-0909 April 1999 Forwards Response to NRC 990129 RAI Re GL 96-05 Program at Ei Hatch Nuclear Plant ML20209A3741999-04-0505 April 1999 Submits Several Requests for Relief for Plant from Code Requirements Pursuant to 10CFR50.55a(a)(3) & (g)(5)(iii).NRC Is Respectfully Requested to Approve Requests Prior to Jan 1,2000 ML20205H3481999-03-31031 March 1999 Forwards Georgia Power Co,Oglethorpe Power Corp,Municipal Electric Authority of Ga & City of Dalton,Ga Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81 HL-5761, Forwards Revised Ei Hatch Nuclear Plant Psp,Effective 990331,per 10CFR50.54(p)(2).Justification & Detailed Instructions Encl.Plan Withheld,Per 10CFR73.211999-03-31031 March 1999 Forwards Revised Ei Hatch Nuclear Plant Psp,Effective 990331,per 10CFR50.54(p)(2).Justification & Detailed Instructions Encl.Plan Withheld,Per 10CFR73.21 1999-09-20
[Table view] Category:LEGAL/LAW FIRM TO NRC
MONTHYEARML20044A7461990-06-25025 June 1990 Forwards Endorsement 35 to Nelia Policy NF-302 & Endorsement 29 to Maelu Policy MF-129 ML20064B4911990-05-31031 May 1990 Forwards 900507 Court Order Instructing Parties to Provide Info to Wage & Hour Administrator Re M Hobby Claims Against Util Under ERA ML19354E4191990-01-25025 January 1990 Comments Re Issuance of OL Amends & Proposed NSHC Determination Re Transfer of Operational Mgt Control of Plants & Views on anti-trust Issues Re Application for Amend for Plants ML20006A6241990-01-16016 January 1990 Forwards Draft Qualified Master Trust Agreement for Decommissioning of Nuclear Plants,For Review.Licensee Will Make Contributions to Qualified & Nonqualified Trust as Appropriate ML19332D8511989-11-30030 November 1989 Forwards Antitrust Comments W/Exhibits & One Copy of Comments Sans Exhibits of Cities of Benton,Conway,North Little Rock,Osceola,Prescott & West Memphis,Ak & Farmers Electric Cooperative Corp ML19325E3711989-10-30030 October 1989 Forwards 891027 Ltr to Counsel for NRC for Filing on Appropriate Dockets & Legal Issues Re Antitrust Aspect of NRC Review of Consolidation of License Amend Application ML19325E3741989-10-27027 October 1989 Lists Three Legal Issues Re Antitrust Aspects of NRC Review of Consolidation of License Amend Application for Facilities.Licensee Supplemental Info Filed W/Nrr ML18094A6521989-08-24024 August 1989 Forwards Endorsements 140 & 141 to Nelia Policy NF-164, Endorsements 117 & 118 to Maelu Policy MF-44,Endorsements 115 & 116 to Nelia Policy NF-208 & Endorsements 102 & 103 to Maelu Policy MF-77 ML20245C9081989-04-11011 April 1989 Forwards Endorsements 63 & 64 to Maelu Policy MF-102, Endorsements 71 & 72 to Nelia Policy NF-247.Endorsements 106 & 107 to Nelia Policy NF-198,Endorsement 11 to Nelia Certificates N-38,N-39 & N-40 & Endorsement 10 to MF-75 ML20244D9001989-04-0606 April 1989 Forwards Endorsements 94 & 18 to Maelu Policies MF-78 & MF-129,respectively & Endorsements 112 & 24 to Nelia Policies NF-215 & NF-302,respectively ML20244D9131989-04-0505 April 1989 Forwards Endorsements 1 to Nelia Certificate N-117 & Maelu Certificate M-117 ML17347B0961989-03-29029 March 1989 Forwards Endorsements 77 & 100 to Nelia Policies NF-227 & NF-185 & Endorsements 64 & 87 to Maelu Policies MF-88 & MF-55,respectively ML20244E0431989-03-28028 March 1989 Forwards Endorsements 92 & 78 to Nelia Policy NF-174 & Maelu Policy MF-51,respectively & Endorsements 78 & 67 to Nelia Policy NF-197 & Maelu Policy MF-68,respectively ML20245D6071989-03-27027 March 1989 Forwards Endorsements 113 & 114 to Nelia Policy NF-220, Endorsements 133 & 134 to Nelia Policy NF-164,Endorsement 143 to Nelia Policy NF-1 & Endorsement 86 to Nelia Policy NF-195 ML20247H3981989-03-21021 March 1989 Forwards 890228,0308 & 15 Ltrs on No Significant Change Finding Re Antitrust OL Review ML20247A3021989-03-21021 March 1989 Discusses 890302 Notice of Finding of No Significant Antitrust Changes Re OL for Unit.Oglethorpe Power Corp 890317 Comments Do Not Affect NRC Ability to Recommend & Commission Ability to Issue Full Power License on 890330 ML20245D3421989-03-20020 March 1989 Forwards Listed Endorsements,Including Endorsements 14,163, 144,94,75,39 & 31 to Nelia Policies NF-295,NF-100,MAELU Policy MF-29,NELIA Policy NF-182,MAELU Policy MF-61,NELIA Policy NF-281 & Maelu Policy MF-112,respectively ML20245H7831989-02-28028 February 1989 Discusses Transaction Between Oglethorpe Power Corp & Seminole Power Cooperative,Per Antitrust Review.Antitrust Review Reflects Assertions That Are Factually Incorrect & Should Reflect Addl Facts Available ML20235R3351989-02-13013 February 1989 Forwards Endorsement 4 to Nelia Certificate N-111 & Endorsement 4 to Maelu Certificate M-111 ML20235T8911989-01-18018 January 1989 Forwards Endorsements 130 & 131 to Nelia Policy NF-164, Endorsements 107 & 108 to Maelu Policy MF-44,Endorsements 94 & 95 to Nelia Policy NF-107,Endorsements 110 & 111 to Nelia Policy NF-220 & Endorsements 97 & 98 to Maelu Policy MF-73 ML17347A9071989-01-12012 January 1989 Forwards Endorsements 5,11,9,63,62,4,11,11,86 & 85 to Maelu Certificates MW-60,M-56,M-89,MF-88,MF-88,MW-29,M-26,M-25, MF-55 & MF-55,respectively & Listed Endorsements to Listed Nelia Policies ML20205Q3381988-11-0404 November 1988 Forwards Requests for Renewal or Extension of Exemption from Requirements of 10CFR50.54(w)(i) Re Property Insurance.Fee Paid ML17345A4751988-10-24024 October 1988 Forwards Endorsements 10 to Nelia Certificates N-59,N-25, N-26,MAELU Certificates M-59,M-25,M-26,respectively & Endorsements 8 to Nelia Certificate N-89 & Maelu Certificate M-89,respectively ML17345A4051988-09-16016 September 1988 Forwards Endorsements 73 & 74 & 95 & 96 to Nelia Policies NF-227 & NF-185,respectively & Endorsements 60 & 61 & 82 & 83 to Maelu Policies MF-88 & MF-55,respectively ML20151Z5491988-08-23023 August 1988 Forwards Supplemental Reg Guide 9.3 Info in Response to Mathews to Wg Hairston ML20155F7771988-08-0505 August 1988 FOIA Request for Documents Re Low Level Radwaste Facilities to Be Built at Plants ML20151D8121988-07-15015 July 1988 Forwards Opposition of City of Clyde,Oh to Util Application to Suspend Antitrust Conditions at Facilities,Per 880616 53FR22589 & 53FR22590 ML20150E4781988-07-0505 July 1988 Forwards Endorsement 14 to Maelu Policy MF-129 & Endorsement 20 to Nelia Policy NF-302 ML20155A2501988-06-0303 June 1988 Forwards Endorsements 4 & 4 to Nelia Certificate NW-78 & Maelu Certificate MW-18 & Endorsements 3 & 3 to Nelia Certificate NW-125 & Maelu Certificate MW-46,respectively ML20154P0371988-05-26026 May 1988 Forwards Policy Endorsments,Including Endorsments 51,36,91 & 77 to Nelia Policies NF-252,NF-281,NF-182 & NF-238, Respectively & Endorsements 32,28,72 & 65 to Maelu Policies MF-108,MF-112,MF-61 & MF-93,respectively ML20154K8561988-05-18018 May 1988 Forwards Endorsements 93 & 94 to Maelu Policy MF-73 & Endorsements 106 & 107 to Nelia Policy NF-220 ML18093A8111988-04-28028 April 1988 Forwards Endorsements 102 & 103 to Nelia Policy NF-208, Endorsements 89 & 90 to Maelu Policy MF-77,Endorsements 100 & 101 to Nelia Policy NF-230 & Endorsements 84 & 85 to Maelu Policy MF-90 ML20151A6361988-03-28028 March 1988 Forwards Endorsements 1 & 2 to Nelia Certificates NW-96, NW-103 & NW-34 Respectively,Endorsements 1 & 2 to Maelu Certificates MW-32,MW-62 & MW-8 Respectively & Endorsement 140 to Nelia Policy NW-1 & Endorsement 43 to Policy MF-95 ML20148K1111988-03-22022 March 1988 Forwards Listed Endorsements to Listed Policies,Including Endorsement 102 to Maelu Policy MF-26,Endorsement 123 to Nelia Policy NF-76,Endorsement 71 to Maelu Policy MF-56 & Endorsement 89 to Nelia Policy NF-189 ML17347A6951988-03-17017 March 1988 Forwards Endorsement 71 to Nelia Policy NF-227,Endorsement 58 to Maelu Policy MF-88,Endorsement 88 to Nelia Policy NF-185 & Endorsement 75 to Maelu Policy MF-55 ML20150D4821988-02-23023 February 1988 FOIA Request for All Plans (Subsequent to Util 870807 Commitment to Excellence Action Plan) by Util to Commission Re Restart of Facility ML20147F8231988-02-18018 February 1988 FOIA Request for Documents Re Purchase,Shipment, Distribution,Installation & Removal of Asbestos & asbestos- Containing Products at Various Nuclear Power Stations in State of CT for Jan 1966 - Dec 1975 ML20148H0821988-01-12012 January 1988 Forwards Endorsements 105 & 16 to Nelia Policies NF-215 & NF-302 & Endorsements 87 & 10 to Maelu Policies MF-78 & MF-129 ML17342B0731988-01-0707 January 1988 Forwards Endorsements 69 & 70 to Nelia Policy NF-227, Endorsements 86 & 87 to Nelia Policy NF-185,Endorsements 56 & 57 to Maelu Policy MF-88 & Endorsements 73 & 74 to Maelu Policy MF-55 ML20236U2571987-11-0505 November 1987 FOIA Request for Documents Re Ball Type Main Steam Isolation Valves Used at Facilities ML20236F7221987-10-0202 October 1987 Forwards,On Behalf of Util,Request for Exemption Per 10CFR50.12(a)(2)(v).Fee Paid ML20235J0031987-09-21021 September 1987 Forwards Endorsements 122 & 123 to Nelia Policy NF-164, Endorsements 99 & 100 to Maelu Policy MF-44,Endorsements 100 & 101 to Nelia Policy NF-220 & Endorsements 87 & 88 to Maelu Policy MF-73 ML20214E3101987-05-11011 May 1987 Forwards Endorsements 120 & 97 to Nelia Policies NF-164 & NF-220 & Endorsements 97 & 84 to Maelu Policies MF-44 & MF-73,respectively ML18093A1291987-05-11011 May 1987 Forwards Endorsement 94 to Nelia Policy NF-230 & Endorsement 78 to Maelu Policy MF-90 ML17347A4841987-05-0707 May 1987 Forwards Endorsements 72,104,46,67,83,96 & 59 to Nelia Policies NF-238,NF-215,NF-252,NF-227,NF-185,NF-198 & NF-247 & Endorsements 60,86,27,54,70,82 & 51 to Maelu Policies MF-93,MF-78,MF-108,MF-88,MF-55,MF-66 & MF-102,respectively ML20206R9481987-04-10010 April 1987 Forwards Endorsements 15 & 9 to Nelia Policy NF-302 & Maelu Policy MF-129,respectively ML20235G2321987-04-0101 April 1987 FOIA Request for Documents Re Forged NDE Inspectors Certification Supplied by Barclay Intl for Use at Quad Cities Nuclear Station & Stated Investigations at Plants ML20207T6041987-02-26026 February 1987 Forwards Dept of Labor 870218 Final Decision Dismissing Case 86-ERA-9 Re JW Durham Vs Util & Butler Svc Group,Per Cw Whitney Request.W/Certificate of Svc ML20204F4841987-02-26026 February 1987 Forwards Endorsement 8 to Maelu Policy MF-129 & Endorsements 10,11,12,13 to Nelia Policy NF-302 ML20235B2741987-02-19019 February 1987 FOIA Request for Documents Indicated on Encl Docket Sheets. Request Does Not Encompass Matl Already Available in PDR or Lpdr Denoted by Three or Four Asterisks on List 1990-06-25
[Table view] |
Text
l Varsh&
. wgtennan J l i
M & M Nuclear Consultants I 1221 Avenueof the Americas New York, New Tork 10020-1011 Telephone 212 997-2000 January 12, 1988 Mr. Ira Dinitz Office of Nuclear Reactor Regulations Mail Stop 128 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Georgia Power
Dear Ira,
Enclosed are two copies each of the Master Worker Policy endorsements for E. Hatch (NF-215/MF-78) and Vogtle (NF-302/MF-129).
Please call me should you have any questions.
Regards, Luke J. anna Nuclear Consultant LJS:ef enc.
cc: C.L. Whatley, Southern Company J. Collins, M&M Atlanta i
l l
O f
l 8801270120 880112 s\\
PDP ADOCK 05000321 J DCD
Nuclear Energy Liability Insurance NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION AMENDMENT OF COVERAGE ENDORSEMENT FOR WORKERS CLAIMS (Facility Form)
PREAMBLE
- 1. The insurance and rating plan presently used by Nuclear Energy Liability Insurance Association ("NELIA") and Mutual Atomic Energy Liability Underwriters ("MAELU") do not make a distinction between workers claims arising from catastrophic events and those arising from lesser events;
- 2. NELIA and MAELU believe that the lack of such a distinc-tion will adversely affect their ability to continue to attract from world markets very large amounts of nuclear energy liability insurance for the nuclear industry;
- 3. NELIA and MAELU want to avoid this potential loss of capacity and to continue to provide nuclear energy lia-bility insurance for workers claims. Accordingly NELIA and MAELU desire to restructure their present insurance programs, including this policy, effective January 1, 1988.
NOW, THEREFORE, the Named Insured and the companies do hereby agree as follows:
- 1. DEFINITIONS When used in reference to this endorsement:
"this policy" means the policy of which this endorsement forms a part; ,
"nuclear related employment" means all work performed at one or more than one nuclear facility in the United States of America or in connection with the transporta-tion of nuclear material to or from any such facility.
All of a worker's nuclear related employment shall be considered as having begun on the first day of such employment, regardless of the number of employers in-volved or interruptions in such employment; "worker" refers to a person who is or was engaged in nuclear related employment; NE-64 (1/1/88) page 1
F "workers claims" means claims for damages because of bodily injury to a worker caused by the radioactive, toxic, explosive or other hazardous properties of nuc-lear material and arising out of or in the course of the worker's nuclear related employment; "extraordinary nuclear occurrence" means an event which the United States Nuclear Regulatory Commission has determined to be an "extraordinary nuclear occurrence" as defined in the Atomic Energy Act of 1954, or in any law amendatory thereof.
- 2. APPLICATION OF THIS ENDORSEMENT This endorsement applies only to such insurance as is afforded by this policy for workers claims which do not arise in whole or in part out of an extraordinary nuclear occurrence.
- 3. EXCLUSION OF NEW WORKERS CLAIMS This policy does not apply to bodily injury to a worker which arises in whole or in part out of nuclear related employment that begins on or after January 1, 1988.
- 4. APPLICATION OF POLICY TO WORKERS CLAIMS NOT EXCLUDED With respect to such insurance as is afforded by this policy for workers claims which are not excluded, Insuring Agreement IV does not apply and the following Insuring Agreement IV-A dces apply:
IV-A APPLICATION OF POLICY TO WORKERS CLAIMS This policy applies only to bodily injury (1) which is caused during the policy period by
- the nuclear energy hazard and (2) which is discovered and for which written claim is made against the insured not later than the close of December 31, 1997.
- 5. AVAILABILITY OF SUPPLEMENTAL INSURANCE NELIA and MAELU are offering to make insurance under one l or more Master Worker Policies available to all holders l of Nuclear Energy Liability Policies (Facility Form).
l THIS OFFER IS CONTINGENT ON SUFFICIENT SUPPORT FROM POLICYHOLDERS, AND MAY BE WITHDRAWN OR MODIFIED BY NELIA OR MAELU AS THEY DEEM NECESSARY OR APPROPRIATE.
l l The Master Worker Policies will provide, under their I
separate terms and conditions, coverage for new workers claims. Premiums will be subject to a separate Industry l Retrospective Rating Plan.
l l
NE-64 (1/1/88) !
Page 2
l o
1 i
l COVERAGE UNDER THE NEW MASTER WORKER POLICIES IS NOT AUTOMATIC. A WRITTEN REQUEST MUST BE SUBMITTED TO NELIA OR MAELU THROUGH REGULAR MARKET CHANNELS.
It is understood and agreed that all of the provisions of this endorsement shall remain in full force and effect without regard to this section 5, and without regard to whether or not the Named Insureds become insureds under the Master Worker Policies, or whether or not NELIA or MAELU terminate such policies or withdraw or modify their offer to underwrite such policies.
Executed for the companies Date /ftf
~h By T
. W , SAN /L' (Signatu're of' Authorized Officer)
John L. Quattrocchi . Vice President-liability Underwriting (Print or Type Name and Title of Officer)
Executed for the Named Insured Georgia Power Company (Named Insured - Print or Type)
Date // .L V -J'/~1 By hc Ly (Signatt(3$Vof Authorized Of ficer)
Warren Y. Jobe Executive Vice President (Print or Type Name and Title of Of ficer)
Executed for the Named Insured City of Dalton , Georgia (Named Insured - Print or Type)
Date th/87 By Ak (Signature u r && of Authorized Officer)
D E / 214.2 4.9 7 P,4A'Aro77 - /wWV (Print or Type Name and Title of Officer) l NE-64 (1/1/88) Page 3
Paga 4 Executed for the Named Insured Municipal Electric Authority of Georgia med Insur rint or Type)
Date //,f-/hk By fbgf/ M V y'(Signattfrg' of 'Authori d Of ficer)
Donald L. Stokley President and General Manager (Print or Type Name and Title of Officer)
Executed for the Named Insured
. Oglethorpe Power Corporation (Named Insured - Print or Type)
Date 12/18/87 By (Sigsfature of Authorized Officer)
Eugen Heckl Senior Vice President (Print or Type Name and Title of Officer)
This is to ccatify that this is a true copy of the origM Endorsement having the endorwment number ar.d being made r M of the Nudear Energy DaMity Po! icy Wacility Form) as de4-sna dhereon.NoI uragceiseffot/Wdhereundcr.
J%
2 t*rocetu, We Proesdent lubt r An eticm Nucleu lnsurers Effective Date of this Endorsement January 1. 1988 To form a part of Policy No NF-215 12:01 A.M. Standard Time Issusd to Georaia Power Company, 00lethorpe Power Corporation, Municipal Electric Authority of Georgia and City of Dalton, Georgia Dato of Issue October 19.19R7 For the subscribing companies By 4' '30 .1 General Manager Endorsement No 105 countersigned by NE-64 (1/1/88)
4 o I Nuclear Energy Liability Insurance l MUTUAL ATOMIC ENERGY LIABILITY UNDERWRITERS i
AMENDMENT OF COVERAGE ENDORSEMENT FOR WORKERS CLAIMS (Facility Form)
FREAMBLE
- 1. The insurance and rating plan presently used by Mutual Atomic Energy Liability Underwriters ("MAELU") and Nuclear Energy Liability Insurance Association ("NELIA")
do not make a distinction between workers claims arising from catastrophic events and those arising from lesser events;
- 2. MAELU and NELIA believe that the lack of such a dis-tinction will adversely affect their ability to continue to attract from world markets very large amounts of nuclear energy liability insurance for the nuclear industry;
- 3. MAELU and NELIA want to avoid this potential loss of capacity and to continue to provide nuclear energy lia-bility insurance for workers claims. Accordingly MAELU and NELIA desire to restructure their present insurance programs, including this policy, effective January 1, 1988.
NOW, THEREFORE, the Named Insured and the companies do hereby agree as follows:
- 1. DEFINITIONS When used in reference to this endorsement:
"this policy" means the policy of which this endorsement forms a part; "nuclear related employment" means all work performed at one or more than one nuclear facility in the United States of America or in connection with the transporta-tion of nuclear material to or from any such facility.
All of a worker's nuclear related employment shall be considered as having begun on the first day of such employment, regardless of the number of employers involved or interruptions in such employment; "worker" refers to a person who is or was engaged in nuclear related employnent; ME-64 (1/1/88) Page 1
h "workers claims" means claims for damages because of bodily injury to a worker caused by the radioactive, toxic, explosive or other hazardous properties of nuc-lear material and arising out of or in the course of the worker's nuclear related employment; "extraordinary nuclear occurrence" means an event which the United States Nuclear Regulatory Commission has determined to be an "extraordinary nuclear occurrence" as defined in the Atomic Energy Act of 1954, or in any law amendatory thereof.
- 2. APPLICATION OF THIS ENDORSEMENT This endorsement applies only to such insurance as is afforded by this policy for workers claims which do not arise in whole or in part out of an extraordinary nuclear occurrence.
- 3. EXCLUSION OF NEW WORKERS CLAIMS This policy does not apply to bodily injury to a worker which arises in whole or in part out of nuclear related employment that begins on or after January 1, 1988.
- 4. APPLICATION OF POLICY TO WORKERS CLAIMS NOT EXCLUDED With respect to such insurance as is afforded by this policy for workers claims which are not excluded, Insuring Agreement IV does not apply and the following Insuring Agreement IV-A does apply:
IV-A APPLICATION OF POLICY TO WORKERS CLAIMS This policy applies only to bodily injury (1) wnich is caused during the policy period by the nuclear energy hazard and (2) which is discovered and for which written claim is made against the insured not later than the close of Decerter 31, 1997.
- 5. AVAILABILITY OF SUPPLEMENTAL INSURANCE MAELU and NELIA are offering to make insurance under one or more Master Worker Policies available to all holders of Nuclear Energy Liability Policies (Facility Form).
THIS OFFER IS CONTINGENT ON SUFFICIENT SUPPORT FROM POLICYHOLDERS, AND MAY BE WITHDRAWN OR MODIFIED BY MAELU OR NELIA AS THEY DEEM NECESSARY OR APPROPRIATE.
The Master Worker Policies will provide, under their separate terms and conditions, coverage for new workers claims. Premiums will be subject to a separate Industry Retrospective Rating Plan.
ME-64 (1/1/88) Page 2
COVERAGE UNDER THE NEW MASTER WORKER POLICIES IS NOT AUTOMATIC. A WRITTEN REQUEST MUST BE SUBMITTED TO MAELU OR NELIA THROUGH REGULAR MARKET CHANNELS.
It is understood and agreed that all of the provisions of this endorsement shall remain in full force and effect without regard to this Section 5, and without regard to whether or not the Named Insureds become insureds under the Master Worker Policies, or whether or not MAELU or NELIA terminate such policies or withdraw or modify their offer to underwrite such policies.
Executed for the companies Date /!V!
/
By .M, // .
\J (SignaEure oT AutfiolIzed Of ficer)
John L. Quattrocchi, Vice President-Liability Underwriting (Print or Type Name and Title of Officer)
Executed for the Named Insured Georgia Power Company (Named Insured - Print or Type)
Date ll~d V- ?/ By l bn.w V ~~
(Signature /WAuthorized Of ficer)
Warren Y. Jobe Executive Vice President (Print or Type Name and Title of Of ficer)
Executed for the Named Insured City of Dalton , Georgia (Named Insured - Print or Type)
Date /W//87 By o8 a W 6PM~
(Signature of Authoriz.ed Officer)
Z76AceLC97 P,ageorr Gu eeet w,cce,/ -
(Print or Type Name and Title o'f Of ficer)
ME-64 (1/1/88) Page 3
. Pcgs 4 Executed for the Named Insured Municipal Electric Authority of Georgia d Insure r or Type)
Date (b/5-87 By aff A//M Mic) nature,6f futhoriz
~
officer)
Donald L. Stokley President and General Manager (Print or Type Name and Title of Officer)
Executed for the Named Insured Oglethorpe Power Corporation (Named Insured - Print or Type)
Date 12/18/87 By & ~
(Sgnatiure of Authorized Officer)
Eugen Heckl Senior Vice President (Print or Type Name and Title of officer)
Tiss is to certify that this is a true copy cd the odginal Endorsement having the endorschant -
oft and being made part ignat . Nuclear her Energy Liabcity Poucyp semy Form) as de-No rcunder.
M.n L mocchi. Vre Pros, dent thb3fy Undentt:ing Arnencen Nudear insurets Effsetive Date of To form a part -
this Endorsement January 1, 1988 of Policy No MF-78 12:01 A.M. Standard Time Issusd to _ Georaia Power Company, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia and City of Dalton, Georgia Dste of Issue October 19, 1987 For the Subscribing Companies MUTUAL ATOMIC ENERGY LIABILITY ERWRITERS By l
Endorsement No 87 Countersigned by Authorized Representative ME-64 (1/1/88)
. % 1
'.* Nuclear Energy LiabiHty Insurance NUCLEAR ENERGY LIADILITY INSURANCE ASSOCIATION i AMENDMENT OF COVERAGE ENDORSEMENT FOR WORKERS CLAIMS (Facility Form)
PREAMBLE i l
- 1. The insurance and rating plan presently used by Nuclear Energy Liability Insurance Association ("NELIA") and Mutual Atomic Energy Liability Underwriters ("MAELU") do not make a distinction between workers claims arising from catastrophic events and those arining from lesser events;
- 2. NELIA and MAELU believe that the lack of such a distinc-tion will adversely affect their ability to continue to-attract from world markets very large amounts of nuclear energy liability insurance for the nuclear industry;
- 3. NELIA and MAELU want to avoid this potential loss of capacity and to continue to provide nuclear energy lia-bility insurance for workers claims. Accordingly NELIA and MAELU desire to restructure their p: esent insurance programs, including this policy, effective January 1, 1988.
NOW, THEREFORE, the Named Insured and the companies do hereby agree as follows:
- 1. DEFINITIONS When used in reference to this endorsement:
"this policy" means the policy of which this endorsement forms a part; "nuclear related employment" means all work performed at one or more than one nuclear facility in the United States of America or in connection with the transporta-tion of nuclear material to or from any such facility.
All of a worker's nuclear related employment shall be considered as having begun on the first day of such employment, regardless of the number of employers in-volved or interruptions in such employment; "worker" refers to a person who is or was engaged in nuclear related employment; NE-64 (1/1/88) page 1
"workers claims" means clairc for. damages because of bodily injury to a worker used by the radioactive, toxic, explosive or other h .ardous properties of nuc-lear material and arising out of or in the caurse of the worker's nuclear related employment; "extraordinary nuclear occurrence" means an event which the United States Nuclear Regulatory Commission has determined to be an "extraordinary nuclear occurrence" as defined in the Atomic Energy Act of 1954, or in any law amendatory thereof.
- 2. APPLICATION OF THIS ENDORSEMENT This endorsement applies only to such insurance as is afforded by this policy for workers claims which do not arise in whole or in part out of an extraordinary nuclear occurrence.
- 3. EXCLUSION OF NEW WORKERS CLAIMS This policy does not apply to bodily injury to a worker ,
which arises in whole or in part out of nuclear related employment that begins on or after January 1, 1988.
- 4. APPLICATICN OF POLICY TO WORKERS CLAIMS NOT EXCLUDED With respect to such insurance as is afforded by this policy for workers claims which are not excluded, Insuring Agreement IV does not apply and the following Insuring Agreement IV-A does apply:
IV-A APPLICATION OF POLICY TO WORKERS CLAIMS This policy applies only to bodily injury (1) which is caused during the policy period by the nuclear energy hazard and (2) which is discovered and for which written claim is made against the insured not later than the close of December 31, 1997.
- 5. AVAILABILITY OF SUPPLEMENTAL INSURANCE NELIA and MAELU are offering to make insurance under one
( or more Master Worker Policies available to all holders l of Nuclear Energy Licbility Policies (Facility Form).
THIS OFFER IS CONTINGENT ON SUFFICIENT SUPPORT FROM POLICYHOLDERS, AND MAY BE WITHDRAWN OR MODIFIED BY NELIA OR MAELU AS THEY DEEM NECESSARY OR APPROPRIATE.
l The Master Worker Policies will provide, under their i
separate terms and conditions, coverage for new workers l claims. Premiums will be subject to a separate Industry Retrospective Rating Plan.
l NE-64 (1/1/88) page 2 l
-B COVERAGE UNDER THE NEW MASTER WORKER POLICIES IS NOT AUTOMATIC. A WRITTEN REQUEST MUST BE SUBMITTED TO NELIA OR MAELU THROUGH REGULAR MARKET CHANNELS.
It is understood and agreed that all of the provisions of this endorsement shall remain in full force and effect without regard to this Section 5, and without regard to whether or not the Named Insureds become insureds under the Master Worker Policies, or whether or not NELIA or MAELU terminate such policies or withdraw or modify their offer to underwrite such policias.
Executed for the companies Date /!t/!((
I '
By d\.T_ s- A
" (Signa'Eu'Pe ~o~f Authorized Of ficer)
John L. Quattrocchi . Vice President-Liability Urldenvriting (Print or Type Name and Titl=a of Of ficer)
Executed for the Named Insured Georgia Powe* Company (Named Insured - Print or Type)
Date ll*W -f"Y By lA.l %_ V _
(Signature of4Xuthorized Officer)
Warren Y. Jobe Executive Vice President (Print or Type Name and Title of Of ficer)
Executed for the Named Insured City of Dalton, Georgia (Named Insured - Print or Type)
Date _/2.h!87 By Aht&M _ .
~ ' "
(Jignature of Authorized officer)
Geeero/
DECC2.CCS~ i PAW Ro77- A-tmger-(Print or Type Name and Title of officer)
NE-64 (1/1/88) Page 3
.o PEgo 4 k
Executed for the Named Insured i Municipal Electric Authority of Georgia (N Insure -
rint or Type)
Date />fd% D By WY Hif A V(S'icinatuth'of'Ailf.horiped Of ficer)
P M benk*anbO b ral Manager (Print or Type Name and Title of Officer)
[ Executed for the Named Insured -
Oglethorpe Power Corporation (Named Insured - Print or Type)
Date 12/1g/A7 By w ~
(SAnatu're of Authorized Officer)
Eugen Heckl Senior Vice President (Print or Type Name and Title of Of ficer)
Wisis to cert!fy that this
@ and beingmodo part Endarsement hav' v3 u the g 39 pg) as des-of th Nuclear EncrwM creunder.
John L
" = s " L & s d er&-
"'" ' N gg.Nuchar Insurus Effective Date of this Endorsement January 1. 1988 To form a part of Policy No NF-302 l 12:01 A.M. Standard Time Issusd to Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, City of Dalton, Georgia Dato of Issue October 19.19R7 For the subscribing companies l l By ' '0
- s .
General Manager Endorsement No 16 Countersigned by NE-64 (1/1/88)
. Nuclear Energy Liability Insurance MUTUAL ATOMIC ENERGY LIABILITY UNDERWRITERS AMENDMENT OF COVERAGE ENDORSEMENT FOR WORKERS CLAIMS (Facility Form)
PREAMBLE
- 1. The insurance and rating plan presently used by Mutual Atomic Energy Liability Underwriters ("MAELU") and Nuclear Energy Liability Insurance Association ("NELIA")
do not make a distinction between workers claims arising from catastrophic events and those arising from lesser events;
- 2. MAELU and NELIA believe that the lack of such a dis-tinction will adversely affect their ability to continue to attract from world markets very large amounts of nuclear energy liability insurance for the nuclear industry;
- 3. MAELU and NELIA want to avoid this potential loss of capacity and to continue to provide nuclear energy lia-bility insurance for workers claims. Accordingly MAELU and NELIA desire to restructure their present insurance programs, including this policy, effective January 1, 1988.
NOW, THEREFORE, the Named Insured and the companies do hereby agree as follows:
- 1. DEFINITIONS When used in reference to this endorsement:
"this policy" means the policy of which this endorsement forms a part; "nuclear related employment" means all work performed at one or more than one nuclear facility in the United
. States of America or in connection with the transporta-tion of nuclear material to or from any such facility.
All of a worker's nuclear related employment shall be considered as having begun on the first day of such employment, regardless of the number of employers involved or interruptions in such employment; "worker" refers to a person who is or was engaged in nuclear related employment; l
ME-64 (1/1/88) Page 1
"workers claims" means claims for damages because of bodily injury to a worker caused by the radioactive, toxic, explosive or other hazardous properties of nuc-lear material and arising out of or in the course of the worker's nuclear related employment; "extraordinary nuclear occurrence" means an event which the United States Nuclear Regulatory Commission has determined to be an "extraordinary nuclear occurrence" as defined in the Atomic Energy Act of 1954, or in any law amendatory thereof.
- 2. APPLICATION OF THIS ENDORSEMENT This endorsement applies only to such insurance as is afforded by this policy for workers claims which do not arise in whole or in part out of an extraordinary nuclear occurrence.
- 3. EXCLUSION OF NEW WORKERS CLAIMS This policy does not apply to bodily injury to a worker which arises in whole or in part out of nuclear related employment that begins on or after January 1, 1988.
- 4. APPLICATION OF POLICY TO WORKERS CLAIMS NOT EXCLUDED With respect to such insurance as is af forded by this policy for workers claims which are not excluded, Insuring Agreement IV does not apply and the following Insuring Agreement IV-A does apply:
IV-A APPLICATION OF 'OLICY TO WORKERS CLAIMS This policy applies only to bodily injury (1) which is caused during the policy period by the nuclear energy hazard and (2) which is discovered and for which written claim is made against the insured not later than the close of December 31, 1997.
- 5. AVAILABILITY OF SUPPLEMENTAL INSURANCE MAELU and NELIA are offering to make insurance under one or more Master Worker Policies available to all holders of Nuclear Energy Liability Policies (Facility Form).
THIS OFFER IS CONTINGENT ON SUFFICIENT SUPPORT FROM POLICYHOLDERS, AND MAY BE WITHDRAWN OR MODIFIED BY MAELU OR NELIA AS THEY DEEM NECESSARY OR APPROPRIATE.
The Master Worker Policies will provide, under their separate terms and conditions, coverage for new workers claims. Premiums will be subject to a separate Industry Retrospective Rating Plan.
ME-64 (1/1/88) Page 2
e COVERAGE UNDER THE NEW MASTER WORKER POLICIES IS NOT AUTOMATIC. A WRITTEN REQUEST MUST BE SUBMITTED TO MAELU OR NELIA THROUGH REGULAR MARKET CHANNELS.
It is understood and agreed that all of the provisions of this endorsement shall remain in full force and effect without regard to this Section 5, and without regard to whether or not the Named Insureds become insureds under the Master Worker Policies, or whether or not MAELU or NELIA terminate such policies or withdraw or modify their offer to underwrite such policies.
Executed for the companies Date / V' hBy . M . by -
./ A T (Signature of ~Authorihed--6f ficer)
John L. Quattrocchi, Vice President-Liability Underwritina (Print or Type Name and Title of Officer)
Executed for the Named Insured Georgia Power Company (Named Insured - Print or Type)
Date ll-1V- ? ? By $ vt.r- Li (Signature /eJ/ Authorized of ficer)
WarrenY.J5be Executive Vice President (Print or Type Name and Title of Officer)
Executed for the Named Insured City of Dalton, Georgia (Named Insured - Print or Type)
Date /2///A7 By A %swt d f a g (Signature of Authorized Officer)
M EA'S7 FABA *W- pre $a (Print or Type Name and Title 'of Of ficer)
ME-64 (1/1/88) Page 3
Pago 4 Executed for the Named Insured Municipal Electric Authority of Georgia ed Insu - Pr nt or Type)
Date /,4-/N '
By ~ p
"(Signaturs of Author' zed Of ficer)
Donald L. Stokley President and General ger (Print or Type Name and Title of Officer)
Executed for the Named Insured 00lethorpe Power Corporation (Named Insured - Print or Type)
C Date 12/18/87 By /s 1Sigtfature of Authorized Officer)
Eugen Heckl Senior Vice President (Print or Type Name and Title of Of ficer)
'Ihis is to cutify that this is a true cop; of the orignal Endorsement having the endorsement number and being made part lear Energy Liability Po6cy( Form) as des-ofthe '* hereunder.
ignate etcon. No 3
ttrocchi,% Preudenttiat4ty sina John L.
Anwrkan Nudear Insem Effective Date of To form a part this Endorsement January 1.1983 of Policy No MF-129 12:01 A.M. Standard Time Issusd to nonraia Power Company. 0alethorpe Power Corporation. Municipal Electric Auth6rity of Georgia, City of Dalton, Georgia Dato of Issue October 19. 1987 For the Subscribing Companies MUTUAL ATOMIC ENERGY LIABILITY ERWRITERS By i
Endorsement No 10 countersigned by Authorized Representative ME-64 (1/1/88)