MONTHYEARML20206C8331999-04-26026 April 1999 Summary of 980929 Meeting with Texas Utilities Electric Co Re Licensing Submittals Requesting Exemption to App K & Topical Rept Submitted in Support of Exemption Request .List of Attendees Encl ML20236X4431998-08-0505 August 1998 Summary of 980814 Meeting W/Util Re Use of Caldon Leading Edge Flow Meter for App K Exemption & Power Uprate License Amend on 980714.List of Meeting Attendees Encl ML20198H4361997-12-24024 December 1997 Summary of 971112 Meeting W/Util at NRC Ofcs to Discuss 970228 Responses to 960522 Cable Functionality Safety Evaluation.Licensee Briefly Described Revised Response to Open Item Re Fire Stops.List of Attendees Encl ML20141H9291997-07-30030 July 1997 Summary of 970717-18 Meeting W/Tue Representatives in Glen Rose,Texas Re Licensee Proposed risk-informed Inservice Testing Program.List of Attendees Encl ML20129B5921996-10-16016 October 1996 Summary of 961016 Meeting W/Util in Rockville,Md Re License Amend Request 96-005,inverters & Battery Chargers Mod ML20058J0961993-11-29029 November 1993 Summary of 930920 Meeting W/Util Re Results of Thermo-Lag Tests for Facility Fire Barrier Configurations ML20058F4501993-11-26026 November 1993 Summary of 931006 Meeting Re Possible Implementation of Improved Standard Ts.List of Attendees Encl ML20059K3131993-11-0505 November 1993 Summary of Operating Reactors Events Meeting 93-42 on 931103 ML20057E4861993-08-0606 August 1993 Trip Repts of NRC Observation of Thermo-Lag Fire Barrier Test Specimen Const by Util for Qualification of Thermo-Lag Fire Barriers Installed in Facility & NUMARC for Generic Qualification of Thermo-Lag Fire Barriers in Industry ML20056D9841993-05-18018 May 1993 Summary of Operating Reactors Events Meeting 93-17 on 930512 ML20128K0041993-02-11011 February 1993 Summary of 930107 Meeting W/Utils in Rockville,Md to Provide Forum for Licensees to Present Staff W/Info Re Design, Operational & Testing Experience & Justification for long- Term Operability of Alternate Min Flow Path ML20126M2191993-01-0606 January 1993 Summary of 921217 Meeting W/Util Re Findings from Fire Protection Insp on 921116 & Related Fire Protection Issues. List of Attendees & Handouts Encl ML20128D1731992-12-0202 December 1992 Summary of 921027 Meeting W/Util in Rockville,Md to Discuss Fire Barrier Acceptance Criteria ML20126J7941992-01-0404 January 1992 Summary of Meeting W/Util Re Pressurizer Surge Line leak- before-break Analysis ML20058N9711990-08-0909 August 1990 Summary of Operating Reactors Events Meeting 90-20 on 900808 ML20247R0161989-09-21021 September 1989 Summary of Operating Reactors Events Meeting 89-34 on 890920 to Brief Senior Managers & Regional Offices on Selected Events That Occured Since Last Meeting NUREG-0797, Summary of Meeting on 890905 in Rockville,Md to Discuss Ground Motion Estimates for Criner Tectonic Structure of Southern Oklahoma Aulacongen in Wichita Tectonic Province, Per Section 2.5.2 of Fsar.Viewgraphs Encl1989-09-11011 September 1989 Summary of Meeting on 890905 in Rockville,Md to Discuss Ground Motion Estimates for Criner Tectonic Structure of Southern Oklahoma Aulacongen in Wichita Tectonic Province, Per Section 2.5.2 of Fsar.Viewgraphs Encl ML20247E3641989-09-0606 September 1989 Summary of 890717 Meeting W/Numarc,B&W Owners Group & Representatives of Lead Plants Re Status of STS Amends & Outstanding Issues Associated W/Lead Plant STS Submittals ML20247D5291989-09-0505 September 1989 Summary of Operating Reactors Events Meeting 89-31 on 890830.Significant Event for Input Into NRC Performance Indicator Program Identified ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20247K2471989-08-24024 August 1989 Trip Rept of Staff 890718-19,21 & 0801-02 Visits to Nuclear Power Plants to Gather Info Re Industry Actions to Address Loss of Oil Malfunctions of Rosemount Models 1153 & 1154 Transmitters ML20245L2621989-08-0909 August 1989 Summary of 890801 Meeting W/Util in Rockville,Md Re Util Proposed Responses to NRC 890711 Request for Addl Info on Plant Operations QA Program.W/Related Info,Including Request for Addl Info,Draft Responses to Questions & Attendee List ML20245G5421989-08-0303 August 1989 Summary of Operating Reactors Events Meeting 89-28 on 890802.List of Attendees,Events Discussed & Significant Elements of Events & Summaries of Reactor Scrams for Wks Ending 890723 & 30 Encl ML20248B5171989-08-0303 August 1989 Summary of 890725 Interface Meeting W/Util in Birrmingham,Al Re Sonopco/Util Corporate Organization Including Generic Activities & Initiatives Re Plants.Agenda & Viewgraphs Encl ML20247K8451989-07-20020 July 1989 Summary of 890710 Meeting W/Licensee in Arlington,Tx to Discuss Options Re Evacuation of Site Personnel During Upcoming Emergency Preparedness Exercise ML20246P7771989-07-13013 July 1989 Summary of Operating Reactors Events Meeting 89-26 on 890712.Events Discussed & Significant Elements of Events Presented in Encl 2.List of Attendees Also Encl ML20246F8691989-06-22022 June 1989 Summary of Operating Reactors Events Meeting 89-24 on 890621.On 890615,potential Unmonitored Primary Coolant Release Path to Environ Discovered at WPPSS-2.On 890617,loss of Offsite Power Occurred at Brunswick,Unit 2 ML20245G6411989-06-15015 June 1989 Summary of Operating Reactors Events Meeting 89-23 on 890614.On 890607,multiple Electrical Distribution Sys Problems Occurred at Oconee,Units 1,2 & 3.On 890610,unit Power Signal Caused Scram ML20245F2221989-06-0808 June 1989 Summary of Operating Reactors Events Meeting 89-21 on 890531.List of Attendees & Related Info Encl ML20245A3851989-05-30030 May 1989 Summary of Operating Reactors Events Meeting 89-20 on 890524.List of Meeting Attendees & Viewgraphs Encl ML20247M7961989-05-24024 May 1989 Summary of 890502 Meeting W/Util,Sargent & Lundy & Rl Cloud Assoc in Rockville,Md Re Nonlinear Piping Analyses Used to Justify Removal of Snubbers & Pipe Supports.List of Attendees & Presentation by Licensee & Contractors Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247J7051989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl. Record Copy ML20247J6991989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20247D3441989-05-16016 May 1989 Summary of Operating Reactors Events Meeting 89-19 on 890510.List of Attendees,Events Discussed & Significant Elements of Events & Rept of long-term Followup Assignments & Summary of Scrams for Wk Ending 890507 Encl ML20246L7281989-05-0505 May 1989 Summary of 890503 Meeting W/Util in Rockville,Md Re Containment Vessel Structural Integrity Tech Specs for Plants.List of Attendees & Licensee Presentation Encl ML20246C3261989-05-0404 May 1989 Summary of Operating Reactors Events Meeting 89-18 on 890503 ML20246B5161989-04-28028 April 1989 Summary of 890419 Operating Reactors Events Meeting 89-16. List of Attendees & Handouts Encl ML20248K5931989-04-11011 April 1989 Summary of 890406 Meeting W/Util Re Proposed Changes to Unit 1 Initial Startup Testing Program.List of Attendees & Slides Used in Util Presentation Encl ML20248K3761989-04-10010 April 1989 Summary of Operating Reactors Events Meeting 89-014 on 890405.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Reactor Scrams for Wk Ending 890402 Encl ML20247F1991989-03-24024 March 1989 Summary of Operating Reactors Events Meeting 89-12 on 890322.List of Attendees,Events Discussed & Significant Elements,Summary of Reactor Scrams & Comparison of Weekly Statistics W/Industry Averages for Wk Ending 890319 Encl ML20247A8971989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-11 on 890315.List of Attendees,Events Discussed & Significant Elements of Events & Four Events Identified for Input to NRC Performance Indicator Program & Summary of Scrams Encl ML20246N9201989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-010 on 890308.List of Attendees,Significant Events Identified for Input to NRC Performance Indicator Program & Summary of Reactor Scrams for Wk Ending 890305 Encl ML20245H8011989-02-23023 February 1989 Summary of Operating Reactors Events Meeting 89-08 on 890222.Attendee List & Events Discussed & Significant Elements of Events Encl ML20235M1671989-02-17017 February 1989 Summary of Operating Reactors Events Meeting 89-07 on 890215.List of Attendees,List of Events Discussed,Summary of Events for Long Term Followup or Input to NRC Performance Indicator Program & Summary of Reactor Scrams Encl ML20235G0491989-02-10010 February 1989 Summary of 890123 Meeting W/Util in Rockville,Md Re Revs 9 & 10 to Emergency Plan.Resolutions Proposed for 13 Planning Items ML20196B9821988-12-0101 December 1988 Summary of Operating Reactors Events Meeting 88-47 on 881129.List of Attendees,Events Discussed & Significant Elements of Events,Two Events Suggested for long-term Followup & Summary of Reactor Scrams Encl ML20206L9831988-11-25025 November 1988 Summary of Operating Reactors Events Meeting 88-45 on 881115.List of Attendees & Handouts Encl ML20195H0271988-11-25025 November 1988 Summary of Operating Reactor Events Meeting 88-46 on 881122 1999-04-26
[Table view] Category:TRIP REPORTS
MONTHYEARML20057E4861993-08-0606 August 1993 Trip Repts of NRC Observation of Thermo-Lag Fire Barrier Test Specimen Const by Util for Qualification of Thermo-Lag Fire Barriers Installed in Facility & NUMARC for Generic Qualification of Thermo-Lag Fire Barriers in Industry ML20247K2471989-08-24024 August 1989 Trip Rept of Staff 890718-19,21 & 0801-02 Visits to Nuclear Power Plants to Gather Info Re Industry Actions to Address Loss of Oil Malfunctions of Rosemount Models 1153 & 1154 Transmitters ML20154L1661988-05-10010 May 1988 Trip Rept of 880412-15 Mgt Team Visit to Plant Sites,Two Matls Licensees & Region I Ofcs.List of Team Members & Summary of Observations & Perceptions from Visit Encl.Info Deleted ML20196F9951988-02-24024 February 1988 Partially Withheld Trip Rept of 880209-11 Mgt Team Visit to Region V & San Onofre & Trojan Sites Re Integrated Assessment of Mgt Effectiveness Associated W/Regionalized NRR & NMSS Programs ML20236Q4351987-11-0606 November 1987 Trip Rept of 871007 Visit to Corporate Consulting & Development Co,Ltd,In Raleigh,Nc Re Static Tests of HVAC Ductwork ML20235F9851987-07-0101 July 1987 Trip Rept of 870623 Visit to Culver City,Ca Re Testing of Conduit Clamps at Anco Engineers,Inc.List of Meeting Attendees Encl ML20151W0041987-03-12012 March 1987 Submits After Trip Rept ML20209J3181986-09-0303 September 1986 Trip Rept of Attendance at 860821 Meeting in Arlington,Tx Re Util Plans for Plant Issues.Summaries of Observations Listed IA-86-778, Trip Rept of 860514-15 Site Visit Re Seismic Design Issues Concerning Cable Trays,Conduit Qualification,Hvac Concerns, CRD Return Lines,Ie Bulletins 79-14 & 79-02 & Nonessential Piping.Request for Addl Info Re Vermont Yankee Encl1986-07-31031 July 1986 Trip Rept of 860514-15 Site Visit Re Seismic Design Issues Concerning Cable Trays,Conduit Qualification,Hvac Concerns, CRD Return Lines,Ie Bulletins 79-14 & 79-02 & Nonessential Piping.Request for Addl Info Re Vermont Yankee Encl ML20213F8661986-07-31031 July 1986 Trip Rept of 860514-15 Site Visit Re Seismic Design Issues Concerning Cable Trays,Conduit Qualification,Hvac Concerns, CRD Return Lines,Ie Bulletins 79-14 & 79-02 & Nonessential Piping.Request for Addl Info Re Vermont Yankee Encl ML20206J6561986-06-23023 June 1986 Trip Rept of 860612 Training Session in Lacey,Wa Re Federal Radiological Emergency Response Plans & Meeting W/Utils & State of Wa Concerning Potential Emergency Preparedness Issues.Attendees Listed & Training Agenda Encl ML20210S4371986-05-21021 May 1986 Trip Rept of 860505-07 Site Visit to Attend Civil/Structural Issues Audit Meetings.Audit Attendee List & Agenda Encl ML20244D8391986-05-0707 May 1986 Trip Rept of 860415 Site Visit Re Demonstration for Ultrasonic Exam Procedure of Statically Cast Stainless Steel Primary Loop Welds.Issue of Preservice Ultrasonic Exam of Welds Resolved.Trip Repts by Inel & Bnwl Encl ML20244D8401986-04-22022 April 1986 Trip Rept of 860415 Site Visit Re Demonstration of Ultrasonic Exams Performed on Cast Stainless Steel Primary Piping Welds.Exam Procedure Appears to Meet or Exceed ASME Code Requirements.Written Procedure Not Available ML20140H4751986-04-0101 April 1986 Trip Rept of 851120-22 Site Audit of S&W Implementation of Project Procedure CPPP-8 for Piping & Pipe Supports.No Items of Noncompliance or Deviations Noted IA-86-270, Trip Rept of 860219 Site Visit to Examine Problems Re Improperly Installed Cable Splices Used for Bunker-Remo Electrical Penetration Connections to Field Wiring.List of Attendees Encl1986-03-0606 March 1986 Trip Rept of 860219 Site Visit to Examine Problems Re Improperly Installed Cable Splices Used for Bunker-Remo Electrical Penetration Connections to Field Wiring.List of Attendees Encl ML20205K8111986-03-0606 March 1986 Trip Rept of 860219 Site Visit to Examine Problems Re Improperly Installed Cable Splices Used for Bunker-Remo Electrical Penetration Connections to Field Wiring.List of Attendees Encl ML20154L9181986-03-0606 March 1986 Trip Rept of 851021-24 Site Visits Re Wrong Unit/Wrong Train Events to Determine Whether Simple,Low Cost Improvements Can Be Identified & Implemented ML20237C9681986-02-19019 February 1986 Trip Rept of Attendance at State of Il 860213 Meeting Re Training Session on NRC Incident Response Program & NRC Participation in 860408 Plant Emergency Exercise.List of Attendees & Partial Agenda Encl ML20153E3411986-02-18018 February 1986 Trip Rept of 851021-24 Site Visit Re QA Program Procedures. Results of Discussions Factored Into 860115 Memo ML20205J5411986-02-18018 February 1986 Trip Rept of 851021-24 Site Visit Re QA Program Procedures. Listed Personnel Contacted at Site.Results of Discussions Documented in 860115 Memo ML20137U7271986-01-29029 January 1986 Trip Rept 2201 of 860121 Visit to Robert L Cloud & Assoc,In Berkeley,Ca Re Participation in Facility Cable Tray Verification Program.Company Will Audit Cable Tray Tests Performed by Ebasco,Impell Corp & Anco ML20137U7791986-01-22022 January 1986 Trip Rept 2202 of 860122 Visit to Impell Corp in Walnut Creek,Ca Re Applicability of Slenderness Ratio Limit to Facility Cable Tray Hangers & Impell Design Criteria & Procedures.Viewgraphs Encl ML20210C0771986-01-17017 January 1986 Trip Rept 2200 of 860117 Site Visit Re HVAC Hanger Program Audit.Status of Licensee Steam Electric Station Seismic Qualification Rept of Seismic Category 1 Duct Work & Hangers Changed from Approved to Not Approved on 860121 ML20210B9781986-01-16016 January 1986 Trip Rept of 851202-03 Visit to Tera Ofcs in Bethesda,Md to Audit Documentation Supporting Initial Level of Homogeneity for Design Activities Review Procedure DAP-21 That Will Be Implemented to Validate Homogeneity ML20141H8551986-01-10010 January 1986 Trip Rept of 851112-15 Site Visits Re Wrong Unit/Wrong Train Events.Visit Conducted as Part of short-term Effort to Determine If Low Cost Improvements Can Be Identified & Implemented to Reduce Frequency of Events ML20141C9661985-12-18018 December 1985 Trip Rept of 851009-10,15-17 & 28-31 Site Visits Re Methodology Used by Applicant/Contractor in Establishing Equipment Populations & Equipment/Work Processes Homogeneity ML20197E2451985-12-18018 December 1985 Trip Rept of 851125 Visit to S&W Engineering Corp Re Audit of Nonseismic Piping Effects on Seismic Design Piping. Further Audit of Anchor Designs Required.List of Attendees & Related Info Encl ML20141K3731985-12-0505 December 1985 Trip Rept of 851126 Audit Discussions Per Slenderness Ratio Limitations for Hanger Type Supports.Ebasco Svcs,Inc Considering Adoption of Revised Procedure.Slenderness Ratios Should Be Used Only Where Uncertainties Exist ML20141K3761985-12-0202 December 1985 Trip Rept of 851011 Audit W/Util,Tera & Comanche Peak Response Team.List of Attendees Encl.Meeting Between Tera & BNL Consultants Will Be Held to Discuss Steam Generator Lateral Restraints ML20141K3941985-12-0202 December 1985 Trip Rept of 851113-14 Visit to Corporate Consulting & Development Co,Ltd to Audit Ongoing Tests of Electrical Conduit Clamps ML20141K4031985-12-0202 December 1985 Trip Rept of 851118-22 Audit of Cable Tray Hanger Walkdown. Supports Walked Down & Noted Discrepancies Listed ML20141K4841985-11-22022 November 1985 Trip Rept of 851025 Audit at S&W Ofcs in New York,Ny Re Piping & Pipe Support Effort.List of Attendees Encl ML20137G6351985-11-21021 November 1985 Draft Trip Rept 2178 of 851029-31 Site Visit Re Item Vii.C, Const Reinsp/Documentation Review Plan ML20138P7841985-10-24024 October 1985 Trip Rept of 850827-29 Site Visit W/Util & Contractors Re Witnessing of Unit 1 Cable Tray Supports Walkdown in Progress & Collection of Info Concerning New Allegations ML20141K2381985-10-22022 October 1985 Trip Rept of 851014-18 Site Visit Re Status of Comanche Peak Response Team Verification & Corrective Action Activities by S&W,Ebasco & Tera,Qa/Qc Const Verification Effort & Action Plan Implementation ML20141K1991985-10-22022 October 1985 Trip Rept of 851008 Visit to Gibbs & Hill Ofc in New York,Ny Re Audit of Adlpipe Computer Code Used in Piping Analysis. Allegation AP-26 Questioning Validity of Code Verification & QA Maint Unsubstantiated.Agenda Encl ML20141K4371985-10-11011 October 1985 Trip Rept of 850923-26 Audit of S&W as-built Verification Walkdown.Contingent Upon Acceptable Resolution Re Piping Run Geometry & Clearances,S&W Walkdown Well Documented & Easily Verifiable ML20141K4671985-10-11011 October 1985 Trip Rept of 850923-26 Site Visit W/Teledyne Engineering Svcs Re Audit of S&W as-built Verification Walkdown ML20141K2111985-10-11011 October 1985 Trip Rept of 851008 Visit to Gibbs & Hill Ofc Re Followup on Allegation A-26 That Adlpipe Computer Program Not Validated. Attendance List Encl ML20138A1201985-09-23023 September 1985 Trip Rept of 850617-20 Site Visits Re Reduction of Wrong Unit/Wrong Train Events at Facilities ML20141K1261985-09-10010 September 1985 Trip Rept of 850829-30 Visit W/Util & Teledyne at S&W Ofcs in New York,Ny Re Status of S&W Effort Concerning Design Adequacy Program for Plant Piping & Pipe Supports.Lists of Attendees,Agenda & Util Action Plan Encl ML20213F3641985-03-0505 March 1985 Trip Rept of 850208 Site Visit to Inspect Unused Holes in Cable Tray Support Flanges,To Locate Cantilevered Horizontal Plate Attached to Containment Liner Plate & to Inspect & Gather Info on Elastic Joint Filler ML20141K4301985-02-0707 February 1985 Trip Rept of 850126 Site Visit Re Observation of Schmidt Hammer Tests,Seismic Air Space Between Structures & Insp of Portion of Exposed Ceiling in Control Room.List of Attendees & Comments Encl ML20199G3181985-01-15015 January 1985 Trip Rept of 841114-16 Site Visit Re Meetings W/Qa/Qc Inspectors to Emphasize That All Safety Issues Must Be Resolved Before Units Can Be Licensed ML20127B5101984-04-13013 April 1984 Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria Confirmed IA-85-160, Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria Confirmed1984-04-13013 April 1984 Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria Confirmed ML20138M9741983-12-20020 December 1983 Trip Rept of 831129-30 Site Visit Statistical Analysis of Backfit Insp Program ML20205T5371983-02-15015 February 1983 Trip Rept of 830126 Meeting in Bethesda to Discuss Question of Corrective Actions to Be Required of Util Re Finding of Uncertified QC Inspectors at Site ML20134B4611982-09-16016 September 1982 Trip Rept of 820830-31 Visit to Bechtel,Norwalk,Ca to Observe Region IV Insp Concerning Effectiveness of Util/ Bechtel Processing of Field Change Notices for Facility Const.Supporting Documentation Encl 1993-08-06
[Table view] |
Text
.
3 '/ UNITED STATES 85 n NUCLEAR REGULATORY COMMISSION h"v. WASHINGTON, D. C. 20555 g. b, e y.z)]s *****.
- . g JAN 15 E85 '
Docket Nos.:- 50-445/446 . .
l l . MEMORANDUM FOR:
- Darrell G. Eisenhut, Director 1 Division of. Licensing -
FRON: ' Vincent S. Noonan, Director j Comanche Peak Project
~
SUBJECT:
NOVEMBER 14-16, 1984 TRIP REPORT i TO COMANCHE PEAK
- On Thursday, November 15, 1984, I requested that Texas Utilities (TV) make
- available QA/QC inspectors in all disciplines from Comanche Peak Units 1 and 2 for discussions with myself and Annette Vietti, a project manager on my staff.
l; We met with approximately 70 QA/QC inspectors in groups of five to ten i throughout the day. The purpose of the meetings was to emphasize to the
] inspectors that the NRC must resolve.all safety concerns before either unit can be licensed. We also assured each group that any inspector having a safety concern could discuss it in confidence with the NRC staff and to' facilitate .
- this opportunity, we would accept collect telephone calls. Ms. Vietti and I
- provided.them with our telephone numbers by handing out our business cards.
! We also discussed with them the NRC's concerns regarding TU supervisory attitudes toward the QA/QC issues they had raised. We emphasized to them that the NRC will attempt.to ensure that TU adequately addresses all safety concerns identified by QA/QC inspectors. Finally, we discussed with them the role of
. the NRC resident inspector in forwarding their concerns directly to me at NRC headquarters.
It is too soon to tell how effective the meetings were, although it was obvious to us that the inspectors appreciated the interest taken by NRC in fostering an attitude that will permit them to perform their important work
/P effectively. In fact, one group, which voiced several concerns, then met with
& Herb Livermore, TRT QA/QC Group Leader, who will now follow up on a couple of
.f I
the concerns raised.
That evening, three NRC staff members, three of our consultan'ts and myself l assembled for a pre-arranged feedback interview with one of our primary l
allegers, A-3. Although we waited a reasonable amount of time, alleger A-3 8606250168 860611
e
- - ~ . . , . . . - ;.. . . . - . . . . .
z - -
1 . .
JAN 151985 i
I .
Darrell G. Eisenhut did not appear, so we concluded the meeting after making a record of who had attended and noting'that the allege- did not attend. We will keep a file copy of the record and provide a copy to the alleger. -
li,
/. .
1 eu .N nan, Director
! Comanche 'eak reject i
1' I
E 1
9 cc: W. Dircks
. E. Case j H. Gagliardo R. Wessman c 1 S. Burwell
! J. Zudans
! R. C. Tang
) R. Bangart j R. Keimig L. Shao -
C. McCracken H. Livemore 4
e 1
4 n
l' r
1 P.
.t _ _ _ _ ..__. _ _ _ _ . . _ . - - _ _ _ __ . - - -
' pungjh UNITED STATES u
/. . ,
" 7. / N ", f (
m 4 NUCLEAR REGULATORY COMMISSION
$ n .
- j WASHINGTON. D. C. 20555 g ,
n
$g + ,/
i FEB i 2 1985 t
l Dockets: 50-445/446 Texas Utilities Electric Company Skyway Tower 400 North Olive Street l Lock Box 81 Dallas, TX 75201 l ATTN:
M.D. Spence,P{esident,TUGC0 l
Subject:
Request for Information on Employee Survey
Dear Mr. Spence:
f The NRC Comanche Peak Intimidation Panel has identified the need for
- information about employeefsurveys conducted in 1979 and 1983, to determine the conditions under which these surveys were administered. Please i provide responses to the following questions to assist the panel in its
- evaluation effort. ,
i n i 1. What were employees told concerning the confidentiality of their
! responses, who would be seeing the results, and how the survey data
! would be used? i
} I s 2. How were the suryeys introduced and passed out to employees?
i i
- 3. Where and how did employees complete the surveys?
- 4. What guidelines ere used by those transcribing employee responses?
l 5. Howwerethecomhletedsurveysreturnedtomanagement.
A
- 6. How were employees selected to participate?
, F t 7. Which organizational units and/or job categories were included and
! excluded from ths surveys and what criteria were used for this process? -
i
- 8. How many QC inspectors were employed at the plant when each of these twosurveyswerejtaken?
. I, .
i
~2~
FEB t 2 1966 Please provide responses to me within ten working days of receipt of this letter.
i.
Sincerely, 1
)
, / - .
i , ector anche Pea Project cc: J. Gagliardo B. Kaplan -
S. Treby 1
o 1
r P
> /
e P
8 G F
e e
P
UNITED STATES n -
C 3
c8%>k -
j NUCLEAR REGULATORY COMMISSION w WASHINGTON, D. C. 20555 e
2 8 BBS MEMORANDUM FOR: Vincent S. Noonan, Director -
Comanche Peak Project FROM: Herbert Livermore QA/QC Group Leader Comanche Peak Technical Review Team
SUBJECT:
MEETING WITH UTILITY REPRESENTATIVE JOHN HANSEL I Her'b Livermore and Clif Hale met with John Hansel (TVEC QA Issues Leader), and I a member of his team on January 21, 1985, at 1:00 pm. Mr. Hansel wanted i certain specifics regarding items in our January 8,1985, letter to TUGC0 concerning QA/QC. Areas discussed were:
. Document Control As-built inspections Inspector qualifications and training Corrective actions and trending l 10 CFR Part 50.55(e) reporting Valve disassembly and reassembly Fuel pool liner The information provided to Mr. Hansel was typical of the information provided during our January 17, 1985, meeting with the utility. Mr. Hansel was advised that all the details would be provided in the SSERs when they are compiled and 7
issued.
b ,
He t Livermor j QA/QC Group Leader Comanche Peak Technical l Review Team cc: TRT Group Leaders R. Wessman l L,