ML20071N904
| ML20071N904 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 05/26/1983 |
| From: | Drummond F LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, W3I83-0193, W3I83-193, NUDOCS 8306070274 | |
| Download: ML20071N904 (1) | |
Text
.
EDUISIANA 24a OctAnoNOe Srnter POWER & LIGHT P. O BOX 6008
- NEW OAtEANS. LOUISIANA 70174. (504) 366-2345 NuS$sysYtU May 26, 1983 W3I83-0193 Q-3-A35.07.42 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission g
h M$%
611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012
-!N
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382
,n j
Significant Construction Deficiency No. 42 R-1 g%
"HMA Auxiliary Relays"
REFERENCE:
LP&L letter W3183-0100 dated March 28, 1983
Dear Mr. Collins:
The above referenced letter indicated suomittal of a Final Report to the USNRC no later than May 27, 1983.
At the present time, NCR W3-3361 is redispositioned to use the heat shrink tubing available on site. The corrective action is underway and should be completed by June 20, 1983.
Therefore, a Final Report will be submitted to the USNRC by July 17, 1983.
Very truly yours, Mm F. J. Drummond Project Support Manager - Nuclear FJD/RWP/ MAL:keh cc:
- 1) Director 3)
Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555
- 2) Director 4)
Mr. W. M. Stevensor.
Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.
20555 8306070274 830526 1
'N PDR ADOCK 05000382
/fC