ML20071F379

From kanterella
Revision as of 14:59, 23 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1983
ML20071F379
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 02/04/1983
From: Kelly W
PACIFIC GAS & ELECTRIC CO.
To:
Shared Package
ML20071F375 List:
References
NUDOCS 8303150512
Download: ML20071F379 (4)


Text

-

MONTHLY NARRATIVE REPORT OF OPERATION AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the month of January, 1983. This narrative report was prepared by the plant staff and is submitted in accordance with Section 6.9.1.10 of the plant Technical Specifications.

There is no significant operating experience or major safety related maintenance to report.

No challenges to the PORV's or safety valves have been made. Furthermore, no char.ges have been made in the Offsite Dose Calculation Procedure, the Environmental Radiological Monitoring Procedure, or any radioactive waste treatment systems.

Y n

&GO3150512 830204 PDR R

ADOCK 05000275 PDR

OPERATING DATA REPORT DOCKET NO. 50-275 DATE 2/4/83 COMPLETED BY Wid1 E01.IV TELEPHONE t u / va-7351 OPERATING STATUS Diablo Canyon Unit 1 Notes

1. Unit Name:
2. Re' porting Period: January 1983
3. Licensed Thermal Power (MWt):

~166.9

4. Nameplate Rating (Gross MWe):

1170

5. De' sign Electrical Rating (Net MWe): 1084
6. Maximum Dependable Ca'pacity (Gross MWe): 1134
7. Maximum Dependable Capacity (Net MWe): 1084
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
9. Power Lesel To Which Restricted,If Any (Net MWe): 10. Reasons For Restrictions,if Any:

Suspended Low Power Test License This Month Yr to.Date Cumulative 0 0 0

11. Hours in Reporting Period
12. Number Of Hours Reactor Was Critical 0 0 0
13. Reactor Reserve Shutdown Hours 0 0 0 0 0 0
14. Hours Generator On.Line
15. Unit Reserve Shutdown Hours 0 0 0'
16. Gross Thermal Energy Generated (MWH) 0 0 0
17. Gross Electrical Energy Generated (MWH) 0 _,

0 0

18. Net Electrical Energy Generated (MWH) 0 0 0
19. Unit Senice Factor . N/A
20. Unit Asailability Factor N/A
21. Unit Capacity Factor (Using MDC Net) N/A
22. Unit Capacity Factor (Using DER Net) N/A
23. Unit Forced Outage Rate N/A
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:

March, 1983 (fuel load)

26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIA L CRITICALITY MAY 1983 INITIAL ELECTRICITY MAY 1983 COMMERCIAL OPER ATION AUGUST 1983 (4/77)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-275 UNIT Diablo Canyon Unit I DATE 2/4/83 COMPLETED BY W.J. Kelly TELEPHONE (805)595-7351 S!0Nm January, 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) (MWe-Net) 0 0 1 37 -_

2 0 ig 0

3 0 19 0 4 0 20 0 5 0 2, 'O 6 0 0 22 7 0 0

23 -

8 0 0 24 1

9 0 0 25 10 0 0 26 0 0 -

11 27 12 0 0 28 13 0 0 29 14 0 0 30 15 0 33 0

16 0 INSTRUCTIONS

! On this forrnat list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to j the nearest whole megawait.

l l

l (9/77) ,

l L_

  • 50-275' ',
  • UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME Diablo Canyon Unit 1 DATE 2/4/83 COMPLETED BY W.J._ Kelly REPORT MONTil January 1983 TELEPilONE (6Ub)b9b-/db1

L

, .!E 3 Y Licensee ,E v, b o4 Cause & Corrective ,

No. Date g 3 ij s jg5 Event gy mo gyU Action to H

$E $ jdg Report te g Prevent Recurrence 6

810928 F 0 H 4 81-002/01T ZZ ZZZZZZ Halted fuel loading preparations upon discovery of seismic calculation errors. Reanalysis and reviews are being conducted ~in accordance with Commission's instructions 1 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data Il-Maintenance or Test '

2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative 5 I G-Operational Error (Explain) Exhibit I - Same Source 19/77) Il Other (Explain) l