Northern States Power Company 1717 Wakonade Drive East Welch, MN 55089 Telephone 612-388-1121
'3AN.I IS9 7 t
C;;;rch ?, '??E Prairie Island Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60
)
Monthly Operating Report pecember 1996 Attached is the Monthly Operating Report for December 1996 for the Prairie Island Nuclear Generating Plant.
l s
(&
Michael D Wadley Plant Manager Prairie island Nuclear Generating Plant c:
Regional Administrator-Ill, NRC NRR Project Manager, NRC NRC Resident inspector State of Minnesota - Kris Sanda 1
Attachment 9701150051 961231 PDR ADOCK 05000292 R
i s
NRC MONTHLY REPORT PRINTED 1/6/97 Page 1 l
DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE 1/6/97 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-11214376 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE l
MONTH: DECEMBER 1996 Unit 1 was base loaded for the month. There were no shutdowns or power reductions l
\\
L l
1 f
l I
i 1
s e i CURRENT CONTINUOUS OPERATING RUN OF 182 DAYS l
l
NRC MONTHLY REPORT PRINTED 1/6/07 Page 2 DOCKET NO. 50-282 UNIT PRAIRIE ISt.AND NO.1 DATE 1/6/97 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-11214376
,i AVERAGE DAILY POWER LEVEL UNIT 1 MONTH: DECEMBER 1996 DATE.
AVERAGE DAILY POWER LEVEL 12/1/96 528 12/2/96 527 12/3/96 531 l
12/4/96 526 12/5/96 529 12/6/96 528 12/7/96 528 12/8/96 525 12/9/96 528 1
12/10/96 532 12/11/96 522 12/12/96 529 i
12/13/96 528 12/14/96 528 12/15/96 528 12/16/96 528 12/17/96 527 12/18/96 527 12/19/96 528 12/20/96 528 l
12/21/96 528 12/22/96 526 12/23/96 527 12/24/96 527 12/25/96 529 12/26/96 527 12/27/96 528 12/28/96 528 12/29/96 526 12/30/96 528 12/31/96 527 AVERAGE LOADS ABOV 513 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER 5
j
1 NRC MONTHLY REPORT PRINTED 1/6/97 Page 3 DOCKET NO. 50-282 UNIT PRAIRIE ISt.AND NO.1 DATE 1/6/97 COMPLETED BY DALE DUGSTAD OPERATING DATA REPORT i
OPERATING STATUS
- 1. UNIT NAME:
PRAIRIE ISLAND NO.1
- 2. REPORTING PERIOD:
DECEMBER 1996
- 3. LICENSED THERMAL POWER (MWT): 1650
- 4. NAMEPLATE RATING (GROSS MWE): 593
- 5. DESIGN ELECTRICAL RATING (NET MWE): 530
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MVE):
545
- 7. MAXIMUM DEPENDADLE CAPACITY (NET MWE):
513
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON:
NONE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTIONS, IF ANY:
NONE THIS MONTH YR.TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 8784 202008
- 12. NUMBER OF HOURS REACTOR CRITICAL 744.0 7381.4 173740.7
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.00 5571.1
]
- 14. HOURS GENERATOR ON-LINE 744.0 7328.7 172021.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.00 0.00 j
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1224576 11900030 273053513
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 412620 3956900 90080610 l
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 392532 3737975 84712280
- 19. UNIT SERVICE FACTOR 100 83.4 85.2
- 20. UNIT AVAILABILITY FACTOR 100 83.4 85.2
- 21. UNIT CAPACITY FACTOR ( MDC NET) 102.8 83 83.1
- 22. UNIT CAPACITY FACTOR ( DER NET) 99.5 80.3 79.1
- 23. UNIT FORCED OUTAGE RATE O
0.8 4.5
- 24. FORCED OUTAGE HOURS 0.0 61.2 8187.1
- 25. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):
N/A
- 26. IF CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE:
N/A
j NRC MONTHLY REPORT PRINTED 1/6/97 Page 4 l
DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE 1/6/97 i
COMPLETED BY DALE DUGSTAD i
TELEPHONE 612-388-1121-4376
)
UNIT SHUTDOWNS AND POWER REDUCTIONS i
MONTH: DECEMBER 1996 4
1 DATE UNIT TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 12/1/96 1
None 0
NOTES:
l l
4 l
1 HEE REASON METHOD SYSTEM CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL TRIP J
C-REFUELING 3-AUTO TRIP D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING AND 5-REDUCED LOAD COMPONENT CODE LICENSE EXAMINATION 9-OTHER IEEE STD 803A-1983 FADMINISTRATIVE G-OPERATIONAL ERROR H-OTHER
eO NRC MONTHLY REPORT PRINTED 1/6/97 Page 5 DOCKET NO. 50-306
)
UNIT PRAIRIE ISLAND NO. 2 DATE 1/6/97 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE MONTH: DECEMBER 1996 j
Unit 2 was base loaded for the month. There were no shutdowns or power reductions.
j 9
h CURRENT CONTINUOUS OPERATING RUN OF 182 DAYS
NRC MONTHLY REPORT PRINTED 1/6/97 Page 6 DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 14/97 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 AVERAGE DAILY POWER LEVEL i
UNIT 2 MONTH: DECEMBER 1996 DATE.
AVERAGE DAILY POWER LEVEL 12/1/96 532 12/2/96 531 12/3/96 534 J
12/4/96 529 12/5/96 534 12/6/96 530 12/7/96 529 12/8/96 532 l
12/9/96 531 12/10/96 532 12/11/96 529 12/12/96 532 12/13/96 531 12/14/96 531 12/15/96 531 12/16/96 532 12/17/96 531 12/18/96 531 12/19/96 533 12/20/96 530 12/21/96 532 12/22/96 529 12/23/96 531 12/24/96 530 12/25/96 532 12/26/96 531 12/27/96 531 12/28/96 532 12/29/96 530 12/30/96 532 12/31/96 531 4
AVERAGE LOADS ABOV 512 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER
~
1 NRC MONTHLY REPORT PRINTED 1/6/97 Page 7 DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 1/6/97 COMPLETED BY DALE DUGSTAD i
TELEPHONE 612-388-1121-4376 OPERATING DATA REPORT j
OPERATING STATUS I
- 1. UNIT NAME:
PRAIRIE ISLAND NO. 2 4
- 2. REPORTING PERIOD:
DECEMBER 1996
- 3. LICENSED THERMAL POWER (MW7): 1650
- 4. NAMEPLATE RATING (GROSS MWE):
593
- 5. DESIGN ELECTRICAL RATING (NET MWE) 530
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
544
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
512
)
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON:
j NONE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTIONS, IF ANY:
NONE
?
THIS MONTH YR TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 8784 193126
- 12. NUMBER OF HOURS REACTOR CRITICAL 744.0 8684.2 171493.2
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.00 1516.1 1
- 14. HOURS GENERATOR ON-LINE 744.0 8654.8 170044.3 3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.00 0.00
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1224000 14129040 270922109
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 415030 4733980 88635290
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 395146 4485110 83810774
- 19. UNIT SERVICE FACTOR 100 98.5 88 l
- 20. UNIT AVAILABILITY FACTOR 100 98.5 88
- 21. UNIT CAPACITY FACTOR ( MDC NET) 103.7 99.7 86.5 1
t
- 22. UNIT CAPACITY FACTOR ( DER NET) 100.2 96.3 81.9
- 23. UNIT FORCED OUTAGE RATE O
1.5 2.4
- 24. FORCED OUTAGE HOURS 0.0 129.2 4113.9 j
- 25. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (rYPE, DATE, AND DURATION OF EACH):
REFUELING AND MAINT OUTAGE 1/25/1997. APPOX. DURATION 39 DAYS.
- 26. IF CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE:
N/A i
)
4
NRC MONTHLY REPORT PRINTED 1/6/97 o
Page 8 DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 1/6/97 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH: DECEMBER 1996 DATE UNIT TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 12/1/96 2
None 0
NOTES:
IEEE REASON METHOD ftYSTEM CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD S-SCHEDULED B MAINTENANCE OR TEST 2-MANUAL TRIP C-REFUELING 3-AUTO TRIP D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING AND 5-REDUCED LOAD COMPONENT CODE LICENSE EXAMINATION 9-OTHER IEEE STD 803A-1983 F-ADMINISTRATIVE G-OPERATIONAL ERROR H-OTHER