Trip Rept of 841114-16 Site Visit Re Meetings W/Qa/Qc Inspectors to Emphasize That All Safety Issues Must Be Resolved Before Units Can Be Licensed
ML20199G318
Person / Time
Site: Comanche Peak, 05000000
Issue date: 01/15/1985
From: Noonan V
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML20197J178 List: ... further results
References
FOIA-85-59 NUDOCS 8606250168
Download: ML20199G318 (2)


Text

.

3 '/ UNITED STATES 85 n NUCLEAR REGULATORY COMMISSION h"v. WASHINGTON, D. C. 20555 g. b, e y.z)]s *****.

. g JAN 15 E85 '

Docket Nos.:- 50-445/446 . .

l l . MEMORANDUM FOR:

  • Darrell G. Eisenhut, Director 1 Division of. Licensing -

FRON: ' Vincent S. Noonan, Director j Comanche Peak Project

~

SUBJECT:

NOVEMBER 14-16, 1984 TRIP REPORT i TO COMANCHE PEAK

On Thursday, November 15, 1984, I requested that Texas Utilities (TV) make
available QA/QC inspectors in all disciplines from Comanche Peak Units 1 and 2 for discussions with myself and Annette Vietti, a project manager on my staff.

l; We met with approximately 70 QA/QC inspectors in groups of five to ten i throughout the day. The purpose of the meetings was to emphasize to the

] inspectors that the NRC must resolve.all safety concerns before either unit can be licensed. We also assured each group that any inspector having a safety concern could discuss it in confidence with the NRC staff and to' facilitate .

this opportunity, we would accept collect telephone calls. Ms. Vietti and I
provided.them with our telephone numbers by handing out our business cards.

! We also discussed with them the NRC's concerns regarding TU supervisory attitudes toward the QA/QC issues they had raised. We emphasized to them that the NRC will attempt.to ensure that TU adequately addresses all safety concerns identified by QA/QC inspectors. Finally, we discussed with them the role of

. the NRC resident inspector in forwarding their concerns directly to me at NRC headquarters.

It is too soon to tell how effective the meetings were, although it was obvious to us that the inspectors appreciated the interest taken by NRC in fostering an attitude that will permit them to perform their important work

/P effectively. In fact, one group, which voiced several concerns, then met with

& Herb Livermore, TRT QA/QC Group Leader, who will now follow up on a couple of

.f I

the concerns raised.

That evening, three NRC staff members, three of our consultan'ts and myself l assembled for a pre-arranged feedback interview with one of our primary l

allegers, A-3. Although we waited a reasonable amount of time, alleger A-3 8606250168 860611

e

- - ~ . . , . . . -  ;.. . . . - . . . . .

z - -

1 . .

JAN 151985 i

I .

Darrell G. Eisenhut did not appear, so we concluded the meeting after making a record of who had attended and noting'that the allege- did not attend. We will keep a file copy of the record and provide a copy to the alleger. -

li,

/. .

1 eu .N nan, Director

! Comanche 'eak reject i

1' I

E 1

9 cc: W. Dircks

  • H. Denton

. E. Case j H. Gagliardo R. Wessman c 1 S. Burwell

! J. Zudans

! R. C. Tang

) R. Bangart j R. Keimig L. Shao -

C. McCracken H. Livemore 4

e 1

4 n

l' r

1 P.

  • e

.t _ _ _ _ ..__. _ _ _ _ . . _ . - - _ _ _ __ . - - -

' pungjh UNITED STATES u

/. . ,

" 7. / N ", f (

m 4 NUCLEAR REGULATORY COMMISSION

$ n .

j WASHINGTON. D. C. 20555 g ,

n

$g + ,/

i FEB i 2 1985 t

l Dockets: 50-445/446 Texas Utilities Electric Company Skyway Tower 400 North Olive Street l Lock Box 81 Dallas, TX 75201 l ATTN:

M.D. Spence,P{esident,TUGC0 l

Subject:

Request for Information on Employee Survey

Dear Mr. Spence:

f The NRC Comanche Peak Intimidation Panel has identified the need for

  • information about employeefsurveys conducted in 1979 and 1983, to determine the conditions under which these surveys were administered. Please i provide responses to the following questions to assist the panel in its

- evaluation effort. ,

i n i 1. What were employees told concerning the confidentiality of their

! responses, who would be seeing the results, and how the survey data

! would be used? i

} I s 2. How were the suryeys introduced and passed out to employees?

i i

3. Where and how did employees complete the surveys?
4. What guidelines ere used by those transcribing employee responses?

l 5. Howwerethecomhletedsurveysreturnedtomanagement.

A

6. How were employees selected to participate?

, F t 7. Which organizational units and/or job categories were included and

! excluded from ths surveys and what criteria were used for this process? -

i

8. How many QC inspectors were employed at the plant when each of these twosurveyswerejtaken?

. I, .

i

~2~

FEB t 2 1966 Please provide responses to me within ten working days of receipt of this letter.

i.

Sincerely, 1

)

, / - .

i , ector anche Pea Project cc: J. Gagliardo B. Kaplan -

S. Treby 1

o 1

r P

> /

e P

8 G F

e e

P

UNITED STATES n -

C 3

c8%>k -

j NUCLEAR REGULATORY COMMISSION w WASHINGTON, D. C. 20555 e

2 8 BBS MEMORANDUM FOR: Vincent S. Noonan, Director -

Comanche Peak Project FROM: Herbert Livermore QA/QC Group Leader Comanche Peak Technical Review Team

SUBJECT:

MEETING WITH UTILITY REPRESENTATIVE JOHN HANSEL I Her'b Livermore and Clif Hale met with John Hansel (TVEC QA Issues Leader), and I a member of his team on January 21, 1985, at 1:00 pm. Mr. Hansel wanted i certain specifics regarding items in our January 8,1985, letter to TUGC0 concerning QA/QC. Areas discussed were:

. Document Control As-built inspections Inspector qualifications and training Corrective actions and trending l 10 CFR Part 50.55(e) reporting Valve disassembly and reassembly Fuel pool liner The information provided to Mr. Hansel was typical of the information provided during our January 17, 1985, meeting with the utility. Mr. Hansel was advised that all the details would be provided in the SSERs when they are compiled and 7

issued.

b ,

He t Livermor j QA/QC Group Leader Comanche Peak Technical l Review Team cc: TRT Group Leaders R. Wessman l L,