Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G4461999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pingp.With ML20216E7151999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with ML20210Q4891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with ML20209F9811999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20195G5181999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included ML20206L6191999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with ML20205N1081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with ML20207J6951999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant ML20207L2811999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2 ML20206P7861998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With ML20206N2731998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20155K6301998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20154H4061998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Prairie Island Nuclear Generating Plant.With ML20153B0761998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Prairie Island Nuclear Generating Plant.With ML20236X8531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Prairie Island Nuclear Generating Plant ML20236R0771998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Prairie Island Nuclear Generating Plant ML20249A5751998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Prairie Island Nuclear Generating Plant ML20247G2921998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Prairie Island Nuclear Generating Plant ML20216C6361998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Prairie Nuclear Generating Plant Units 1 & 2 ML20216E2051998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Prairie Island Nuclear Generating Plant ML20216E2121998-01-31031 January 1998 Revised MOR for Jan 1998 for Prairie Island Nuclear Generating Plant for Unit 2 & Narrative Summary of Operating Experience ML20202E7761998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Prairie Island Nuclear Generating Plant ML20198P1541997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Prairie Island Nuclear Generating Plant,Unit 1 & 2 ML20203H4341997-11-30030 November 1997 Monthly Operating Repts for Nov 1996 for Prairie Island Nuclear Generating Plant,Unit 1 ML20199D0701997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Prairie Island Nuclear Generating Plant ML20198J7281997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20210S5911997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20217J0681997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Prairie Island Nuclear Generating Plant ML20148K3871997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20141A9581997-04-30030 April 1997 Monthly Operating Repts for April 1997 for Prairie Island Nuclear Plant ML20137T2891997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Prairie Island Nuclear Plant ML20135F6841997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Praire Island Nuclear Generating Plant ML20134L8831997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Praire Island Nuclear Generating Plant ML20133F8611996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Praire Island Nuclear Generating Plant ML20135E8811996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Prairie Island Nuclear Generating Plant ML20134L7091996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Prairie Island Nuclear Generating Plant ML20128G1741996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Prairie Island Nuclear Generating Plant ML20117N1521996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Prairie Island Nuclear Generating Plant ML20116J6451996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Prairie Island Nuclear Generating Plant ML20115A8321996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Prairie Island Nuclear Generating Plant Units 1 & 2 ML20117K5811996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Prairie Island Nuclear Generating Plant ML20111B2801996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Prairie Island Nuclear Generating Plant ML20101N8931996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Prairie Island Nuclear Generating Plant Units 1 & 2 ML20101D0671996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Praire Island Nuclear Generating Plant Units 1 & 2 ML20097D5411996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Prairie Island Units 1 & 2 ML20096E9631995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Prairie Island Nuclear Generating Plant ML20095G4371995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Prairie Island Nuclear Generating Station ML20094L7491995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Prairie Island Nuclear Generating Plant ML20098D0101995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Prairie Island Nuclear Generating Plant ML20092D0091995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Prairie Island Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G4461999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pingp.With ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20216E7151999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with ML20211D3981999-08-24024 August 1999 Safety Evaluation Supporting Requested Actions to Licenses DPR-42 & DPR-60,respectively ML20211C2531999-08-0404 August 1999 Unit 1 ISI Summary Rept Interval 3,Period 2 Refueling Outage Dates 990425-990526 Cycle 19 971212-990526 ML20210Q4891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with ML20211B5971999-07-31031 July 1999 Cycle 20 Voltage-Based Repair Criteria 90-Day Rept ML20209J1131999-07-15015 July 1999 Safety Evaluation of Topical Rept NSPNAD-8102,rev 7 Reload Safety Evaluation Methods for Application to PI Units. Rept Acceptable for Referencing in Prairie Island Licensing Actions ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20209F9811999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20196F4081999-06-23023 June 1999 Revised Pages 71,72 & 298 to Rev 7 of NSPNAD-8102, Prairie Island Nuclear Power Plant Reload Safety Evaluation Methods for Application to PI Units ML20195G5181999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included ML20207B5931999-05-26026 May 1999 SER Accepting Licensee Proposed Alternative to ASME Code for Surface Exam (PT) of Seal Welds on Threaded Caps for Unit 1 Reactor Vessel Head Penetrations for part-length CRDMs ML20196L2501999-05-13013 May 1999 Rev 0 to PINGP Unit 1 COLR Cycle 20 ML20206L6191999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with ML20205N1081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with ML20205Q5101999-03-15015 March 1999 Inservice Insp Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 981109-1229 Cycle 19,970327-981229 ML20207J6951999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant ML20202J7711999-02-0404 February 1999 Simulator Certification Rept for Prairie Island Plant Simulation Facility,1998 Annual Rept ML20202G3761999-01-31031 January 1999 Non-proprietary Rev 7 to NSPNAD-8102-NP, Prairie Island Nuclear Power Plant Reload SE Methods for Application to PI Units ML20207L2811999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2 ML20202J1731999-01-22022 January 1999 Safety Evaluation Concluding That NSP Proposed Alternative to Surface Exam Requirements of ASME BPV Code for CRD Mechanism Canopy Seal Welds Will Provide Acceptable Level of Quality & Safety ML20206P7861998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With ML20205H0561998-12-31031 December 1998 Northern States Power Co 1998 Annual Rept. with ML20198J6441998-12-17017 December 1998 Rev 0 to PINGP COLR Unit 2-Cycle 19 ML20206N2731998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20196D7341998-11-20020 November 1998 Third Quarter 1998 & Oct 1998 Data Rept for Prairie Island Isfsi ML20155K6301998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20154H4061998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Prairie Island Nuclear Generating Plant.With ML20202J7991998-09-30030 September 1998 Non-proprietary Version of Rev 3 to CEN-629-NP, Repair of W Series 44 & 51 SG Tubes Using Leaktight Sleeves,Final Rept ML20198P0571998-09-0303 September 1998 Rev 1 to 95T047, Back-up Compressed Air Supply for Cooling Water Strainer Backwash Valve Actuator ML20153B0761998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Prairie Island Nuclear Generating Plant.With ML20237A3961998-08-11011 August 1998 Safety Evaluation on Westinghouse Owners Group Proposed Insp Program for part-length CRDM Housing Issue.Insp Program for Type 309 Welds Inadequate from Statistical Point of View ML20237A8171998-08-0505 August 1998 SER Related to USI A-46 Program GL 87-02 Implementation for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20236X8531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Prairie Island Nuclear Generating Plant ML20236R6481998-07-15015 July 1998 Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at PINGP Unit 2 - Preliminary Summary Rept ML20236R0771998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Prairie Island Nuclear Generating Plant ML20249A5751998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Prairie Island Nuclear Generating Plant ML20247G7011998-05-31031 May 1998 Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at Prairie Island Nuclear Generating Plant,Unit 2 ML20248M0561998-05-31031 May 1998 Rev 5 to CEN-620-NP, Series 44 & 51 Design SG Tube Repair Using Tube Rerolling Technique ML20247E2671998-05-0505 May 1998 Rev 0 to Pingp,Units 1 & 2,Pressure & Temp Limits Rept (Effective Until 35 Efpy) ML20247G2921998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Prairie Island Nuclear Generating Plant ML20217M6901998-04-29029 April 1998 Safety Evaluation Accepting Methodology for Relocation of Reactor Coolant Sys P/T Limit Curves & LTOP Sys Limits Proposed by NSP for Pingp,Units 1 & 2 ML20216C6361998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Prairie Nuclear Generating Plant Units 1 & 2 ML20216H0341998-03-31031 March 1998 Cycle-19 Voltage Based TSP Alternate Repair Criteria 90-Day Rept ML20217D2041998-03-13013 March 1998 Rev 1 to 28723-A, Intake Canal Liquefaction Analysis Rept for Pingp,Welch,Mn ML20236P9801998-03-12012 March 1998 Rev 0 to 97FP02-DOC-01, Compliance Review of 10CFR50,App R, Section Iii.O RCP Lube Oil Collection Sys ML20248L3931998-03-10010 March 1998 ISI Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 971018-971212 Cycle 18,960303-971212 ML20216D0911998-03-0606 March 1998 Rev 0 to Prairie Island Generating Plant,Units 1 & 2, Pressure & Temp Limits Rept 1999-09-30
[Table view] |
Text
Northem Sta ower Company Prairie Island Nuclear Generating Plant 1717 Wakonade Dr. East Welch M:nnesota 55089 September 8, 1995 Prairie Island Technical Specifications
', Section 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND !RICLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Monthly Operating Report August 1995 Attached is the Monthly Operating Report fcr August 1995 for the Prairie Island Nuclear Generating Plant.
gu sc- [ 6( ,
Michael D Wadley Plant Manager Prairie Island Nuclear Generating Plant
. c: Regional Administrator-III, NRC NRR Project Manager, NRC l NRC Resident Inspector l State of Minnesota - Kris Sanda Attachment ]
l l4C004 9509140001 950831 PDR R ..
ADOCK 05000282
_ _ .PDR
[lj' v
i i
l l
.- i NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE SEPTEMBER 6, 1995 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 MONTH: AUGUST 1995 Unit one was base loaded this month, there were no shutdowns or power reductions.
CURRENT CONTINUOUS OPERATING RUN OF 194 DAYS.
J AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 j DATE SEPTEMBER 6, 1995 COMPLETED BY DALE DUGSTAD TELEPHONE 6J.2-388-1121-4376 i
MONTH: AUGUST 1995 i
DAY AVERAGE DAILY POWER LEVEL (MWE-NET) 4 i 1 511 2 510 2 3 510 '
4 511 5 511 l
6 521 7 512 8 515
. 9 511 10 508 l 11 510 I
12 510 13 509 ,
- 14 511
' 15 511 16 511 a 17 506 18 508 19 511
- 20 509 21 510
- 22 508 23 509 24 510 1 25 511 -
26 511 27 509
. 28 510
- 29 513 30 513 31 512 4
i AVERAGE LOADS ABOVE 513 MWE-NET ARE DUE I TO COOLER CONDENSER CIRCULATING WATER i
e
1 OPERATING DATA REPORT i
DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE SEPTEMBER 6, 1995 ,
COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 {
OPERATING STATUS !
- 1. UNIT NAME: PRAIRIE ISLAND NO. 1
- 2. REPORTING PERIOD: AUGUST 1995
- 3. LICENSED THERMAL POWER (MWT) : 1650
- 4. NAMEPLATE RATING (GROSS MWE): 593
- 5. DESIGN ELECTRICAL RATINC (NET MWE) : 530
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MNE) : 545
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 513
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) >
SINCE LAST REPORT GIVE REASON: NONE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) : NONE
- 10. REASONS FOR RESTRICTIONS, IF ANY: NONE THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 5831 190295
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5831.0 163430.3
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 5571.1
- 14. HOURS GENERATOR ON-LINE 744.0 5823.0 161764.0 1S. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1225396 9557266 256465905 I 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 403210 3189930 84539580 j 18. NET ELECTRICAL ENERGY GENERATED (MWH) 379670 3015359 79470626 l 19. UNIT SERVICE FACTOR 100.0 99.9 85.0
- 20. UNIT AVAILABILITY FACTOR 100.0 99.9 85.0
' 21. UNIT CAPACITY FACTOR (USING MDC NET) 99.5 100.8 82.9
- 22. UNIT CAPACITY FACTOR (USING DER NET) 96.3 97.6 78.8
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 4.8
- 24. FORCED OUTAGE HOURS 0.0 0.0 8125.9 l 25. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH):
Refueling and Maintenance Outage starting in January 1996.
- 26. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE
- N/A i
2 a
4
(
UNIT SHUTDOWNS AND POWER REDUCTION l
DOCKET NO 5_0,-282 ;
UNIT NAME PRAIRIE ISLAND NO. 1 I DATE SEPTEMBER 6, 1995
. COMPLETED BY DALE DUGSTAD TELEPHONE 612 -3 8 8 -1121-4 ~o 76 l
MOh"I'H : AUGUST '.995 DATE TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT i YY/MM/DD 000.0 )
95/08/00 None.
1 l
TYPE REASON METHOD SYSTEM CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD S-SCHED B-MAINTENANCE OR TEST 2-MANUAL TRIP 805-1984 (P805-DS)
C-REFUELING 3-AUTO TRIP D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING & 5-REDUCED LOAD COMPONENT CODE LICENSE EXAMINATION 9-OTHER F-ADMINISTRATIVE IEEE STD 803A-1983 G-OPERATIONAL ERROR ,
H-OTHER
k S '
i NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE i
t DOCKET NO. 50-306 t
' UNIT PRAIRIE ISLAND NO.2 DATE SEPTEMBER 6, 1995 .
COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 l MONTH: AUGUST 1995 ,
Unit Two was base loaded this month, there were no shutdowns or power reductions.
f' t
+
CURRENT CONTINUOUS OPERATING RUN OF 65 DAYS. ,
6 t
8
^
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO, 5_0-306 UNIT PRAIRIE ISLAND NO.2 DATE SEPTEMBER 6, 1995
- COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 MONTH: AUGUST 1995 DAY AVERAGE DAILY POWER LEVEL (MWE-NET) 1 514 2 513 !
3 510 4 514 5 511 6 513 7 513 8 516 9 511 10 509 11 511 12 511 13 509 14 512 ;
15 511 l 16 512 i I
17 506 18 509 i 19 512 1 20 508 j 21 509 22 508 I 23 508 24 511
. 25 512 j 26 513 27 511 t 28 513 l 29 514 I 30 514 31 513 AVERAGE LOADS ABOVE 512 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER 1
e
N
DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO.2 DATE SEPTEMBER 6, 1995 I COMPLETED BY DALE DUGSTAD (
TELEPHONE 612-388-1121-4376 '
OPERATING STATUS
- 1. UNIT NAME: PRAIRIE ISLAND NO. 2
- 2. REPORTING PERIOD: AUGUST 1995
- 3. LICENSED THERMAL POWER (MWT): 1650
- 4. NAMEPLATE RATING (GROSS MWE) : 593
- 5. DESIGN ELECTRICAL RATING (NET MWE): 530
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) : 544
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 512
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT GIVE REASON: NONE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) : NONE
- 10. REASONS FOR RESTRICTIONS, IF ANY: NONE THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 5831 181413
- 13. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 4769.8 159880.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1516.1
- 14. HOURS GENERATOR ON-LINE 744.0 4737.8 158460.5
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1226040 7717827 251998049
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 404240 2572940 82284980
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 380421 2431532 77789028
- 19. UNIT SERVICE FACTOR 100.0 81.3 87.3
- 20. UNIT AVAILABILITY FACTOR 100.0 81.3 87.3
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 99.9 81.4 85.6
- 22. UNIT CAPACITY FACTOR (USING DER NET) 96.5 78.7 80.9
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 2.5
- 24. FORCED OUTAGE HOURS 0.0 0.0 3984.7
- 25. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH):
N/A
, 26. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE: N/A
UNIT SHUTDOWNS AND POWER REDUCTION l .,
J DOCKET NO 50-306 UNIT NAME PRAIRIE ISLAND NO. 2 -
DATE SEPTEMBER 6, 1995 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 MONTH: AUGUST 1995 DATE TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT YY/MM/DD 000.0 95/08/00 None.
TYPE REASON METHOD SYSTEM CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD S-SCHED B-MAINTENANCE OR TEST 2-MANUAL TRIP 8 05-1984 (P805-DS)
C-REFUELING 3-AUTO TRIP D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING & 5-REDUCED LOAD COMPONENT CODE LICENSE EXAMINATION 9-OTHER F-ADMINISTRATIVE IEEE STD 803A-1983 G-OPERATIONAL ERROR ,
p H-OTHER
- . .