ML20134P214

From kanterella
Revision as of 20:35, 20 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Provides Licensed Operator Training Staff W/Advanced Copy of NUREG-1021, Operator Licensing Exam Stds for Power Reactors, Interim Rev 8.W/o Encl
ML20134P214
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/20/1997
From: Brockman K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Terry C
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
References
RTR-NUREG-1021 NUDOCS 9702250202
Download: ML20134P214 (5)


Text

- - - , , - . - - - - - . . - - - - . - - . .. - - . - . - . . - . . . ~ . ~ , - . . . -

+

f* "'% qt U25tT ED STATES 1

  • It p .,.

g o NUCLEAR REGULATORY COMMISSION

{, .. $

REGloN IV 8 $

611 RYAN PLAZA oRIVE, sulTE 400 9...../ art.INGToN, TEXAS 760118064 FEB 2 01997  !

Mr. C. L. Terry TU Electric Group Vice President, Nuclear '

ATTN: Regulatory Affairs Department -

P.O. Box 1002 Glen Rose, Texas 76043  !

SUBJECT:

ISSUANCE OF INTERIM REVISION 8 OF NUREG-1021, " OPERATOR LICENSING EXAMINATION STANDARDS FOR POWER REACTORS"

Dear Mr. Terry:

The purpose of this letter is to provide your licensed operator training staff with an ,

advance copy of NUREG-1021," Operator Licensing Examination Standards for Power Reactors," Interim Revision 8. Due to the length of this document, a copy is attached only to our contact on your training staff listed below. Formal publication and normal distribution is expected by the end of February 1997. Because this is an early copy, minor i l font and pagination changes may be expected when compared to the distribution copy. >

Also enclosed, to the same contact, is a single electronic version on diskette of the '

document in a compressed format. Additional electronic copies are available via the

[ Internet at URL http://www.nrc. gov /NRC/NUREGS/SR1021/index.html.  !

l As noted in the formal publication of the interim revision, it will be required for initial license examinations administered 6 months after its publication date and may be adopted sooner at your option.

if you have questions or comments, please contact John L. Pellet, Chief, Operations l Branch, at (817) 860-8159.

I Sincerely, m 3_ _

p Kenneth E. Brockman, Acting Director ]

Division of Reactor Safety ,

Docket Nos.: 50-445;50-446 License Nos.: NPF-87; NPF-89 l

J 1

I

\

A hh45 V PDR d

l

Entergy Operations, Inc. cc w/ enclosures:

S. Falley, Operations Training Manager TU Electric Comanche Peak SES P.O. Box 1002 Glen Rose, Texas 76043-1147 cc w/o enclosures:

Mr. Roger D. Walker TU Electric Regulatory Affairs Manager P.O. Box 1002 Glen Rose, Texas 76043 Juanita Ellis +

President - CASE 1426 South Polk Street Dallas, Texas 75224 TU Electric Bethesda Licensing 3 Metro Center, Suite 610 Bethesda, Maryland 20814 George L. Edgar, Esq.

Morgan, Lewis & Bockius 1800 M. Street, NW Washington, D.C. 20036 G. R. Bynog, Program Manager /

Chief Inspector Texas Department of Licensing & Regulation Boiler Division '

P.O. Box 12157, Capitol Station Austin, Texas 78711 Honorable Dale McPherson l County Judge  !'

P.O. Box 851 Glen Rose, Texas 76043 l l

Texas Radiation Control Program Director l 1100 West 49th Street l Austin, Texas 78756 )

l

d i

Entergy Operations, Inc. j John Howard, Director Environmental and Natural Resources Policy Office of the Governor P.O. Box 12428  ;

Austin, Texas 78711 i

l l

l l

1

)

l l

l i

J

9 r e

Entergy Operations, Inc.  ;

l E-Mail report to T. Boyce (THB)  !

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK) bec to DMB (1E42) bec distrib. by RIV:  ;

Regional Administrator Resident inspector  ;

DRP Director MIS System -

Branch Chief (DRP/C) RIV File r Project Engineer (DRP/C) DRS-PSB Branch Chief (DRP\TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10) .

S. Richards, NRR I

f l l i-l \

f i I r

r I

t DOCUMENT NAME: G:\DRSLTRS\NURG1021\CP.JLP To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy f C:OB:DRS ,l EC AD:DRS N .

I JLPellet /)) KEBrockman

  • 02/ /97 02M97 OFFIClAL RECORD COPY  !

6 Entergy Operations, Inc. E-Mail report to T. Boyce (THB)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK) bec to DMB (1E42) bec distrib. by RIV:

Regional Administrator Resident inspector DRP Director MIS System Branch Chief (DRP/C) RIV File Project Engineer (DRP/C) DRS-PSB Branch Chief (DRP\TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

S.~ Richards, NRR DOCUMENT NAME: G:\DRSLTRS\NURG1021\CP.JLP To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy C:OB:DRS _l f(, AD:DRS N JLPellet [)) KEBrockman 02j$97 vr 02/ /97 OFFICIAL RECORD col 8Y

\

0

,?5001 y