ML20136B826

From kanterella
Revision as of 11:40, 19 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Recommends That Board Be Notified of Allegations Re Protective Coatings at Facility Due to Applicability to ASLB Hearing as Licensing Issue & Items Associated W/Safety Significance
ML20136B826
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/18/1984
From: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML20136B196 List:
References
FOIA-84-779 NUDOCS 8511200293
Download: ML20136B826 (2)


Text

. . .

y - S y - f ~> 2 h . . * " " . ,,, umTE:: STATE s

<s gf, ,

' [ .. ' ~

Y NUCLEAR REGULATORY COr.1MISSICN

, b REGloN IV

, i // 611 RYAN PLAIA cRIVE. SUITE 1000 -

ARLINGTON. TEXAS 76011 g i t. M MEMORANDUM FOR: Darrell G. Eisenhut, Director, Division of Licensing, NRR FRCM: John T. Collins, Regional Administrator

SUBJECT:

PROPOSED BOARD NOTIFICATION - COMANCHE PEAK PROTECTIVE COATINGS ALLEGATIONS THAT HAVE SEEN IDENTIFIED AND PREVIOUSLY FORWARDED TO TEXAS UTILITIES ELECTRIC COMPANY

)

A total of 60 allegations related to the Comanche Peak Steam Electric Station protective coatings program have been identified. These allegations have been forwarded to the licensee for their technical review, corrective . actions, and preventative measures.

The licensee is in the process of completion of application of protective coatings on Unit 1. Three inspections have been performed at Comanche Peak Steam Electric Station during 1984 to date. These inspections have been perfctmed by our contractor, Brookhaven National Laboratory (BNL). The interim findings from these inspections are under review and Region IV is currently planning to request that Texas Utilities Electric Company assess and report the safety significance of these concerns. No NRC inspection recorts on protective coatings inspection results by Brookhaven National Laboratory have been written to date.

Because of the applicability of the protective coatings to the Comanche Peak Steam Electric Station ASLB Hearing as a licensing issue and items associated

with safety significance, I am recommending that the Board be notified immediately of this potential area of concern. --

1 We will continue to keep you advised as to the disposition of this matter.

If additional information is required, contact D. M. Hunnicutt (723-8I37) or R. L. Bangart (728-3249).

f- Y J

,A,ta/ s - .i 't -

John T. Collins

Attachment:

Allegations cc:

G. Edison, LBI T. A. Ippolito, NRR 8511 0293 OIA e51025 E. Case, NRR PDR PDR R. CeYoung, OIE GARDEB4-779 S. Trecy, ELD l S. Eurwell, NRR '

'A : n (J J J

bec to DMS ( /f5/ )

bcc distrib. by RIV:

RPB1 RPS2 D. Hunnicutt, TF RRI - OPS RRI - CONST J. Collins, RA C. Wisner, PA0 R. Denise, DRSP R. Bangart, TF S. Treby, ELD RIV File TEXAS STATE DEPT. OF HEALTH Juanita Ellis Renea Hicks Billie Pirner Garde lLMw d

e t

a