Significant Const Deficiency 42 R-1 Re Hma Auxiliary Relays. Initially Reported on 830328.NCR W3-3361 Redispositioned to Use Heat Shrink Tubing Available Onsite.Final Rept Delayed Until 830717
ML20071N904
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/26/1983
From: Drummond F
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3I83-0193, W3I83-193, NUDOCS 8306070274
Download: ML20071N904 (1)


Text

.

EDUISIANA 24a OctAnoNOe Srnter POWER & LIGHT P. O BOX 6008

  • NEW OAtEANS. LOUISIANA 70174 . (504) 366-2345 NuS$sysYtU May 26, 1983 W3I83-0193 Q-3-A35.07.42 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission g h M$%

611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

SUBJECT:

Waterford SES Unit No. 3 -!N Docket No. 50-382 Significant Construction Deficiency No. 42 R-1

,n g%

j "HMA Auxiliary Relays"

REFERENCE:

LP&L letter W3183-0100 dated March 28, 1983

Dear Mr. Collins:

The above referenced letter indicated suomittal of a Final Report to the USNRC no later than May 27, 1983.

At the present time, NCR W3-3361 is redispositioned to use the heat shrink tubing available on site. The corrective action is underway and should be completed by June 20, 1983.

Therefore, a Final Report will be submitted to the USNRC by July 17, 1983.

Very truly yours, Mm F. J. Drummond Project Support Manager - Nuclear FJD/RWP/ MAL:keh cc: 1) Director 3) Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

2) Director 4) Mr. W. M. Stevensor.

Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 8306070274 830526 1 'N PDR ADOCK 05000382