ML20154G347
| ML20154G347 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 05/16/1988 |
| From: | Joshua Wilson NRC OFFICE OF SPECIAL PROJECTS |
| To: | Charemagne Grimes NRC OFFICE OF SPECIAL PROJECTS |
| References | |
| NUDOCS 8805240335 | |
| Download: ML20154G347 (25) | |
Text
.-
May 16, 1988
{
Docket Nos. 50-445 i
and 50-446 MEMORANDUM FOR:
Christopher I. Grimes, Director Comanche Peak Project Division Office of Special Projects FROM:
James H. Wilson, Assistant Director 1
for Projects Comanche Peak Project Division l
l Office of Special Projects
SUBJECT:
SUMMARY
OF MAY 12, 1988 MEETING WITH Til ELECTRIC At a meeting held on May 12, 1988 in Rockville, Maryland, NRC staff met with TV Electric to discuss a design change involving the backup meteorological monitoring tower at Comanche Peak Steam Electric Station. A list of attendees is provided as Enclosure 1.
TU Electric is seeking the staff's approval for relocation of the backup net tower in order to resolve certain emergency plan-ning open issues (Enclosure 2 contains the slides presented at the meeting).
Open issues 445/8807-02 and 446/8806-02 concern data recovery in that the ap-plicant has not been able to demonstrate long-tem joint data recovery greater than 90%. Open issues 445/8333-70 and 445/8317-70 concern representativeness in that the applicant has not been successful in conducting a real-time com-parison of 10-meter data from the backup tower with similar data from the f
primary tower.
Relocation of the backup tower from its current location 3/4 mile west of the primary tower to the proposed location about 75 feet east of the primary tower would facilitate calibration, repairs and maintenance and would serve to enhance reliability and data recovery.
The proposed relocation so that the primary and backup towers are in close physical proximity to each other would also likely result in better comparisons of real-time data.
l TV Electric's current schedule calls for engineering design completion by 1
June 15, 1988 with construction to be completed by July 31, 1988. Amendment 72 I
to the FSAR, to be submitted July 1, 1988 will describe the change in location i
of the backup tower. NRC headquarters staff will review the FSAR change, prepare input to an SSER and coordinate with RIV stiff to ensure that the emergency planning open issues are resolved.
i (original signed by)
James H. Wilson, Assistant Director 8905%8$ $$$M6 oo445 for Projects PDR pga Comanche Peak Project Division F
Office of Special Projects l
Enclosures:
. DISTRIBUTION 1.
List of Attendees
>N3 JHWilson JPartlow l
2.
Slides presented at meeting NRC PDR JLyons
!$pickler Local PDR RWarnick ACRS(10)
].
cc: See next page CPPD Reading Walloy OSP Reading CPPD-LA J
SEbneter/JAxelrad OGC-WF CGrimes FMiraglia
]l PMcKee EJordan l
AD:CPPD 0:CPPD:05 l
JHWilso 6 CIGrimes i
05/$/88 05/llc/88 q
a
/p %y
?,,
UNITED STATES
- yi,e<
g NUCLE AR REGULATORY COMMISSION WASHING TON, D. C. 20555 N.....f May 16, 1988 Docket hos. 50-445 l
and 50-446 MEMORANDUM FOR:
Christopher I. Grimes, Director Comanche Peak Project Division l
Office of Special Projects FROM:
James H. Wilson, Assistant Director for Projects Comanche Peak Project Division Office of Special Projects
SUBJECT:
SUMMARY
OF MAY 12, 1988 MEETING WITH TU ELECTRIC At a meeting held on May 12, 1988 in Rockville, Maryland, NRC staff met with TV Electric to discuss a design change involving the backup meteorological monitoring tower at Comanche Peak Steam Electric Station. A list of attendees is provided as Enclosure 1.
TV Electric is seeking the staff's approval for relocation of the backup met tower in order to resolve certain emergency plan-ning open issues (Enclosure 2 contains the slides presented at the meeting).
Open issues 445/8807-02 and 446/8806-02 concern data recovery in that the ap-plicant has not been able to demonstrate long-term joint data recovery greater than 90%. Open issues 445/8333-70 and 445/8317-70 concern representativeness in that the applicant has not been successful in conducting a real-time com-parison of 10-meter data from the backup tower with similar data from the primary tower. Relocation of the backup tower from its current location 3/4 mile west of the primary tower to the proposed location about 75 feet east of the primary tower would facilitate calibration, repairs and maintenance and would serve to enhance reliability and data recovery. The proposed relocation 1
so that the primary and backup towers are in close physical proximity to each other would also likely result in better comparisons of real-time data.
TV Electric's current schedule calls for engineering design completion by June 15, 1988 with construction to be completed by July 31, 1988. Amendment 72 to the FSAR, to be submitted July 1, 1988 will describe the change in location of the backup tower. NRC headquarters staff will review the FSAR change, prepare input to an SSER and coordinate with RIV staff to ensure that the emergency planning open issues are resolved.
NY W
Jane H. Wilson, Assistant Director r Projects Comanche Peak Project Division Office of Special Projects
Enclosures:
1.
List of Attendett 2.
Slides presented at meeting cc: See next page
e.
l W. G. Counsil Cemanche Peak Steam Electric Station Texas Utilities Electric Company Units 1 and 2 cc:
Jack R. Newman, Esq.
Asst. Director for Enspec. Programs Newman & Holtzinger, P.C.
Comanche Peak Project Division Suite 1000 U.S. Nuclear Regulatory Commission 1615 L Street, N.W.
P. O. Box 1029 Washington, D.C. 20036 Granbury, Texas 76048 Robert A. Wooldridge, Esq.
Regional Administrator, Region IV Worsham, Forsythe, Sampels &
V.S. Nuclear Regulatory Commission Wooldridge 611 Ryan Plaza Drive, Suite 1000 2001 Bryan Tower, Suite 2500 Arlington, Texas 76011 Dallas, Texas 75201 Lanny A. Sinkin i
Mr. Homer C. Schmidt Christic Institute Director of Nuclear Services 1324 North Capitol Street Texas Utilities Electric Company Washington, D.C.
20002 Skyway Tower 400 North Olive Street, L.B. 81 Ms. Billie Pirner varde Esq.
Dallas, Texas 75201 Government Accountability Project Midwest Office Mr. R. W. Ackley 104 East Wisconsin Avenue Stone & Webster Appleton, Wisconsin 54911 Comanche Peak Steam Electric Station P. O. Box 1002 David R. Pigott, Esq.
Glen Rose, Texas 76043 Orrick, Herrington & Sutcliffe 600 Montgomery Street Mr. J. L. Vota San Francisco, California 94111 Westinghouse Electric Corporation P. O. Box 355 Anthony Z. Roisman, Esq.
Pittsburgh, Pennsylvania 15230 Suite 600 1401 New York Avenue, NW Susan M. Theisen Washington, D.C. 20005 Assistant Attorney General Environmental Protection Division Robert Jablon P. O. Box 12548, Capitol Station Bonnie S. Blair Austin, Texas 78711-1548 Spiegel & McDiarmid 1350 New York Avenue, NW i
Mrs. Juanita Ellis, President Washington, D.C. 20005-4798 Citizens Association for Sound Energy 1426 South Polk George A. Parker, Chainnan Dallas, Texas 75224 Public Utility Comittee l
Senior Citizens Alliance Cf l
Ms. Nancy H. Williams Tarrant County, Inc.
CYGNA Energy Services 6048 Wonder Drive 2121 N. California Blvd., Suite 390 Fort Worth, Texas 76133 Walnut Creek, CA 94596 i
W. G. Counsil Comanche Peak Electric Station Texas Utilities Electric Company Units 1 and 2 cc:
Joseph F. Fulbright Fulbright & Jaworski 1301 McKinney Street Houston, Texas 77010 Roaer D. Walker Manager, Nuclear Licensing Texas Utilities Electric Company Skyway Tower 400 North Olive Street, L.B. 81 Dallas, Texas 75201 Mr. Jack Redding c/o Bethesda Licensing Texas Utilities Electric Company 3 Metro Center, Suite 610 Bethesda, Maryland 20814 William A. Burchette. Esq.
Counsel for Tex-La Electric Cooperative of Texas Heron, Burchette, Ruckert & Rothwell 1
Suite 700 1025 Thomas Jefferson Street, NW Washington, D.C.
20007 GDS ASSOCIATES, INC.
Suite 720 1850 Parkway Place Marietta, Georgia 30067-8237 Administrative Judge Peter Bloch U,S. Nuclear Regulatory Comission i
Washington, D.C.
20555 Elir6ueth B. Johnson Administrative Judge Oak Ridge National Laboratory P. O. Box X. Building 3500 Oak Ridge, Tennessee 37830 Dr. Kenneth A. McCollom 4i 1107 West Knapp Stillwater, Oklahoma 74075 l
Dr. Walter H. Jordan 881 West Outer Drive
]
Oak Ridge, TN 37830 l
N ENCLOSURE 1 List of Attendees at Meeting Between NRC Staff and TV Electric Held on May 12, 1988 NRC U. H. Wilson I. Spickler TV ELECTRIC R. Walker D. Woodlan J. Redding C. Creamer S. Johnson J. Hwang R. Berk P. Lilleston STONE & WEBSTER A. Kaspiar
-a
'e e
en ENCLOSURE 2 b
l l
-. ~ _.. -. _.
t
/
\\
~
PRESENTATION OF I
l COMANCHE PEAK STEAM ELECTRIC STATION i
METEOROLOGICAL SYSTEM MODIFICATIONS l
MAY 12,1988 4
\\
/
1
.l
/
\\
l j
AGENDA i
J m STATUS OF OPEN ITEMS l
I i
a DETAILS OF SYSTEM MODIFICATIONS
= FSAR CHANGE
{
u
SUMMARY
0
\\
/
b i
l
\\
i l
l e EMERGENCY PLANNING OPEN ISSUES l
- DATA RECOVERY 445/8807-02 c
I 446/8806-02 t
REPRESENTATIVENESS 445/8333-70 i
446/8317-70 l
l
/
l l
/
\\
j EMERGENCY PLANNING OPEN ISSUES 1
f I
l j
- DATA RECOVERY
)
445/8807-02 l
l i
446/8806-02 I
i l
- STATEMENT OF CONCERN l
j j
LICENSEE HAS NOT RECENTLY DEMONSTRATED LONG TERM (12 MONTH) JOINT DATA RECOVERY l
l OF GREATER THAN 90%
l i
\\
/
l
/
\\
EMERGENCY PLANNING OPEN ISSUES I
f i
- DATA RECOVERY l
445/8807-02 446/8806-02
- RESOLUTION OF CONCERN l
PROGRAM ESTABLISHED JAN.1988 j
t j
HAS RESULTED IN GREATER THAN 98%
I DATA RECOVERY THROUGH APRIL 1988 N
/
i l
/
\\
EMERGENCY PLANNING OPEN ISSUES l
1 i
i
- REPRESENTATIVENESS l
445/8333-70 i
446/8317-70
- STATEMENT OF CONCERN I
i PROVIDE A REAL-TIME COMPARISON OF 10 METER DATA FROM THE BACK UP TOWER WITH SIMILIAR DATA FROM THE PRIMARY TOWER i
l
.=>
l EMERGENCY PLANNING OPEN ISSUES l
l l
l h
- REPRESENTATIVENESS i
445/8333-70 446/8317-70 i
- RESOLUTION OF CONCERN I
RELOCATION OF BACK UP TOWER NEAR 1
THE PRIMARY TOWER WILL PROVIDE DATA 4
WHICH ADDRESSES THIS CONCERN
\\
/
i
f
\\
l l
DETAILS OF SYSTEM MODIFICATIONS 1
l a
NEW BACKUP TOWER LOCATION i
a TOPOGRAPHICAL CHARACTERISTICS i
u AREA PROTECTION
\\
\\
1 1
m INSTRUMENTATION l
u ENGINEERING AND CONSTRUCTION SCHEDULE
\\
/
i
_.(
i
/
\\~!
i i
I l
NEW BACKUP TOWER LOCATION i
i i
1 i
i APPROXIMATELY 75 FT. ENE OF THE PRIMARY TOWER l
- WITHIN PRIMARY TOWER PERIMETER I
i
\\
/
1
__.__________________.____.__.m..__________.____.__.___m_
L 5
." l 1
/
\\
A, R
b
(
d
\\
N
- 2, l
0
\\
l
)
INSTRUMENT f
BUILDING PRtuARY MyY MQ j
O f4E W BACKUP j
f[
N N/
T0nER LOCATION j
N d
5 j
_.I__.
i PUuPwELL HOUSE i
/
/
l Y
/
t' DISTANCES ARE APPROXIMATED
/
\\
/
l I
i
1.
i
.,7w
,;_,,; *%{
n; y
,;a v-
\\
m
/ (f s
\\
/
\\
\\
ss(M
\\
u gn f, s,,.e ud -
sjel, I a:
4 c.,M k c
' e.v-
{x P
ss s
v+.
~ s A' s p
\\>
/
,v
^
xN k\\
/
.l
/
f o \\ L] \\ip
\\ \\r s
%s p
C pa pP M+5
, ~ e.\\
,y,/\\,\\,. ((;.
s
.s
'4 jl
&v, Q(( c.=
T tw
~ $'q%^:
c'
\\
v
's,M C'?
/,
m (l
~
.'q/;f=\\.s
~
~
~..
\\
x
~
x
~
s R '[%
'y
['
,,s e
/m'
~
~
,s g
-^
/
i
[
\\
l TOPOGRAPHICAL CHARACTERISTICS l
l e
CONSISTENT TOPOGRAPHY i
i l
l REPRESENTATIVE DATA I
l 1
f
\\
/
1 i
/
\\
AREA PROTECTION WITHIN PLANT SECURITY AREA l
l BARRICADED PERIMETER i
i
/
\\
~
j i
INSTRUMENTATION e
CONTROLLED ENVIRONMENT 1
e MINIMlZED TEMPERATURE DRIFT e
IMPROVED OPERATIONAL EFFICIENCY l
\\
/
s
/
\\
I ENGINEERING AND CONSTRUCTION SCHEDULE 1
i e
ENGINEERING DESIGN JUNE 15,1988 i
COMPLETION DATE l
CONSTRUCTION JULY 31,1988 l
COMPLETION DATE
\\
/
i
/
\\
FSAR CHANGE i
l REVISE COMMITMENT FROM R.G.1.23 (SEPT.1980) PROPOSED REVISION 1 l
TO R.G.1.23 (APRIL 1986) SECOND PROPOSED REVISION 1 l
l
\\
/
i 4
I
m
/
\\
SUMMARY
AFTER THE COMPLETION OF THESE MODIFICATIONS, TU ELECTRIC EXPECTS:
e TO RESOLVE COMPLETELY THE CONCERNS OF THE NRC REGARDING DATA RECOVERY AND REPRESENTATIVENESS, AND FURTHER IMPROVEMENTS TO SYSTEM PERFORMANCE, OPERATION, AND MAINTAINABILITY
\\
/
u
o l
i NEW CPSES l
METEOROLOGICAL SYSTEM l.
a l
ca.1.at
'sc
[ tar l
soou Y
I I
I I
I I
,e ex g..
% /s j
l Y
TRANS TRANS PRIMARY
'^70R R
Ru-2:
runn,
COMPUTER cowEs l
TOWER TRANS lTRANS LATOR l MITTE R TAPE drive i
i 2 STRIP CHARTS j
const er i MULTI POINT coute RECORDER I
BACKUP TOWER ERF COMPUTER O
v DISK drive i
j l CD"0'l 7 _ --.
_3 cor l
rst 1
)A Rg__5_5)1 fs,C~ h
_gA 1
l 5
i i
s J
CURRENT CPSES I
METEOROLOGICAL SYSTEM i
i C 0,"oo'f Tsc A
k4 kA k
Y l
j Y
f i
RM-21 TRANS TRANS cuent ar LATOR MITTE R DE CElvt 0 COMPUTER 09NES PRIMARY 73pg opive j
TOWER l
S TCs l
l t
9 STRIP CHARTS
\\
l TRANS TRANS j
ERF LATOR M!TTER cuneter COMPUTER D
parvt o I
BACKUP DISK O RIVE 1
i TOWER t,u,g.1 gy,;
estrme i oso r____
,1=i e4
/h f.x for Es gr_ = sp,
- l l
l