|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G4461999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pingp.With ML20216E7151999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with ML20210Q4891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with ML20209F9811999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20195G5181999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included ML20206L6191999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with ML20205N1081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with ML20207J6951999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant ML20207L2811999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2 ML20206P7861998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With ML20206N2731998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20155K6301998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20154H4061998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Prairie Island Nuclear Generating Plant.With ML20153B0761998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Prairie Island Nuclear Generating Plant.With ML20236X8531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Prairie Island Nuclear Generating Plant ML20236R0771998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Prairie Island Nuclear Generating Plant ML20249A5751998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Prairie Island Nuclear Generating Plant ML20247G2921998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Prairie Island Nuclear Generating Plant ML20216C6361998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Prairie Nuclear Generating Plant Units 1 & 2 ML20216E2051998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Prairie Island Nuclear Generating Plant ML20216E2121998-01-31031 January 1998 Revised MOR for Jan 1998 for Prairie Island Nuclear Generating Plant for Unit 2 & Narrative Summary of Operating Experience ML20202E7761998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Prairie Island Nuclear Generating Plant ML20198P1541997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Prairie Island Nuclear Generating Plant,Unit 1 & 2 ML20203H4341997-11-30030 November 1997 Monthly Operating Repts for Nov 1996 for Prairie Island Nuclear Generating Plant,Unit 1 ML20199D0701997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Prairie Island Nuclear Generating Plant ML20198J7281997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20210S5911997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20217J0681997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Prairie Island Nuclear Generating Plant ML20148K3871997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20141A9581997-04-30030 April 1997 Monthly Operating Repts for April 1997 for Prairie Island Nuclear Plant ML20137T2891997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Prairie Island Nuclear Plant ML20135F6841997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Praire Island Nuclear Generating Plant ML20134L8831997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Praire Island Nuclear Generating Plant ML20133F8611996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Praire Island Nuclear Generating Plant ML20135E8811996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Prairie Island Nuclear Generating Plant ML20134L7091996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Prairie Island Nuclear Generating Plant ML20128G1741996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Prairie Island Nuclear Generating Plant ML20117N1521996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Prairie Island Nuclear Generating Plant ML20116J6451996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Prairie Island Nuclear Generating Plant ML20115A8321996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Prairie Island Nuclear Generating Plant Units 1 & 2 ML20117K5811996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Prairie Island Nuclear Generating Plant ML20111B2801996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Prairie Island Nuclear Generating Plant ML20101N8931996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Prairie Island Nuclear Generating Plant Units 1 & 2 ML20101D0671996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Praire Island Nuclear Generating Plant Units 1 & 2 ML20097D5411996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Prairie Island Units 1 & 2 ML20096E9631995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Prairie Island Nuclear Generating Plant ML20095G4371995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Prairie Island Nuclear Generating Station ML20094L7491995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Prairie Island Nuclear Generating Plant ML20098D0101995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Prairie Island Nuclear Generating Plant ML20092D0091995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Prairie Island Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G4461999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pingp.With ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20216E7151999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with ML20211D3981999-08-24024 August 1999 Safety Evaluation Supporting Requested Actions to Licenses DPR-42 & DPR-60,respectively ML20211C2531999-08-0404 August 1999 Unit 1 ISI Summary Rept Interval 3,Period 2 Refueling Outage Dates 990425-990526 Cycle 19 971212-990526 ML20210Q4891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with ML20211B5971999-07-31031 July 1999 Cycle 20 Voltage-Based Repair Criteria 90-Day Rept ML20209J1131999-07-15015 July 1999 Safety Evaluation of Topical Rept NSPNAD-8102,rev 7 Reload Safety Evaluation Methods for Application to PI Units. Rept Acceptable for Referencing in Prairie Island Licensing Actions ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20209F9811999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20196F4081999-06-23023 June 1999 Revised Pages 71,72 & 298 to Rev 7 of NSPNAD-8102, Prairie Island Nuclear Power Plant Reload Safety Evaluation Methods for Application to PI Units ML20195G5181999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included ML20207B5931999-05-26026 May 1999 SER Accepting Licensee Proposed Alternative to ASME Code for Surface Exam (PT) of Seal Welds on Threaded Caps for Unit 1 Reactor Vessel Head Penetrations for part-length CRDMs ML20196L2501999-05-13013 May 1999 Rev 0 to PINGP Unit 1 COLR Cycle 20 ML20206L6191999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with ML20205N1081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with ML20205Q5101999-03-15015 March 1999 Inservice Insp Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 981109-1229 Cycle 19,970327-981229 ML20207J6951999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant ML20202J7711999-02-0404 February 1999 Simulator Certification Rept for Prairie Island Plant Simulation Facility,1998 Annual Rept ML20202G3761999-01-31031 January 1999 Non-proprietary Rev 7 to NSPNAD-8102-NP, Prairie Island Nuclear Power Plant Reload SE Methods for Application to PI Units ML20207L2811999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2 ML20202J1731999-01-22022 January 1999 Safety Evaluation Concluding That NSP Proposed Alternative to Surface Exam Requirements of ASME BPV Code for CRD Mechanism Canopy Seal Welds Will Provide Acceptable Level of Quality & Safety ML20206P7861998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With ML20205H0561998-12-31031 December 1998 Northern States Power Co 1998 Annual Rept. with ML20198J6441998-12-17017 December 1998 Rev 0 to PINGP COLR Unit 2-Cycle 19 ML20206N2731998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20196D7341998-11-20020 November 1998 Third Quarter 1998 & Oct 1998 Data Rept for Prairie Island Isfsi ML20155K6301998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20154H4061998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Prairie Island Nuclear Generating Plant.With ML20202J7991998-09-30030 September 1998 Non-proprietary Version of Rev 3 to CEN-629-NP, Repair of W Series 44 & 51 SG Tubes Using Leaktight Sleeves,Final Rept ML20198P0571998-09-0303 September 1998 Rev 1 to 95T047, Back-up Compressed Air Supply for Cooling Water Strainer Backwash Valve Actuator ML20153B0761998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Prairie Island Nuclear Generating Plant.With ML20237A3961998-08-11011 August 1998 Safety Evaluation on Westinghouse Owners Group Proposed Insp Program for part-length CRDM Housing Issue.Insp Program for Type 309 Welds Inadequate from Statistical Point of View ML20237A8171998-08-0505 August 1998 SER Related to USI A-46 Program GL 87-02 Implementation for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20236X8531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Prairie Island Nuclear Generating Plant ML20236R6481998-07-15015 July 1998 Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at PINGP Unit 2 - Preliminary Summary Rept ML20236R0771998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Prairie Island Nuclear Generating Plant ML20249A5751998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Prairie Island Nuclear Generating Plant ML20247G7011998-05-31031 May 1998 Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at Prairie Island Nuclear Generating Plant,Unit 2 ML20248M0561998-05-31031 May 1998 Rev 5 to CEN-620-NP, Series 44 & 51 Design SG Tube Repair Using Tube Rerolling Technique ML20247E2671998-05-0505 May 1998 Rev 0 to Pingp,Units 1 & 2,Pressure & Temp Limits Rept (Effective Until 35 Efpy) ML20247G2921998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Prairie Island Nuclear Generating Plant ML20217M6901998-04-29029 April 1998 Safety Evaluation Accepting Methodology for Relocation of Reactor Coolant Sys P/T Limit Curves & LTOP Sys Limits Proposed by NSP for Pingp,Units 1 & 2 ML20216C6361998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Prairie Nuclear Generating Plant Units 1 & 2 ML20216H0341998-03-31031 March 1998 Cycle-19 Voltage Based TSP Alternate Repair Criteria 90-Day Rept ML20217D2041998-03-13013 March 1998 Rev 1 to 28723-A, Intake Canal Liquefaction Analysis Rept for Pingp,Welch,Mn ML20236P9801998-03-12012 March 1998 Rev 0 to 97FP02-DOC-01, Compliance Review of 10CFR50,App R, Section Iii.O RCP Lube Oil Collection Sys ML20248L3931998-03-10010 March 1998 ISI Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 971018-971212 Cycle 18,960303-971212 ML20216D0911998-03-0606 March 1998 Rev 0 to Prairie Island Generating Plant,Units 1 & 2, Pressure & Temp Limits Rept 1999-09-30
[Table view] |
Text
_
~
g l Northern States Power Company 1717 Wakonade Drive East .
' Welch, MN 55089 Telephone 612-388-1121 February 7,1997 Prairie Island Technical Specifications Section 6.7.A.3 I I
US Nuclear Regulatory Commission I Attn: Document Control Desk l Washington, DC 20555 1
PRAlRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Monthly Operating Report January 1997 Attached is the Monthly Operating Report for January 1997 for the Prairie Island Nuclear Generating Plant.
l Joel P Sorensen Plant Manager .
Prairie Island Nuclear Generating Plant !
c: Regional Administrator-Ill, NRC NRR Project Manager, NRC e "J '/- '
NRC Resident inspector State of Minnesota - Kris Sanda
[b Attachment 19005'? I l 9702190332 970131 PDR ADOCK 05000282 R PDR
PRINTED 02J05/97 I -
NRC MONTHLY REPORT Page1
) -
DOCKET No. 5o 282
, f UNIT PRAIRIE ISLAND NO.1
(
DATE 02/05/97
- COMPLETED BY DALE DUGSTAD TELEPHONE 612-3881121-4376 i
i NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE l
MONTHLJANUARY_lttZ
, Unit 1 was base loaded for January. A power reduction beQan on January 18th at 0007 for turbine i
! valve tesdng. The unit returned to full power on the 18th at 0830. There were no shutdowns or j other power reductions.
l f
l l
1 O
O CURRENT CONTINUOUS OPERATING RUN OF 213 DAYS
PRINTED 02AMV97 NRC MONTHLY REPORT Page 2 DOCKET NO. 50-282
/] UNIT PRAIRIE ISLAND NO.1 l DATE 02/05417 COMPLETED BY DALE DUGSTAD TELEPHONE 612-306-1121-4376 AVERAGE DAILY POWER LEVEL UNIT 1 l MONTH: JANUARY 1H7 D&If,1 AVERAGE DAILY POWER LEVEL i 01/01/97 527 01/02/97 529 01/03/97 525 01/04/97 528 01/05/97 519 01/06/97 528 01/07/97 512 ,
01/08/97 527 l 01/09/97 527 01/10/97 529 ;
01/11/97 526 I 01/12/97 527 ;
01/13/97 526 01/14/97 529 O'
01/15/97 523 01/16/97 528 01/17/97 528 01/18/97 459 01/19/97 531 01/20/97 523 01/21/97 527 01/22/97 528 01/23/97 528 01/24/97 526 01/25/97 525 01/26/97 525 01/27/97 525 01/28/97 528 01/29/97 529 01/30/97 529 s 01/31/97 529 O
V AVERAGE LOADS ABOVE 513 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER
PRINTED 02/05S7 NRC MONTHLY REPORT Page 3 i
DOCKET NO. 50 282 UNIT PRAIRIE ISLAND NO.1 D DATE 02/0547 COMPLETED BY DALE DUGSTAD TELEPHONE 612 388-1121-4376 OPERATING DATA REPORT l
)
OPERATING STATUS i
- 1. UNIT NAME: PRAIRIE ISLAND NO.1
- 2. REPORTING PERIOD: JANUARY 1997 i
- 3. L! CENSED THERMAL POWER (MWT): 1850
- 4. NAMEPLATE RATING (GROSS MWE)
- 593
- 5. DESIGN ELECTRICAL RATING (NET MWE): 530
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 545
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE)
- 513 l 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON:
- NONE 1
' 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTIONS, IF ANY: NONE i'
THIS MONTH YR-TO-DATE CUMULATIVE
' 202752
- 11. HOURS IN REPORTING PERIOD 744 '*4 4
- 12. NUMBER OF HOURS REACTOR CRITICAL 744.0 14.0 174484.7
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.00 5571.1
- 14. HOURS GENERATOR ON-LINE 744.0 744.0 172765.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.00 0.00 ;
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1218453 1218453 274271966
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 410340 410340 90490950 <
390124 390124 85102404 !
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
- 19. UNIT SERVICE FACTOR 100 100 85.2
- 20. UNIT AVAILABILITY FACTOR 100 100 85.2
- 21. UNIT CAPACITY FACTOR ( MDC NET) 102.2 102.2 83.2
- 22. UNIT CAPACITY FACTOR ( DER NET) 98.9 98.9 79.2
- 23. UNIT FORCED OUTAGE RATE O O 4.5
- 24. FORCED OUTAGE HOURS 0.0 0.0 8187.1
- 25. SHUTDOWNS SCHEDULED OVER NEXT StX MONTHS (TYPE, DATE, AND DURATION OF EACH):
N/A
- 26. IF CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE-N/A O ;
l
- NRC MONTHLY REPORT Page 4 i .
i DOCKET NO. 50 282 UNIT PRAIRIE ISt.AND NO.1 DATE 02/05/97 COMPLETED BY DALE DUGSTAD TELEPHONE 612-386-1121-4376 UNIT SHUTDOWNS AND POWER REDUCTIONS i
MONTH: JANUARY 1997 l
4 DATE UNIT TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 01/18/97 1 S 0 B S N/A N/A N/A NOTES: Turbine valve testing f
4 i
4 O ;
Iy.Eg REASON METHOD SYSTEM CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL TRIP C-REFUELING 3-AUTO TRIP D. REGULATORY RESTRICTION 4 CONTINUED E-OPERATOR TRAINING AND 5-REDUCED LOAD COMPONENT CODE LICENSE EXAMINATION 94THER IEEE STD 803A-1983 O F-ADMINISTRATIVE G-OPERATIONAL ERROR H-OTHER
PRINTED 02/05/97 NRC MONTHLY REPORT Page 5 DOCKET NO. 50306 UNIT PRAIRIE ISLAND NO. 2 O DATE 02KAi/97 COMPLETED BY DALE DUGSTAD TEL '* HONE 612-3881121-4376 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE MONTH: JANUARY 1997 Unit 2 was base loaded for January. Coast down operation began on Jan. 7th at 1230 for the refueling and maintenance outage. The outage started when the generator was then off line on the 24th at 2256 and the reactor was tripped on the 25th at 0155. This ended a continuous operating run of 206 days.
O O
CUR 9ENT CONTINUOUS OPERATING RUN OF 206 DAYS
' NRC MONTHLY REPORT
- Page 6
- l DOCKET NO. 50 306 I UNIT PRAIRIE ISLAND NO,2 i DATE02 M 97 j COMPLETED BY DALE DUGSTAD i d TELEPHONE 612N1121-4376 j
! AVERAGE DAILY POWER LEVEL UNIT 2 MONTH: JANUARY 1997
]
DATfd AVERAGE DAILY POWER LEVEL j 01/01/97 531 01/02/97 532 -
01/03/97 528 1
01/04/97 530 l
01/05/97 529 01/06/97 531 01/07/97 529 01/08/97 525 01/09/97 520 01/10/97 516 01/11/97 509 01/12/97 508 01/13/97 501 01/14/97 497 01/15/97 490 01/16/97 487 01/17/97 482 01/18/97 477 i 01/19/97 469 01/20/97 464 01/21/97 461 01/22/97 458 01/23/97 454 01/24/97 398 01/25/97 -14 01/26/97 -8 01/27/97 -3 01/28/97 -3 01/29/97 -2 01/30/97 -2 01/31/97 -2 l
AVERAGE LOADS ABOVE 512 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER
l .
- NRC MONTHLY REPORT PRINTED 02M97 PaOS 7 l i
[ DOCKET NO. 50 308 i UNIT PRAIRIE ISLAND NO.2 DATE02 W 97 COMPLETED BY DALE DUGSTAD TELEPNONE 012-388-11214376 l
, OPERATING DATA REPORT i i
i i
l- OPERATING STATUS
! 1. UNIT NAME- PRAIRIEISLAND NO.2
- 2. REPORTING PERIOD: JANUARY 1997 i 3. LICENSED THERMAL POWER (MWT): 1650
- 4. NAMEPLATE RATING (GROSS MWE)
- 593
- 5. DESIGN ELECTRICAL RATING (NET MWE): 530 l" 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 544
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 512
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON:
i NONE t
i 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE 4
j 10. REASONS FOR RESTRICTIONS, IF ANY: NONE
. I THIS MONTH YR-TO-DATE CUMULATIVE t
- 11. HOURS IN REPORTING PERIOD 744 744 193870
[^
- 12. NUMBER OF HOURS REACTOR CRITICAL 577.9 0.0 577.9 0.00 172071.1 1516.1
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON-LINE 574.9 574.9 170619.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.00 0.00
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 901680 901680 271823789
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 301560 301560 88036850 l
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 285455 285455 84096229
- 19. UNIT SERVICE FACTOR 77.3 77.3 88
- 20. UNIT AVAILABILITY FACTOR 77.3 77.3 88
- 21. UNIT CAPACITY FACTOR ( MDC NET) 74.9 74.9 86.4
- 22. UNIT CAPACITY FACTOR ( DER NET) 72.4 72.4 81.8 t
- 23. UNIT FORCED OUTAGE RATE O O 2.4
- 24. FORCED OUTAGE HOURS 0.0 0.0 .4113.G
- 25. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE AND DURATION OF EACH):
REFUELING AND MAINTENANCE OUTAGE IN PROCESS.
- 26. IF CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE:
55-97
_j
PRINTED 02/OSrD7
, NRC MONTHLY REPORT Page 8 DOCKET NO. 50 306 UNIT PRAIRIE ISLAND NO.2 DATE 02/05/97 COMPLETED BY DALE DUGSTAD TELEPHONE 612 3861121-4376 f
UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH: JANUARY 1997 DATE UNIT TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 01/07/97 2 S 0 C 5 N/A N/A N/A NOTES: Coastdown operation 01/24/97 2 S 169.1 C 1 N/A N/A N/A NOTES: Refueling outage, cycle 17 to 18 J l
l l
H2g REASON METHOD SYSTEM CODE F-FORCED A-EQUlPMENT FAILURE 1-MANUAL DRAFTlEEE STD S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL TRIP C-REFUELING 3. AUTO TRIP D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING AND 5-REDUCED LOAD COMPONENT CODE LICENSE EXAMINATION S.OTHER IEEE STD 803A-1983 F-ADMINISTRATIVE G-OPERATIONAL ERROR H-OTHER