Monthly Operating Repts for Mar 1998 for Prairie Nuclear Generating Plant Units 1 & 2
ML20216C636
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 03/31/1998
From: Dugstad D, Sorensen J
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9804140522
Download: ML20216C636 (7)


Text

.

Northern States Power Company Prairie Island Nuclear Generating Plant 1717 Wakonade Dr. East Welch, Minnesota 55089 April 6,1998 Prairie Island Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk )

Washington, DC 20555 i I

l l

PRAIRIE ISLAND NUCLEAR GENERATING PLANT l Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 {

Monthly Operating Report  ;

March 1998 j Attached is the Monthly Operating Report for March 1998 for the Priarle Island Nuclear Generating Plant. ,

I l

i l

i 1

el P Sorensen i Plant Manager Prairie Island Nuclear Generating Plant l c: Regional Adrninistrator-lll, NRC 4 NRR Project Manager, NRC ,

NRC Resident inspector ,

i State of Minnesota - Kris Sanda f .g.

I 4 Attachment 13 9804140522 990331 PDR ADOCK 05000202 R PDR

' NRC MONTHLY REPORT PRlNTED 04/03/98 Page1

. . DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE 04/03/98 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-11214376 NARRATIVE.

SUMMARY

OF OPERATING EXPERIENCE MONTH: MARCH 1998 During the month of March, Unit 1 was base loaded.

There was one power reduction and there were no shutdowns.

On the 15th at 0100 the Unit started to ramp down in power for a Turbine Valve testing. At 0325 tne Unit halted the power decline and started the testing. At 0439 the Unit started to ramp up and at 0800 the Unit returned to full power operation.

l Because of the LP rotor upgrade the Unit is producing additional megawatts. The values for the Designed Electrical Rating and Maximum Dependable Capacity (both gross and net) will be changed after the Unit completes an URGE test.

t l

f l

I l

l 1

l CURRENT CONTINUOUS OPERATING RUN OF 80 DAYS l l

l l

~

' NRC MONTHLY REPORT PRINTED 04/03/98 Page 2 DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE 04/03/98 COMPLETED BY DALE DUGSTAD OPERATING DATA REPORT

\

OP_EREDN.O STATUS

1. UNIT NAME: PRAlRIE ISLAND NO.1
2. REPORTING PERIOD: MARCH 1998
3. LICENSED THERMAL POWER (MWT): 1650
4. NAMEPLATE RATING (GROSS MWE): 593  ;
5. OESIGN ELECTRICAL RATING (NET MWE): 530 J
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 545
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 513 l
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 7) SINCE LAST REPORT, GIVE REASON:

NONE l

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE

.]

10. REASONS FOR RESTRICTIONS, IF ANY: NONE i

THIS MORT}j YR-TO-DAIE CUMULATIVE ]

I

11. HOURS IN REPORTING PERIOD 744 2160 212928 l
12. NUMBER OF HOURS REACTOR CRITICAL 744.0 2160.0 182937.0
13. REACTOR RESERVE SHU FDOWN HOURS 0.0 0.00 5571.1
14. HOURS GENERATOR ON-LINE 744.0 2136.7 181125.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.00 0.00 1218366 3489327 287767170

]

16. GROSS THERMAL ENERGY GENERATED (MWH)
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 424360 1216480 95035190
18. NET ELECTRICAL ENERGY GENERATED (MWH) 404173 1158687 89393008
19. UNIT SERVICE FACTOR 100 98.9 85.1

) 20. UNIT AVAILABILITY FACTOR 100 98.9 85.1

21. UNIT CAPACITY FACTOR ( MDC NET) 105.9 104.6 83.2
22. UNIT CAPACITY FACTOR ( DER NET) 102.5 101.2 79.2
23. UNIT FORCED OUTAGE RATE 0 0 4.5
24. FORCED OUTAGE HOURS 0.0 0.0 8540.7
25. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):

N/A

26. !F CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE:  !

N/A l

j

~

~

NRC MONTHLY REPORT PRINTED 04/03/98 Page 3

+ . DOCKET NO. 54282 UNIT PRAIRIE ISLAND NO.1 DATE 04/03/98 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH: MARCH 1998 i DATE UNIT TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 03/15/98 1 S 0 B 5 N/A N/A N/A NOTES: Turbine valve testing.

IYEE REAIDE MEDiOD SY1 TEM CODE F-FORCED A EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL TRIP C-REFUELING 3 AUTO TRIP D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING AND 5-REDUCED LOAD COi4PONENLCDDE LICENSE EXAMINATION 9-OTHER IEEE STD 803A-1983 F-ADMINISTRATIVE G-OPERATIONAL ERROR H-OTHER

- . ' NRC MONTHLY REPORT PRINTED 04/03/98 Page 4 DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 04/03G8 COMPLETED BY DALE DUGSTAD TELEPHONE 612-3881121-4376 NARRATIVE

SUMMARY

OF. OPERATING EXPERIENCE NIONTHLMARCH 1998 During the month of March, Unit 2 ended the forced outage that started on January 24th at 15?'2. The forced outage bsted approximately 38 days. The Unit returned to base load ooerotion.

The outage ended on the 4th at 1 *00 when the generator was placed on-line.

The reactor went critical at 0227 of the 4th. The Jnit slowly escalated up in power and reached full power operation on the 6th at 1707.

There were no other reductions or shutdowns for the remainder of the month.

I CURRENT CONTINUOUS OPERATING RUN OF 27 DAYS l

1

}

  • .' ' NRC MONTHLY REPORT PRINTED 04/03/98 Page 5

. . DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 04/03/98 COMPLETED BY DALE DUGSTAD TELEPHONE 612 388-11214376 OPERATING DATA REPORT OPERATING STATUS

1. UNIT NAME: PRAIRIE ISLAND NO. 2
2. REPORTING PERIOD: MARCH 1998
3. LICENSED THERMAL POWER (MWT): 1650 4 NAMEPLATE RATING (GROSS MWE): 593
5. DESIGN ELECTRICAL RATING (NET MWE): 530
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 544
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 512 s
3. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 7) SINCE LAST REPORT, GIVE REASON:

NONE

5. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE
10. REASONS FOR RESTRICTIONS,IF ANY: NONE l

l YR TO-DATE l IHIS MONTH CUMULATIVE l

11. HOURS IN REPORTING PERIOD 744 2160 204346
12. NUMBER OF HOURS REACTOR CRITICAL 669.5 1237.1 1799633
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.00 1516.1
14. HOURS GENERATOR ON-LINE 660.9 1228.3 178455.4
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.00 0.00
16. GROSS THERMAL ENERGY GENERATED (MWH) 1051996 1984170 284448757
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 354260 670270 93167680
18. NET ELECTRICAL ENERGY GENERATED (MWH) 335222 632792 88083962
19. UNIT SERVICE FACTOR 88.8 56.9 87.5
20. UNIT AVAILABILITY FACTOR 88.8 56.9 87.5
21. UNIT CAPACITY FACTOR ( MDC NET) 88 57.2 85.9
22. UNIT CAPACITY FACTOR ( DER NET) 85 55.3 81.5
23. UNIT FORCED OUTAGE RATE 11.2 43.1 3.1
24. FORCED OUTAGE HOURS 83.1 931.7 5662.8 25, SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):

N/A I l

26. IF CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE:

)

N/A l l

l

  • .'- ' NRC MONTHLY REPORT PRINTED 04/03/98 Page 6 DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 04/03/98 COMPLETED BY DALE DUGSTAD TELEPHONE 612 388-1121-4376 UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH: MARCH 1998 DATE UNIT TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 03/04/98 2 F 83.1 A 4 N/A N/A N/A NOTES: Replace au Part-length Control Rod Drive Mechanisms.

IYEE REASON MEIHQQ SYSTEM CQDE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT lEEE STD S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL TRIP C-REFUELING 3-AUTO TRIP D-REGULATORY REST RICTION 440NTINUED E-OPERATOR TRAINING AND 5-REDUCED LOAD COMPONENT CODE LICENSE EXAMINATION 9-OTHER IEEE STD 803A-19C3 F ADMINISTRATIVE G-OPERATIONAL ERROR H-OTHER