ML20101Q931

From kanterella
Jump to navigation Jump to search
Part 21 Rept Re Failure to Comply w/1 Minute Rating of NCX-17 Cells Mfg by Gnb Battery Co (Formally Gould).Addl Testing of Cell Sizes & End Voltages Scheduled to Begin on 920713 & Be Completed on 920815
ML20101Q931
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/08/1992
From: Seiken A
NUCLEAR LOGISTICS, INC. (NLI)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-PT21-92 NCR-02-01, NCR-2-1, NUDOCS 9207150165
Download: ML20101Q931 (2)


Text

-4 f.

' ~ - ' '

-- - - " ~ ~

l

)

+4 if' )

L C

NLI NUCLEAR LOGISTICS INC y

July Ss 1992 m

[

NCP-02-01 P<

$ Document Control Desk 2s TU.S; Nucl ar Regulatory Commission E Washington, DC : 20555

-Initial Notification: : NRC_ Operations _ Center 1

Fax (301) 492-8187 y

Subject:

y Reporting of a failure to comply in accorOce with 10CFR21 h

?DEariSir:

1 Nuclear Logistics presents the following information in accordance with 10CFR21 concerning.

e a failure to comply which has been identified.

1):

'Information submitted by:- - Aron Seiken

,1

President-

' Nuclear Logistics,-Inc.

7461' Airport Freeway 7.

-. Fort Worth, TX <76118 '

W Phone: (017) 284-0077-Fax: (817) 590-0484-7 w

lii)4 The item which fails to comply is the NCX-17 (formerly designated NCX-1_200) battery ;

4 Land cells manufactured by GNB Industrial Battery Company (formerly Gould).

clii): -Nucleu I.ngistics:Inc.~ supplied the battery / cells as Class-1E components. NL1 has a i

partnetLip agreement with GNB Industrial Battery Company.for the sale of safety related -

battedes; niv); 2The failure to comply involves the 1 minute rating ofihe NCX-17 cells. Published GNB "n

~. literature ideatifies a 1' minute rating of 1306 amps to 1.75 VPC. Testing by NL1 at this Trate daused the cells to not meet the' acceptance criteria of 1.75 VPC.

~

r

%l:

-!f,.y 6v);

i This. issue was determined to be a defect and reportable under 10CFR21 on July 6,' 1992.

m f$

L 1l0j ' l[

i J

1

{ l.

' it :e 17461 Airport Freeway-.* Fort Worth, Texas 76118 t

1

%. M O h '

<!iTelephone 817-284-0077

  • FAX 817-590-0484

/ I I

{ 0 1

1 m#~ ac.m~.

m u

dv,..;

mi NCR-02 i Page 2 vi)

.These components have been supplied as safety related by.NLI to the following facilities:

1)

LP&L/Waterford - 5 replacement cells vii)

Testing has been performed by NLI to determine a discharge rate where the cells will consistently meet the acceptance criteria of 1.75 VPC. A 1 minute rate of 1165 amps to 1.75 VPC has been established. Testing was completed 6/26/92.

Additional testing is scheduled by GNB and NLI to verify the 1 minute ratings on GNB _

i cells. ' The following testing is planned:

Tes;ing of additional cell sizes Testing to additional end voltages (1.78 VPC,1.81 VPC)

This testing is scheduled to begin 7/13/92 and be compL-te by 8/15/92.

viii) - The results of the testing has been discussed with 2ersonnel at the plant identified in ! tem 1

vi.

If you require additional information on this issue, please contact Mr. Ardie Bell or myscif.

Nery truly yours, I

'h of\\

4

- Aron Seiken Prcsident AS/dw

~

.l NLI i MOJAA LDAftE31NC.

.g i