Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G4461999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pingp.With ML20216E7151999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with ML20210Q4891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with ML20209F9811999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20195G5181999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included ML20206L6191999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with ML20205N1081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with ML20207J6951999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant ML20207L2811999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2 ML20206P7861998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With ML20206N2731998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20155K6301998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20154H4061998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Prairie Island Nuclear Generating Plant.With ML20153B0761998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Prairie Island Nuclear Generating Plant.With ML20236X8531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Prairie Island Nuclear Generating Plant ML20236R0771998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Prairie Island Nuclear Generating Plant ML20249A5751998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Prairie Island Nuclear Generating Plant ML20247G2921998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Prairie Island Nuclear Generating Plant ML20216C6361998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Prairie Nuclear Generating Plant Units 1 & 2 ML20216E2051998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Prairie Island Nuclear Generating Plant ML20216E2121998-01-31031 January 1998 Revised MOR for Jan 1998 for Prairie Island Nuclear Generating Plant for Unit 2 & Narrative Summary of Operating Experience ML20202E7761998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Prairie Island Nuclear Generating Plant ML20198P1541997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Prairie Island Nuclear Generating Plant,Unit 1 & 2 ML20203H4341997-11-30030 November 1997 Monthly Operating Repts for Nov 1996 for Prairie Island Nuclear Generating Plant,Unit 1 ML20199D0701997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Prairie Island Nuclear Generating Plant ML20198J7281997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20210S5911997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20217J0681997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Prairie Island Nuclear Generating Plant ML20148K3871997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20141A9581997-04-30030 April 1997 Monthly Operating Repts for April 1997 for Prairie Island Nuclear Plant ML20137T2891997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Prairie Island Nuclear Plant ML20135F6841997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Praire Island Nuclear Generating Plant ML20134L8831997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Praire Island Nuclear Generating Plant ML20133F8611996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Praire Island Nuclear Generating Plant ML20135E8811996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Prairie Island Nuclear Generating Plant ML20134L7091996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Prairie Island Nuclear Generating Plant ML20128G1741996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Prairie Island Nuclear Generating Plant ML20117N1521996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Prairie Island Nuclear Generating Plant ML20116J6451996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Prairie Island Nuclear Generating Plant ML20115A8321996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Prairie Island Nuclear Generating Plant Units 1 & 2 ML20117K5811996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Prairie Island Nuclear Generating Plant ML20111B2801996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Prairie Island Nuclear Generating Plant ML20101N8931996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Prairie Island Nuclear Generating Plant Units 1 & 2 ML20101D0671996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Praire Island Nuclear Generating Plant Units 1 & 2 ML20097D5411996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Prairie Island Units 1 & 2 ML20096E9631995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Prairie Island Nuclear Generating Plant ML20095G4371995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Prairie Island Nuclear Generating Station ML20094L7491995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Prairie Island Nuclear Generating Plant ML20098D0101995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Prairie Island Nuclear Generating Plant ML20092D0091995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Prairie Island Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML20217G4461999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pingp.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20216E7151999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with ML20211J2851999-08-26026 August 1999 Safety Evaluation Supporting Amends 146 & 137 to Licenses DPR-42 & DPR-60,respectively ML20211D3981999-08-24024 August 1999 Safety Evaluation Supporting Requested Actions to Licenses DPR-42 & DPR-60,respectively ML20211C2531999-08-0404 August 1999 Unit 1 ISI Summary Rept Interval 3,Period 2 Refueling Outage Dates 990425-990526 Cycle 19 971212-990526 ML20211B5971999-07-31031 July 1999 Cycle 20 Voltage-Based Repair Criteria 90-Day Rept ML20210Q4891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with 05000282/LER-1999-007-01, :on 990625,loss of CR Special Ventilation Function Was Noted.Caused by Broken Door Latch Pins on CR Chiller Door.Ts Amend Request to Establish Allowed OOS Time Was Submitted1999-07-23023 July 1999
- on 990625,loss of CR Special Ventilation Function Was Noted.Caused by Broken Door Latch Pins on CR Chiller Door.Ts Amend Request to Establish Allowed OOS Time Was Submitted
ML20209J1131999-07-15015 July 1999 Safety Evaluation of Topical Rept NSPNAD-8102,rev 7 Reload Safety Evaluation Methods for Application to PI Units. Rept Acceptable for Referencing in Prairie Island Licensing Actions ML20209F9811999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20196F4081999-06-23023 June 1999 Revised Pages 71,72 & 298 to Rev 7 of NSPNAD-8102, Prairie Island Nuclear Power Plant Reload Safety Evaluation Methods for Application to PI Units ML20195G5181999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included ML20207B5931999-05-26026 May 1999 SER Accepting Licensee Proposed Alternative to ASME Code for Surface Exam (PT) of Seal Welds on Threaded Caps for Unit 1 Reactor Vessel Head Penetrations for part-length CRDMs ML20196L2501999-05-13013 May 1999 Rev 0 to PINGP Unit 1 COLR Cycle 20 05000282/LER-1999-005-01, :on 990508,containment Inservice Purge Sys Was Not Isolated During Heavy Load Movement Over Fuel.Caused by Missing Procedure Step in D58.1.6.PINGP 1224 Was Initiated to Communicate Event & Forestall Repeating Event1999-05-0808 May 1999
- on 990508,containment Inservice Purge Sys Was Not Isolated During Heavy Load Movement Over Fuel.Caused by Missing Procedure Step in D58.1.6.PINGP 1224 Was Initiated to Communicate Event & Forestall Repeating Event
ML20206L6191999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with ML20205N1081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with ML20205B3351999-03-17017 March 1999 Safety Evaluation Supporting Amends 143 & 134 to Licenses DPR-42 & DPR-60,respectively ML20205Q5101999-03-15015 March 1999 Inservice Insp Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 981109-1229 Cycle 19,970327-981229 05000306/LER-1999-001-01, :on 990206,TS Required Reactor Protection Logic Test Was Missed.Caused by Personnel Error.Sd Banks Were Inserted at 0544,RT Breakers Were Opened & Test Was Performed.With1999-03-0808 March 1999
- on 990206,TS Required Reactor Protection Logic Test Was Missed.Caused by Personnel Error.Sd Banks Were Inserted at 0544,RT Breakers Were Opened & Test Was Performed.With
ML20207J6951999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant ML20202J7711999-02-0404 February 1999 Simulator Certification Rept for Prairie Island Plant Simulation Facility,1998 Annual Rept ML20202G3761999-01-31031 January 1999 Non-proprietary Rev 7 to NSPNAD-8102-NP, Prairie Island Nuclear Power Plant Reload SE Methods for Application to PI Units ML20207L2811999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2 ML20202J1731999-01-22022 January 1999 Safety Evaluation Concluding That NSP Proposed Alternative to Surface Exam Requirements of ASME BPV Code for CRD Mechanism Canopy Seal Welds Will Provide Acceptable Level of Quality & Safety 05000306/LER-1998-006-01, :on 981219,unplanned Actuation of ESF Equipment During Performance of Sp.Caused by Personnel Error.Control Room Took Prompt Action & Returned Plant to Proper Status & Second pre-job Briefing for SP-2126 Was Conducted1999-01-18018 January 1999
- on 981219,unplanned Actuation of ESF Equipment During Performance of Sp.Caused by Personnel Error.Control Room Took Prompt Action & Returned Plant to Proper Status & Second pre-job Briefing for SP-2126 Was Conducted
ML20205H0561998-12-31031 December 1998 Northern States Power Co 1998 Annual Rept. with ML20206P7861998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With ML20198J6441998-12-17017 December 1998 Rev 0 to PINGP COLR Unit 2-Cycle 19 05000306/LER-1998-005-02, :on 981109,RT from 22% Power During Planned SD Operation Was Noted.Caused by Tt.Fw Heater Drain Level Control Was Thoroughly Inspected & Calibrated.With1998-12-0909 December 1998
- on 981109,RT from 22% Power During Planned SD Operation Was Noted.Caused by Tt.Fw Heater Drain Level Control Was Thoroughly Inspected & Calibrated.With
ML20198L2211998-12-0707 December 1998 Safety Evaluation Supporting Amends 141 & 132 to Licenses DPR-42 & DPR-60,respectively ML20206N2731998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With 05000282/LER-1998-016, :on 981029,negative Flux Rate RT Occurred Upon CR Insertion After Failure of CRD Cable.Caused by Internal Short Circuit Developing in CRDM Patch Cables at Reactor Head Connector.Replaced CRDM Patch Cables.With1998-11-24024 November 1998
- on 981029,negative Flux Rate RT Occurred Upon CR Insertion After Failure of CRD Cable.Caused by Internal Short Circuit Developing in CRDM Patch Cables at Reactor Head Connector.Replaced CRDM Patch Cables.With
ML20196D7341998-11-20020 November 1998 Third Quarter 1998 & Oct 1998 Data Rept for Prairie Island Isfsi ML20195D3821998-11-0404 November 1998 Safety Evaluation Supporting Amends 140 & 131 to Licenses DPR-42 & DPR-60,respectively ML20155K6301998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20195D3761998-10-30030 October 1998 Safety Evaluation Supporting Amends 139 & 130 to Licenses DPR-42 & DPR-60 05000306/LER-1998-004-01, :on 980910,shield Building Integrity Was Breached.Caused by Inadequate TS Change.Revised Affected Procedures.With1998-10-0505 October 1998
- on 980910,shield Building Integrity Was Breached.Caused by Inadequate TS Change.Revised Affected Procedures.With
ML20202J7991998-09-30030 September 1998 Non-proprietary Version of Rev 3 to CEN-629-NP, Repair of W Series 44 & 51 SG Tubes Using Leaktight Sleeves,Final Rept ML20198R8061998-09-30030 September 1998 Rev 1 to NSPLMI-96001, Prairie Island Nuclear Generating Plant Ipeee ML20154H4061998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Prairie Island Nuclear Generating Plant.With ML20198P0571998-09-0303 September 1998 Rev 1 to 95T047, Back-up Compressed Air Supply for Cooling Water Strainer Backwash Valve Actuator ML20153B0761998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Prairie Island Nuclear Generating Plant.With 05000282/LER-1998-009-01, :on 980731,noted That Recent Testing of RCS Vent Paths Had Not Been Performed in Literal Compliance with Wording of TS 4.18.1.Caused by Misunderstanding of Wording in TS Section 4.18.Will Modify Surveillance Procedures1998-08-27027 August 1998
- on 980731,noted That Recent Testing of RCS Vent Paths Had Not Been Performed in Literal Compliance with Wording of TS 4.18.1.Caused by Misunderstanding of Wording in TS Section 4.18.Will Modify Surveillance Procedures
ML20237D6491998-08-13013 August 1998 Safety Evaluation Supporting Amends 137 & 128 to Licenses DPR-42 & DPR-60,respectively ML20237A3961998-08-11011 August 1998 Safety Evaluation on Westinghouse Owners Group Proposed Insp Program for part-length CRDM Housing Issue.Insp Program for Type 309 Welds Inadequate from Statistical Point of View ML20237A8171998-08-0505 August 1998 SER Related to USI A-46 Program GL 87-02 Implementation for Prairie Island Nuclear Generating Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
,
1 Northern States Power Company 1717 Wakonade Drive East Welch, MN 55089 Telephone 612-388-1121 May 6,1996 Pralrie Island Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Monthly Operating Report Aoril 1996 i
Attached is the Monthly Operating Report for April 1996 for the Prairie Island Nuclear Generating Plant.
kl Michael D Wadley Plant Manager Prairie Island Nuclear Generating Plant c:
Regional Administrator Ill, NRC NRR Project Manager, NRC NRC Resident Inspector State of Minnesota - Kris Sanda Attachment i
140143 9605140308 960430 PDR ADOCK 05000202 I
R PDR
ll PRINTED OS02/96 NRC MONTHLY REPORT Page1 i
DOCKET NO. 50-262 UNIT PRAIRIE ISLAND NO.1 a-DATE OG02/96 COMPLETED BY DALE DUGSTAD TELEPHONE 612-3661121-4376 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE MONTH: APRIL 1996 For April Unit 1 was base loaded, there were no shutdowns or power reductions.
There were 719 hours0.00832 days <br />0.2 hours <br />0.00119 weeks <br />2.735795e-4 months <br /> in the reposting period due to Daylight savings time change.
I i
i l
1 l
CURRENT CONTINUOUS OPERATING RUN OF 58 DAYS
PRINTED 0502/96 NRC MONTHLY REPORT Page 2 DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE 0502/96 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 AVERAGE DAILY POWER LEVEL UNIT 1 MONTH: APRIL 1996 DATE AVERAGE DAILY POWER LEVEL 04/01/96 520 04/02/96 523 4
04/03/96 521 04/04/96 518 04/05/96 521 04/06/96 521 04/07/96 526 1
04/08/96 521 04/09/96 519 04/10/96 519 04/11/96 518 04/12/96 521 i
04/13/96 521 04/14/96 524 04/15/96 520 04/16/96 521 04/17/96 521 j
04/18/96 516 04/19/96 522 04/20/96 513 f
04/21/96 514 04/22/96 510 j
04/23/96 512
^
04/24/96 508 04/25/96 510 04/26/96 516 04/27/96 518 04/28/96 515 04/29/96 508 04/30/96 512 i
AVERAGE LOADS ABOVE 513 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER i
i w
ow--
1 PRINTED 05/02/96
'NRC MONTHLY REPORT Page 3 DOCKET No. 50-282 i
UNIT PRAIRIE ISLAND NO.1 DATE 05/02/96 COMPLETED BY DALE DUGSTAD TELEPHONE 612 388-11214376
)
i OPERATING DATA REPORT OPERATING STATUS
- 1. UNIT NAME:
PRAIRIE ISLAND NO.1
- 2. REPORTING PERIOD; APRIL 1996
- 3. LICENSED THERMAL POWER (MWT): 1650
- 4. NAMEPLATE RATING (GROSS MWE):
593 4
- 5. DESIGN ELECTRICAL RATING (NET MWE): 530
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
545
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
513 7
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON:
NONE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTIONS, IF ANY: NONE a
i THIS MONTH YR-TO-DATE CUMULATIVE 4
- 11. HOURS IN REPORTING PERIOD 719 2903 196127
- 12. NUMBER OF HOURS REACTOR CRITICAL 719.0 1532.9 167892.2
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.00 5571.1
- 14. HOURS GENERATOR ON-LINE 719.0 1!.08.0 166201.9
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0 ')0 0.00
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1185798 2376912 263530395
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 305020 706270 86019980
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 372186 746568 81720873
- 19. UNIT SERVICE FACTOR 100 52 84.7
- 20. UNIT AVAILABILITY FACTOR 100 52 84.7
- 21. UNIT CAPACITY FACTOR ( MDC NET) 100.9 50.1 82.6
- 22. UNIT CAPACITY FACTOR ( DER NET) 97.7 48.5 78.6
- 23. UNIT FORCED OUTAGE RATE 0
0 4.7
- 24. FORCED OUTAGE HOURS 0.0 0.0 8125.9
- 25. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):
N/A l
- 26. IF CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE:
N/A
i PRINTED 0502/96 NRC MONTHLY REPORT Page 4 DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE 0502/96 COMPLETED BY DALE DUGSTAD TELEPHONE 6124881121-4376 i
UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH: APRIL 1994 DATE UNIT TYPE,
HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 04/01/96 i
None O
NOTES:
b 112E REASON METHQQ SYSTEM CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT lEEE STD S-SCHEDULED B44AINTENANCE OR TEST 24AANUAL TRIP C-REFUEUNG 3-AUTO TRIP D-REGULATORY RESTRICTION 4-CONTINUED E OPERATOR TRAINING AND 5-REDUCED LOAD COMPONENT CODE UCENSE EXAMINATION MTHER lEEE STD 803A-1983 F ADMINISTRATIVE G-OPERATIONAL ERROR H-OTHER i
c
PRINTED 0502M NRC MONTHLY REPORT Page5 DOCKET NO. 50306 UNIT PRAIRIE ISLAND NO. 2 DATE 0502M COMPLETED BY DALE DUGSTAD TELEPHONE 612 388-1121437e NARRATNE
SUMMARY
OF OPERATING EXPERIENCE MONTH: APRIL 1996 For April Unit 2 was base loaded, there was a shutdown.
On Thursday, April 18 at 1916 the Unit tripped due to loss of air to the Feedwater Regulating Valves. The loss of air was due to an instrument air dryer valve failure.
After repairs the reactor was taken critical on the 19th at 2102 and the generator was placed on-line at 2307 of the 19th.
There were no other problems.
There were 719 hours0.00832 days <br />0.2 hours <br />0.00119 weeks <br />2.735795e-4 months <br /> in the reporting period due to Daylight savings time change.
'j l
CURRENT CONTINUOUS OPERATING RUN OF 11 DAYS
)
PRINTE0 05/02/96 NRC MONTHLY REPORT Page6 DOCKET NO. 50306 UNIT PRAIRIE ISLAND NO. 2 DATE 05/02/96 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 J
AVERAGE DAILY POWER LEVEL 1
l MONTH: APRIL 1994 DAIE1 AVERAGE DAILY POWER LEVEL 04/01/96 526 04/02/96 528 04/03/96 526 04/04/96 528 04/05/96 524 04/06/96 525 04/07/96 531 04/08/96 524 04/09/96 523 04/10/96 521 04/11/96 519 04/12/96 523 04/13/96 525 04/14/96 525 04/15/96 522 04/16/96 520 J
04/17/96 520 04/18/96 409 04/19/96
-18 04/20/96 463 04/21/96 516 04/22/96 513 04/23/96 513 04/24/96 511 04/25/96 514 04/26/96 518 04/27/96 520 04/28/96 519 1
04/29/96 516 04/30/96 517 AVERAGE LOADS ABOVE 512 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER
~
PRINTE0 05/02/96 NRC MONTHLY REPORT Page 7 DOCKET NO. 50 306 UNIT PRAIRIE ISLAND NO. 2 DATE 0SV2MI COMPLETED BY DALE DUGSTAD TELEPHONE 612-368-11214376 1-OPERATING DATA REPORT OPERATING STATUS i
- 1. UNIT NAME:
PRAIRIE ISLAND NO. 2
- 2. REPORTING PERIOD:
APRIL 1996 4
- 3. LICENSED THERMAL POWER (MWT): 1650
- 4. NAMEPLATE RATING (GROSS MWE):
593
- 5. DESIGN ELECTRICAL RATING (NET MWE): 530
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
544
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
512
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON:
NONE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE 2
- 10. REASONS FOR RESTRICTIONS, IF ANY: NONE a
THIS MONTH YR TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 719 2903 187245
- 12. NUMSER OF HOURS REACTOR CRITICAL 693.2 2848.9 165657.9
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.00 1516.1
- 14. HOURS GENERATOR ON-LINE 691.1 2831.6 164221.1 I
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.00 0.00
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1136280 4622640 261415709
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 379690 1557890 85459200 1
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 357508 1476397 80802061
- 19. UNIT SERVICE FACTOR 96.1 97.5 87.7
- 20. UNIT AVAILABILITY FACTOR 96.1 97.5 87,7
- 21. UNIT CAPACITY FACTOR ( MDC NET) 97.1 99.3 86.1
- 22. UNIT CAPACITY FACTOR ( DER NET) 93.8 96 81.4
- 23. UNIT FORCED OUTAGE RATE 3.9 2.5 2.4
- 24. FORCED OUTAGE HOURS 27.9 71.4 4056.1
- 25. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE. AND DURATION OF EACH):
N/A
- 26. IF CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE:
N/A
PRINTED 0503/96
'NRC MONTHLY REPORT Page 8 DOCKET NO. 50306 UNIT PRAIRIE ISLAND NO. 2 DATE 05CW6 COMPLETED BY DALE DUGSTAD TELEPHONE 612N11214376 UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH: APRll,1996 DATE UNIT TYPE,
HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 27,9 A
3 2-96-02
' 04/18/96 2
F NOTES: Loss of Instrument Air due to failure of a valva.
d 4
HER REASON METHOD SYSTEM COQE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD S-SCHEDULED B-MAINTENANCE OR TEST 24AANUAL TRIP C-REFUELING 3-AUTO TRIP D-REGULATORY RESTRICTION 4 CONTINUED E-OPERATOR TRAINING AND 5 REDUCED LOAD COMPONENT CODE UCENSE EXAMINATION 9-OTHER IEEE STD 603A-1963 F-ADMINISTRATIVE GOPERATIONAL ERROR H.OTHER
.