MONTHYEARML20206C8331999-04-26026 April 1999 Summary of 980929 Meeting with Texas Utilities Electric Co Re Licensing Submittals Requesting Exemption to App K & Topical Rept Submitted in Support of Exemption Request .List of Attendees Encl ML20236X4431998-08-0505 August 1998 Summary of 980814 Meeting W/Util Re Use of Caldon Leading Edge Flow Meter for App K Exemption & Power Uprate License Amend on 980714.List of Meeting Attendees Encl ML20198H4361997-12-24024 December 1997 Summary of 971112 Meeting W/Util at NRC Ofcs to Discuss 970228 Responses to 960522 Cable Functionality Safety Evaluation.Licensee Briefly Described Revised Response to Open Item Re Fire Stops.List of Attendees Encl ML20141H9291997-07-30030 July 1997 Summary of 970717-18 Meeting W/Tue Representatives in Glen Rose,Texas Re Licensee Proposed risk-informed Inservice Testing Program.List of Attendees Encl ML20129B5921996-10-16016 October 1996 Summary of 961016 Meeting W/Util in Rockville,Md Re License Amend Request 96-005,inverters & Battery Chargers Mod ML20058J0961993-11-29029 November 1993 Summary of 930920 Meeting W/Util Re Results of Thermo-Lag Tests for Facility Fire Barrier Configurations ML20058F4501993-11-26026 November 1993 Summary of 931006 Meeting Re Possible Implementation of Improved Standard Ts.List of Attendees Encl ML20059K3131993-11-0505 November 1993 Summary of Operating Reactors Events Meeting 93-42 on 931103 ML20057E4861993-08-0606 August 1993 Trip Repts of NRC Observation of Thermo-Lag Fire Barrier Test Specimen Const by Util for Qualification of Thermo-Lag Fire Barriers Installed in Facility & NUMARC for Generic Qualification of Thermo-Lag Fire Barriers in Industry ML20056D9841993-05-18018 May 1993 Summary of Operating Reactors Events Meeting 93-17 on 930512 ML20128K0041993-02-11011 February 1993 Summary of 930107 Meeting W/Utils in Rockville,Md to Provide Forum for Licensees to Present Staff W/Info Re Design, Operational & Testing Experience & Justification for long- Term Operability of Alternate Min Flow Path ML20126M2191993-01-0606 January 1993 Summary of 921217 Meeting W/Util Re Findings from Fire Protection Insp on 921116 & Related Fire Protection Issues. List of Attendees & Handouts Encl ML20128D1731992-12-0202 December 1992 Summary of 921027 Meeting W/Util in Rockville,Md to Discuss Fire Barrier Acceptance Criteria ML20126J7941992-01-0404 January 1992 Summary of Meeting W/Util Re Pressurizer Surge Line leak- before-break Analysis ML20058N9711990-08-0909 August 1990 Summary of Operating Reactors Events Meeting 90-20 on 900808 NUREG-0797, Summary of Meeting on 890905 in Rockville,Md to Discuss Ground Motion Estimates for Criner Tectonic Structure of Southern Oklahoma Aulacongen in Wichita Tectonic Province, Per Section 2.5.2 of Fsar.Viewgraphs Encl1989-09-11011 September 1989 Summary of Meeting on 890905 in Rockville,Md to Discuss Ground Motion Estimates for Criner Tectonic Structure of Southern Oklahoma Aulacongen in Wichita Tectonic Province, Per Section 2.5.2 of Fsar.Viewgraphs Encl ML20245L2621989-08-0909 August 1989 Summary of 890801 Meeting W/Util in Rockville,Md Re Util Proposed Responses to NRC 890711 Request for Addl Info on Plant Operations QA Program.W/Related Info,Including Request for Addl Info,Draft Responses to Questions & Attendee List ML20247K8451989-07-20020 July 1989 Summary of 890710 Meeting W/Licensee in Arlington,Tx to Discuss Options Re Evacuation of Site Personnel During Upcoming Emergency Preparedness Exercise ML20247D3441989-05-16016 May 1989 Summary of Operating Reactors Events Meeting 89-19 on 890510.List of Attendees,Events Discussed & Significant Elements of Events & Rept of long-term Followup Assignments & Summary of Scrams for Wk Ending 890507 Encl ML20246C3261989-05-0404 May 1989 Summary of Operating Reactors Events Meeting 89-18 on 890503 ML20248K5931989-04-11011 April 1989 Summary of 890406 Meeting W/Util Re Proposed Changes to Unit 1 Initial Startup Testing Program.List of Attendees & Slides Used in Util Presentation Encl ML20235G0491989-02-10010 February 1989 Summary of 890123 Meeting W/Util in Rockville,Md Re Revs 9 & 10 to Emergency Plan.Resolutions Proposed for 13 Planning Items ML20205T6041988-11-0707 November 1988 Summary of 880929 Meeting W/Util in Rockville,Md Re Plant Sys Branch FSAR Review.Problem Areas Include Reliability of Station Svc Water Sys & Util Relief Request from broad-scope Rule Amend GDC 4 Concerning Pressurizer Surge Line.W/Agenda ML20205N7911988-10-31031 October 1988 Summary of 881019 Meeting W/Util in Rockville,Md Re Unit 1 Tech Specs.Meeting Notice,Corrected Agenda & List of Attendees Encl ML20206E9051988-10-31031 October 1988 Summary of 881005-06 Meetings W/Util in Rockville,Md Re Proposed Changes to Tech Specs.Related Info,Including Meeting Notice W/Agenda,List of Attendees & Annotated Summary of All Unreviewed Generic Changes Encl ML20207P1081988-10-0404 October 1988 Summary of 880922 Meeting W/Util in Rockville,Md Re Tech Specs & Util Prioritization of 64 Unreviewed Generic Changes Proposed for Facility ML20155G3311988-10-0404 October 1988 Summary of 880111-15 Meeting in Glen Rose,Tx Re Proposed Changes to First Draft Tech Specs.List of Attendees & Viewgraphs Encl ML20207L5201988-10-0404 October 1988 Summary of 880412 Meeting W/Util in Rockville,Md Re Planned Changes to Tech Spec 6.0 Concerning Administrative Controls, Tech Spec Development & Review Schedule & NRC Review of Proposed Tech Spec Changes ML20155G2041988-09-30030 September 1988 Summary of 880317-18 Meeting W/Util in Rockville,Md Re Fire Protection Programon Program in Response to Open & Unresolved Items in Insp Rept 50-445/87-22.Util Attends to Submit Advanced Draft FSAR Changes by Early May 1988 ML20155C7271988-09-30030 September 1988 Summary of 880921 Meeting W/Util in Rockville,Md Re Chemical Engineering Branch Review of Fsar.List of Attendees,Meeting Notice & Agenda Encl ML20155C7241988-09-30030 September 1988 Summary of 880321 Meeting W/Util in Rockville,Md Re Attenuation of Jets from high-energy Line Breaks.Meeting Notice,List of Attendees & Handouts on Jet Impingement Loadings Encl ML20154L7101988-09-20020 September 1988 Summary of 880908 Meeting W/Util in Rockville,Md Re Changes to Emergency Plan Since Rev 8 Was Reviewed by Staff & Results of Review Documented in Safety Ser.Meeting Notice & List of Attendees Encl ML20154J8911988-09-19019 September 1988 Summary of 880907 Meeting W/Util in Rockville,Md Re Bounding Analysis for Stress Condition Pressurizer Surge. List of Attendees & Presentation Matl Encl.Proprietary Version of Presentation Slides Also Encl ML20154C1601988-09-0202 September 1988 Summary of 880830 Meeting W/Licensee Representatives at Util Site Re Operator Training Program & License Exam Results. W/List of Attendees,Agenda & Viewgraphs ML20153F0431988-08-31031 August 1988 Summary of 880818 Meeting W/Util & Westinghouse in Rockville,Md Re Application of leak-before-break Methodology to Pressurizer Surge Line.Meeting Notice,Agenda,List of Attendees & Slides Used in Presentation Encl ML20151P1841988-07-28028 July 1988 Summary of 880614 Meeting W/Util Re Radiation Protection Organization.Meeting Notice,Agenda,List of Attendees & Util Presentation Encl ML20206H5171988-07-26026 July 1988 Summary of Allegation Review Committee 880721 Meeting Held by Telephone Re Encl Listed Allegations ML20155F4811988-05-31031 May 1988 Summary of 880523-26 Audit of Util Corrective Action Program in Glen Rose,Tx.Audit Included Review of Util Reasons for Establishing HVAC Design Validation Effort & Review of Scope of QA Technical Audit Program ML20154G3471988-05-16016 May 1988 Summary of 880512 Meeting W/Util in Rockville,Md Re Design Change Involving Backup Meteorological Monitoring Tower at Plant.List of Attendees & Viewgraphs Encl ML20150D9191988-03-17017 March 1988 Summary of 880205 Meeting W/Util in Rockville,Md Re NRC Comments on Ebasco Svcs,Inc Jet Attenuation Calculation, CPE-SI-CA-0000-645 ML20149M0791988-02-18018 February 1988 Summary of 871112 Meeting W/Util in Bethesda,Md Re Jet Impingement Effects in Break Exclusion Region of Main Steam & Feedwater Piping at Plant.Meeting Notice & List of Attendees Encl ML20149H0141988-02-12012 February 1988 Summary of 871207-11 Audit Re Implementation of Procedures for Train C Conduit Supports Less than or Equal to 2 Inches. Lists of Persons Involved W/Audit & Documents Reviewed Encl ML20149D7401988-02-0101 February 1988 Summary of 871216 Meeting W/Util Re leak-before-break Piping Analysis & Amplified Response Spectra for Floors.List of Attendees & Presentation Slides on leak-before-break & Amplified Response Spectra Encl ML20236V9001987-11-25025 November 1987 Summary of 871028-30 Audit W/Util & S&W in Cherry Hill,Nj Re Implementation of Piping Design Criteria ML20236W2641987-11-25025 November 1987 Summary of 870908-10 Audit of as-built Field Verification Program for Conduit Support Trains a & B & Train C Greater than 2 Inches at Plant.List of Personnel Involved & Walkdown Packages Reviewed During Audit Encl ML20236Q4351987-11-0606 November 1987 Trip Rept of 871007 Visit to Corporate Consulting & Development Co,Ltd,In Raleigh,Nc Re Static Tests of HVAC Ductwork ML20236L6241987-11-0505 November 1987 Summary of 870928-1001 Audit of Comanche Peak Response Team third-party Review of Cable Tray/Supports at Ofcs of Tenera in Berkeley,Ca.List of Persons Involved in Audit & Attending Exit Meeting Encl ML20236F1201987-10-20020 October 1987 Summary of 870914 Meeting W/Util & Ebasco Svcs,Inc in New York,Ny Re Resolutions to Generic Technical Issues Re Design of Conduit Supports ML20236F7621987-10-19019 October 1987 Summary of 870915 Meeting W/Util & Util Design Contractors in New York,Ny Re Resolutions to Generic Technical Issues on Structural Integrity of HVAC Design ML20236C3851987-10-16016 October 1987 Summary of 870922-24 Audit at Ofcs of S&W in Cherry Hill,Nj Re Implementation of Pipe Design Criteria.Attendance List Encl 1999-04-26
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20206C8331999-04-26026 April 1999 Summary of 980929 Meeting with Texas Utilities Electric Co Re Licensing Submittals Requesting Exemption to App K & Topical Rept Submitted in Support of Exemption Request .List of Attendees Encl ML20236X4431998-08-0505 August 1998 Summary of 980814 Meeting W/Util Re Use of Caldon Leading Edge Flow Meter for App K Exemption & Power Uprate License Amend on 980714.List of Meeting Attendees Encl ML20198H4361997-12-24024 December 1997 Summary of 971112 Meeting W/Util at NRC Ofcs to Discuss 970228 Responses to 960522 Cable Functionality Safety Evaluation.Licensee Briefly Described Revised Response to Open Item Re Fire Stops.List of Attendees Encl ML20141H9291997-07-30030 July 1997 Summary of 970717-18 Meeting W/Tue Representatives in Glen Rose,Texas Re Licensee Proposed risk-informed Inservice Testing Program.List of Attendees Encl ML20129B5921996-10-16016 October 1996 Summary of 961016 Meeting W/Util in Rockville,Md Re License Amend Request 96-005,inverters & Battery Chargers Mod ML20058J0961993-11-29029 November 1993 Summary of 930920 Meeting W/Util Re Results of Thermo-Lag Tests for Facility Fire Barrier Configurations ML20058F4501993-11-26026 November 1993 Summary of 931006 Meeting Re Possible Implementation of Improved Standard Ts.List of Attendees Encl ML20059K3131993-11-0505 November 1993 Summary of Operating Reactors Events Meeting 93-42 on 931103 ML20056D9841993-05-18018 May 1993 Summary of Operating Reactors Events Meeting 93-17 on 930512 ML20128K0041993-02-11011 February 1993 Summary of 930107 Meeting W/Utils in Rockville,Md to Provide Forum for Licensees to Present Staff W/Info Re Design, Operational & Testing Experience & Justification for long- Term Operability of Alternate Min Flow Path ML20126M2191993-01-0606 January 1993 Summary of 921217 Meeting W/Util Re Findings from Fire Protection Insp on 921116 & Related Fire Protection Issues. List of Attendees & Handouts Encl ML20128D1731992-12-0202 December 1992 Summary of 921027 Meeting W/Util in Rockville,Md to Discuss Fire Barrier Acceptance Criteria ML20126J7941992-01-0404 January 1992 Summary of Meeting W/Util Re Pressurizer Surge Line leak- before-break Analysis ML20058N9711990-08-0909 August 1990 Summary of Operating Reactors Events Meeting 90-20 on 900808 NUREG-0797, Summary of Meeting on 890905 in Rockville,Md to Discuss Ground Motion Estimates for Criner Tectonic Structure of Southern Oklahoma Aulacongen in Wichita Tectonic Province, Per Section 2.5.2 of Fsar.Viewgraphs Encl1989-09-11011 September 1989 Summary of Meeting on 890905 in Rockville,Md to Discuss Ground Motion Estimates for Criner Tectonic Structure of Southern Oklahoma Aulacongen in Wichita Tectonic Province, Per Section 2.5.2 of Fsar.Viewgraphs Encl ML20245L2621989-08-0909 August 1989 Summary of 890801 Meeting W/Util in Rockville,Md Re Util Proposed Responses to NRC 890711 Request for Addl Info on Plant Operations QA Program.W/Related Info,Including Request for Addl Info,Draft Responses to Questions & Attendee List ML20247K8451989-07-20020 July 1989 Summary of 890710 Meeting W/Licensee in Arlington,Tx to Discuss Options Re Evacuation of Site Personnel During Upcoming Emergency Preparedness Exercise ML20247D3441989-05-16016 May 1989 Summary of Operating Reactors Events Meeting 89-19 on 890510.List of Attendees,Events Discussed & Significant Elements of Events & Rept of long-term Followup Assignments & Summary of Scrams for Wk Ending 890507 Encl ML20246C3261989-05-0404 May 1989 Summary of Operating Reactors Events Meeting 89-18 on 890503 ML20248K5931989-04-11011 April 1989 Summary of 890406 Meeting W/Util Re Proposed Changes to Unit 1 Initial Startup Testing Program.List of Attendees & Slides Used in Util Presentation Encl ML20235G0491989-02-10010 February 1989 Summary of 890123 Meeting W/Util in Rockville,Md Re Revs 9 & 10 to Emergency Plan.Resolutions Proposed for 13 Planning Items ML20205T6041988-11-0707 November 1988 Summary of 880929 Meeting W/Util in Rockville,Md Re Plant Sys Branch FSAR Review.Problem Areas Include Reliability of Station Svc Water Sys & Util Relief Request from broad-scope Rule Amend GDC 4 Concerning Pressurizer Surge Line.W/Agenda ML20205N7911988-10-31031 October 1988 Summary of 881019 Meeting W/Util in Rockville,Md Re Unit 1 Tech Specs.Meeting Notice,Corrected Agenda & List of Attendees Encl ML20206E9051988-10-31031 October 1988 Summary of 881005-06 Meetings W/Util in Rockville,Md Re Proposed Changes to Tech Specs.Related Info,Including Meeting Notice W/Agenda,List of Attendees & Annotated Summary of All Unreviewed Generic Changes Encl ML20155G3311988-10-0404 October 1988 Summary of 880111-15 Meeting in Glen Rose,Tx Re Proposed Changes to First Draft Tech Specs.List of Attendees & Viewgraphs Encl ML20207L5201988-10-0404 October 1988 Summary of 880412 Meeting W/Util in Rockville,Md Re Planned Changes to Tech Spec 6.0 Concerning Administrative Controls, Tech Spec Development & Review Schedule & NRC Review of Proposed Tech Spec Changes ML20207P1081988-10-0404 October 1988 Summary of 880922 Meeting W/Util in Rockville,Md Re Tech Specs & Util Prioritization of 64 Unreviewed Generic Changes Proposed for Facility ML20155C7241988-09-30030 September 1988 Summary of 880321 Meeting W/Util in Rockville,Md Re Attenuation of Jets from high-energy Line Breaks.Meeting Notice,List of Attendees & Handouts on Jet Impingement Loadings Encl ML20155C7271988-09-30030 September 1988 Summary of 880921 Meeting W/Util in Rockville,Md Re Chemical Engineering Branch Review of Fsar.List of Attendees,Meeting Notice & Agenda Encl ML20155G2041988-09-30030 September 1988 Summary of 880317-18 Meeting W/Util in Rockville,Md Re Fire Protection Programon Program in Response to Open & Unresolved Items in Insp Rept 50-445/87-22.Util Attends to Submit Advanced Draft FSAR Changes by Early May 1988 ML20154L7101988-09-20020 September 1988 Summary of 880908 Meeting W/Util in Rockville,Md Re Changes to Emergency Plan Since Rev 8 Was Reviewed by Staff & Results of Review Documented in Safety Ser.Meeting Notice & List of Attendees Encl ML20154J8911988-09-19019 September 1988 Summary of 880907 Meeting W/Util in Rockville,Md Re Bounding Analysis for Stress Condition Pressurizer Surge. List of Attendees & Presentation Matl Encl.Proprietary Version of Presentation Slides Also Encl ML20154C1601988-09-0202 September 1988 Summary of 880830 Meeting W/Licensee Representatives at Util Site Re Operator Training Program & License Exam Results. W/List of Attendees,Agenda & Viewgraphs ML20153F0431988-08-31031 August 1988 Summary of 880818 Meeting W/Util & Westinghouse in Rockville,Md Re Application of leak-before-break Methodology to Pressurizer Surge Line.Meeting Notice,Agenda,List of Attendees & Slides Used in Presentation Encl ML20151P1841988-07-28028 July 1988 Summary of 880614 Meeting W/Util Re Radiation Protection Organization.Meeting Notice,Agenda,List of Attendees & Util Presentation Encl ML20206H5171988-07-26026 July 1988 Summary of Allegation Review Committee 880721 Meeting Held by Telephone Re Encl Listed Allegations ML20155F4811988-05-31031 May 1988 Summary of 880523-26 Audit of Util Corrective Action Program in Glen Rose,Tx.Audit Included Review of Util Reasons for Establishing HVAC Design Validation Effort & Review of Scope of QA Technical Audit Program ML20154G3471988-05-16016 May 1988 Summary of 880512 Meeting W/Util in Rockville,Md Re Design Change Involving Backup Meteorological Monitoring Tower at Plant.List of Attendees & Viewgraphs Encl ML20150D9191988-03-17017 March 1988 Summary of 880205 Meeting W/Util in Rockville,Md Re NRC Comments on Ebasco Svcs,Inc Jet Attenuation Calculation, CPE-SI-CA-0000-645 ML20149M0791988-02-18018 February 1988 Summary of 871112 Meeting W/Util in Bethesda,Md Re Jet Impingement Effects in Break Exclusion Region of Main Steam & Feedwater Piping at Plant.Meeting Notice & List of Attendees Encl ML20149H0141988-02-12012 February 1988 Summary of 871207-11 Audit Re Implementation of Procedures for Train C Conduit Supports Less than or Equal to 2 Inches. Lists of Persons Involved W/Audit & Documents Reviewed Encl ML20149D7401988-02-0101 February 1988 Summary of 871216 Meeting W/Util Re leak-before-break Piping Analysis & Amplified Response Spectra for Floors.List of Attendees & Presentation Slides on leak-before-break & Amplified Response Spectra Encl ML20236V9001987-11-25025 November 1987 Summary of 871028-30 Audit W/Util & S&W in Cherry Hill,Nj Re Implementation of Piping Design Criteria ML20236W2641987-11-25025 November 1987 Summary of 870908-10 Audit of as-built Field Verification Program for Conduit Support Trains a & B & Train C Greater than 2 Inches at Plant.List of Personnel Involved & Walkdown Packages Reviewed During Audit Encl ML20236L6241987-11-0505 November 1987 Summary of 870928-1001 Audit of Comanche Peak Response Team third-party Review of Cable Tray/Supports at Ofcs of Tenera in Berkeley,Ca.List of Persons Involved in Audit & Attending Exit Meeting Encl ML20236F1201987-10-20020 October 1987 Summary of 870914 Meeting W/Util & Ebasco Svcs,Inc in New York,Ny Re Resolutions to Generic Technical Issues Re Design of Conduit Supports ML20236F7621987-10-19019 October 1987 Summary of 870915 Meeting W/Util & Util Design Contractors in New York,Ny Re Resolutions to Generic Technical Issues on Structural Integrity of HVAC Design ML20236C3851987-10-16016 October 1987 Summary of 870922-24 Audit at Ofcs of S&W in Cherry Hill,Nj Re Implementation of Pipe Design Criteria.Attendance List Encl ML20236B1871987-10-0909 October 1987 Summary of 870826-27 Meetings W/Util & Contractors in New York,Ny Re Resolution of Generic Technical Issues Associated W/Cable Tray Hangers.Meeting Notice,List of Attendees & Presentation Matl Encl ML20235V1771987-10-0505 October 1987 Summary of 870902 Public Meeting W/Util & S&W in Cherry Hill,Nj Re Uresolved Large Bore Piping & Pipe Support Issues 1999-04-26
[Table view] |
Text
~ -
o o _
g* I/ UNITED STATES
(
1 q .
o 4 NOCLEAR REGULATOPY COMMISSION +R 8 WASHINGTON, D. C. 20806 .
5 November 25, 1987; fi i
. Docket Nos. 50-445D ,m and 50-446- ", t y^
gQ Texas Uti'Ities Electric Company (TU. Electric) ]L APPLICANT:
FACILITY: Comanche Peak'SteamLElectric. Station (CPSES), Units 1 and 2' '
SUBJECT:
SUMMARY
0F AUDIT.ON OCTOBER 28-30, 1987 --IMPLEMENTATION'0Ff ,
d j
1
' PIPING DESIGN CRITERIA ".
1 On.0ctober 28-30,1987,'the'NRCstaffand-itsconsultantscoAducted'a9olloAp' audit of the CPSES Corrective Action Program for-of Stone'& Webster Engineering Corporation'(SWEC) piping'Jersey.-
.in Cherry Hill,'New' design at the off
~
ll The purpose-of the audit was to continue 1the review >of the adequacy of.the ,
implementation of design criteria: developed by SWEC forithe resolution:of..'
generic technical issues associated with large bore' piping and pipe supports; L o 1 at CPSES. The followup audit was.a continuation of' audits"previously held on; ~ '
.c j September 2-4, 1987 and September 22-24 '1987 (see NRC' staff; audit summaries; 1 1 '
dated September 28, 1987 and October. 16,1987,respectively)..'In-addition, .h the staff discussed a number of specific questions arising:from a general review of the piping design criteria @rovided in Comanche Peak; Project Procedure (CPPP)-7, " Design Criteria for Pipe Stress and Pipe' Supports,"' Revision!3, N dated February 23, 1987. , j The following is a sumary of the issues selected in the audit, the extent of their implementation reviewed by the staff, and the-status of the staff's review of the issues as discussed at the exit meeting. A list of attendees at Ii.;
the exit meeting is provided;in the enclosure to-this summary.
)
Pipe Support Stability - The staff reviewed 12 additional' pipe support calcula- 4 tions selected from the deposition of one of the. CASE
- witnesses -(CASE exhibit. l 669/6698) related to the issue of stability. The staff reviewed.the~. latest . j pipe support calculations and drawings for the. adequacy of modifications imple -
mented by SWEC'per CFPP-7 guidelines. The staff found that of the 12 supports reviewed, 6 supports have been' deleted. 3 supports (associated with a. single. 6 non-rigid gang frame) have.been modified to a single rigid gang frame,'and j 1 U-bolt support has been modified to a' welded pipe stanchion.. In addition .
I frame support (details unknown in CASE Exhibit 669/6698L) is; currently:a rigid l gang hanger frame. The staff found.that'the modifications to these 12 supports >
adequately resolve the instability concerns associated with them 'as identified '
in the. CASE Exhibit 669/669B. j i
nl b a( 7'3 Q)yo
.J , j'l l 8712070157 871125 N i' L!
h PDR ADOCK 05000445 '
A PDR g -9 'i o .
h[
g -
y Sumary of Audit on 10/28-30,' 1987 ' - P - November 25, 1947 l
h j '
U-solt Twisting and Cinched U-Bolt - The stiff Ytviewed 8 additional suppobts k
I identifieo.in CASE Exhibit 669/669B which ntiNd a cinched U-bolt on a .
E trapeze designs The latest pipe support kew,%9s were reviewed for the adequacy- '
of the modification to resolve the issues 'or D-bolt twisting and cinchedf U-bolt. Of thelB; pipe supports reviewed, the staff found thst 3 supportsi .j l have been deleted, ? supports are incomplete (in process), I support has been l modified to a strap with lugs per CPPP-7,1 support has been modified to a rigid frame, and I support has been modified to a standard pipe clamp with ~l snubber. The staff found the modifications completed to date to' conform to
- the guidelines M CDPP 7 and adequately. msolve the concerns associated with U-bolt twisting' and% bolt cinching, The staff did not identify any open itecG 1
in the modificat hos to these supports. l 1
Seismic /Non-Seismic Interface Anchor Desigti - As part of the followQ review l of issues identified in the CPSES Safety dduation Report Supple' ent {,SSER) !
No.10, the staff audited an item regardird the design of saisin%/ndh-seismic i interface anchors (see NRC staff " Summary of Meeting on SeptemWe 2 f1987N 1 Piping Generic Technical Issues," dated October 5.1987, Item 32). Jte5 staff y selected a seismic /non-seismic interface anchor in the Auxiliary feedwater _I l
system to review the methods of analysis used for the piping systems connected to the anchor. The piping on the seismic side of the anchor used a detailed' response spectrum nethod of analysis (stress problem 1-N015). The pfptng on the non-seismic (turbine building) side und a simplified calculation based.on .1 the plastic hinge moment which would occur in"the event of piping system ' collapse.
The methods of analyses are consistent with the licensing commitments in the FSAR and are, thus, acceptable. Tde staff did not identify any open or unresolad ites.
Richmond Inserts 1 The staff continued its revieN of the modifications proposed to accommodate the itermal expansion in a feedwater gang fran:e located inside containunt using Richmond inserts. (See Item A.2 in Audit Summary dated October 16, 1987.) @ e modifications are not yet finalized. However, the staff review'of the proposed modifications finds a reduction in the overall length of the tube stoel frame.
The new sections will be evaluated by SWEC using the CPPP-7 deslgn criteria for establishing the maximum tube steel section lengths. Contingent upon the proposed modifications satisfying the acceptance criteria in CPPF-/fhe staff finds the modifications to be acceptable, The staff concludes that tne overall process used to Atemine the accepteoility of thermal expansion in long-tube steel frames inside containment using Richmt.ind dnserts to be adequately idplen,ented. The staff did nct identify any open or unresolved items. d LocalStressin'Pign3-Thestaffselected3calculationsforevaluatino local st*6is~E~~'sprag.
p The calculations included an opposing double trunnion design, pads on large diameter piping, antfa stanchion welded to a pipe elbow.
The staff revie,wed th applications of the methodology used to evaluate the local stress effects in the piping for overall correctness. The staff did not:
identify any open or unresolved items. 4 ,
/
.]
sw k
_ _ _ _ - ..r .o
y- -
p m I
,; k j i,, ,,
- h 19 i s
Summary of Audit on 10/28-30,1987 , ' Ncven6er 25,1987 Excessive Girth Butt Weld Ra fial Shrinkage - As part of the followup review of 55ER 11 iswes, the staff audfIIS an item related to the stress intensifi- t',J catien factor (SIF) used in pipiig design for evaluating excessive radial. weld h' shrinkage in piping girth butt walds'. (See Item 33 in1 Enclosure 3 to Meeting Sumary dated October 5,1987.) The staff finds that j;he SIF of 1.1 developed by SWEC for CPSES Lppears to be joconsistent with SIF values established by the ASME Boiler & Pr2ssure Vessd Code Section III (ASME Code) for evaluating other as-welded pipe conditions. Ahe staff finds that there are only 7 welds of ;
concern where the SIF has been used. This is considered an open item and will {
be discussed fn:Nr in a safety evaluation.
j Pipe Support Generic Stiffness - The staff audited the uso: of acttal pipe support stiffness which would be used in lieu of the generfcitt!ff sefis as i specified in CPPP-7. ThestaffrevlewedProjectMemorandud(?AI)Md7which controls the process when actual Stiffnesses are to be used. phe ' actual stiffnesses will be used during final reconciliation of the as-Jdit piping conditions. The staff did not identify any open or unresolted items.
Tube Steel Seatien Properties - The staf'i audited the conformance of the SWEC design data uTa'olrd pipe support calculations to the American Institute of Steel Constructica '(ALSC) " Manual of Steel Construction," 8th Edition, as specified in CPPP.7 and reviewed PM-140 which addresses the calculation of effective throat Mr 2 by 2 inch tube steel. The staff ff d not identifyf t.ny 3 open or unresolved items, Additional Followup Items - During a previous staff audit of the piping as-built verification program, the staff identified on a safety injection line a pipe support design with a pipe clamp welded to a trapeze cross member. The {
staff reg' Jested the pipe support calculation to verify the acceptability of the 1 design. The specific pipe support and similar designs have been modified to {
eliminate the clamp and replace it with a stanchion welded to the pipe and i trapeze cross member. The resultinn moment restraint effects and higher SIF on the pipe will be alculated by SWEC'in the final piping reconcilidion analysis.
The staff did not identify any open or unresolved items. !
A total of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> was involved during this audit at the SWEC offices. ) ,
A David Turco, Mechanical Engineer i Comanche Hek Project Division Office of Special Projects i
Enclosure:
List of Exit Meeting Attendees 3 cc: See next page., ,
I !
j I f 2 d-A e.u
~
} :o p -
f l W. G. Counsil Comanche Peak Steam Electric Station d Texas utilitTes Electric Company Units 1 and 2 cc:
Thomas G. Dignan, Jr. Asst. Director for Inspec. Programs
. Ropes & Gray Comanche Peak Project Division 225 Franklin Street U.S. Nuclear Regulatory Commission Boston, Massachusetts 02110 P. O. Box 1029 Granbury, Texas 76048 Robest A. Wooldridge, Esq. Regional Administrator, Region IV Worsham,$Forsythe, Sampels & U.S. Nuclear Regulatory Commission i Wooldridge 611 Ryan Plaza Drive, Suite 1000 l l
2001 Bryan Tower, Suite 2500 Arlington, Texas 76011 Dallas, Texas 75201 Lanny A. Sinkin Christic Institute
& , Homer C. Schmidt
' Director of Nuclear Services 1324 North Capitol Street Texas Utilities Electric Company Washington D.C. 20002 Skyway Tower e
400 North Olive Street, L.B. 81 Ms. Billie Pirner Garde. Esq.
'" Dallas, Texas 75201 Government Accountability Project -
Midwest Office Mr. Et;bert E. Bailard, Jr. 104 East Wisconsin Avenue
.Girector of Projects Appleton, Wisconsin 54911 libbs and Hill, Inc.
11 Penn Plaza New York, New York 10001 David R. Pigott, Esq.
Orrick, Herrington & Sutcliffe 600 Montgomery Street j San Francisco, California 94111 Mr. R. S. Howard Westinghouse Electric Corporation P. O. Box 355 Anthony Z. Roisman, Esq.
Pittsburgh, Pennsylvania 15230 Suite 600 l 1401 New York Avenue, NW '
Renea Hicks, Esq. Washington, D.C. 20005 Assistant Attorney General Environmental Protection Division Robert Jablon P. O. Box 12548 Capitol Station Bonnie S. Blair Austin, Texas 78711 Spiegel & McDiarmid 1350 New York Avenue, NW Mrs. Juanita Ellis, President Washington, D.C. 20005-4798 Citizens Association for Sound Energy 1426 South Polk George A. Parker, Chairman Dallas, Texas 75224 Public Utility Committee
- Senior Citizens Alliance Of Ms. Nancy H. Williams Tarrant County, Inc.
CYGNA Energy Services 6048 Wonder Drive 2121 N. California Blvd., Suite 390 Fort Worth, Texas 76133 Wal s t Creek, CA 94596 L
r 1 i
t JJ . . ,
W. G. Counsil Comanche Peak Electric Station -
Texas Utilities Electric Company Units 1 and 2
)
cc' '
Joseph F. Fulbright -Jack R. Newman, Esq.
-Fulbright & Jaworski- Newman~& Holtzinger, P.C.-
1301 McKinney Street Suite 1000 4 Houston, Texas.77010- 1615 L Street, N.W. ]
Washington, D.C. 20036 .]
Roger D. Walker i j
L Manager, Nuclear Licensing 1 Texas Utilities Electric Company Skyway Tower !
400 North Olive Street, L.B. 81 :l Dallas, Texas 75201 Mr. Jack Redding '1 c/o Bethesda Licensing- 'i Texas Utilities-Electric Company -J 3 Metro Center Suite 610 {
Bethesda, Maryland 20814 William A. Burchette. Esq.
Counsel for Tex-La Electric Cooperative of Texas Heron, Burchette, Ruckert & Rothwell q Suite 700 1 I
l 1025 Thomas Jefferson Street, NW i
Washington, D.C. 20007 James P. McGaughy, Jr. d GDS Associates Inc.
a Suite 720 '
1850 Parkway Place Marietta, Georgia 30067 l Administrative Judge Peter Bloch 4 U.S. Nuclear Regulatory Commission <
i Washington, D.C. 20555 Elizabeth B. Johnson Administrative Judge Oak Ridge National Laboratory P. O. Box X, Building 3500 Oak Ridge, Tennessee 37830 Dr. Kenneth A. McCollom-1107 West Knapp Stillwater, Oklahoma 74075 Dr. Walter H. Jordan Administrative Judge ;
881 West Guter Drive Oak Ridge, Tennessee 37830 ;
-4 i
'b Enclosure-Exit Meeting (10/30/87)
Piping Audit - Implementation of Generic Technical Issues SWEC (Cherry Hill, NJ)
List of Attendees TU Electric D. M. Rencher SWEC A. C. Leonard S. A. Ali R. P. Klause F. L. Ogden S. C. Chow W. Wang USNRC/ Consultants D. Terao G. Moy (Teledyne Engineering Services)
R. Hookway (Teledyne Engineering Services) 1 i
i i
l
_ _ - _ - _ _ _ _ _ _ _ _ _ _l
,. ._ _ ~
i c Q Q Q ): I h h
, ~..
4 Sumary of Audit on"10/28-30/87 . 4 .- . Novenber!2571987l Distribution: '
! Docket. File- '
NRC PDR Local PDR. '
t CPPD Reading +
OSP Reading J. Keppler/J. Axelrad 1
-C. Grimes P. McKee ;
J..Lyons R..WarnickL 1 l
M. Malloy
-A. Vietti-Cook D..Terao CPPD-LA.
0GC.Bethesda T F. Miraglia E.-Jordan J. Partlow ACRS(10) <
i l
l l
l l
OFG .:05P:0 PPD 5 P:C PD :05P:CP :A/D:05P:0 PPD -:. :
- AVietti-Cook ':
NAME' :DTerao:cb oy- :JLy .: .:
,?
I DATE ::11/10/87 :11/l')/87 ' :11/t187' ':11/M/87 :: :.
r ,
L _ -_-. - , :IL ss '>