ML20072C885

From kanterella
Revision as of 17:12, 22 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures FNP-0-EIP-15 Re Emergency Drills & FNP-0-EIP-4 Re Chemistry & Health Physics Support to Emergency Plan
ML20072C885
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/02/1983
From: Hudspeth J
ALABAMA POWER CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20072C884 List:
References
NUDOCS 8303100407
Download: ML20072C885 (1)


Text

~ '

I g

(

~

AlabamaPower the southem e!cctrc system February 2, 1983 i

Director NRR Nuclear R'eactor Relations USNRC Phillips Building

. 7920 Norfolk Avenue Bethesda, MD 20014

Dear Sir:

In accordance with Alabama Power Company Administrative Procedure FNP-0-AP-4, Control of Plant Documents and Records, attached are revisions to plant procedures.

Please verify that you have the procedures with the correst, 7 ding copy numbers that are listed on the transmittal. .

Please sign and return the forms as soon as possible to the following address:

i Alabama Power Company Farley Nuclear Plant Box 470 Ashford, AL 36312 ATTN: Document Control Supervisor If you should have any questions, please call me at (205) 899-5156 Ext. 422.

Sincerely, hoJ lb. 'Y  !

(Jo(jy B/)Hudspeth1*.,PDobdmentControl[ Superviso I JBH:hre cc: Larry W. Enfinger File l l

0

< og >

I .

O 8303100407 830302 PDR ADOCK 05000348 F PD9