Part 21 Rept Re Failure to Comply w/1 Minute Rating of NCX-17 Cells Mfg by Gnb Battery Co (Formally Gould).Addl Testing of Cell Sizes & End Voltages Scheduled to Begin on 920713 & Be Completed on 920815
ML20101Q931
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/08/1992
From: Seiken A
NUCLEAR LOGISTICS, INC. (NLI)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-PT21-92 NCR-02-01, NCR-2-1, NUDOCS 9207150165
Download: ML20101Q931 (2)


Text

' "' ' ~ - ' ' ' - -- - - " ~ ~ - -

-4 f.

) +4 if' ) L l C NLI NUCLEAR LOGISTICS INC y ..

m , July Ss 1992

[  : NCP-02-01 P< $ Document Control Desk 2s .

TU.S; Nucl ar Regulatory Commission ,

. E Washington, DC : 20555

- -Initial Notification: : NRC_ Operations _ Center 1y '

Fax (301) 492-8187 y .. .

Subject:

Reporting of a failure to comply in accorOce with 10CFR21 h ?DEariSir:

1 Nuclear Logistics presents the following information in accordance with 10CFR21 concerning .  :

e a failure to comply which has been identified.

,1 1): 'Information submitted by:- - Aron Seiken

President-

' Nuclear Logistics,-Inc.

7461' Airport Freeway

7. -

-. Fort Worth, TX <76118 '

W Phone: (017) 284-0077-Fax: (817) 590-0484- 7 w

lii)4 The item which fails to comply is the NCX-17 (formerly designated NCX-1_200) battery ;

4 Land cells manufactured by GNB Industrial Battery Company (formerly Gould).

clii): -Nucleu I.ngistics:Inc.~ supplied the battery / cells as Class-1E components. NL1 has a i -

partnetLip agreement with GNB Industrial Battery Company.for the sale of safety related -

battedes; niv); 2The failure to comply involves the 1 minute rating ofihe NCX-17 cells. Published GNB

' "n ~ . literature ideatifies a 1' minute rating of 1306 amps to 1.75 VPC. Testing by NL1 at this ~

Trate daused the cells to not meet the' acceptance criteria of 1.75 VPC. r

%l: , , .

-!f, .y

- m ,

6v); i This. issue was determined to be a defect and reportable under 10CFR21 on July 6,' 1992.

f$ L i -

, 1l0j '$ l[

J 1

{ l.

' it :e t 1 17461 Airport Freeway-.* Fort Worth, Texas 76118 -

%.MOh'

<!iTelephone 817-284-0077

  • FAX 817-590-0484 / I I {m0 1 1 m#~ ac.m~ . . u
dv, . .;

mi NCR-02 i Page 2 vi) .These components have been supplied as safety related by .NLI to the following facilities:

1) LP&L/Waterford - 5 replacement cells vii) Testing has been performed by NLI to determine a discharge rate where the cells will consistently meet the acceptance criteria of 1.75 VPC. A 1 minute rate of 1165 amps to 1.75 VPC has been established. Testing was completed 6/26/92.

Additional testing is scheduled by GNB and NLI to verify the 1 minute ratings on GNB _ i cells. ' The following testing is planned:  ;

  • Tes;ing of additional cell sizes
  • Testing to additional end voltages (1.78 VPC,1.81 VPC)

This testing is scheduled to begin 7/13/92 and be compL-te by 8/15/92.

viii) - The results of the testing has been discussed with 2ersonnel 1 at the plant identified in ! tem vi.

If you require additional information on this issue, please contact Mr. Ardie Bell or myscif.