Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G4461999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pingp.With ML20216E7151999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with ML20210Q4891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with ML20209F9811999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20195G5181999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included ML20206L6191999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with ML20205N1081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with ML20207J6951999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant ML20207L2811999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2 ML20206P7861998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With ML20206N2731998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20155K6301998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20154H4061998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Prairie Island Nuclear Generating Plant.With ML20153B0761998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Prairie Island Nuclear Generating Plant.With ML20236X8531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Prairie Island Nuclear Generating Plant ML20236R0771998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Prairie Island Nuclear Generating Plant ML20249A5751998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Prairie Island Nuclear Generating Plant ML20247G2921998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Prairie Island Nuclear Generating Plant ML20216C6361998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Prairie Nuclear Generating Plant Units 1 & 2 ML20216E2051998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Prairie Island Nuclear Generating Plant ML20216E2121998-01-31031 January 1998 Revised MOR for Jan 1998 for Prairie Island Nuclear Generating Plant for Unit 2 & Narrative Summary of Operating Experience ML20202E7761998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Prairie Island Nuclear Generating Plant ML20198P1541997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Prairie Island Nuclear Generating Plant,Unit 1 & 2 ML20203H4341997-11-30030 November 1997 Monthly Operating Repts for Nov 1996 for Prairie Island Nuclear Generating Plant,Unit 1 ML20199D0701997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Prairie Island Nuclear Generating Plant ML20198J7281997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20210S5911997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20217J0681997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Prairie Island Nuclear Generating Plant ML20148K3871997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20141A9581997-04-30030 April 1997 Monthly Operating Repts for April 1997 for Prairie Island Nuclear Plant ML20137T2891997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Prairie Island Nuclear Plant ML20135F6841997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Praire Island Nuclear Generating Plant ML20134L8831997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Praire Island Nuclear Generating Plant ML20133F8611996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Praire Island Nuclear Generating Plant ML20135E8811996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Prairie Island Nuclear Generating Plant ML20134L7091996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Prairie Island Nuclear Generating Plant ML20128G1741996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Prairie Island Nuclear Generating Plant ML20117N1521996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Prairie Island Nuclear Generating Plant ML20116J6451996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Prairie Island Nuclear Generating Plant ML20115A8321996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Prairie Island Nuclear Generating Plant Units 1 & 2 ML20117K5811996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Prairie Island Nuclear Generating Plant ML20111B2801996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Prairie Island Nuclear Generating Plant ML20101N8931996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Prairie Island Nuclear Generating Plant Units 1 & 2 ML20101D0671996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Praire Island Nuclear Generating Plant Units 1 & 2 ML20097D5411996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Prairie Island Units 1 & 2 ML20096E9631995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Prairie Island Nuclear Generating Plant ML20095G4371995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Prairie Island Nuclear Generating Station ML20094L7491995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Prairie Island Nuclear Generating Plant ML20098D0101995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Prairie Island Nuclear Generating Plant ML20092D0091995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Prairie Island Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML20217G4461999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pingp.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20216E7151999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with ML20211J2851999-08-26026 August 1999 Safety Evaluation Supporting Amends 146 & 137 to Licenses DPR-42 & DPR-60,respectively ML20211D3981999-08-24024 August 1999 Safety Evaluation Supporting Requested Actions to Licenses DPR-42 & DPR-60,respectively ML20211C2531999-08-0404 August 1999 Unit 1 ISI Summary Rept Interval 3,Period 2 Refueling Outage Dates 990425-990526 Cycle 19 971212-990526 ML20211B5971999-07-31031 July 1999 Cycle 20 Voltage-Based Repair Criteria 90-Day Rept ML20210Q4891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with 05000282/LER-1999-007-01, :on 990625,loss of CR Special Ventilation Function Was Noted.Caused by Broken Door Latch Pins on CR Chiller Door.Ts Amend Request to Establish Allowed OOS Time Was Submitted1999-07-23023 July 1999
- on 990625,loss of CR Special Ventilation Function Was Noted.Caused by Broken Door Latch Pins on CR Chiller Door.Ts Amend Request to Establish Allowed OOS Time Was Submitted
ML20209J1131999-07-15015 July 1999 Safety Evaluation of Topical Rept NSPNAD-8102,rev 7 Reload Safety Evaluation Methods for Application to PI Units. Rept Acceptable for Referencing in Prairie Island Licensing Actions ML20209F9811999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20196F4081999-06-23023 June 1999 Revised Pages 71,72 & 298 to Rev 7 of NSPNAD-8102, Prairie Island Nuclear Power Plant Reload Safety Evaluation Methods for Application to PI Units ML20195G5181999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included ML20207B5931999-05-26026 May 1999 SER Accepting Licensee Proposed Alternative to ASME Code for Surface Exam (PT) of Seal Welds on Threaded Caps for Unit 1 Reactor Vessel Head Penetrations for part-length CRDMs ML20196L2501999-05-13013 May 1999 Rev 0 to PINGP Unit 1 COLR Cycle 20 05000282/LER-1999-005-01, :on 990508,containment Inservice Purge Sys Was Not Isolated During Heavy Load Movement Over Fuel.Caused by Missing Procedure Step in D58.1.6.PINGP 1224 Was Initiated to Communicate Event & Forestall Repeating Event1999-05-0808 May 1999
- on 990508,containment Inservice Purge Sys Was Not Isolated During Heavy Load Movement Over Fuel.Caused by Missing Procedure Step in D58.1.6.PINGP 1224 Was Initiated to Communicate Event & Forestall Repeating Event
ML20206L6191999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with ML20205N1081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with ML20205B3351999-03-17017 March 1999 Safety Evaluation Supporting Amends 143 & 134 to Licenses DPR-42 & DPR-60,respectively ML20205Q5101999-03-15015 March 1999 Inservice Insp Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 981109-1229 Cycle 19,970327-981229 05000306/LER-1999-001-01, :on 990206,TS Required Reactor Protection Logic Test Was Missed.Caused by Personnel Error.Sd Banks Were Inserted at 0544,RT Breakers Were Opened & Test Was Performed.With1999-03-0808 March 1999
- on 990206,TS Required Reactor Protection Logic Test Was Missed.Caused by Personnel Error.Sd Banks Were Inserted at 0544,RT Breakers Were Opened & Test Was Performed.With
ML20207J6951999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant ML20202J7711999-02-0404 February 1999 Simulator Certification Rept for Prairie Island Plant Simulation Facility,1998 Annual Rept ML20202G3761999-01-31031 January 1999 Non-proprietary Rev 7 to NSPNAD-8102-NP, Prairie Island Nuclear Power Plant Reload SE Methods for Application to PI Units ML20207L2811999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2 ML20202J1731999-01-22022 January 1999 Safety Evaluation Concluding That NSP Proposed Alternative to Surface Exam Requirements of ASME BPV Code for CRD Mechanism Canopy Seal Welds Will Provide Acceptable Level of Quality & Safety 05000306/LER-1998-006-01, :on 981219,unplanned Actuation of ESF Equipment During Performance of Sp.Caused by Personnel Error.Control Room Took Prompt Action & Returned Plant to Proper Status & Second pre-job Briefing for SP-2126 Was Conducted1999-01-18018 January 1999
- on 981219,unplanned Actuation of ESF Equipment During Performance of Sp.Caused by Personnel Error.Control Room Took Prompt Action & Returned Plant to Proper Status & Second pre-job Briefing for SP-2126 Was Conducted
ML20205H0561998-12-31031 December 1998 Northern States Power Co 1998 Annual Rept. with ML20206P7861998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With ML20198J6441998-12-17017 December 1998 Rev 0 to PINGP COLR Unit 2-Cycle 19 05000306/LER-1998-005-02, :on 981109,RT from 22% Power During Planned SD Operation Was Noted.Caused by Tt.Fw Heater Drain Level Control Was Thoroughly Inspected & Calibrated.With1998-12-0909 December 1998
- on 981109,RT from 22% Power During Planned SD Operation Was Noted.Caused by Tt.Fw Heater Drain Level Control Was Thoroughly Inspected & Calibrated.With
ML20198L2211998-12-0707 December 1998 Safety Evaluation Supporting Amends 141 & 132 to Licenses DPR-42 & DPR-60,respectively ML20206N2731998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With 05000282/LER-1998-016, :on 981029,negative Flux Rate RT Occurred Upon CR Insertion After Failure of CRD Cable.Caused by Internal Short Circuit Developing in CRDM Patch Cables at Reactor Head Connector.Replaced CRDM Patch Cables.With1998-11-24024 November 1998
- on 981029,negative Flux Rate RT Occurred Upon CR Insertion After Failure of CRD Cable.Caused by Internal Short Circuit Developing in CRDM Patch Cables at Reactor Head Connector.Replaced CRDM Patch Cables.With
ML20196D7341998-11-20020 November 1998 Third Quarter 1998 & Oct 1998 Data Rept for Prairie Island Isfsi ML20195D3821998-11-0404 November 1998 Safety Evaluation Supporting Amends 140 & 131 to Licenses DPR-42 & DPR-60,respectively ML20155K6301998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20195D3761998-10-30030 October 1998 Safety Evaluation Supporting Amends 139 & 130 to Licenses DPR-42 & DPR-60 05000306/LER-1998-004-01, :on 980910,shield Building Integrity Was Breached.Caused by Inadequate TS Change.Revised Affected Procedures.With1998-10-0505 October 1998
- on 980910,shield Building Integrity Was Breached.Caused by Inadequate TS Change.Revised Affected Procedures.With
ML20202J7991998-09-30030 September 1998 Non-proprietary Version of Rev 3 to CEN-629-NP, Repair of W Series 44 & 51 SG Tubes Using Leaktight Sleeves,Final Rept ML20198R8061998-09-30030 September 1998 Rev 1 to NSPLMI-96001, Prairie Island Nuclear Generating Plant Ipeee ML20154H4061998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Prairie Island Nuclear Generating Plant.With ML20198P0571998-09-0303 September 1998 Rev 1 to 95T047, Back-up Compressed Air Supply for Cooling Water Strainer Backwash Valve Actuator ML20153B0761998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Prairie Island Nuclear Generating Plant.With 05000282/LER-1998-009-01, :on 980731,noted That Recent Testing of RCS Vent Paths Had Not Been Performed in Literal Compliance with Wording of TS 4.18.1.Caused by Misunderstanding of Wording in TS Section 4.18.Will Modify Surveillance Procedures1998-08-27027 August 1998
- on 980731,noted That Recent Testing of RCS Vent Paths Had Not Been Performed in Literal Compliance with Wording of TS 4.18.1.Caused by Misunderstanding of Wording in TS Section 4.18.Will Modify Surveillance Procedures
ML20237D6491998-08-13013 August 1998 Safety Evaluation Supporting Amends 137 & 128 to Licenses DPR-42 & DPR-60,respectively ML20237A3961998-08-11011 August 1998 Safety Evaluation on Westinghouse Owners Group Proposed Insp Program for part-length CRDM Housing Issue.Insp Program for Type 309 Welds Inadequate from Statistical Point of View ML20237A8171998-08-0505 August 1998 SER Related to USI A-46 Program GL 87-02 Implementation for Prairie Island Nuclear Generating Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
.
.t Northern States Power Coir.pany Prairie Island Nuclear Gener:1lng Pisnt 1717 Wakonada Dr. East Welch, tAnnesota 550e9 January 13,1998 Prairie island Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Atto: Docunent Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50 282 License Nos. DPR 42 50-306 DPR60 Monthly Operating Report December 1997 Attached is the Monthly Operating Report for Decen1ber 1997 for the Priarle Island Nuclear Generating Plant.
Joel P Sorenson Plant Manager Prairie Island Nuclear Generating Plant c:
Regional Administrator Ill, NRC NRR Project Manager, NRC g
- b ' (f NRC Resident inspector State of Minnesota - Kris Sanda j
Attachment j.[v b lll lllll!ll!!!l!!llO!l[Illl 9901220020 971231 PDR ADOCK 05000282 R
PDR,
PRINTE0 01.M98 NRC MONTHLV REPORT P:gei DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE 01/o898 COMPLETED BY DALE DuGSTAD TELEPHONE 612 3881121-4376 NARBAI1YfJiUMMARY OF OEERATING EXPERIENCE MONIHLDECEMBER.1921 At the beginning of December, Unit 1 was still in the refueling (cycle 18 to 19) and maintenance outage that started on October 10. Some of the major tasks completed were: low pressure turbine rotor upgrade, steam generator insp0ction and repairs, reactor coolant pump motor inspection, charging pump discharge check valves replacement, internallifting rig work,10 Bani: transformer modification of tap changer, and refueling.
The reactor was taken critical on the 13th at 0100 and the generator was placed on-line on the 14th at 1355. The generator was taken off line on the 15th at 0423 to conduct tests on the new LP rotors (reactor was at hot standby). After the rotor tests were completed the generator was placed on-line on the 16th at 0114. The Unit obtained full power operation on the 19th at 0526.
Because of the LP rotor upgraue the Unit is producing additional megawatts. The values for the Designed Electrical Rating and Maximum Dependable Capacity (both gross and net) will be changed aftor the Unit completes an URGE test.
CURRENT CONTINUOUS OPERATING RUN OF 15 DAYS
NRC MONTHLY REPORT PRINTED 01/07/98 PageO DOCKET NO. 50 282 UNIT PRAIRIE ISLAND NO.1 DATE 0147/98 COMPLETED BY DALE DUGSTAD TELEPHONE 612-386-11214376 AVERAGE _ DAILY POWER LEVEL UNIT.1 MOfifH:.DECEMBEIL1911 DATE:
AYERAGE. DAILY POWER LEVEi.
12/01/97 0
12/02/97 0
12/03/97 1
12/04/97 3
12/05/97 3
12/06/97 6
12/07/97 14 12/08/97 10 12/09/97 16 12/10/97
-17 12/11/97 17 12/12/97 17 12/13/97 17 12/14/97 4
12/15/97 20 12/10/97 114 12/17/97 250 12/18/97 404 12/19/97 545 12/20/97 546 12/21/97 546 12/22/97 547 12/23/97 548 12/24/97 544 12/25/97 549 12/26/97 545 12/27/97 550 12/28/97 547 12/29/97 548 12/30/97 548 12/31/97 546 AVERAGE LOADS ADOVE 513 MWE NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER
i NRC MONTHLY REPORT PRINTE0 01/Of/98 Page3 DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE O107/95 COMPLETED BY DALE DUGSTAD QPERATING DATA REPORT DEERAIINCLAIAIMS
- 1. UNIT NAME:
PRAIRIE ISLAND NO.1
- 2. REPORTING PERIOD; DECEMBER 1997
- 3. LICENSED THERMAL POWER (MWT): 1650
- 4. NAMEPLATE RATING (GROSS MWE): 593
- 5. DESIGN ELECTRICAL RATING (NET MWE): 530
- 6. MAXIMUM DEPF.NDABLE CAPACITY (GROSS MWE):
545
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
513
- 8. IF CHANGES OCCUR IN CAPACITY RA.lNGS (ITEMS 3 7) SINCE LAST REPORT, GIVE REASON:
NONE
- 9. POWER LEVEL TO WHICH RESTRICTED,IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTIONS,IF ANY:
NONE flilS MQHIlj YR.TO-DATE CUMQLAI1YE
- 11. HOURS IN REPORTING PERIOD 744 8760 210768
- 12. NUMBER OF HOURS REACTOR CRITICAL 455.0 7030.3 180777.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.00 5571.1
- 14. HOURS GENERATOR ON LINE 397.2 6906.8 178988.5
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.00 0.00
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 575022 11224330 284277843
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 199760 3738100 93818710
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 185518 3522041 88234321
- 10. UNIT SERVICE FACTOR 53.4 79.5 84.9
- 20. UNIT AVAILADILITY FACTOR 53.4 79.5 84.9
- 21. UNIT CAPACITY FACTOR ( MDC NET) 48.6 78.4 82.9
- 22. UNIT CAPACITY FACTOR ( DER NET) 47 75.9 79
- 23. UNIT FORCED OUTAGE RATE O
4.8 4.6
- 24. FORCED OUTAGE HOURS 0.0 353.6 8540.7
- 25. SHUTDOWNS SCHEDULED OVE3 NEXT SIX MONTHS (WPE. DATE. AND DURATION OF EACH):
N/A
- 26. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
N/A
NRC MONTHLY REPORT PRINTED 01/07/98 Page 4 DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE 01/07/98 COMPLETED BY DALE DUGSTAD TELEPHONE 612 3881121-4376 UNIT SHUTDOWHSAND POWER REDUCTIONS MONTH; DECEMBEB_1MI DAT2 UNIT TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 12/01/97 i
S 346.8 C
4 N/A N/A N/A NOTES:
Continued refueling / maintenance out990 that started on Oct.18th.
IYEE REASQN MEIHOD RYRIENLCDDE F-FORCED A EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD S-SCHEDULED D-MAINTENANCE OR TEST 2 MANUAL TRIP C-REFtJELING 3-AUTO TRIP D-REGULATORY RESTRCTION 440NTINUED E OPERATOR TRAINING AND 5-REDUCED LOAD COMP _QNENT CC DE LICENSE EXAMINATION 94THER IEEE STD 803A-1983 F ADMINISTRATIVE
- GOPERATIONAL ERROR H-OTHER
l NMC MONTHLY REPORT PRINTED 01/07/98 Page5 n
DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 01/07/96 COMPLETED BY DALE DUGSTAD TELEPHONE 612 386-11214376 NAMSMMMt.RY OF OPERATING EXPERIENCE MONTH: DECEMBER 1997.
1 Unit 2 was base loaded for the mothh of December. There were no shutdowns or power I
reductions, s
h L
1 K
E E
7; CURRENT CONTINUOUS OPERATING R'IN OF 94 DAYS 3-r
PRINTED 01/07/98 NRC MONTHLY REPORI l
Page 6 l
DOCKET NO 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 01/07/98 COMPLETED DY DALE DUGSTAD TELEPHONE 612 388-1121-4376 AVERAGE DAILY POWER LEVEL UNIT 2
?
MONTH: DECF.MBER.1992 DAIE; AVERAGE DAILY POWER LEVEL 12/01/97 529
/
12/02/97 530 12/03/97 529 12/04/97 534 12/05/97
$28 12/06/97 532 12/07/97 530 12/08/97 532 12/09/97 531 12/10/97 530 12/11/97 529 12/12/97 531 12/13/97 533 12/14/97 529 12/15/97 527 12/16/C7 530 12l17/97 525 12/18/97 530 12/19/97 530 12/20/97 531
-12/21/97 ti29 12/22/97 532 12/23/97 534 12/24/97 529 12/20/97 532 12/26/97 529 12/27/97 533 12/2E/97 531 12/29/97 531 12/30/97 532 12/31/97 533 AVERAGE LOADS ABOVE 512 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER
\\.'
l NRC MONTHLY REPORT PRINTED 01/07?98 Page 7 DOCKET NO. 50-306 UNIT PRAlRIE ISLAND NO. 2 DATE 01/07/98 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1171-4376 OPERATING DATA REPORT QPERATING STATUS
- 1. UNIT NAME:
PRAIRIE ISLAND NO. 2
- 2. RtiPORTING PERIOD:
DECEMBER 1997
- 3. LICENSED THERMAL POWER (MWT): 1650
- 4. NAMEPLATE RATING (GROSS MWE):
533
- 5. DESIGN ELECTRICAL RATING (NE T MWE): 530
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
544
- 7. MAXIMUM DEPENPABLE CAPACITY (NET MWE):
512
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON:
NONE
- 9. POWER LEVEL TO WHICH RESTRICTED,IF ANY (NET MWII): NONE
- 10. REASONS FOR RESTRICTIONS,IF ANY:
NONE THIS MONTH YR.TO-DATE CUMULAINE
- 11. HOURS IN REPORTING PERIOD 744 8760 201886
- 12. NUMBER OF HOURS REACTOR CRITICAL 744.0 7233.0 178726.2
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.00 1516.1
- 14. HOURS GENERATOR ON-LINE 744.0
).82.8 177227.1
- 15. UNIT RESERVE SHUTDOWN HOURP 0.0 0.00 0.00
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1224S21 11542478 282464587
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 414610 3862120 92497410
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 39469's 3640396 87451170
- 10. UNIT SERVICE FACTOR 100 82 87.8
- 20. UNIT AVAILABILITY FACTOR 100 82 87.8
- 21. UNIT CAPACITY rACTOR ( MDC NET)
"t,3.6 81.2 8e.3
- 22. UNIT CAPACITY FACTOR ( DER fiET) 100.1 78.4 81.7
- 23. UNIT FORCED OUTAGE RATE O
7.9 2.6
- 24. FORCC.D OUTAGE HOURS 0.0 617.2 4731.1
- 25. SHUTDOWNS CCHEDULED OVER NETT SIX MONTHS (TYPE. DATE. AND DURATION OF EACH):
N/A
- 26. IF CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE:
N/A l
l
i NRC MONTHLY REPORT PRINT ED 01/n7/98 L
Page8 DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 01/07/98 COMPLETED BY DALE DUGSTAD TELEPHONE 012-388-1121-4376 UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH: DECEMBER 1997 DATE UNIT TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 12/31/97 2
None.
O NOTES:
IYEE REASON blETHOD SYSTEM CODE F FORCED A-EQUIPMENT FAILURE 1 MANUAL
- DRAFT IEEE STD S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL TRIP C-REFUELING 3 AUTOTPIP D-REGULATORY RESTRICTION 4-CONTl;4UED E4PERATOR TRAINING AND 5-RdDUCED LOAD COMPONENT CODE LICENSE EXAMINATION 0-OTHER IEEE STD 803A-1983 F AOMINISTRATIVE W'ERATIONAL ERROR H-OTHER
_