ML20083A113

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Jan 1995 for Prairie Island Nuclear Plant
ML20083A113
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 01/31/1995
From: Dugstad D
NORTHERN STATES POWER CO.
To:
Shared Package
ML20083A100 List:
References
NUDOCS 9505100033
Download: ML20083A113 (2)


Text

r. __

.. g

  • j i

OPERATING DATA REPORT  !

I DOCKET NO. 50-282  :

UNIT PRAIRIE ISLAND NO.1 DATE FEBRUARY 2, 1995 [

COMPLETED BY DALE DUGSTAD  !

TELEPHONE 612-388-1121-4376 i

$ddrrectedshecapaciUy[facid2[

OPERATING STATUS d "* }

  • f
1. UNIT NAME: PRAIRIE ISLAND NO. 1
2. REPORTING PERIOD: JANUARY 1995  !
3. LICENSED THERMAL POWER (MWT): 1650
4. NAMEPLATE RATING (GROSS MWE): 593  ;
5. DESIGN ELECTRICAL RATING (NET MWE): 530 [
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) : 545  !
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) : 513 t
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)  ;

SINCE LAST REPORT GIVE REASON: NONE 1

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE [
10. REASONS FOR RESTRICTIONS, IF ANY: NONE  :

P THIS MONTH YR-TO-DATE CUMULATIVE i i.

11. HOURS IN REPORTING PERIOD 744 744- 185208
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 158343.3
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 5571.1 .
34. HOURS GENERATOR ON-LINE 744.0 744.0 156685.0  !
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 [
16. GROSS THERMAL ENERGY GENERATED (MWH) 1225396 1225396 248134035 t
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 415460 415460 81765110
18. NET ELECTRICAL ENERGY GENERATED (MWH) 395542 395542 76850809

'19. UNIT SERVICE FACTOR 84.6 5 100.0 100.0

20. UNIT AVAILABILITY FACTOR 100.0 100.0 84.6  :

121".;; UNIT CAPACITY- FACTORL (USING MDCL NET)L .103;6 ' 1103.6 82.4 [

22. UNIT CAPACITY FACTOR (USING DER NET) 100.3 100.3 78.3
23. UNIT FORCED OUTAGE RATE 0.0 0.0 4.9. ;
24. FORCED OUTAGE HOURS 0.0 0.0 8125.9 i
25. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF FACH):

i N/A i

26. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE: N/A i

i

{

i t

+

9505100033 950503  ;

PDR ADOCK 05000282 R PDR .

i

r=

]

t* i" OPERATING DATA REPORT DOCKET NO. 50-3f6 UNIT PRAIRIE ISLAND NO.2 DATE FEBRUARY 2, 1995 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 Corrected the capacity factor i(MCD net)E OPERATING-STATUS

1. UNIT NAME: PRAIRIE ISLAND NO. 2
2. REPORTING PERIOD: JANUARY 1995
3. LICENSED THERMAL POWER (MWT): 1650
4. NAMEPLATE RATING (GROSS MWE): 593
5. DESIGN ELECTRICAL RATING (NET MWE): 530
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) : 544
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) : 512
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT GIVE REASON: NONE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE
10. REASONS FOR RESTRICTIONS, IF ANY: NONE ___

THIS MONTH YR-TO-DATE cut 1ULATIVE

11. HOURS IN REPORTING PERIOD 744 744 176326  ;
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 155854.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1516.1
14. HOURS GENERATOR ON-LINE 744.0 744.0 154466.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) ,1224824 1224824 245505046
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 414610 414610 80126650
18. NET ELECTRICAL ENERGY GENERATED (MWH) 394903 394903 75752399
19. UNIT SERVICE FACTOR 100.0 100.0 87.6
20. UNIT AVAILABILITY FACTOR 100.0 100.0 87.6
21. UNIT CAPACITYLFACTOR (USING'MDC. NET). 103s7~ ~ 103.7 t. 85.8
22. UNIT CAPACITY FACTOR (USING DER NET) 100.1 100.1 81.1
23. UNIT FORCED OUTAGE RATE 0.0 0.0 2.5
24. FORCED OUTAGE HOURS 0.0 0.0 3984.7  ;
25. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH):

REFUELING OUTAGE STARTING ON MAY 12, 1995.

26. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE: N/A f

F i