MONTHYEARML20206C8331999-04-26026 April 1999 Summary of 980929 Meeting with Texas Utilities Electric Co Re Licensing Submittals Requesting Exemption to App K & Topical Rept Submitted in Support of Exemption Request .List of Attendees Encl ML20236X4431998-08-0505 August 1998 Summary of 980814 Meeting W/Util Re Use of Caldon Leading Edge Flow Meter for App K Exemption & Power Uprate License Amend on 980714.List of Meeting Attendees Encl ML20198H4361997-12-24024 December 1997 Summary of 971112 Meeting W/Util at NRC Ofcs to Discuss 970228 Responses to 960522 Cable Functionality Safety Evaluation.Licensee Briefly Described Revised Response to Open Item Re Fire Stops.List of Attendees Encl ML20141H9291997-07-30030 July 1997 Summary of 970717-18 Meeting W/Tue Representatives in Glen Rose,Texas Re Licensee Proposed risk-informed Inservice Testing Program.List of Attendees Encl ML20129B5921996-10-16016 October 1996 Summary of 961016 Meeting W/Util in Rockville,Md Re License Amend Request 96-005,inverters & Battery Chargers Mod ML20058J0961993-11-29029 November 1993 Summary of 930920 Meeting W/Util Re Results of Thermo-Lag Tests for Facility Fire Barrier Configurations ML20058F4501993-11-26026 November 1993 Summary of 931006 Meeting Re Possible Implementation of Improved Standard Ts.List of Attendees Encl ML20059K3131993-11-0505 November 1993 Summary of Operating Reactors Events Meeting 93-42 on 931103 ML20057E4861993-08-0606 August 1993 Trip Repts of NRC Observation of Thermo-Lag Fire Barrier Test Specimen Const by Util for Qualification of Thermo-Lag Fire Barriers Installed in Facility & NUMARC for Generic Qualification of Thermo-Lag Fire Barriers in Industry ML20056D9841993-05-18018 May 1993 Summary of Operating Reactors Events Meeting 93-17 on 930512 ML20128K0041993-02-11011 February 1993 Summary of 930107 Meeting W/Utils in Rockville,Md to Provide Forum for Licensees to Present Staff W/Info Re Design, Operational & Testing Experience & Justification for long- Term Operability of Alternate Min Flow Path ML20126M2191993-01-0606 January 1993 Summary of 921217 Meeting W/Util Re Findings from Fire Protection Insp on 921116 & Related Fire Protection Issues. List of Attendees & Handouts Encl ML20128D1731992-12-0202 December 1992 Summary of 921027 Meeting W/Util in Rockville,Md to Discuss Fire Barrier Acceptance Criteria ML20126J7941992-01-0404 January 1992 Summary of Meeting W/Util Re Pressurizer Surge Line leak- before-break Analysis ML20058N9711990-08-0909 August 1990 Summary of Operating Reactors Events Meeting 90-20 on 900808 NUREG-0797, Summary of Meeting on 890905 in Rockville,Md to Discuss Ground Motion Estimates for Criner Tectonic Structure of Southern Oklahoma Aulacongen in Wichita Tectonic Province, Per Section 2.5.2 of Fsar.Viewgraphs Encl1989-09-11011 September 1989 Summary of Meeting on 890905 in Rockville,Md to Discuss Ground Motion Estimates for Criner Tectonic Structure of Southern Oklahoma Aulacongen in Wichita Tectonic Province, Per Section 2.5.2 of Fsar.Viewgraphs Encl ML20245L2621989-08-0909 August 1989 Summary of 890801 Meeting W/Util in Rockville,Md Re Util Proposed Responses to NRC 890711 Request for Addl Info on Plant Operations QA Program.W/Related Info,Including Request for Addl Info,Draft Responses to Questions & Attendee List ML20247K8451989-07-20020 July 1989 Summary of 890710 Meeting W/Licensee in Arlington,Tx to Discuss Options Re Evacuation of Site Personnel During Upcoming Emergency Preparedness Exercise ML20247D3441989-05-16016 May 1989 Summary of Operating Reactors Events Meeting 89-19 on 890510.List of Attendees,Events Discussed & Significant Elements of Events & Rept of long-term Followup Assignments & Summary of Scrams for Wk Ending 890507 Encl ML20246C3261989-05-0404 May 1989 Summary of Operating Reactors Events Meeting 89-18 on 890503 ML20248K5931989-04-11011 April 1989 Summary of 890406 Meeting W/Util Re Proposed Changes to Unit 1 Initial Startup Testing Program.List of Attendees & Slides Used in Util Presentation Encl ML20235G0491989-02-10010 February 1989 Summary of 890123 Meeting W/Util in Rockville,Md Re Revs 9 & 10 to Emergency Plan.Resolutions Proposed for 13 Planning Items ML20205T6041988-11-0707 November 1988 Summary of 880929 Meeting W/Util in Rockville,Md Re Plant Sys Branch FSAR Review.Problem Areas Include Reliability of Station Svc Water Sys & Util Relief Request from broad-scope Rule Amend GDC 4 Concerning Pressurizer Surge Line.W/Agenda ML20205N7911988-10-31031 October 1988 Summary of 881019 Meeting W/Util in Rockville,Md Re Unit 1 Tech Specs.Meeting Notice,Corrected Agenda & List of Attendees Encl ML20206E9051988-10-31031 October 1988 Summary of 881005-06 Meetings W/Util in Rockville,Md Re Proposed Changes to Tech Specs.Related Info,Including Meeting Notice W/Agenda,List of Attendees & Annotated Summary of All Unreviewed Generic Changes Encl ML20207P1081988-10-0404 October 1988 Summary of 880922 Meeting W/Util in Rockville,Md Re Tech Specs & Util Prioritization of 64 Unreviewed Generic Changes Proposed for Facility ML20155G3311988-10-0404 October 1988 Summary of 880111-15 Meeting in Glen Rose,Tx Re Proposed Changes to First Draft Tech Specs.List of Attendees & Viewgraphs Encl ML20207L5201988-10-0404 October 1988 Summary of 880412 Meeting W/Util in Rockville,Md Re Planned Changes to Tech Spec 6.0 Concerning Administrative Controls, Tech Spec Development & Review Schedule & NRC Review of Proposed Tech Spec Changes ML20155G2041988-09-30030 September 1988 Summary of 880317-18 Meeting W/Util in Rockville,Md Re Fire Protection Programon Program in Response to Open & Unresolved Items in Insp Rept 50-445/87-22.Util Attends to Submit Advanced Draft FSAR Changes by Early May 1988 ML20155C7271988-09-30030 September 1988 Summary of 880921 Meeting W/Util in Rockville,Md Re Chemical Engineering Branch Review of Fsar.List of Attendees,Meeting Notice & Agenda Encl ML20155C7241988-09-30030 September 1988 Summary of 880321 Meeting W/Util in Rockville,Md Re Attenuation of Jets from high-energy Line Breaks.Meeting Notice,List of Attendees & Handouts on Jet Impingement Loadings Encl ML20154L7101988-09-20020 September 1988 Summary of 880908 Meeting W/Util in Rockville,Md Re Changes to Emergency Plan Since Rev 8 Was Reviewed by Staff & Results of Review Documented in Safety Ser.Meeting Notice & List of Attendees Encl ML20154J8911988-09-19019 September 1988 Summary of 880907 Meeting W/Util in Rockville,Md Re Bounding Analysis for Stress Condition Pressurizer Surge. List of Attendees & Presentation Matl Encl.Proprietary Version of Presentation Slides Also Encl ML20154C1601988-09-0202 September 1988 Summary of 880830 Meeting W/Licensee Representatives at Util Site Re Operator Training Program & License Exam Results. W/List of Attendees,Agenda & Viewgraphs ML20153F0431988-08-31031 August 1988 Summary of 880818 Meeting W/Util & Westinghouse in Rockville,Md Re Application of leak-before-break Methodology to Pressurizer Surge Line.Meeting Notice,Agenda,List of Attendees & Slides Used in Presentation Encl ML20151P1841988-07-28028 July 1988 Summary of 880614 Meeting W/Util Re Radiation Protection Organization.Meeting Notice,Agenda,List of Attendees & Util Presentation Encl ML20206H5171988-07-26026 July 1988 Summary of Allegation Review Committee 880721 Meeting Held by Telephone Re Encl Listed Allegations ML20155F4811988-05-31031 May 1988 Summary of 880523-26 Audit of Util Corrective Action Program in Glen Rose,Tx.Audit Included Review of Util Reasons for Establishing HVAC Design Validation Effort & Review of Scope of QA Technical Audit Program ML20154G3471988-05-16016 May 1988 Summary of 880512 Meeting W/Util in Rockville,Md Re Design Change Involving Backup Meteorological Monitoring Tower at Plant.List of Attendees & Viewgraphs Encl ML20150D9191988-03-17017 March 1988 Summary of 880205 Meeting W/Util in Rockville,Md Re NRC Comments on Ebasco Svcs,Inc Jet Attenuation Calculation, CPE-SI-CA-0000-645 ML20149M0791988-02-18018 February 1988 Summary of 871112 Meeting W/Util in Bethesda,Md Re Jet Impingement Effects in Break Exclusion Region of Main Steam & Feedwater Piping at Plant.Meeting Notice & List of Attendees Encl ML20149H0141988-02-12012 February 1988 Summary of 871207-11 Audit Re Implementation of Procedures for Train C Conduit Supports Less than or Equal to 2 Inches. Lists of Persons Involved W/Audit & Documents Reviewed Encl ML20149D7401988-02-0101 February 1988 Summary of 871216 Meeting W/Util Re leak-before-break Piping Analysis & Amplified Response Spectra for Floors.List of Attendees & Presentation Slides on leak-before-break & Amplified Response Spectra Encl ML20236V9001987-11-25025 November 1987 Summary of 871028-30 Audit W/Util & S&W in Cherry Hill,Nj Re Implementation of Piping Design Criteria ML20236W2641987-11-25025 November 1987 Summary of 870908-10 Audit of as-built Field Verification Program for Conduit Support Trains a & B & Train C Greater than 2 Inches at Plant.List of Personnel Involved & Walkdown Packages Reviewed During Audit Encl ML20236Q4351987-11-0606 November 1987 Trip Rept of 871007 Visit to Corporate Consulting & Development Co,Ltd,In Raleigh,Nc Re Static Tests of HVAC Ductwork ML20236L6241987-11-0505 November 1987 Summary of 870928-1001 Audit of Comanche Peak Response Team third-party Review of Cable Tray/Supports at Ofcs of Tenera in Berkeley,Ca.List of Persons Involved in Audit & Attending Exit Meeting Encl ML20236F1201987-10-20020 October 1987 Summary of 870914 Meeting W/Util & Ebasco Svcs,Inc in New York,Ny Re Resolutions to Generic Technical Issues Re Design of Conduit Supports ML20236F7621987-10-19019 October 1987 Summary of 870915 Meeting W/Util & Util Design Contractors in New York,Ny Re Resolutions to Generic Technical Issues on Structural Integrity of HVAC Design ML20236C3851987-10-16016 October 1987 Summary of 870922-24 Audit at Ofcs of S&W in Cherry Hill,Nj Re Implementation of Pipe Design Criteria.Attendance List Encl 1999-04-26
[Table view] Category:TRIP REPORTS
MONTHYEARML20057E4861993-08-0606 August 1993 Trip Repts of NRC Observation of Thermo-Lag Fire Barrier Test Specimen Const by Util for Qualification of Thermo-Lag Fire Barriers Installed in Facility & NUMARC for Generic Qualification of Thermo-Lag Fire Barriers in Industry ML20236Q4351987-11-0606 November 1987 Trip Rept of 871007 Visit to Corporate Consulting & Development Co,Ltd,In Raleigh,Nc Re Static Tests of HVAC Ductwork ML20235F9851987-07-0101 July 1987 Trip Rept of 870623 Visit to Culver City,Ca Re Testing of Conduit Clamps at Anco Engineers,Inc.List of Meeting Attendees Encl ML20209J3181986-09-0303 September 1986 Trip Rept of Attendance at 860821 Meeting in Arlington,Tx Re Util Plans for Plant Issues.Summaries of Observations Listed ML20210S4371986-05-21021 May 1986 Trip Rept of 860505-07 Site Visit to Attend Civil/Structural Issues Audit Meetings.Audit Attendee List & Agenda Encl ML20140H4751986-04-0101 April 1986 Trip Rept of 851120-22 Site Audit of S&W Implementation of Project Procedure CPPP-8 for Piping & Pipe Supports.No Items of Noncompliance or Deviations Noted ML20205K8111986-03-0606 March 1986 Trip Rept of 860219 Site Visit to Examine Problems Re Improperly Installed Cable Splices Used for Bunker-Remo Electrical Penetration Connections to Field Wiring.List of Attendees Encl IA-86-270, Trip Rept of 860219 Site Visit to Examine Problems Re Improperly Installed Cable Splices Used for Bunker-Remo Electrical Penetration Connections to Field Wiring.List of Attendees Encl1986-03-0606 March 1986 Trip Rept of 860219 Site Visit to Examine Problems Re Improperly Installed Cable Splices Used for Bunker-Remo Electrical Penetration Connections to Field Wiring.List of Attendees Encl ML20205J5411986-02-18018 February 1986 Trip Rept of 851021-24 Site Visit Re QA Program Procedures. Listed Personnel Contacted at Site.Results of Discussions Documented in 860115 Memo ML20153E3411986-02-18018 February 1986 Trip Rept of 851021-24 Site Visit Re QA Program Procedures. Results of Discussions Factored Into 860115 Memo ML20137U7271986-01-29029 January 1986 Trip Rept 2201 of 860121 Visit to Robert L Cloud & Assoc,In Berkeley,Ca Re Participation in Facility Cable Tray Verification Program.Company Will Audit Cable Tray Tests Performed by Ebasco,Impell Corp & Anco ML20137U7791986-01-22022 January 1986 Trip Rept 2202 of 860122 Visit to Impell Corp in Walnut Creek,Ca Re Applicability of Slenderness Ratio Limit to Facility Cable Tray Hangers & Impell Design Criteria & Procedures.Viewgraphs Encl ML20210C0771986-01-17017 January 1986 Trip Rept 2200 of 860117 Site Visit Re HVAC Hanger Program Audit.Status of Licensee Steam Electric Station Seismic Qualification Rept of Seismic Category 1 Duct Work & Hangers Changed from Approved to Not Approved on 860121 ML20210B9781986-01-16016 January 1986 Trip Rept of 851202-03 Visit to Tera Ofcs in Bethesda,Md to Audit Documentation Supporting Initial Level of Homogeneity for Design Activities Review Procedure DAP-21 That Will Be Implemented to Validate Homogeneity ML20141C9661985-12-18018 December 1985 Trip Rept of 851009-10,15-17 & 28-31 Site Visits Re Methodology Used by Applicant/Contractor in Establishing Equipment Populations & Equipment/Work Processes Homogeneity ML20197E2451985-12-18018 December 1985 Trip Rept of 851125 Visit to S&W Engineering Corp Re Audit of Nonseismic Piping Effects on Seismic Design Piping. Further Audit of Anchor Designs Required.List of Attendees & Related Info Encl ML20141K3731985-12-0505 December 1985 Trip Rept of 851126 Audit Discussions Per Slenderness Ratio Limitations for Hanger Type Supports.Ebasco Svcs,Inc Considering Adoption of Revised Procedure.Slenderness Ratios Should Be Used Only Where Uncertainties Exist ML20141K3761985-12-0202 December 1985 Trip Rept of 851011 Audit W/Util,Tera & Comanche Peak Response Team.List of Attendees Encl.Meeting Between Tera & BNL Consultants Will Be Held to Discuss Steam Generator Lateral Restraints ML20141K3941985-12-0202 December 1985 Trip Rept of 851113-14 Visit to Corporate Consulting & Development Co,Ltd to Audit Ongoing Tests of Electrical Conduit Clamps ML20141K4031985-12-0202 December 1985 Trip Rept of 851118-22 Audit of Cable Tray Hanger Walkdown. Supports Walked Down & Noted Discrepancies Listed ML20141K4841985-11-22022 November 1985 Trip Rept of 851025 Audit at S&W Ofcs in New York,Ny Re Piping & Pipe Support Effort.List of Attendees Encl ML20137G6351985-11-21021 November 1985 Draft Trip Rept 2178 of 851029-31 Site Visit Re Item Vii.C, Const Reinsp/Documentation Review Plan ML20138P7841985-10-24024 October 1985 Trip Rept of 850827-29 Site Visit W/Util & Contractors Re Witnessing of Unit 1 Cable Tray Supports Walkdown in Progress & Collection of Info Concerning New Allegations ML20141K1991985-10-22022 October 1985 Trip Rept of 851008 Visit to Gibbs & Hill Ofc in New York,Ny Re Audit of Adlpipe Computer Code Used in Piping Analysis. Allegation AP-26 Questioning Validity of Code Verification & QA Maint Unsubstantiated.Agenda Encl ML20141K2381985-10-22022 October 1985 Trip Rept of 851014-18 Site Visit Re Status of Comanche Peak Response Team Verification & Corrective Action Activities by S&W,Ebasco & Tera,Qa/Qc Const Verification Effort & Action Plan Implementation ML20141K2111985-10-11011 October 1985 Trip Rept of 851008 Visit to Gibbs & Hill Ofc Re Followup on Allegation A-26 That Adlpipe Computer Program Not Validated. Attendance List Encl ML20141K4371985-10-11011 October 1985 Trip Rept of 850923-26 Audit of S&W as-built Verification Walkdown.Contingent Upon Acceptable Resolution Re Piping Run Geometry & Clearances,S&W Walkdown Well Documented & Easily Verifiable ML20141K4671985-10-11011 October 1985 Trip Rept of 850923-26 Site Visit W/Teledyne Engineering Svcs Re Audit of S&W as-built Verification Walkdown ML20141K1261985-09-10010 September 1985 Trip Rept of 850829-30 Visit W/Util & Teledyne at S&W Ofcs in New York,Ny Re Status of S&W Effort Concerning Design Adequacy Program for Plant Piping & Pipe Supports.Lists of Attendees,Agenda & Util Action Plan Encl ML20213F3641985-03-0505 March 1985 Trip Rept of 850208 Site Visit to Inspect Unused Holes in Cable Tray Support Flanges,To Locate Cantilevered Horizontal Plate Attached to Containment Liner Plate & to Inspect & Gather Info on Elastic Joint Filler ML20141K4301985-02-0707 February 1985 Trip Rept of 850126 Site Visit Re Observation of Schmidt Hammer Tests,Seismic Air Space Between Structures & Insp of Portion of Exposed Ceiling in Control Room.List of Attendees & Comments Encl ML20199G3181985-01-15015 January 1985 Trip Rept of 841114-16 Site Visit Re Meetings W/Qa/Qc Inspectors to Emphasize That All Safety Issues Must Be Resolved Before Units Can Be Licensed ML20138M9741983-12-20020 December 1983 Trip Rept of 831129-30 Site Visit Statistical Analysis of Backfit Insp Program ML20054N0431982-07-0707 July 1982 Trip Rept of Caseload Forecast Panel 820413-15 Meeting W/Util at Site Re Collection of Data for Assessing Projected Fuel Load Date 1993-08-06
[Table view] |
Text
I WTri m(NE g ENGINEERING SERVICES TRIP REPORT NO. 2178 PROJECT 6410T VISIT OF JAMES A. FLAHERTY AND JAMES J. RIVARD TO COMANCHE PEAK F0P AUDIT OF CPRT ACTION PLAN ITEM NUMBER: VII.C CONSTRUCTION REINSPECTION / DOCUMENTATION REVIEW PLAN October 29-31, 1985 The scope of this audit was the in-depth review to establish if homogeneity of the work process and attributes had been achieved for selected populations in the mechanical and structural area being performed by ERC as part of Item VII.C of the program plan. This was an extension of the previous trip of October 16 through 18, 1985, which was also held at the Comanche peak site.
TES met with other members of the NRC audit team, Tuesday, October 29, 1985 at the ERC trailer. Evangelos Marinos of the NRC was the audit leader. James J. Rivard was assigned to the structural area. James A. Flaherty was assigned to the mechanical / structural area and Robert Masterson of EAS was also assigned to the mechanical / structural area to specifically review piping and pipe-support populations.
Tuesday afternoon, I sat with R. Masterson and discussed the areas he had reviewed. Bob had reviewed rigid and non-rigid large-bore pipe-support populations. In addition, I sat in on a discussion on large-bore /small-bore piping welds.
I. PIPE WELDS / MATERIAL POPULATION ERC has revised the welding population and work processes since the audit of October 16. The revised population combines large-bore and small-bore piping weld, since the same weld-procedure specifications were used.
With'in the welding process, two welding methods were used: Gas Tungsten Arc Welding (GTAW) and Shielded Metal Arc Welding (SMAW). Both methods were utilized for carbon- and stainless-steel welding and were performed by the same work force. Therefore each welding method will have a minimum of 60 randomly selected samples. This revision of the Pipe Welds / Material Population Group (PIWM) removes my concern, which was raised during the October 16, 1985 audit. This is a more homogneous approach to the PIWM reinspection.
Bob Masterson reviewed the original Brown and Root specification. It was noted that the original specification required noting of cleanliness and listing of any base-metal defects. The attributes listed on the PIWM checklist did not include these two elements. ERC was asked to review and coment.
8601210121 851121 PDR 0 ADOCM 05000445 PDR
m W F W NE
'. Trip Report ENGFEERING SERVICES No. 2178 II. MECHANICAL EQUIPMENT INSTALLATION The afternoon and evening of Tuesday, Octobar 29, 1985, James A.
Flaherty reviewed the Mechanical Equipment Installation (MEIN) population.
The following documents were reviewed.
- a. Work Process Definition for MEIN.
- b. Population Description.
- c. Population Item List.
- d. QI-059, Revision 0, Draft Procedure Quality Instruction for Issue Specific Action Plan (ISAP) VII.C., " Reinspection of Mechanical Equipment Installation").
- e. Original Mechanical Erection Specification 2323-MS-101, Revi-sion 4, 6/28/84, Gibbs & Hill, Inc. Specification.
- f. Brown & Root Specification MCP-1, 8/1/84, Revision 4, " General Installation of Mechanical Equipment".
- g. Brown & Root QI-QAP-11-1-39, Revision 4, 6/11/84, " Mechanical Equipment Installation Inspection Procedure".
- h. Brown & Root, CCP-24, Revision 4, 6/26/80, " Rigging".
- i. Brown & Root, " Grouting Base Plates, Bearing Plates and Equip-ment Bases, CCP-16, Revision 4, 2/8/84.
- j. Brown & Root, " Installation of Hilti Drilled-In Bolts, CEI-20, Rvision 9, 12/16/83.
There are currently three work processes being reviewed. The welding work process has been deleted from the MEIN population and, as of October 28, 1985, has been put in the appropriate pipe weld work process.
ERC is also reviewing the deletion of grout from the attribute list and is establishing a new population that specifically addresses grout. This change is due primarily to the way documentation was established.
The ERC reinspection procedures and orginal construction specifica-tions and procedures were reviewed and compared for homogeneity of work processes and choice of generic attributes. The writer feels that all attributes listed are appropriate and cover the original construction sequence.
Five documentation packages from the sampled population were reviewed for completion of documentation and comparison to general specifications and attribute list.
The five documentation packages reviewed were:
TF WE
', Trip Report ENGrEERING SERVICES No. 2178 1. Service Water Pump, P.O. CP-010-001 Rotating equipment installed per Hayward Tyler manual. Manual gave specific tolerances on parallel alignment between motor half coupling and collar.
- 2. Pressurizer, P.O. -0001-18 All dimensions for installation are per Westinghouse drawings.
- 3. Safety Injection Pump, TBX-SIAPSI-01 and 02 Specified tolerances on rim-to-rim and face-to-face coupling alignment. A requirement was also given on vibration tolerance.
In a discussion with ERC, ERC stated that this attribute may be added to attribute list as a documentation check.
- 4. Centrifugal Charging Pump, TBX-CSAPCH-01 and CP-0001-024 for Unit 1 Installation is per manuf acturer manual. This pump is part of the Chemical and Volume Control System and was fabricated by Pacific Pumps.
- 5. Motor-Driven Auxiliary Feedwater Pumps, P.O. CP-007-001 Alignment is per manufacturer's specifications. Criteria given for checking anchor bolts, level and alignment and grouting.
- 6. Excess Letdown Heat Exchanges Criteria given for backing off of foundation bolts to allow for thermal growth. Requirement given by Westinghouse.
The above six mechanical component document packages were well doc-umented and the appropriate attributes listed on the ERC checklist. The only open item was the vibration attribution documentation check, which ERC is reviewing.
III. PIPING SYSTEM BOLTED JOINTS / MATERIAL On Wednesday, October 30, James A. Flaherty reviewed the Piping System Bolted Joints / Material Population. The following ERC procedures were reviewed:
(a) Work Process Definitions.
(b) Population Description.
l (c) Population Items List.
i
i@ WE t Trip Report ENGNEERNG SERVICES No. 2178 (d) QI-021, Revision 1, " Reinspection of Piping System Bolted Joint Material.
During the October 18 audit, the NRC audit teams raised a concern on torque being an attribute and not a work process. The concern was relative to equipment specifications requiring a specific torque value on certain types of flanges and the reinspection attribute not containing sufficient samples. In the discussion with ERC, it was noted that there are approx-imately 7000 items in the piping system bolted joint population. Of the approximately 7000 items, 6700 are in line-piping connections which were installed in accordance with Brown & Root Procedure CP-CPM 6.9E. Sec-tion 3.12 of the B&R procedure did not require a specific torque value to be used. The governing requirement was that the joint "shall be tightened sufficiently to prevent leakage during pressure testing". Since ISAP VII.C is addressing QC-accepted items, only reinspection per the original spec-ification is required. The only flanges which may have required specific torque values would therefore be in the Mechanical Equipment Population.
ERC has reviewed the MEIN population and has only found approximately six flanges which required specific values. Therefore the issue raised during the October 16 audit is no longer an issue to this auditor.
It was also noted that the Population Description and Population Item Lists will be revised to delete instrument flanges. These will now be included in the electrical area.
IV. HVAC EQUIPMENT INSTALLATION This population was reviewed Wednesday af ternoon. This was a con-tinuation of the audit of October 16 on homogeneity of the population. The following ERC procedures were reviewed.
- a. Work Process Definitions.
- b. Population Items List.
- c. QI-023, " Reinspection of HVAC Equipment".
This population has been modified based on a concern raised during the October 16 audit. The work process for Equipment Setting by Brown &
Root has been deleted and will be combined with the MEIN population since the same B&R procedures and installation specifications were used.
V. HVAC DUCTS AND PLENUMS This population contains all passive equipment in the safety-related HVAC system whereas the HVAC equipment population contains only active items.
The following ERC procedures were reviewed.
- a. Work Process Definitions.
- b. Population Description.
4 TF WE
'i Trip Report ENGNEERNG SERVICES No. 2178 c. Population Items List.
- d. QI-039, " Reinspection of HVAC Ducts and Plenums".
QI-039 has been issued and is very detailed. It contains much of the original documents and sketches required during the construction phase.
The document review procedure has not been completed yet.
VI. PIPE WHIP RESTkAINTS James A. Flaherty was given an overview of the Pipe Whip Restraint Population. This population consists of moment restraints, pipe whip restraints and restraint support structures listed in Section 3.6 of FSAR.
Due to the original construction, two populations may be established, one for the restraint and one for the support structure. Nine systems have postulated line breaks. Some restraints are listed by Gibbs and Hill and other restraints are listed by Site Damage Group. At this time ERC is still reviewing the work process and is establishing which groups were responsible for installation.
VII. CONCRETE PLACEMENT POPULATION James J. Rivard reviewed the Concrete Placement Population Tuesday afternoon and Wednesday morning, October 29 and 30, 1985. During this time the following documents were reviewed to determine if homogeneity of the work processes and attributes had been achieved.
- a. ERC's Work Process Definitions for Concrete Placement Popula-tion.
- b. ERC's Population Description for Concrete Placement, 8/5/85.
- c. ERC's Population Description for Concrete Placement, 8/5/85.
- d. ERC's Population Items List for Concrete Placement, 9/5/85.
- e. Procedure QI-043, Revision 0, 9/16/85, Procedure, Quality Instructions for Issue-Specific Action Plan No. VII.C,
" Reinspection of Concrete Placement".
- f. Gibbs and Hill Specification 2323-SS-9, 1/16/79, " Concrete".
- g. Gibbs and Hill Specification 2323-SS-30, 2/10/84, " Structural Embedments".
- h. Brown & Root Construction Procedure 35-1195-CCP-11, " Concrete Placement", Rev. O.
The concrete placement population is presently subdivided into three work processes, each work process having various numbers of attributes.
Some of the attributo are to be reviewed by means of a field reinspection;
~
SPTF1 STVNE I Trip Report ENGINEERING SERVICES No. 2178 others can only be reviewed by means of a document review; and some will be reviewed utilizing both field reinspection and documentation review. The field reinspection was in progress at the time of this audit and the doc-umentation review had not yet begun. No reinspection packages were reviewed.
Thc reviewer has a few concerns; however, he feels that in general the reinspection of concrete placement's work processes .ind attributes does achieve an appropriate level of homogeneity. These concerns were discussed with ERC and were lef t as open items. The following is a list of open-items which ERC should address:
- 1. It may be more appropriate to establish cadwelds as a work process rather than as an attribute. ERC is to review the cad-weld inspection procedure and the concrete pour card sign-off requirements to determine whether cadwelds should be a separate work process.
- 2. ERC to consider establishing Richmond Inserts as a separate attribute instead of including it with the embedment attribute.
- 3. ERC to determine if the condition exists where embedded pipe sleeves are used to anchor the piping system. If this situation does exist, the embedded sleeves should be a separate attribute.
VIII. STRUCTURAL-STEEL POPULATION On Wednesday afternoon, October 30, 1985, James J. Rivard performed a review of the structural steel population. At this time only a cursory review was done to determine if the concept of choosing work processes and attributes would achieve acceptable homogeneity. A limited review of the following documents was performed.
- a. Procedure QI-045, Rev. 1, 10/23/85, and Change Notice 001, 10/23/85, Quality Instructions for Specific Action Plan VII.C, Reinspection Procedures for Structural Steel,
- b. ERC's Description Memorandum for Reinspection of Structural Steel:
- 1. Rev. O, 9/15/85
- 11. Rev. 1, 10/8/85 111. Change Notice to Rev. 1, 10/23/85
- c. Gibbs and Hill Specification 2323-5S 16B, " Structural Steel",
5/12/75.
- d. TUGC0 Instruction QI-QP-11.0-15. " Verification of Baseplates for Grouting", Rev. 8, 3/13/85.
After performing this general overview of the structural-steel reinspection activity, it is felt that the work processes and attributes
TE WE
- ( Trip Report ENGREERNG SERVICES No. 2178 identified generally will achieve acceptable homogeneity. However, a more detailed audit of the reinspection procedures will be required to make more detailed comments.
One item of concern identified is grouting. This should be a separate population since it is now not appropriately being reinspected.
An ex't interview was held the afternoon of Wednesday to cover those areas reviewed by all members of the audit group. Comments and open-items are given above in the specific population. James A. Flaherty and James J.
Rivard left Dallas for Boston, Thursday, October 31, 1985.
W (b b 7 s.
James A. Flahert'y h
^
v
[amesJ.@ivard JAF/JJR:jej 1 - Trip Report File 1 - Comanche Peak Project File 1 - B. Saffell (Battelle) 1 - D. F. Landers
1%P W NE l Trip Report ENGNEERING SEFMCES No. 2178 .
others can only be review d by means of a document review; and some will be reviewed utilizing both field reinspection and documentation review. The field reinspection was in progress at the time of this audit and the doc-umentation review had not yet begun. No reinspection packages were reviewed.
The reviewer has a few concerns; however, he feels that in general the reinspection of concrete placement's work processes and attributes does achieve i.n appropriate level of homogeneity. These concerns were discussed with ERC and were lef t as open items. The following is a list of open-items which ERC should address:
- 1. It may be more appropriate to establish cadwelds as a work process rather than as an attribute. ERC is to review the cad-weld inspection procedure and the concrete pour card sign-off requirements to determine whether cadwelds should be a separate work process.
- 2. ERC to consider establishing Richmond Inserts as a separate attribute instead of including it with the embedment attribute.
- 3. ERC to determine if the condition exists where embedded pipe sleeves are used to anchor the piping system. If this situation does exist, the embedded sleeves should be a separate attribute.
VIII. STRUCTURAL-STEEL POPULATION On Wednesday afternoon, October 30, 1985, James J. Rivard performed a review of the structural steel population. At this time only a cursory review was done to determine if the concept of choosing work processes and attributes would achieve acceptable homogeneity. A limited review of the following documents was performed.
- a. Procedure QI-045, Rev. 1, 10/23/85, and Change Notice 001, 10/23/85, Quality Instructions for Specific Action Plan VII.C, Reinspection Procedures for Structural Steel.
- b. ERC's Description Memorandum for Reinspection of Structural Steel:
- 1. Rev. O, 9/15/85
- 11. Rev. 1, 10/8/85 iii. Change Notice to Rev. 1, 10/23/85
- c. Gibbs and Hill Specification 2323-SS 168, " Structural Steel",
5/12/75.
- d. TUGC0 instruction QI-QP-11.0-15, " Verification of Baseplates for Grouting", P.ev. 8, 3/13/85.
After performing this general overview of the structural-steel reinspection activity, it is felt that the work processes and attributes