ML20083A109

From kanterella
Revision as of 00:56, 14 May 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revised Monthly Operating Repts for Feb 1995 for Prairie Island Nuclear Plant
ML20083A109
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 02/28/1995
From: Dugstad D
NORTHERN STATES POWER CO.
To:
Shared Package
ML20083A100 List:
References
NUDOCS 9505100028
Download: ML20083A109 (2)


Text

- - -

(

    • s f

OPERATING DATA REPORT DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE MARCH 2, 1995 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 borrecEed the capaciityl factor

~

. (MDC' net)'

OPERATING STATUS

1. UNIT NAME: PRAIRIE ISLAND NO. 1
2. REPORTING PERIOD: FEBRUARY 1995
3. LICENSED THERMAL POWER (MWT): 1650
4. NAMEPLATE-RATING (GROSS MWE): 593
5. DESIGN ELECTRICAL RATING (NET MWE): 530
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 545
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) : 513
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT GIVE REASON: NONE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE
10. REASONS FOR RESTRICTIONS, IF ANY: NONE _,_

t THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 672 1416 185880
12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1416.0 J59015.3
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 5571.1
14. HOURS GENERATOR ON-LINE 664.0 1408.0 197349.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1081353 2306749 249215388
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 366490 781950 82131600
18. NET ELECTRICAL ENERGY GENERATED (MWH) 348648 744190 77199457
19. UNIT SERVICE FACTOR 98.8 99.4 84.7
20. UNIT AVAILABILITY FACTOR 98.8 99.4 84.7 r21. UNIT CAPACITY FACTOR (USING MDC NET) 101.1- 102.4- 82.5
22. UNIT CAPACITY FACTOR (USING DER NET) 97.9 99.2 78.4
23. UNIT FORCED OUTAGE RATE 0.0 0.0 4.9
24. FORCED OUTAGE HOURS 0.0 0.0 8125.9 ,
25. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH): )

i N /-A l

26. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE: N/A I

I 9505100028 950503 l PDR ADDCK 05000282 '

R PDR l

.. (*

OPERATING DATA REPORT DOCKET NO. 5_0-306 UNIT PRAIRIE ISLAND NO.2 DATE MARCH 2 1995 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-1376 CorrectedLthe. capacity facter, OPERATING STATUS IH "U)

1. UNIT NAME: PRAIRIE ISLAND NO. 2
2. REPORTING PERIOD: FEBRUARY 1995
3. LICENSED THERMAL POWER (MWT): 1650
4. NAMEPLATE RATING (GROSS MWE) : 593
5. DESIGN ELECTRICAL RATING (NET MWE) : 530
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 544 '
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 512
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT GIVE REASON: NONE __

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE
10. REASONS FOR RESTRICTIONS, IF ANY: NONE THIS MONTH YR-TO-DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 672 1416 176998
12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1416.0 156526.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1516.1 l
14. HOURS GENERATOR ON-LINE 672.0 1416.0 155138.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1106558 2331382 246611604
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 374320 788930 80500970 4
18. NET ELECTRICAL ENERGY GENERATED (MWH) 356428 751331 76108827
19. UNIT SERVICE FACTOR 100.0 100.0 87.6
20. UNIT AVAILABILITY FACTOR 100.0 100.0 87.6
21.; UNIT. CAPACITY FACTOR (USING;MDC NET) 103.6 103.6' 85.9
22. UNIT CAPACITY FACTOR (USING DER NET) 100.1 100.1 81.1
23. UNIT FORCED OUTAGE RATE 0.0 0.0 2.5
24. FORCED OUTAGE HOURS 0.0 0.0 3984.7
25. SHUTDOWNS dCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH):

REFUELING OUTAGE STARTING ON MAY 12, 1995.

4

26. IF CURRENTLY SHUTDOWN 3STIMATED STARTUP DATE: N/A

-