ML20128G174
| ML20128G174 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 09/30/1996 |
| From: | Dugstad D, Wadley M NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9610080367 | |
| Download: ML20128G174 (9) | |
Text
.'
Northern States Power Company l
1717 Wakonade Drive East Welch, MN 55089 Telephone 612-388-1121 October 3,1996 Prairie Island Technical Specifications Section 6.7.A.3
^
US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 l
PRAIRIE ISLAND NUCLEAR GENERATING PLANT l
Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Monthly Operating Report September 1996 Attached is the Monthly Operating Report for September 1996 for the Prairie Island Nuclear Generating Plant.
l
\\
b p ud A c.
/
\\
Michael D Wadley
)
Plant Manager i
Prairie Island Nuclear fienerating Plant c:
Regional Admini.c'.rator-Ill, NRC NRR Project Manager, NRC NRC Resident Inspector State of Minnesota - Kris Sanda Attachment h ')Y /
9610080367 960930 PDR ADOCK 05000282 R
PDR i
,NO'b
. C,
)
)
l J
t.
'NRC MONTHLY REPORT PRINTED 10/02,96 Page1 DOCKET NO. 50 282 UNIT PRAIRIE ISLAND NO.1 DATE 10/02/96 OOMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE MONTH: SEPTEMBER 1995 Unit One was base loaded this (nontn, there were no shutdowns or power reductions.
CURRENT CONTINUOUS OPERATING RUN OF 90 DAYS
i 4
I
\\
'NRC MONTHLY REPOP.T PRINTED 10/02/96 I
Page 2 DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE 10/02/96 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 AVERAGE DAILY POWER LEVEL UNIT 1 MONTH: SEPTEMBER 1996 DATE:
AVERAGE CAlLY POWER LEVEL 09/01/96 512 09/02/96 509 09/03/96 512 09/04/96 510 09/05/96 509 09/06/96 508 09/07/96 512 09/08/96 511 09/09/96 512 09/10/96 516 09/11/96 513 09/12/96 520 09/13/96 515 09/14/96 521 09/15/96 519 09/16/96 517 09/17/96 521 09/18/96 520 09/19/96 521 09/20/96 520 09/21/96 523 09/22/96 520 09/23/96 523 09/24/96 522 09/25/96 523 09/26/96 524 09/27/96 526 09/28/96 526 09/29/96 526 09/30/96 525 s
AVERAGE LOADS ABOVE 513 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER
j
'NRC MONTHLY REPORT PRINTED 1002/96 1
Page 3
]
DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 j
DATE 1002/96 COMPLETED BY DALE DUGSTAD I
TELEPHONE 612-3881121-4376 1
I OPERATING DATA REPORT i
i l
OPERATING STATUS i
1
- 1. UNIT NAME:
PRAIRIE ISI.AND NO.1
- 2. REPORTING PERIOD:
SEPTEMBER 1996
{
- 3. LICENSED THERMAL POWER (MWT): 1650
- 4. NAMEPLATE RATING (GROSS MWE):
593 j
- 5. DESIGN ELECTRICAL RATING (NET MWE): 530 i
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
545
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
513
{
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON:
4 NONE 4
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTIONS, IF ANY: NONE i
i THIS MONTH YR-TO-DATE CUMULATIVE 1
i
- 11. HOURS IN REPORTING PERIOD 720 6575 199799
~
- 12. NUMBER OF HOURS REACTOR CRITICAL 720.0 5172.4 171531.7 j
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.00 5571.1 i
- 14. HOURS GENERATOR ON-LINE 720.0 5119.7 169812.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.00 0.00 l
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1185798 8286511 269439994 j
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 303330 2730430 88863140
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 372886 2580005 83554310
- 19. UNIT SERVICE FACTOR 100 77.9 85
}!
- 20. UNIT AVAILABILITY FACTOR 100 77.9 85
- 21. UNIT CAPACITY FACTOR ( MDC NET) 101 76.5 82.9
- 22. UNIT CAPACITY FACTOR ( DER NET) 97.7 74 78.9
- 23. UNIT FORCED OUTAGE RATE O
1.2 4.6
- 24. FORCED OUTAGE HOURS 0.0 61.2 8187.1
- 25. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):
N/A
- 26. IF CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE:
N/A
-- \\
"NRC MONTHLY REPORT PRINTE01002M5 Page 4 DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE 10/0296 COMPLETED BY DALE DUGSTAD TELEPHONE 612-3881121-4376 VNIT SHUTDOWNS AND POWER REDUCTIONS MONTH: SEPTEMBER 1996 DATE UNIT TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 09/01/96 1
None O
NOTES:
net REASON METHOD SYSTEM CODE F-FORCED A-EOUIPMENT FAILURE 1 MANUAL DRAFT lEEE STD S-SCHEDULED B. MAINTENANCE OR TEST 2-MANUAL TRIP C-REFUELING 3 AUTO TRIP D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING AND 5-REDUCED LOAD COMF ONENT CODE LICENSE EXAMINATION 9-OTHER IEEE STD 803A-1983 F-ADMINISTRATIVE G-OPERATIONAL ERROR H4THER
i l
'NRC MONTHLY REPORT PRINTED 10/02/96 Page5 DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 1o/02/96 COMPLETED BY DALE DUGSTAD l
TELEPHONE 612-388-1121-4376 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE MONTH: SEPTEMBER 1996 Unit Two was base loaded this month, there were no shutdowns or power reductions.
d 4
0
=
CURRENT CONTINUOUS OPERATING RUN OF 90 DAYS
- NRC MONTHLY REPORT PRINTED 1002/96 Page 6 DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 10/02/96 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 AVERAGE DAILY POWER LEVEL UNIT 2 MONTH: SEPTEMBER 1996 gelgi AVERAGE DAILY POWER LEVEL 09/01/96 518 09/02/96 515 09/03/96 517 09/04/96 516 09/05/96 515 09/06/96 515 09/07/96 518 09/08/96 517 09/09/96 518 09/10/96 523 09/11/96 518 09/12/96 522 09/13/96 524 09/14/96 526 09/15/96 524 09/16/96 525 09/17/96 524 09/18/96 525 09/19/96 526 09/20/96 526 09/2'J96 528 09/22/96 526 i
09/23/96 528 09/24/96 527 09/25/96 529 09/26/96 530 09/27/96 530 09/28/96 534 09/29/96 531 09/30/96 530 AVERAGE LOADS ABOVE 512 MWE43ET ARE DUE TO COOLER CONDENSER CIRCULATING WATER
l'-
' NRC MONTHLY REPORT-PRINTED 1002/96 Page 7 l
i i
DOCKET NO. 50 306 UNIT PRAIRIE ISLAND NO.2 DATE 10/02/96 l
COMPLETED BY DALE DUGSTAD TELEPHONE 612 386-1121-4376 i
l OPERATING DATA REPORT i
k 4
l OPERATING STATUS
- 1. UNIT NAME:
PRAIRIE ISLAND NO. 2
- 2. REPORTING PERIOD:
SEPTEMBER 1996
{
- 3. LICENSED THERMAL POWER (MWT): 1650 l
- 4. NAMEPLATE RATING (GROSS MWE):
593 l
S. DESIGN ELECTRICAL RATING (NET MWE): 530 i
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
544
{
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
512
{
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON:
NONE j
l
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTIONS, IF ANY: NONE 4
i THIS MONTH XMp-DATE CUMULATIVE l
- 11. HOURS IN REPORTING PERIOD 720 6575 190917
{
- 12. NUMBER OF HOURS REACTOR CRITICAL 720.0 6475.2 169284.2
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.00 1516.1 l
- 14. HOURS GENERATOR ON-LINE 720.0 6445.8 167835.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.00 0.00
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1185240 10498860 267291929 i
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 397200 3502210 87403520
{
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 376842 3312249 82637913
- 19. UNIT SERVICE FACTOR 100 98 87.9 4
- 20. UNIT AVAILABILITY FACTOR 100 98 C7.9 l
- 21. UNIT CAPACITY FACTOR ( MDC NET) 102.2 98.4 86.3
- 22. UNIT CAPACITY FACTOR ( DER NET) 98.8 95 81.7
- 23. UNIT FORCED OUTAGE RATE 0
2 2.4
- 24. FORCED OUTAGE HOURS 0.0 129.2 4113.9
- 25. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):
RE! FUELING AND MAINTENANCE OUTAGE starting in JANUARY 1997
- 26. IF CURRENTLY SHUTDOWN, ECTIMATED STARTUP DATE:
N/A
.NRC MONTHLY REPORT PRINTED 1002/96 Pa0e 8 i
j DOCKET NO. 50 306 UNIT PRAIRIE ISLAND NO. 2 DATE 10/02/96 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 1
UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH: SEPTEMBER 199 4
DATE UNIT TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 09/01/96 2
None 0
NOTES:
l IyEE REASON MEIHQQ SYSTEM CODE F-FORCED A EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD B-MAINTENANCE OR TEST 2-MANUAL TRIP S-SCHEDULED
+
C-REFUEUNG 3-AUTO TRIP D-REGULATORY RESTRICTION
- 4. CONTINUED E-OPERATOR 1 RAINING AND
- 5. REDUCED LOAD COMPONENT CODE LICENSE EXAMINATION 9-OTHER lEEE STD 803A-1983 F-ADMINISTRATIVE G-OPERATIONAL ERROR H-0THER