Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With
ML20209F981
Person / Time
Site: Prairie Island  
Issue date: 06/30/1999
From: Dugstad D, Schuellke D
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9907160198
Download: ML20209F981 (7)


Text

i.

Northern States Power Company Pral-' Island Nuclear Generating Plant 1717V" nde Dr. East Wek..

ota 55089 July 9,1999 Technical Specifications 6.7.A.3 US Nuclear Regulatory Commission Attn
Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nes. 50-282 License Nos. DPR-42 50-306 DPR-60 Monthly Operating Report June 1999 Attacht.d is the Monthly Operating Report for June 1999 for the Prairie Island Nuclear Generating Plant.

Don Schuelike Plant Manager

'j/

Prairie Island Nuclear Generating Plant c:

Regional Administrator-Ill, NRC NRR Project Manager, NRC NRC Resident inspector State of Minnesota - Steve Minn

-7 Attachment 9907160190 990630 PDR ADOCK 05000282 R

PDR

l

'NRC MONTHLY REPORT PRINTED 7/9/1999 l-Pagn1 l

DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE 7/9/1999 COMPLETED BY DALE DUGSTAD PHONE 651-388-11214376 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE MONTH: JUNE 1999 During the month of June, Unit 1 was base loaded. There were no shutdowns and only one power reduction for this month.

On Friday, June 25th, at 2012, Unit 1 generated l*/ 100 millionth megawatt-hour of electricity Unit 1 is the first reactor in the world rated at 560 megawatts gross capacity to achieve the 100 milliontil megawatt-hour milestone. It also is the first Westinghouse two-loop pressurized water reactor in the country to do so.

On the 17th, at '118, the Unit started to reduce power to allow work on 158 Feedwater Heater Controller (relay). The work was completed by 1419 and the l

Unit returned to full power operation at 1515.

There are no other items to report.

i l

l l

1 l

l l

CURRENT CONTINUOUS OPERATING RUN OF 34 DAYS l

l L

'NrtC MONTHLY REPORT PRINTED 7/9/1999 Pagn 2

. DOCKET NO. 50 282 UNIT PRAIRIE ISLAND NO.1 DATE 7/9/1999 COMPLETED BY DALE DUGSTAD PHONE 651-388-11214376 OPERATING DATA REPORT OPERATING STATilS

1. UNIT NAME:

PRAIRIE ISLAND NO.1

2. REPORTING PERIOD:

JUNE 1999 1

3. LICENSED THERMAL POWER (MWT): 1650
4. NAMEPLATE RATING (GROSS MWE): 593
5. DESIGN ELECTRICAL RATING (NET MWE): 536
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

554

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

522

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON:

NONE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE-
10. REASONS FOR RESTRICTIONS, IF ANY:

NONE I,_HIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 720 4343 223871

)

12. NUMBER OF HOURS REACTOR CRITICAL 720.0 3284.3 192071.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.00 5571.1
14. HOURS GENERATOR ON-LINE 720.0 3227.5 190166.2

]

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.00 0.00
16. GROSS THERMAL ENERGY GENERATED (MWH) 1182352 5223861 302454216
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 399950 1798680 100068650
18. NET ELECTRICAL ENERGY GENERATED (MWH) 376659 1699575 94143057
19. UNIT SERVICE FACTOR 100.0 74.3 84.9
20. UNIT AVAILABILITY FACTOR 100.0 74.3 84.9
21. UNIT CAPACITY FACTOR ( MDC NET) 100.2 75.0 83.1
22. UNIT CAPACITY FACTOR ( DER NET) 97.6 73.0 79.3
23. UNIT FORCED OUTAGE RATE 0.0 4.6 4.7
24. FORCED OUTAGE HOURS 0.0 156.6 9483.8 J
  • NRC MONTHLY REPORT PRINTED 7/9/1999 Page 3 DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE 7/9/1999 COMPLETED BY DALE DUGSTAD PHONE 651-388-1121-4376 UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH: JUNE 1999 DATE UNIT TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 6/17/1999 i

S 0

A 5

N/A N/A N/A NOTES:

158 Feedwater Heater Level Controller.

i 4

UPg REASON METHOD SYSTEM CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT lEEE STD S-SCHEDULED B-MAlrdTENANCE OR TEST 2-MANUAL TRIP C-REFUELING 3-AUTO TRIP D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING AND 5 REDUCED LOAD COMPONENT CODE LICENSE EXAMINATION -

9-OTHER IEEE STD 803A-1983 F-ADMINISTRATIVE G-OPERATIONAL ERROR H OTHER

r,.

l

\\

~ NRC MONTHLY REPORT PRINTED 7/9/1999 Pcge 4 DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 7/9/1999 COMPLETED BY DALE DUGSTAD PHONE 651-388-1121-4376 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE MONTH: JUNE 1999 During the month of June, Unit 2 was base loaded. There were no shutdowns and only one power reduction for this month.

On the 5th, at 2233, the Unit started a load reduction to allow turbine valve testing and condenser tube cleaning. With all of the work completed the Unit roumed to full power operation on the 6th at 2107.

There are no other items to report.

1 l

l l

l l

l l

CURRENT CONTINUOUS OPERATING RUN OF 143 DAYS l

n.

{

' NRC MONTHLY REPORT PRINTED 7/9/1999 PcgG5 l

l DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 7/9/1999 COMPLETED BY DALE DUGSTAD PHONE 651388-1121-4376 OPERATING DATA REPORT OPERATING STATUS

1. UNIT NAME:

PRAIRIEISLAND NO.2

2. REPORTING PERIOD:

JUNE 1999

3. LICENSED THERMAL POWER (MWT): 1650
4. NAMEPLATE RATING (GROSS MWE):

593

5. DESIGN ELECTRICAL RATING (NET MWE): 536
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

554

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

522

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON:

NONE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE
10. REASONS FOR RESTRICTIONS, IF ANY:

NONE THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 720 4343 214989
12. NUMBER OF HOURS REACTOR CRITICAL 720.0 4308.8 189630.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1516.1
14. HOURS GENERATOR ON-LINE 720.0 4273.9 188058.1
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1167855 6899389 300050470
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 393580 2360700 98396630
18. NET ELECTRICAL ENERGY GENERATED (MWH) 370414 2235920 93022249
19. UNIT SERVICE FACTOR 100.0 98.4 87.5
20. UNIT AVAILABILITY FACTOR 100.0 98.4 87.5
21. UNIT CAPACITY FACTOR ( MDC NET) 98.6 98.6 86.0
22. UNIT CAPACITY FACTOR ( DER NET) 96.0 96.1 81.6
23. UNIT FORCED OUTAGE RATE 0.0 0.0 2.9
24. FORCED OUTAGE HOURS 0.0 0.0 5662.8 l

1 I

' NRC MONTHLY REPORT PRINTED 7/k!399 Pag 3 6 DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 7/9/1999 COMPLETED BY DALE DUGSTAD PHONE 651-388-1121-4376 UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH: JUNE 1991 DATE UNIT TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 6/5/1999 2

S 0

B 5

N/A N/A N/A NOTES: Turbine Valve Testing & Condenser Tube Cleaning.

l Iyfg REASON METHOD SYSTEM CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD

' S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL TRIP C-REFUELING 3-AUTO TRIP D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING AND 5-REDUCED LOAD COMPONENT CODE LICENSE EXAMINATION 9-OTHER IEEE STD 803A-1983 F-ADMINISTRATIVE G-OPERATIONAL ERROR H-OTHER