Northern States Power Company Prairie Island Nuclear Generating Plant 1717 Wakonade Dr. East Welch, Minnesota 55089 i
November 5,1998 Technical Specifications 6.7.A.3 i
US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Monthly Operating Report October 1998 Attached is the Monthly Operating Report for October 1998 for the Prairie Island Nuclear Generating Plant.
(.
W 1
Joel P. Sorensen Plant Manager j
Prairie Island Nuclear Generating Plant
/
c:
Regional Administrator-Ill, NRC NRR Project Manager, NRC Id NRC Resident inspector
'g2/
State of Minnesota - Kris Sanda Attachment 9811160043 981031 PDR ADOCK 05000282 R
PDR y
, C C O 1. 0
n l
- NRC MONTHLY REPORT PRINTED 11/3/199 Page1 DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE 11/3/1998 COMPLETED BY DALE DUGSTAD PHONE 651-388-1121-4376 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE MONTH: OCTOBER 1998 During the month of October, Unit 1 was base loaded. The unit operated routinely until near the end of the month.
On the 29th at 2350, a reactor trip occurred due to a short in one of the control l
rod cables. The unit was brought to cold shutdown to allow repairs. All of the control rod drive and the control rod position indication cables will be replaced.
l The service hours for this month wero 745 due to daylight savings time change.
The trip ended a continuous operating run of approximately 133 days.
CURRENT CONTINUOUS OPERATING RUN OF 0 DAYS i
NRC MONTHLY REPORT PRINTED 11/3/199 Page 2 DOCKET NO. 50 282 UNIT PRAIRIE ISLAND NO.1 DATE 11/3/1998 COMPLETED BY DALE DUGSTAD PHONE 651388-1121-4376 OPERATING DATA REPORT OPERATING STATUS
- 1. UNIT NAME:
PRAIRIE ISLAND NO.1
- 2. REPORTING PERIOD:
OCTOBER 1998
- 3. LICENSED THERMAL POWER (MWT): 1650
- 4. NAMEPLATE RATING (GROSS MWE): 593
- 5. DESIGN ELECTRICAL RATING (NET MWE): 543
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
558
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
526
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON:
NONE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTIONS,IF ANY:
NONE THIS MONTH YR TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 745 7296 218064
- 12. NUM. 'R QF HOU"G REACTOR CRITICAL 696.8 6954.7 187731.7
- 13. REAM OR RESERVE SHUTDOWN HOURS 0.0 0.00 5571.1
- 14. HOURS GENERATOR ON-LINE 696.8 6918.0 185906.5
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.00 0.00
- 16. GROSS THERMAL ENERGY GENFRATED (MWH) 1143108 11274462 295552305
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 399090 3865080 97683790
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 378354 3655882 91890203
- 19. UNIT SERVICE FACTOR 93.5 94.8 85.3
- 20. UNIT AVAILABILITY FACTOR 93.5 94.8 85.3
- 21. UNIT CAPACITY FACTOR ( MDC NET) 96.6 94.6 83.2
- 22. UNIT CAPACITY FACTOR ( DER NET) 95.8 91.6 79.2
- 23. UNIT FORCED OUTAGE RATE 6.5 4.9 4.6 e -
- 24. FORCED OUTAGE HOURS 48.2 354.7 8895.4
NRC MONTHLY REPORT PRINTED 11/3/199 Page 3 DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE 11/3/1998 3
COMPLETEO BY DALE DUGSTAD PHONE 651-388-11214376 UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH: OCTOBER 1998 l
DATE UNIT TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 10/29/1998 1
F 48.2 A
3 1-98-16 N/A N/A NOTES:
Reactor trip caused by control rod cable short.
i TYPE
, REASON METHOD SYSTEM CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL TRIP C-REFUELING 3-AUTO TRIP D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING AND 5-REDUCED LOAD COMPONENT CODE LICENSE EXAMINATION 0-OTHER IEEE STD 803A-1983 F-ADMINISTRATIVE G-OPERATIONAL ERROR l
H-OTHER
NRC MONTHLY REPORT PRINTED 11/3/199 Prge 4 DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 11/3/1998 5
i COMPLETED BY DALE DUGSTAD PHONE 651-3881121-4378 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE MONTH: OCTOBER 1998 During the month of October, Unit 2 was base loaded. There were no shutdowns or power reductions.
The service hours for this month were 745 due to daylight savings time change.
1 l
CURRENT CONTINUOUS OPERATING RUN OF 241 DAYS l
\\
l
i
- NRC MONTHLY REPORT PRINTED 11/3/199 Page 5 DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 11/3/1998 COMPLETED BY DALE DUGSTAD PHONE 651-3881121-4370 l
OPERATING DATA REPORT l
OPERATING STATUS
- 1. UNIT NAME:
PRAIRIE ISLAND NO. 2
- 2. REPORTING PERIOD:
OCTOBER 1998
- 3. LICENSED THERMAL POWER (MWT): 165P
- 4. NAMEPLATE RATING (GROSS MWE):
593 5 DESIGN ELECTRICAL RATING (NET MWE): 530
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
544
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
512
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON:
NONE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTIONS, IF ANY:
NONE THIS MONTH YR.,TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 745 7296 209182
- 12. NUMBER OF HOURS REACTOR CRITICAL 745.0 6373.1 185099.3
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1516.1
- 14. HOURS GENERATOR ON-LINE 745.0 6364.3 183591.4
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1224621 10368661 292833248
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 414960 3431540 95928950
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 393938 3238401 90689571
- 19. UNIT SERVICE FACTOR 100.0 87.2 87.8
- 20. UNIT AVAILABILITY FACTOR 100.0 87.2 87.8
- 21. UNIT CAPACITY FACTOR ( MDC NET) 103.3 86.7 86.3
- 22. UNIT CAPACITY FACTOR ( DER NET) 99.8 83.7 81.8
- 23. UNIT FORCED OUTAGE RATE 0.0 12.8 3.0
- 24. FORCED OUTAGE HOURS 0.0 931.7 5662.8 l
NRC MONTHLY REPORT PRINTED 11/3/199 Prge 6 DOCKET NO. 50 306 UNIT PRAIRIE ISLAND NO. 2 DATE 11/3/1998 T
COMPLETED BY DALE DUGSTAD PHONE 651-38811214376 UN_IT SHUTDOWNS AND POWER REDUCTIONS MONTH: OCTOBER 1998 DATE UNIT TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 10/31/1998 2
0 NOTES: None.
TYPE REASON METHOD SYSTEM CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL TRIP C-REFUELING 3-AUTO TRIP D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING AND 5-REDUCED LOAD COMPONENT CODE LICENSE EXAMINATION 9-OTHER IEEE STD 803A-1983 F-ADMINISTRATIVE G-OPERATIONAL ERROR H-OTHER
!