ML20072C885
| ML20072C885 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 02/02/1983 |
| From: | Hudspeth J ALABAMA POWER CO. |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20072C884 | List: |
| References | |
| NUDOCS 8303100407 | |
| Download: ML20072C885 (1) | |
Text
I g
~
(
~
AlabamaPower the southem e!cctrc system February 2, 1983 i
Director NRR Nuclear R'eactor Relations USNRC Phillips Building 7920 Norfolk Avenue Bethesda, MD 20014
Dear Sir:
In accordance with Alabama Power Company Administrative Procedure FNP-0-AP-4, Control of Plant Documents and Records, attached are revisions to plant procedures.
Please verify that you have the procedures with the correst, 7 ding copy numbers that are listed on the transmittal.
Please sign and return the forms as soon as possible to the following address:
i Alabama Power Company Farley Nuclear Plant Box 470 Ashford, AL 36312 ATTN: Document Control Supervisor If you should have any questions, please call me at (205) 899-5156 Ext. 422.
Sincerely, hoJ lb.
'Y (Jo(jy B/)Hudspeth1*.,PDobdmentControl[ Superviso I
JBH:hre cc:
Larry W. Enfinger File l
l 0
og I
O 8303100407 830302 PDR ADOCK 05000348 F
PD9