Northern States Power Company Prairie Island Nuclear Generating Plant 1717 Wakonado Dr. East Welch, Minnesota 55o89 October 10,1997 Prairie Island Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission
("yy!DocumentControlDesk; w f Washingt6rs DC'20555""*4'e4 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50 306 DPR-60 s
Monthly Operating Report Sectember 1997 Attached is the Monthly Operating Report for September 1997 for the Prairie Island Nuclear Generating Plant.
y' l
/[Tj Joel P Sorensen Plant Manager
\\
Prairie Island Nuclear Generating Plant c-Regional Administrator-lll,llRC NRR Project Manager, NRC NRC Resident inspector State of Minnesota - Kris Sanda Attachment
${lllLldB}lijll!!Ill 9710220007 970930 ADOCK0500g2 DR
.4 NRC MONTHLY REPORT PRIN7ED 10/03/97 Page1
. DOCKET NO 50-282 UNIT PRAtRIE ISLAND NO 1 DATE 10/03/97 COMPLETED DY DA1.E DUGSTAD TELEPHONE 612 38811214370 NARRATWEAUMMARLOE.ORERAIING_ EXPERIENCE
- MQNIRSEPTEMBERf99I
' Unit 1 was base' loaded the rnonth of September. There were no shutdow 1. The only power reduction, a coastdown, was started on the 27th at 0125.
l I
e l-CURRENT CONTINUOUS OPERATING RUN OF 105 DAYS
e NRC MONTHLY REPORT PRINTED 10/03S7.
Page 2 4
DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE 10/03/97 COMPLETED BY DALE DUGSTAD -
TELEPHONE 612-388-1121-4370 AVIB&QL DAILY POWER LEVEL UNIT..1 MONTH: SEPTEMBER 1997 QM AVEBAGE DAILY POVVER LEVEL 09/01/97 511 09/02/97 512 09/03/97 513 09/04/97 515 09/05/97 515 09/06/97 514 09/07/97 515 09/08/97 515 09/09/97 517 09/10/97 515 09/11/97 517 09/12/97 517 09/13/97-
$19 09/14/97 515 09/15/97 520 09/16/97 516 09/17/97 519 09/18/97 517 09/10/97 518 09/20/97
'520 09/21/97 521 09/22/97 521 09/23/97 521 09/24/97 521 09/25/97 520 03/26/97 519 09/27/97 514 09/28/97 513 09/29/97 510 09/30/97 508 l
l l'
!~-
AVERAGE LOADS ABOVE.
513 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER l
I
NRC MONTHLY REPORT PRIM 7ED 10/0197 Page 3 e
DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO,1 DATE 10/03/97 COMPLETED BY DALE DUGSTAD OPERATING DATA REPORT OPERA 11NG STATUS
- 1. UNIT NAME:
PRAIRIEISLAND NO.1
- 2. REPORTING PERIOD; SEPTEMBER 1997
- 3. LICENSED THERMAL POWER (MWT): 1650
- 4. NAMEPLATE RATING (GROSS MWE): 593
- 5. DESIGN ELECTRICAL RATING (NET MWE): 530
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
545
_7. MAXIMUM DEPENDABLE CAPACITY (NET MWE);
513
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 7) SINCE LAST REPORT GIVE REASON:
NONE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTIONS, IF ANY:
NONE THIS MONTH YR TO-DATE CUMULAIIVE
- 11. HOURS IN REPORTING PERIOD.
720 6551 208559
- 12. NUMBER OF HOURS REACTOR CRITICAL 720.0 6172.2 179912.9
.13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.00 5571.1
- 14. HOURS GENERATOR ON-LINE 720.0 6161.0 178182.7
- 15. UNIT RESERV5 SHUTDOWN HOURS 0.0 0.00 0.00
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1181716 10049686 283103199
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 392960 3338250 93418860
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 371691 3149652 87861932
- 19. UNIT SERVICE FACTOR 100 94 85.4
- 20. UNIT A>.'AILABILITY FACTOR 100 94 85.4
- 21. UNIT CAPACITY FACTOR ( MDC NET) 100.6 93.7 83.5
- 22. UNIT CAPACITY FACTOR ( DER NET) 97.4 90.7 79.5
- 23. UNIT FORCED OUTAGE RATE O
5.4 4.6
- 24. FORCED OUTAGE HOURS 0.0 353.6 8540.7
- 25. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE. DATE AND DURATION OF EACH):
- Refueling outa9e scheduled for October 18,1997, approx. 54 days.
- 26. IF CURRENTLY SHUTDOWN,- ESTIMATED STARTUP DATE:
N/A i-(
~
NRC MONTHLY REPURT -
PRINTED m'0W
+-
Page 4 DOCKET NO,50-282 UNIT PRAIRIE ISLAND NO 1 DATE 10/03/97 COMPLETED BY DALE DUGSTAD TELEPHONE 612 38811214376 i
UNIT StiUIRQMSAt(D POWER REDUCTIONS i
MONTH: SEPTEMBER 193Z DATE UNIT ~ - TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 09/27/97 1
S 0
C 5'
N/A N/A N/A NOTES:
Started coastdown operation. The outage will start next month.
P IYEE REA80N MEIROD SYSIEM.CQQE F FORCED A-EQUIPMENT FAILURE 1 MANUAL DRAFT IEEE STD
-S-SCHEDULED D-MAINTENANCE OR TEST 2-MANUAL TRIP C-REFUELING 34UTO TRIP O-REOULATORY RESTRICTION 4-CONTINUED E. OPE 'ATOR TRAINING AND 5 REDUCED LOAD COMEQNENLCQQE LICENSE EXAMINATION 0-0THER lEEE STD 803A-1983 F-ADMINISTRATIVE G OPERATIONAL ERROR H-OTHER
=
PRINTED 10/10/97 NRC MONTHLY REPORT.
Page 5 DOCKET NO. 50-306 -
UNIT PRAlRIE ISLAND NO. 2 DATE 10/10/97 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 -
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE MONTH: SEPTEMBER 1997 Unit 2 was base baded for the month of September.
On the 26th at 1700, d.7tt 2 started a required Tech Spec shutdown because the maintenance
- airlock failed its volumetric test. At 2128 the generator was taken off-line and at 2143 tiie reactor was made sub-critical.
Repairs to the airlock were started ASAP.
On the 27th at 1224, the reactor was made critical and at 1717 the generator was placed on-line.
The. Unit reached full power operation at 0520 on the 28th.
There were no other shutdowns or power reductions.
i This ended a continuctus operating run of approximately 130 days, f
CURRENT CONTINUOUS OPERATING RUN OF 2 DAYS
._=
- NRC MONTHLY REPORT.
PRINTED 10/03/97 Pa0e 6.
o.
= DOCKET NO. 50-300 UNIT PRAIRIE ISLAND NO. 2 -
. DATE 10/03/97 COMPLETED OY DALE DUGSTAD TELEPHONE 612 38811214376 AVERAGE _ DAILY POWER LEVFJi.
UMT_2 MONTH: SEPlEMBER1MI DAIEI AVERAGE _ DAILY.EQWERMYEL-09/01/97 510 09/02/97 518 09/03/97 519 09/04/P7 520 09/05/97 520 09/06/97 520 09/07/97 519 09/08/97 517 09/09/97 516.
09/10/97 520 09/11/97 522 09/12/97 522 09/13/97
-524 09/14/G7 521
.'09/15/97 525 09/16/97 521 09/17/97 524 09/18/97 523 09/19/97 523-09/20/97 525 09/21/97-520 09/22/97 520
'09/23/97 526 09/24/97 520 09/25/97 520 09/26/97.
425
- 09/27/97 20 09/28/97 499 09/29/97 524 09/30/97 527 AVERAGE LOADS ABOVE 512 MWE NET ARE DOE TO COOLER CONDENSER CIRCULATING WATER l
u
o
- NRC MONTHLY REPORT:
PRifdTED 10/03/97 Page 7 p
DOCKET NO. 50-306 '
UNIT PRAIR!E ISLAND NO. 2 -
DATE 10/03/97 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-11214376
.QEEBATING DATAREEORI OPERATING STAIUS
- 1. UNIT NAME:
PRA!RIE ISLAND NO.2
- 2. REPORTING PERIOD:
SEPTEMBER 1997
- 3. LICENSED THERMAL POWER (MWT): 1650
- 4. NAMEPLATE RATING (GROSS MWE):
593
- 5. DESIGN ELECTRICAL RATING (NET MWE): 530
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
544
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
512
' 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 7) SINCE LAST REPORT, GIVE REASON:-
NONE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTIONS,IF ANY:- NONE THIS MONIH YR TO-DAIE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720 6551 199677
- 12. NUMBER OF HOURS REACTOR CRITICAL 705.3 5024.0 176517.2
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.00 1516.1
- 14. HOURS GENERATOR ON-LINE 700.2 4973.6 175018.1
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.00 0.00
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 11d0339 7908217 278830326
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 382260 2631090 91266380
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 361041 2471281 86282055
- 19. UNIT SERVICE FACTOR 97.3 75.9
-87.7
- 20. UNIT AVAILABILITY FACTOR -
97.3 75.9 87.7 21, UNIT CAPACITY FACTOR ( MDC NET) 97.9 73.7 86.1
- 22. UNIT CAPACITY FACTOR ( DER NET) 94.6 71.2 81.5
- 23. UNIT FORCED OUTAGE RATE 2.7 11 2.6
- 24. FORCED OUTAGE HOURS 19.8 017.2 4731.1
- 25. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):
=N/A 4
- 26. IF CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE:
' N/A 3.
PRINTED 10/03C7 NRC kCNTHLY REPORT Pae. s DOCKEi NO. f4 306 i
UNIT PRAIRIE ISLAND NO. 2 j
DATE 1093/97 COMPLETED BY DALE DUGSTAD TELEPHONE 012 36011214378 i
UNIL8HUIDOWNBAND.EQWEfLREQWCIl0NS I
MQNIHLEEEIEMBElutt DATE UNIT TYPE HOURS
- REASON METHOD LER NUMBER SYSTEM COMPONENT 09/26/97 2
F 19.8 A
1 2974 N/A N/A NOTES: Maintenanco Airlock failed a volumetric test.
l 09/26/97 2
S 0
0 6
N/A N/A N/A I
- NOTES: Turbino valvos test.
I i
+
IYP1 REA8QN MEIHQD 8181EllLCQQE F-FORCED A EQUIPMENT FAILURE 1 MANUAL DRAFT IEEE STD I
S SCHEDULED B MAINTENANCE OR TEST 2 MANUAL TRIP C REFUELING 3-AUTO TRIP D REGULATORY RESTRICTIOf 4 CONTINUED E OPERATOR TRAINING AND 5-REDUCED LOAD CQMP_QNEN11QDE LICENSE EXAMINATION 9-OTHER IEEE STD 803A 1983 F-ADMINISTRATIVE
( '-
G-OPERATIONAL F.RROR l.
H OTHER l
~
,,