05000423/LER-1997-005, Corrects Numbering Inconsistency in Commitments Addressing LER 97-005-00

From kanterella
Revision as of 07:49, 20 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Corrects Numbering Inconsistency in Commitments Addressing LER 97-005-00
ML20135C810
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/25/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
B16295, NUDOCS 9703040307
Download: ML20135C810 (3)


LER-2097-005, Corrects Numbering Inconsistency in Commitments Addressing LER 97-005-00
Event date:
Report date:
4232097005R00 - NRC Website

text

. ._

ggg flope Ferry Rd. (floute 1T,6), Waterford, Ur 06335 Nuclear Energy stai,ione Noci,.r ro.er siation Northeut Nuclear Energy Cornpany P.O. Ikix 128 Waterford, Ur 06385-0128 (860) 447-1791 Fax (860) 444 4277 The Northeast Utilities Systern February 25,1997 Docket No. 50-423 B16295 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit No. 3 Incorrect Commitment Numbering Licensee Event Reecr_t LLFR) 07-005-00 1

In a letter dated February 13, 1997, b ortheast Nuclear Energy Company (NNECO) submitted LER 97-005-00. The attachment to the letter provided NNECO's commitments made in the LER. Those commitments were incorrectly numbered. The attachment to this letter corrects that numbering inconsistency. All other conditions identified in the February 13,1997 letter remain as submitted.

1 Very truly yours, NO UC ENERGY COMPANY

' l A

G. .i #

irector - Millstone Unit No. 3 9703040307 970225 3 l PDR ADOCK 0500 s

Attachment:

1) NNECO's commitments in response to LER 97-005-00 cc: H. J. Miller, Region i Administrator A. C. Cerne, Senior Resident Inspector, Millstone Unit No. 3 l J. W. Andersen, NRC Project Manager, Millstone Unit No. 3  ;

J W. . R ms, r., ire t r, Special Projects -

7 ,7 [

040068 It

= = = - -

Inspappgggs i

Docket No. 50-423 B16295 f

i i

t t

I i

Attachment 1 Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments In' Response To -

(LER 97-005-00)  !

i l

1 l

i l

1

)

I i a l l February 1997

)

4 i

U.S. Nuclocr Regulatory Commission  ;

B162Q5\ Attachment 1\Page 2 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document. i Any other actions discussed in the submittal represent intended or planned actions by NNECO. They are described to the NRC for the NRC's information and are not regulatory commitments. Please notify the Manager - Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.

Number Commitment Due B16206-01 The requn ed PMs for the safety related 4160 volt March 15,1997 breakers will be completed.

B16206-02 The procedure controlling " Conduct of May 1,1997 ,

Maintenance" will be revised to include the expectations for the use of tools and test equipment.

B16206-03 Electrical, Mechanical, and I&C Department March 15,1997 i '

procedures will be reviewed to identify instruments and tools that require calibration.