ML20136C328

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 445/84-05 on 840106-0313.Allegation Reviews Encl
ML20136C328
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 07/11/1984
From: Bangart R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Bradley Jones
AFFILIATION NOT ASSIGNED
Shared Package
ML20136B196 List:
References
FOIA-84-779 NUDOCS 8511210074
Download: ML20136C328 (6)


Text

._

g Q -? 3 t 3 l (l- -

l l

i i

Mr. B. R. Jonas

Dear Mr. Jones:

Enclosed is a copy of NRC Inspection Report 50-445/84-05 resulting from the special inspection conducted during the period January 6 through March 13, 1984, at the Comanche Peak Facility, Unit 1. If you have questions concerning our inspection program or the contents of this report, then please contact this office.

We appreciate your interest and concerns in the safety of this licensee's activities.

Sincerely, brigini St raa sy; tie:m rd L. sersad 1

Richard L. Bangart, Director Region IV Comanche Peak Task Force

Enclosure:

As stated I l

.- 1

., bcc w/o enc 1. --

J. T. Collins ,

T. Ippolito, NRR RRI-Censt.

RRI-Ops .

L. Martin C. Oberg -

D. Hunnicutt ,

RPB2 T. Westerman / e R. L. Bangart h f4851025 PDR -c TA TF eV TL/Th l A 2 EO k D Q'

' k'b/0 &P WCSeidle/nh CROMrg LEMA rt in DMHunnicutt TFWe ste rman Rt1 ngart PS h'eck 7/tc /84 7/l0/84 7//0/84 7/jo/84 7/ 10/84 7/jC/84 7/; ,/84 _

7 L' i

<) ~

V

v ALLEGATION REVIEW Date: 01/10/85 CASE NUMBER 4-83-A-073 DATE OPENED 09/12/83 FACILITY NAME CPSES 50-445/446 SUBJECT Deficiencies in Coating Program SOURCE OF ALLEGATION Contractor Employee NUMBER OF ALLEG.

ASSIGNED TO Task Force CROSS REF. NO. Q4-83-026 ACTION SCHEDULED Special Inspection FIRST/LAST NAME D. Hunnicutt DATE ASSIGNED 10/25/83 REPORT NUMBER 1st:

2nd:

Lst:

FTS NUMBER 8-728-8100 DUE DATE ALLEGATION SUBSTANT SORT CODE A DATE CLOSED ACTION OFFICE RIV MAN HOURS REPORT PREPARATION ASSIST DETAILS: Allegations that there are problems in: (1) Material Storage; ~'

(2) Workmanship; (3) Satisfying ANSI Requirements; and (4) Possibly coating -

integrity. Plan at present is to have RIII inspector assist in followup. The f M } memo is the basis for t,his allegation. Brookhaven National Laboratory had been contracted to assist. W has been interviewed by RIV.

Supplemental to Q4-83-026 has been provided to RIV with the TUGCo interview of l M attached. OI Investigation 4-83-001 Technical issues to be inspected 'c as part of this effort. Task Force letter of May 18, 1984, provided TUEco with, 60 related coating allegations. OI Investigation 4-83-001 released to the ASLB by ELD. OI Investigation 4-83-001 released to the ASLB by ELD.

REFERENCE:

Q4-83-022/0IR4-83-0072, BNL Letters of January 16, 24, and February 16, 1984.  ;

I I

/

l

ALLEGATION REVIEW Date: 01/10/85 CASE NUMBER 4-83-A-052 DATE OPENED 07/11/83 l FACILITY NAME CPSES 50-445/446 SUBJECT Inv. Re: Atchison Co-Workers /Discouragemnt.

RIV Administrative SOURCE OF ALLEGATION Request NUMBER OF ALLEG. 1 ASSIGNED TO Task Force CROSS REF. NO. 4-83-013 ACTION SCHEDULED Investigation FIRST/LAST NAME R. Herr DATE ASSIGNED 07/15/83 REPORT NUMBER 1st:

2nd:

Lst:

FlS NUMBER 8-728-8100 DUE DATE ALLEGATION SUBSTANT SORT CODE O DATE CLOSED ACTION OFFICE RIV MAN HOURS REPORT PREPARATION ASSIST DETAILS: In followup to pending enforcement action, OI was requested by RIV --

Regional Administrator to investigate Atchison co-workers to determine if -

discouragement is a pervasive problem. Both 01 Inv. report to be reviewed for further technical issued (including all attachments). Two 01 Inv Reports

,4-83-013 and 4-84 006 have been released. Inspection of OI interviews of needs to be scheduled. Dillingham transcript is being inspec eo as part of 4- -A-34. Task force has action. '-

we e

ALLEGATION REVIEW Oate: 01/10/85 CASE NUMBER 4-83-A-006 DATE OPENED 01/20/83 )

FACILITY NAME CPSES 50-445/446 i SUBJECT Alleged defective pipe hangers SOURCE OF ALLEGATION (from Gap)

NUMBER OF ALLEG. 1 ASSIGNED TO RPS 0 CROSS REF. NO. A4-83-01 ACTION SCHEDULED Closed FIRST/LAST NAME D. Hunnicutt DATE ASSIGNED 02/28/83 REPORT NUMBER 1st: 83-10 2nd:

Lst:

FTS NUMBER 8-728-8100 DUE DATE ALLEGATION SUBSTANT 01/01 SORT CODE X DATE CLOSED 03/23/83 ACTION OFFICE RIV MAN HOURS REPORT PREPARATION ASSIST DETAILS: hllllf alleges that some hanger welds at CPSES are faulty. Details a3 to locations have been provided to RIV. Subs antiated that one weld was -

faulty. This weld was performed by himself. A Notice of Violation was issued. '

W me m

(3,-lE'

ALLEGATION REVIEW Date: 01/10/85 CASE NUMBER 4-83-A-066 DATE OPENED 08/29/83 FACILITY NAME CPSES 50-445/446 SUBJECT Intimidation of Electri-cal Craft Personnel l SOURCE OF ALLEGATION B&R Electrician NUMBER OF ALLEG. 1 ASSIGNED TO Task Force CROSS REF. NO. Q4-83-021 ACTION SCHEDULED Discussed with TUGC0 Management / Followup TUGC0 Findings FIRST/LAST NAME D. Hunnicutt DATE ASSIGNED 09/01/83 REPORT NUMBER 1st:

2nd:

Lst:

FTS NUMBER 8-728-8100 DUE DATE ALLEGATION SUBSTANT SORT CODE A DATE CLOSED ACTION OFFICE RIV MAN HOURS REPORT PREPARATION ASSIST DETAILS: I alleges workers not given time to read S-0910

manual and not allowed to refer to it during normal working hours. Memo to -

close provided by E. Johnson. Letter was not sent to alleger. Task Force has taken over.

me e

Allegatior, h:;. A-82-49 ALLEGATION REVIEW l SU5 JECT: ALLEGED DISCRIMINATIDA i

FACILITY AND DOCKET N3.: CPSES ALLEGER NAME:

ADDRESS: I TELE. NO.:

POSITION / TITLE:

SOURCE OF ALLEGATION: Cnarles Atchison DETAILS:

Allegation is that Stinson was fired for attert;:tinc to submit ar' NCE on Hilti bolt installation ~

ACTION ASSIGNED T0: Inquiry Q4-82-0011 DISPOSITION: Closed e

4 1

1 ee o

i -

g I7

.---_---.___.-.-:--._.