Unit 1 ISI Summary Rept Interval 3,Period 2 Refueling Outage Dates 990425-990526 Cycle 19 971212-990526
ML20211C253
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 08/04/1999
From:
NORTHERN STATES POWER CO.
To:
Shared Package
ML20211C236 List:
References
NUDOCS 9908250189
Download: ML20211C253 (120)


Text

NORTHERN STATES POWER COMPANY s

414 NICOLLET MALL MINNEAPOLIS, MINNESOTA 55401 NORTHERN STATES POWER COMPANY PRAIRIE ISLAND NUCLEAR GENERATING PLANT UNIT 1 1717 WAKONADE DRIVE E WELCH, MINNESOTA 55089 INSERVICE INSPECTION

SUMMARY

REPORT INTERVAL 3, PERIOD 2 REFUELING OUTAGE DATES 4-25-99 TO 05-26-99 CYCLE 1912-12-97 TO 05-26-99 l

COMMERCIAL SERVICE DATE DECEMBER 16,1973 l

Prepared By: Utma\\./ duel (sr Me4ha A, bo/%

inspection S ervisor V

[/

a Reviewed By-Aw_

ISI Program Engineer Approved By:

3 Supenntendent of Matenals and Special Processes

'W Report Date:

O g:ae= = ::89;ge

i l

NORTHERN STATES POWER

SUMMARY

REPORT l

INSERVICE INSPECTION PRAIRIE ISLAND UNIT 1,1999 l(Q TABLE OF CONTENTS L/

CONTENTS PAGE (SJ 1.

Summary 2

il.

Form NIS-1, Owner's Report for Inservice inspections 3

111.

Form NIS-2, Owner's Reports for Repairs or Replacements 40 APPENDICES PAGE (S)

A.

Interval 3 Period 2 examinations by ISO 23 B.

Interval 3 Period 2 examinations by ASME Item number 23 C.

Interval 3 Period 2 examinations by inspection Report number 23 i

D.

List of section Xi VT-2 Examinations 1

E.

Results of Steam Generator Eddy Current Examinations 31 F.

List of Snubber Inservice Testing 3

i

NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT 1,1999

1.0 INTRODUCTION

The Prairie Island Nuclear Generating Plant Unit 1 refueling outage began April 25,1999 and ended May 26,1999.

l This summary report will convey the components examined, the examination methods used, the examination number and summarizes the examination results performed during the 2nd period of the 3rd interval, (Cycle 19; see appendix ~A, B and C. The 3rd interval, 12-17-1993 to 12-16-2003 is based on the examination requirements of the ASME Boiler and Pressure Vessel Code Section XI,1989 Edition no addenda.

2.0 PERSONNEL Visual and nondestructive examinations were performed by Northern States Power (NSP),

Lambert Macgill and Thomas (LMT), ABB and Zetec inc. Framatone Technologies was contracted to perform independent evaluation of eddy current steam generator data.

Hartford Steam Boiler inspection and Insurance Company, provided the Authorized Inspection. Certifications of examination personnel are maintained on file by Northern States Power Company.

3.0 INSPECTION

SUMMARY

/-

Results of the examinations indicate that the integrity of the plant systems have been maintained.

During the refueling outage 100% of all accessible tubes in steam generator 11 and 12 were examined fulllength as part of the inservice inspection. See appendix E for details.

Hanger and component support examinations listed in appendices A through C as IWF or F-A, B, C include the applicable examination requirements of ASME Section XI Subsection IWF.

I.

Summary (continued)

Page 2 of 2 lO l

V l

l i

r.

l NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT 1,1999 r

1(]

4.0 EXAMINATION REPORTS, EQUIPMENT AND MATERIALS 1 L.)

Examination reports contain references to procedures, equipment and materials used to complete the specific examinations. Copies of the examination reports, examination procedures, and equipment records are available at Northern States Power Company.

This summary report contains several abbreviations which are identified below; (A) = Augmented examinations BL = Baseline examination GEO = Geometry, evaluation of a indication HELB = High Energy Line Break IN = Information Notice IND = Indication requires further evaluation NAD = No Apparent Defects i

NC = Non Code examinations NCR = Nonconformance Report R1, R2 etc. = consecutive examinations following repair, rework or evaluation of a initial exam SE = Safety Evaluation TS = Plant Technical Specifications O

l s

V

F.

l NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT 1,1999 lp d

11.

Form NIS-1 l

Page 1 of 3 FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As required by the Provision of the ASME Code Rules 1.

Owner: Northern States Power Company Address: 414 Nicollet Mall. Minneapolis, MN 55401 ~

2.

Plant: Prairie Island Nuclear Generatina Plan _t Address: 1717 Wakonade Drive E. Welch. MN 55089 3.

Plant Unit:

1

4. Owner certificate of Authorization:

NA 5.

Commercial Service Date:

12-16-73

6. National Board No. :

NA 7.

Components: (See appendices for components inspected this outage)

Manufacture Component or Manufacture or Installer State or National Appurtenance or Installer Serial No.

Province No.

Bdard No.

REACTOR VESSEL CREUOT-LOIRE 686 MINN 200-51 PRESSURIZER WESTINGHOUSE 1111 68-20 STEAM GEN WESTINGHOUSE 1101 68-24 NUMBER 11 STEAM GEN WESTINGHOUSE 1102 68-25 NUMBER 12 REACTOR COOLANT WESTINGHOUSE W515 PUMP 11 REACTOR COOLANT WESTINGHOUSE W516 PUMP 12 RHR HEAT JOSEPH OATS 1817-1 A 340 EXCHANGER 11

& SONS RHR HEAT JOSEPH OATS 1817-1B 341 EXCHANGER 12

& SONS RHR PUMP 11 BYRON JACKSON RHR PUMP 12 BYRON JACKSON SAFETY INJECTION BINGHAM PUMP NUMBER 11

NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT 1,1999 Page 2 of 3 FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As required by the Provision of the ASME Code Rules 7.

Components: (continued)

Manufacture Component or Manufacture or installer

- State or National Acourtenance or Installer Serial No.

Province No.

Board No.

SAFETY INJECTION BINGHAM PUMP NUMBER 12 ACCUMULATOR DELTA SOUTHERN 41038-70-1 2554 TANK 11 ACCUMULATOR DELTA SOUTHERN 41038-70-2 2555 TANK 12 BORIC ACID NAVCO TANK 11 l

1 8.

Examination Dates 12-12-97 to 05-26-99.

'O Ig 9.

Inspection Period identification:

2 10.

Inspection interval identification: from 12-17-1993 to 12-16-2003.

11.

Applicable Edition of Section XI 1989 Addenda none 12.

Date/ Revision of Inspection Plan: 04/22/99 / Revision 2 13.

Abstract of Examinations and Tests.

l See appendices A through F (attached)

L 14.

Abstract of Results of Examinations and Tests.

See appendices A through F (attached) 15.

Abstract of Corrective Measures.

All unacceptable indications detected have been documented on the plant nonconformance reports and have been dispositioned to assure continued plant operation integrity.

,O v

I l

NORTHERN STATES POWER

SUMMARY

REPORT l

lNSERVICE INSPECTION PRAIRIE ISLAND UNIT 1,1999 IO FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS b

As required by the Provision of the ASME Code Rules We certify that a) the statements made in this reporc are correct b) the examinations and tests meet the Inspection Plan as required the ASME Code,Section XI, and c) corrective measures l

taken conform to the rules of the ASME Code,Section XI.

Certificate of Authorization No. (if applicable)

  1. 4 Expiration Date A/4 DateA&a c2 1999 Signed Ab/2rfrAV$rpres Sura Byb lN

/

(Owner)

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, hold a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of b /M /1 C5 o ic<

NcaM boI fe

[

and employed by ar ec oc{ CT of ar

.naveinspected i

the component's described in this Owner's Report during the period of /2 -l) - 9 7 1

I to U b ' 79 and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owner's Report in accordance with the inspection Plan and as required by the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connec d with this inspection.

wm

/

^

Commissions 8/M 79 / 7 inspector's Signatu're National Board, State, Province and Endorsements Date:

oa usk 3 19 k 9 J

l lll.

FORM NIS-2 OWNERS REPORT FOR REPAIRS AND REPLACEMENTS

f' NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT 1,1999 f~'\\

d Ill.

FORM NIS-2 OWNERS REPORT FOR REPAIRS AND REPLACEMENTS i

Twenty Form NIS-2s are attached which identify plant system repairs or replacemerits that have been completed at Prairie Island Unit 1 between the dates of 12-12-97 to 05-26-99.

1) Cooling Water (CL-43-2)
2) Feedwater (16-FW-15)
3) Main Steam (RS-19-1)

~

4) Main Steam (CV-31099)5) Reactor Coolant (#11Pressurizzer Manway Gasket Surface)
6) Reactor Coolant (2-RC-8A)
7) Reactor Coolant (3-RC-5)
8) Reactor Vessel (CRDM Housings, Design Change 98RV03)
9) Reactor Vessel (Lower Canopy Seal)
10) Steam Generator Primary Side (Primary Manways)
11) Steam Generator Secondary Side (Secondary Manways)
12) Steam Generator Secondary Side (Secondary Manways)
13) #11 Steam Generator (Plug Tubes)
14) #12 Steam Generator (Install Sleeves)
15) Safety injection (SI-9-6)
16) Safety injection (Sl-9-3)
17) Chemical Volume and Control (CV-31329) l
18) #12 Steam Generator (Remove Sleeves)
19) Steam Generator Primary Side (Primary Manways)
20) #12 Steam Generator (Plug Tubes) l O

l

1 l

O)

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 7 83 97

1. Ownerjlorthern States Power Co.

case Name I

1717 Wakonade Dr.

E, Welch, MN 55089 eet

[

of JO Sh u ar

2. Plant-Prairie Island Unit WoeK. OrW 990N37 Same Mareas Repair Creenization P,0. No., Job No., etc.

NE

3. Work Perfonned by Owner Type Code Symbol Stamp Name Authorization No.

M Expiration Date M

4. Identification of System.

^9 b

^

l

5. ( ) Applicable Construction Code b!

19 d 7 Edition.

Addenda.

Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 E k ___

i

6. Identification of Components Repaired or Replaced and Replacement Components t 3 ASME Coee v

l National

Repaired, Stamped Name of Name of Manufacturer Board Other Year
Replaced, (Yes Component Manufacturer Serial No.

N o.

Identification Built or Repiscement or Nol can a back c hux

(% 5$wd Ol'V3-1 R%ud XI l

l l

7, Description of Work (0/4 c4 r/

I(cd VL

8. Tests Conducted: Hydrostatic O eneumatic 0 Nominal Operating Pressure Other Pressure //d psi Test Temp. 7d

'F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8% in. x 11 in., (2) Informa.

tlin in Items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is g

recorded at the top of this form.

O bd82)

This Form (ECOO30) may be obtained from the Order Dept., ASME,345 E. 47th St., New York, N.Y.10017 l

l I

l

)

LJ he lofe:SD FORM NIS-2 (Back)

[ f CCd C

Mk

/b 6t /UC

9. R:xnarks -

Applicable Manufacturer's Data Reports to be attached EP CERTIFICATE OF COMPL!ANCE We certify that the statements made in the report ere correct and this W #

onforms to the ru s of the ASME Code Section XI.

r*o*Ir or roo8*coment Typ] Code Symbol Stamp Certificat of Authorization o.

Expiration Data b

Date Owner or Owners ca.ignee, Title 19

/

CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned. holding a vali ca11 mission issued by the N tional Boar of Boiler and Pressu Vessel Inspectors and the State er Prod' cs of M iR A e 9 0 0 and employed by bd M bo'

  1. MI d6J dT of h <e i e-ee ine components eescribee in this Owner's Report during the period /) ' M '

to and state that 12 ths best of my knowledge and befief, the Owner has performed examinations and taken corrective rneasures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector por his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any menner for any personal injury or property damage or a toss of any kind arising from or connected with this inpectizn.

Commissions

,nsoes,o s,.n..u.e

~

~..

n.....,0.

t a...,o.,_ e. an.. no o r s._.n t.

Tu/,. u n.

este I

/

(

)

m a

F I

l fs

(

)

N..)

FORM NIS.2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Northern States Power Co.

Da,e N.m.

i 1717 Wakonade Dr. E, Welch, MN 55089 eet of Sh Address

2. Plant-Prairie Island Unit Name same OJoelc 0-d w 990TVPd Addreas Repelr Orgenfzetion P.O. No Job No., etc.
3. Work Performed by_ Owner Type Code Symbol Stamp M

Nome N4 Authorization No.

Expiration Date MO Address

4. Identification of System.

6

5. L) App!! cable Construction Code 6 7 Edition, 19
Addenda, Code Case (b) Applicable Edition of Section XI Utlitzed for Repairs or Replacements 19
6. Identification of Components Repaired ordteplaced and Replacement Components I

{

}

ASME Code Nationet

Repaired, Stamped Name of Name of Manufacturer Board Other Yeer
Replaced, (Yes Component Manufacturer Serial No.

No.

Identification Bullt or Replacement or Nol e

ftA)

/PE Oftcrai/1L Af &

Af h k#(4)-/5' f q er U

7. Description of Work (X

6C4 I

L04 MiAoe MC IMOM l

8. T(sts Conducted: Hydrostatic 0 Pneumstic 0 nomiasi operstias Pressure O M$

Other O Pressure psi Test Temp.

'F

(

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8% in. x 11 in., (2) Informa.

tion in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered ar't; e number of sheets is recorded et the top of this form.

182)

This Form (E00030) may be obtained from the Order Dept., ASME,345 E. 47th St., New York, N.Y.10017 l

3

I

,m I

\\

O S

SD FORM NIS.2 (Back)

9. Remarks Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this I@I ASME Code,Section XI.

'*P* "'I**'***'"*"* conforms to the rules of the Type Code Symbol stamp Certificat i Authorization No.

Erpiration Date God X

P, b

.06%

Owner or Owner's Des 6cnee. Title Date

' 19-CERTIFICATE OF INSERVICE INSPECTION

1. th2 undersion holding a valid commission issued by the Na n

ard f Boiler and Pres Ve 1 inspectors and the State or Pr inc of-

/d/If50 f 0 and employed by

^

Of M I de M

E of have inspected the components described in this Owner's Report during the period. O S~N S~.25'h9 to --

. and state that 13 th) best of my knowledge and belief, the Owner has performed examinations and taken corrective measures describ d in thi Owner's Report in accordance with the requirements of the ASME Code,Section XI.

e s

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied concerning th cxaminations and conective measures described in this Owner's Report. Furthermore, neither the inspector nor his ernployer sh;'t be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspectlIn.

/

Commissions

/W 9'I"/7 4W 2

onspecto?s Signature Nothonal Board, State, Province; and E ndorsements D;ta 4 & 2b jg W i

/

Y

l

.4

.i

(~~)

FORM NIS-2 CWNER'S REPORT FOR REPAIRS OR REPLACEMENTS Q

As Required by the Provisions of the ASME Code Sectiori XI 7 N T7

1. Owner Northern States Power Co.

eete Name 20 1717 Wakonade Dr.

E, Welch, MN 5 5089 sheet of Accress

2. Plant Prairie Island Unit Name Same (A.JorL 0,- dk V90 YS/>

' g Repair Organization P.O. No., Joe No., etc.

Accrees A/4

3. Woric Performed by Owner Type Code symbol stamp Authorization No.

A/A Expiration Date MN Address

4. Identification of System O'^
5. (a) Applicable Construction Code 19b adition, Addenda Code Case (b) Appl 1 cable Edition of Section X1 Utilized for Repairs or Replacements 19 N
6. Identification of Components Repelred or Replaced and Replacement Components j

l e

ASME I

n\\

/

National

Repaired, Starnoed Name of Name of Manufacturer Board Other Year
Replaced, (Yes Component Manufacturer Serial No.

No.

Identification Built or Replacement or Nol stor cr u.>chu c r vi t u e.

A s ~,

RS-M-/

47 Re A J l

7. Description of Work O df M

hEA e' We b

\\

Asrm A-193 ef &No

8. Tests Conducted: Hydrostatic 0 eneumatic 0 uominai caeraitas reisure r a

j Other Prussure _ /000 psi Test Temp.

8 VO

'F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8% in. x 11 in., (2) inferrna-tion In Items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

7 ] (12/82)

This Form (E00030) may be obtained from the Order Dept., ASME,345 E. 47th St., New York, N.Y.10017

.k/

1

f

-j

.Q; IC W

AWW39/20 i

FORM NIS-2 (Back)

)

9. Remarks -

L e

I YEA $'0D W' k l

App Icacia Manufacturers cata Aaports to be attaened b4 I

CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this y du h conforms to the rules of the ASME Code,Section XI.

'*85#'**'**'"'*"'

Type Code Symbol Stamp

/.l-Cartifica f Authorization No.

Expiration Cate

{

J

, e _.r.r e _.r s.....n.e.

ate 19 Signe b

CERTIFICATE OF INSERVICE INSPECTION 1, the undersigne, holding a valid commission issued by the Nat nal d of B ler and Pressure Ve el I spectors and the State or P vin f ---

IO M 56I6 and employed by O^

b8 A N M I

of OI de have inscected the components described in this Owner's Report during the period

/*2 * /J ' h 7 5^

b'W to and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranry, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personalinjury or property darnage or a foss of any kind arising from or connected with this Inspection.

~ '

i 1

w v' Commissions V

inspectors Signature Nationat Board, State, Provinca, end E ndorsements Oate hh 19 t

O 4

  • e l

l

L a

5 FORM NIS 2 CWNER'S REPCRT FOR REPAIRS CR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 7 ).37 /

1. Owner Northern States Power Co.

e.,,

. no 1717 Wakonade Dr. E, Welch, MN 5 5 0 8 9 heet' Y 20 S

of Accrees

2. Plam Prairie Island Unit N.me Same tilor L Orde r' 97D//02 Repair organization P.O. No., Joe No., etc.

Adorses AlN

3. Work Performed by Owner Type coda Symbol stamp -

Authorization No.

AJ N Expiration Date MA Adorses

4. Identification of System.

O#^

~

19 b7 Edition,

5. (a) Appitcable Construction Code Addenda-Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 77
6. Identification of Components Repelred or Replaced and Replacement Components ASME Code National
Repaired, Starnoed Name of Name of Manufacturer Board Other Year
Replaced, (Yes i

' etiet No.

No.

Identification Bullt or Replacement or Nol Component Manufacturer J

fncArt

/7k n Skam 3ck4-)c s isole.h.

c v' Koe, +.y

%-xA-s e > Sioh 49 Qhc<ma a I

a 4CEd bbb 4* d hMh G^d hCbCo*k NSM N"M 4 NI*

7. Description of Work j

A+s Asr*

A - tn' ac 7

8. Tests Conducted: Hydrostatic O eneumatic0 Nominsi coeratini eressure Y

]

Other O Pressure _ /80 0 psi Test Temp. MVO

,p NOTE: Supplemental sheets in form of !!sts. sketches, or drawings rnay be used, provided (1) size is 8% in. x 11 in (2) informa.

l tion in items 1 through 6 ori this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

J (12/82)

This Form (E00030) may be obtained from the Order Dept., ASME,345 E. 47th St., New York, N.Y 10017 i

a

-7

4' l

j

., e..]

1 l

J

> g, t

i FORM NIS-2 (Back)

9. Remarks Applicable Manufacturer's cete Reports to be atteened

- ~

h%

l CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this U8

    • " conforms to the rules of the A5ME Code,Section XI.

Type Code Symbol Stamp _

A14 Cartificafor Authorization No.

Expiration Date Signed Date O

Owner or Owners Designee, Tatso

' 19 CERTIFICATE OF INSERVICE INSPECTION 1, the undersign holding a valid commission issued by the Nat na B d o Boder and Pressu Vessel inspecy and the or Pro ' ce o

/#I A f'50 Yo bo A

/hf 1 and employed by

.O of have inscected the components described in this Owner's Repet during the period M*O' 7

8~ M'" N to and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

Sy signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspec*.or nor his employer

)

shall be liebte in any mant'er for any personal injury or property damage or a loss of any kind arising from or connected with this

{

inscoction,

  1. W 4

Commissions M'

in oector Tignature tvetiones seera, siste. Province. ene snaarsaments

,& ) b Date N

19 4

a 0

.4 i

/]

FORM NIS-2 OWNER'S REPCRT FOR REPAIRS OR REPLACEMENTS

(_,/

As Required by the Provisions of the ASME Code Section XI 7,d3. [7

1. owner Northern States Power Co.

o,,,

name 1717 Wakenade Dr.

E, Welch, MN 55089 sheet f

JO of Address

2. m nt Prairie Island unit nome Same Wo rk.

Or d u - W fjos G Repair Organisetton P.O. No., Jon No., etc.

Adorens

3. Work Performed by Owner Type Code symbol Stamp Authorization No.

M N***

Expiration Date M/Y Address

4. Identification of System
  1. IA C
  1. ~

O

5. (a) Applicable Construction Code 19 0 I Edition, b "

Addenda-Code Case (b) App!! cable Edition of Section XI Utilized for Repairs or Replacements 19 N

6. Identification of Components Repaired or Replaced and Replacement Components ASME Code A

National

Repaired, Stamped (b}

Name of Name of Manufacturer Beard Other Year

Replaced, (Yes Component Manufacturer Serial No.

N o.

Identification Built er Replacement or No) it Ossumu a4J-pn nn 68 9 o 70

% cJ V

1

7. Description of Work C$4 aod "W4 5A' Uf f

Hydrostatic 0 Pae===tSc Nomiaa' ocer tiai aressure f B. Tests Conducted:

i l

Other Pressure M33 psi Test Temp. N

  • F NOTE: Supplemental sheets in form of lists, sketches, or drawings rnay be used, provided (Il size is B% in x 11 in., (2) informa-tion in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(

\\

(

(12/82)

This Form (E00030) may be obtained from the Order Cept., ASME.345 E. 47th St., New York, N.Y.10017 V

t

F 1.-

f

  • !i f

.. e., ~.yj l

i h es/ S of a20' FCRM NIS 2 (Back)

9. Remarks _

r f9 Ou$4 A 9I/7

' Applicable Manufacturer's cata kaports to be attached l

~

s, CER TIFICATE OF COMPl.!ANCE We certify that the statements made in the report are correct and tnis I

I conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp Certificat of Autnorfration No.

Expiration Cate Signed

(

owner or owner s Designes. Titte' 19 Date l

l CERTIFICATE OF INSERVICE INSPECTION f, the undersign, holding a fid commission issued by the Nati nal of der a d Pressure e Inspectors and the State or P vinc of JAAne

$ o-osu no e

I6 end employed by ere or Ge o

have inspected the components described in thie Owner's Report during the period O'M'Y7 U2b'EO to

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requiruments of the ASME Code,Section XI.

By signing this certificato neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Repo.t. Furthermore. neither the inspector nor his employer l

shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection, j

/W

?*/7Y k

Commissions insoector's SignesGro testional Board, State. Province, and Endorsements Date_

U U 19

/

/0

r-

.4 i

FORM N!S-2 CWNER'S REPCRT FOR REPA!RS OR REPt.ACEMENTS V-As Required by the Provisions of the ASME Code Section XI 7 83 f7

1. Owner Northern States Power Co.

e,ce Name 1717 Wakonade Dr.

E, Welch, MN 5 5089 eet 4

40 Sh Accrees

2. Plant Prairie Island Unit Name 5ame (LW Y-dor 0 0$~SOh 7tspelr Organization P.C. No Joo No., etc.

Accreen MN

3. Work Performed by Owner Type Code Symbot Stamp Mb Authorization No.

Expiration Date M4

4. Identification of System EAC V

O

~

5. (a) Applicable Construction Code 19 Edition-Addenda Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacement: 19h
6. Identiflestion of Components Repaired or Regisced and Replacement Components

~

ASME Code im (V)

National

Repaired, Stamped Name of Name of Manufacturer Board Other Year
Replaced, (Yes Component Manufacturer Serial No.

No.

Identification Bulig or Replacement or No) m PI AA-hSC*h f\\G s rt$

A" l

7. Description of Work U I' Ok I FI d I C A'

'W II E A lk l h Ed 2 /

8. Tests Conducted: Hycrostatic 0 Pneumatic Nominal Operating Pressure O g#

Other O Pressure psi Test Temp.

'F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided F1 size is 8% in. = 11 in., (2) informa.

tion in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded et the top of this form.

A l

\\ (12/82)

This Form (E00030) may be obesmed from the Order Cept., ASME,345 E. 47th St., New York, N.Y.10017

\\

/

.,U

//

I

- - Q, r'N i

i J

slo /4 4

FCRM NIS 2 (Back)

9. Remarks

[

^

L

'b U II ^9

/h $ hC U"

Applicaola Manufactursfr's Casa Reports to be attached b%

CERTIFICATE OF COMPL!ANCE We certify that the statements made in the report are correct and this iI conforms to the rules of the ASME Coce Section XI.

P **' retwacement l

Type Coce Symbol Stamp h

Certificat of Authorization No.

Expiration Date Signed 7

Date owner or owner's cessgnee, Titre 19 CERTIFICATE OF INSERVICE INSPECTION

1. the undersign holding a va commission issued by the N iona ard Boder and Pressure ssti inscectors and the State or P vinc f

/M 8.5 8 4 and employed by-OA N

_NWA hi P IG og

,b N

M have inspected the ccmponents described in this Owner's Repork during the period

~M' 7

b to -

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corret tive measures described in this l

Owner's Report in accordance with the requirements of the ASME Coce.Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, empressad or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising frorn or connected with this inscection.

(

e InspectoFs Signature '

Commissions Nationa6 Soard, Stats, Province, ano Encorsements b

Date -

Li 4 19 7

ou s

1 I

M i

i l

)

i

.i

/'~'

FORM N!S-2 OWNER'S REPORT FOR REPAIRS OR REPt.ACEMENTS As Required by the Provisions of the ASME Code Sectio XI O3 h)

1. Owner Northern States Power Co.

cete

~.m.

1717 Wakonade Dr. E, Welch, MN 55089 heet 7

20 S

of Acornes

2. P19nt Prairie Island Unit

~.mo NOOY Same UO'~ N 0

' ' ~

Mapear orgenlastion P.O.' No., Job No., etc.

Acorses

3. Work Performed by Owner Type code Symbol Stamp Authorization No.

I M##

Expiration Date MN Oofd A

C.

4. Identification of System.

d 7 Edition.

5. (e) Applicable Construction Code 19 Addends -

Code Case (b) Appilcable Edition of Section X1 Utilized for Repairs of Replacements 19 b

6. Identifiestion of Components Repaired or Replaced and Replacement Components ASME Code O

National

Repaired, Stamped Name of Name of Manufacturer Board Other Year
Replaced, (Yes Component Manufacturer Serial No.

N o.

Identification Built or Replacement or No)

%,,a.d P,pc s-iec-c

.I

7. Description of Work No

(^

lLA b n -

r~f f 3

$#rd w

/ ri e t

a f

8. Tests Conducted: Hydrostatic 0 eneumatic 0 uomiasi coerstian ressure O yA a

Other C Pressure psi Test Temp.

  • F NOTE: Supplerrental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8% in, x 11 in., (2) Informa-tion In items 1 through 6 on this report is Included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82)

This Form (E00030) may be obtained from the Order Dept., ASME,345 E. 47th St., New York, N.Y.10017 G.

A

1

~ ~ - -j

-..,\\ '

l

)

{

I i

L/ 7/ao FCRM NIS-2 (Back)
9. mmerks __ /

A

^9

/ M3 Nb Applicaete Manuffturer's Cate Macorts t,o be attachdi h%

CERTIFICATE OF COMPl.!ANCE We certify that the statements made in the report are correct and this NN%

conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp NS Certiflea of Authorization o.

Expiration Cate --

Sign Cate owner or owner's Des 6enee. Title '

,19 CERTIFICATE OF INSERVICE INSPECTION 1, the undersig, holding a Ild commission Issued by the Nati al B of iler nd Pressur e inspectors and the State or P ovin f

MIOf5o and employed by P

^

h

/

f*

[

of

,Y have inspected the components described in this Owner's Report during the period d"M Y

8~O b' N to

. and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or irnpiled, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his ernployer shall be liebte in any manner for any personalinjury or property damage or a loss of any kind arising from or connected with this inspection,

'" /

Commissions s

snso utors'Monature Nanonal 90ero, State, Province, and Endorsements Cate U O $

Y 19

/

l

~,4 N

~

A

.i

[

FORM NIS 2 OWNER'S REPORT FOR REPAlRS CR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

78) N
1. ovener Northern States Power Co.

cete Name 1717 Wakonade Dr.

E, Welch, MN 55089 eet

[

o2O Sh of Accrees

2. Plant Prairie Island Unit N.m.

t.Jo e K Orelu 9 90059/

same Adoream Repe(r Organization P.O. No., Joe No., etc.

.r MA

3. Work Performedby Owner Type Code Symbol Stamp Authorization No.

4/ 4 4

Expiration Date Al N

,I Address

4. Identification of System.

QQG r-

@. SS 6.

b Edition:

,\\ddenda-Code Case

5. (a) Applicable Construction Code E L

(b) Appilcable Edition of Section XI Util* zed for Repairs or Replacements 19

6. Identification of Components Repaired or Replaced and Replacement Components ASME Code National
Repaired, Stamped Name of Name of Manufacturer Board Other Year
Replaced, (Yes Component Manufacturer Sertst No.

No.

Identification Built or Replacement or No)

  1. 1cde(

Pe$c !Qad beu so F

))S "

Sepaed Y

I ERbm Pca t-j.o,ye lee +LQxas Isd u 14.

i bf4 IE dE f k 8

7. Description of Work
8. Tests Conducted: Hydrostatic [ Pneumatic 0 Nominai Coer iias reisure a
  • ]

Other O Pressure M 9 E O psi Test Temp. U7

'F NOTE: Supplemental sheets in form of lists, sketches, er drawings may be used, provided (1) size is 8% in. x 11 in.. (21 informa.

tion in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

) (12/82)

This Form (E00030) may be obtained from the Order Dept., ASME,345 E. 47th St., New York, N.Y.10017 l<,

/T

r

)

~

.'I

~ '

.. ~.,

FORM NIS 2 (Back)

s. Rema,,,[ epa s r-

-feu.- ( cd ~ fo v4 /%4.//s C4Dfn hou.sfny,/h.ssqn I

Appelcaele Manufacturer s c s Rep.rts to be attached NUO3_

Oorid o r & r '"M6 99 DOG [

Q W81 c O

t War k dons k

Cn {du m 32 r u le t 5

tdc, OC 0 l0 A $

), $

CERTIFICATE OF COMPL!ANCE We certify that the statements made In the report era correct and this N OI conforms to the rules of the ASME Code. Section X1.

Type Code Symbos stamp d

Certifica sf Authorization No.

Expiration Date ---

Signed W

ate Owner or Owners Des gnes. Title

,19

/

CERTIFICATE OF INSERVICE INSPECTION l the undersign holding a y d commission issued by the Nat nal ar f Boi r and P ssure Vesset in ctors anState orP inc of Irid M o cs and employed by O#

48' o

P Y._ o f bI in this Cwner's Report during the period O */2 'I 7 i" ected the components described h

to l'a

  • I and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer snakes any warranty, expressed or implied. concerning the examinations and corrective measures described in this owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this insection, Commissions

  • O r

.nm 0,s. gn..u,.

n.....r o........,0. n....no. nco r s._.n. s 2d i,9 Date W

19 O

- 9.

~

/4

r :.

l'

.s i.

O FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPt.ACEMENTS

!V As Required by the Provisions of the ASME Code Section XI t

7M h7

1. owner Northern States Power Co.

cese l

,Name 8

l 1717 Wakonade Dr. E, Welch, MN-55089 sheet I

Jo of Acar l

2. PJant Prairie Island unit Same klo r K. O rd er - WOW b Mapair creantasuon P.O. No., Jotr No., etc.

Amaram M

3. Work Performed by. Ovner Type Code Symbol Stamp l

Authorization No.

MM

(

i Empiration Date MN Asa

4. Identiflestion of System C

8'

~

5. (a) App!! cable Construction Codb L

19

Edition, Addenda.

Code Case l

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 IT

6. Identification of Components Repelred or Replaced and Replacement Components i

ASME Code National

Repaired, Stamped

.(

Name of Name of Manufacturer Beard Other Year

Replaced, (Yes Component Manufacturer Serial No.

No.

Identification Built or Replacement or No) us c f.

UCG*f @ rtuso$

)L]T f e)WifN Md87 heb

/,, o g r 4

  • % M sp ec.

n a os -/.

I f

+-I

7. Description of Work b#6 YEdEI I

i B. Tests Conducted: Hydrostatic Pneumatic Nominal Operating Pressure O pil Test Temp.

fY7

  • F

]

Other O Pressure.# 7-8 0 NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8% in. 11 in., (2) informa-tion in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

O ""

'>-'" =>-

^

~ - ' ' ~

i

/?

-.9 FORM NIS 2 (Back)

YocL Ordor 976oOl h k Cor mea />A ld h ou lcL s o n

n. nemerus

)pwte Co s con Sec l u,as.l, u.n;1.ar.r s c. $l., F2, t9, h io, E H, 63 we DS.

G 7, 1-

.ao w. s..n.cn.a

- l -

0 %%

Gm GL

$$YOh (1]c u- [

09 f v%'Y Jh U/h y y

Se

/bC

/

cet I

j CERTIFICATE OF COMPLIANCE

. We certify that the stetsments made in the report are correct and this bMI I

ASME Code, Section Xl.

conforms to the rules of the Type Code Symbol Stamp

\\

(k Certificat f Authorization No.-

Expiration Cate Signed te -

Owner or Owner's Designee, Title 1g j

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the Nat nal of oiler and Pressur esy inspectors and the State or Pr vince f NIAA #'in Yo 88-l' d 0I

- Nf8A O/ *

[ 8"I and employed by of have insoected the components cescribed in this Owner's Report during the period 10

'E7

[* O I

  • N to

. and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this

~

Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificato neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Fu%ermore, neither the inspector nor his employer shall be liable in any manner for any personalinjury or property damage or a loss of any kind arising from or connected with this inspecticn.

1s4L Commissions

/

insoector's signature Nettones Boere. State, Province, and Encorsements

[

ig 99,

,# al Oate-(A t

{

O 4

I.

M

r

.4 i.

1~ O FORM NIS.2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 7 M kf

1. owner Northern States Power Co.
oei, Name 1717 Wakonade Dr.

E, Welch, MN 5 5089 hee,

/6,, o26 S

Adorses

2. Plant Prairie Island Unit N.m.

Same be e. 00tY5t 0 A

7 Rapelr Organization P.O. No., Job No., etc.

l Ao orses 0

A/ A

3. Work Performed by Owner Type Code symbol Stamp Authorization No.

MN l

i Expiration Date NN Amoreas

'M 9 i

4. Identifk:stfon of System 0 M

^##0 f

~

/

5. (e) Applicable Construction Code ed 19 Edition.

Addenda Code Case (b) Applicable Edition of Section X1 Utillied for Repairs or Replacements 19 $/

6. Identification of Components Repelred or Replaced and Replacement Components l

l ASME Code National

Repeired, Stamped Name of Name of Manufacturer Board Other Year
Replaced, (Yes Component Manufacturer Serial No.

No.

Identification Built or Replacement or No)

}{ 3ku m Gw a.% <

Uer fru;f eusu AJI%

A) A Se ret rt Sept a e Y

r I

I I

7. Description of Work bC Vf f E
8. Tests Conducted: Hydrostatic 0 ea==== tic D Nominal Operating Pressure

-]

OtherO Pressure U 3I psi Test Temp, fY7

'F NOTE: Supplemental sheets in form of lists, sketches. or drawings rnay be used, provided til slie is 8% in. x 11 in (21 informa.

tion in items 1 through G on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded et the top of this form.

) (12/82)

This Form (E00030) mey be obtained from the Order Dept., ASME,345 E. 47th St., New York, N.Y.10017

/9

a.

.l

~.,

. c. ".,"j SU/0 a/ 26 FORM NIS 2 (Back)

~

9. Remarks M4Ck e nr.

PI A C*t MG F1 tdC4 t/ 8 T' 9 OJI4 b Y,~

AppucentelManufacturer's cats Aedort$s t be astaen2"e q

~

fr f wt a n, lho 4Tc /a o o(c.

Ynam -

o +-

t N O $ l0 00 ]

r* I lMO R hA n tUQ-q '

O

t. 6

~

An tue A d Aoucl Aa /,nr on i

I I

CERTIFICATE OF COMPl.!ANCE We certify that the statements made in the report are correct and this I#b8#

conforms to the tu a of the ASME Code,Section X!.

Type Code Symbol Stamp Al f

Certificar f Authothetion o.

Expiration Date Signed Date Owner or owner's Des 6ense. Title 19

(

CERTIFICATE OF INSERVICE INSPECTION

1. the undersigned nal 1rd o 60 er.and Pressur Ves i inspectors and the State or Pr vince of N. holding a v lid commission issued by the Nat

/#fA#f0 4 and employed by U

d*

If4 P' OI &

TC of bb 8 **

have inspected the components described 7

I*M*W in this Owner's Report during the period to

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or irnplied. concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

/7#

'f7 Commissions

/ '

insoecior s signaturis Nationes Boera. State. Province, and Endorsements e

Date d

tg 1

/

I

.M

  • e

,20

3 a

- i O

FORM NIS-2 CWNER'S REPCRT FOR REPA!RS CR REPLACEMENTS V

As Required by the Provisions of the ASME Code Section XI 23.ff

1. Owner Northern States Power Co.

c,se 1717 Wakonade Dr.

E, Welch, MN 55089 heet Jo S

of Addreas

2. Plant Prairie Island Unit Nome Same St L

'UE r3 C St N*

7 Repair organlastion P.O. No Joo No., etc.

A darmes N4

3. Work Performed by Owner Type Code Symbol Stamp Authorization No, MO MN Erpiration Date Address LbO"'d A I7
4. Identification of System
  • l A E M tN rA f

t

5. (e) Applicable Construction Code -

d 19 b Edition.

Addenda Code Case (b) Appilcable Edition of Section XI Ut!!! zed for Repairs or Replacements 19 S7

6. Identification of Components Repelred or Reptaced and Replacement Components ASME Code O

National

Repaired, Stamped Name of Na:ne of Manufacturer Board Cther Year
Replaced, (Yes Component Manufacturer Serial No.

No.

Identification Built or Replacement or Nol

$D[<

w%keund AltS Nt1

% es sy Pep,<

Y Description of Work E. f d f f IE

8. Tests Conducted: Hydrostatic Pneumatic 0 Nominai ooer tina reisure 7 a
  • ]

Other O Pressure /0 ()0 psi Test Temp. 5 Vo

'F NOTE: Supplemental sheets in form of lists. sketches, or drawings may be used, provided (1) size is 6% in. x 11 in (2) informa-tion In Items 1 through 6 on this report is included on each sheet. and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82)

This Form (E000001 may be obtained from the Order Dept., ASME,345 E. 47th St., New York N.Y.10017 i

i

-9 o2/

2 i

i 1

i

- c.;;

\\

~

1 O

FORM NIS 2 (Back)

,. R.,ne,k, )%L,, d &ca cla m f% wa.,s %

9 a.s b 4 ~Pt 4.*

cot %93 v' -

Peel.cou op., tut tu,. s 0.t. A.co,,s,o os. x.d maa man n

\\

9 9n %c/t, SC.cnda q Ida JJbler.l W6 3'7@ - //a.tdkle r - A cf 's'r J<, 99t> 39 3Y mo n wn Sh e ll, 9909/ 3&- /ne n w Cover #

/

A LL Pe r-bhs f m A o u s =-

A-w %. sis

/

CERTIFICATE OF COMPT.!ANCE We cert!fy that the statements made in the report era correct and inis 0# lI

]

conforms to the rules of the ASME Code,Section X!.

Type Code Symool Stamp

1) lh i

J Cartificar f Authorization No.

Expiration Cate Signed h

04' 6

k Date

' Cwner or Owner s Designee, Title 19 CERTIFICATE OF INSERVlCE INSPECTION 1, the undertign hr'rting a va d commission issued by the Na anal d of oiler and Pressure Ves iI ectors and the State of P vin i44830 4 IMA and employed by ue ia e Ai r

_ff [ og 8f O.E have inspected tne components described in this Owner's Repo#rt during the period

/d*/2

  • I7 I ' 2 5' ' k to and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected evith this inspection.

Comrnissions inspector's Signature Nationes Boeta, State. Province, and Encorsements Date-V b

19 j

U

.4

i r

. ~~ ;

..4 O

FORM NIS 2 OWNER'S REPORT FOR REPAlRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1.. Owner Northern States Power Co.

'7 e93 7

cete

..m.

~

1717 Wakonade Dr. E, Welch, MN 55089 sheet M

Jo of_

Acore.

/

2. Man Prairie Island Unit Same W

2MM Accre.

Repair Crvensaction P.O. No.lo No., etc.

3. Work Performed by Owner Type Code symbol Stamp M

Authorization No, M./ N i

Expiration Date MN Amoreas I

4. Identification of System.

Op pfM Qn 4 r7 1

t 1

bE

5. (a) Applicable Construction Code C

19 Edition:

Addenda code Case (b) Apsilcable Edition of Section XI Utillred for Repairs or Replacements 19 S. Identification of Components Repe{ red or Replacsd and Replacement components i

ASME Code Nationsi

Repaired, Stamped Name of Name of Manufacturer Board Other Year
Replaced, (Yes Component Manufacturer Serial No.

No.

Identification Built or Replacement or Nel blb N

Srses Ef kepts(

t% oW r

r e

l I

i

7. Oescription of Work UE Cb i

l

8. Tests Conducted: Hydrostatic Pneumatic Nominal Operating Pressure [

-]

Other Pressure /00a psi Test Temp.

O

'F NOTE: Supplemental sheets in form of lists, sketches, or drawings rnay be used, provided (1) size is 8% in, a 11 in., (2) Informa.

tion in items 1 through 6 on ttris report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

1 (12/82) '

This Form (E00030) may be obtained f rom the Order Dept., ASME,34$ E. 47th St., New York, N.Y.10017 1

. c., j j

(

'\\

FCRM NIS-2 (Back) e e e C! hC.4*

NOI h

9. Remarks C

r'1 W (MA / 5 f'

Amplicafie Manuf Reports to beh4tecama 990 39 Vf

_ _.Se ced a r,

&er's c5' "h o WJ (Do c

Wo 39 W - S ce ndo r,._.. _ _d_ a tn)Aokr AM 5,W<_.

s i

99n \\9 3 (o Se.ccnda n VYdm Wl(, c)903 9Vo Sac. /%w 7 coun i

a kl(

,pey D)es f y Jcus, ha/,_g,,

~

CERTIFICATE OF COMPL!ANCE j

We certify that the statements made in the report are correct and this

!I conforms to the rules of the ASME Code,Section XI.

'*8'"'*****"'

l A

Type Code Symoot Stamp Nh Cartif! cat f Authorizatio No.

_ Expiration Cate i

Signed N

Cate Owner or Owner's Designes, Titte

' 19 CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the Na nal o d of oiler pnd Pressure Vess inspectors and the State 3

or P vin of N 1#f/ M S D f 4 NfG M O E s'

Id and employed by 8f

  • C b

bI of

--- et h

I ected the components described in this Owner's Report during the period M 'O ' 7 7

.to and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code Section XI.

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liacia in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection, IC Commissions

---V ~'

inspector s signerste '

Nationes acord. State, Province, ena Encorsements

)b hk Date_

s4 19

(

s eezY

r, 4

i

/]

FORM NIS-2 CWNER'S REPORT FOR REPAIRS OR REPt.ACEMENTS

(,)

As Required by the Provisions of the ASME Code Section XI 7 c)3 N

1. Owner Northern States Power Co.

o,,e d

,,' R i

Name 1717 Wakonade Dr.

E, Welch, MN 5 5 0 8 9 eet__

Sh Address 1 Plant Prairie Island Unit Name Same N0' h

b7 Repelf Cr1;enlaation P.O. No., Joo No., etc.

Ad dress

3. Work Performed by Owner Type Code Symbol Stamp 44 Authorization No.

A/M Expiration Date NN Address

4. Identification of System G*

~

E. (a) Applicable Construction Code Soc 19

Edition, Addenda Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 N
6. Identification of Components Repaired or Reptaced and Replacement Components ASME Code f

(

National

Repaired, Stamped

\\.-

Name of Name of Manufacturer Board Other Year

Replaced, (Yes Component Manufacturer Serial No.

N o.

Identification Bullt or Repia:ement or Nel

){ Ska m bt t f rA ky-3 Hf cust A/d A/ 4 hreef T/

[rp4ie l

7, Oescription of Work H4 l- [

J B. Tests conducted: Hydrostatic Pneumatic 0 uominai Coer tins Pressure O Other Pressure dMd psi Test Temp. N7

  • F F

f NOTE: Supplemental sheets in form of lists, sketches, or drawings rnay be used, provided (1) size is B% in. x 11 in., (2) informa-tion in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

[

(12/82)

This Form (E00030) may be obtained from the Order Dept., ASME,345 E. 47th St., New York, N.Y.10017 h

I l

.W

y

.p

'-.t O

8 d

FORM NIS.2 (BacM ne,-k:Nuks M & d ou duk p/m

/is4 f

<<.....oi.cu,_8,s....h.o.rs...o..a.<.o-Ldo r t d O n e.

p, X8

.e._ _

~

h%

CERTIFICATE OF COMPL!ANCE We certify that the statements made in the report are correct and this

  1. I conforms to the rules of the ASME Code,Section XI.

"8'**8***'"*"*

Type Code Symbol Stamp Certifica of Authorization No.

Expiration Date 7

Sign

"~

Cate Qwner or owner's Designee, Title 19

)

CERTIFICATE OF INSERVICE INSPECTION I. the undersigned, holding a valid commission issued by the Nat nel or P ovin f N > d A f.I e f 5*

d of Sciter and Pressure V ssel Inspectors and the State

.fbM Mol r Ed

=nd employed by F

of dM. C[

of have inscected the components described in this Owner's Report during the period N'

7 5*2b'I7 to and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Repo't in ac:ordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector not his ernployer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this l

Inspection,

-M r -

Commissions

, nm....gz..u.

.....n.....ro........,...n.

.no. no or s._.n s.

Cate (A

8

,9 gg

.1.

26

- 1

.4

'i

![}

FORM NIS-2 CWNER'S REPORT FOR REPAIRS OR REPLACEMENTS

()

As Required by the Provisions of the ASME Code Section XI

1. owner Northern States Power Co.

7 h3 o,,,

N.m.

1717 Wakonade Dr. E, Welch, MN 55089 heet /Y of 40 S

Address

2. Plant Prairie Island Unit Same (A 0 Y 5

Adarese Resear cryonleetion P.C. No., Joe No etc.

M

3. Work Perfonned by Owner Type Code Symbol Stamp Nanse Authorization No.

MN i

Expiration Date MM 1

t Ad dreas

4. Identffication of System.

/

OM

5. (a) Applicable Construction Code Edh gg h [ Edition, Addenda.

Code Case (b) Appilcable Edition of Section XI Utilized for Repairs or Replacements 19 b

6. Identification of Components Repaired or Replaced and Replacement Components ASME Code National
Repeired, Stamped lk Name of Name of Manufacturer Board O'her Year
Replaced, (Yes Component Manufacturer Serial No.

No.

Identification Built or Replacement or No) i Y1 BOW N

Nb htfitj [{

~

ef \\ r~

e, j

Y

-l l

7. Description of Work "I

UN l

8. Tests conducted: Hydrostatic eumatic 0 Nomia i Operatins Pressure O

'j Other Pressure M N psi Test Temo.

DW

'F NOTE: Supplemental sheets in form of lists, sketches or drawings rnay be used. provided (1) size is 8% in. x 11 in (2) informa.

l tion in items 1 through 6 on this report is included on each sheet. and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82).

This Form (E00030) may be obtained from the Order Dept.. ASME,345 E. 47th St. New York. N.Y.10017 5

I t

27

l i

l

! ~ ~-Yl t

1

.O

)

i l

l FORM NIS-2 (Back)

I

9. Flamarks -

O

C c1 m

C4 5 N

9 les A P f*7 6 9 Applicabk Manufacturer's cota Mooorts to be attaened #

[

r

~

y.

CERTIFICATE OF COMPLlANCE l

We certify that the statements made in the report are corrset and this OI conforms to the rules of the I

ASME Code, Section Xl.

Nh l

Type Code symbol Stamp i

Nh Certiflge of Authorization No.

Expiration Date Sign Qwner or Owner's Designee. Title Date

' 19 CERTIFICATE OF INSERVICE INSPECTION i

i I, the undersigned, holding a valid commission issued by the National ard Boiler and Pressure Ve i inspectors and the State or P vinc

[Ii 4 O PSS [ c' and employed by-sef C&

bom MD t'

_f Y CI gg have inspected the components described in this Owner's Report during the period M'M ^ I bNN to

. and state that i

to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in thi Owner's Report in accordance with the requirements of the ASME Coce.Section XI, By tigning this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerni examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employe shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with th inspectic t

I

/'

Commissions inspector s Signature Nanonal Board. State, Province, and Encorsements Tu[u 96 is 99 Cate l

U

-8 28

~

I

..i s

1

\\

/]

FORM NIS-2 CWNER'S REPCRT FOR REPAIRS OR REPt.ACEMENTS D

As Required by the Provisions of the ASME Code Sectfon XI 7N 97

1. owner Northern States Power Co.

case nom.

t

~

1717 Wakonade Dr.

E, Welch, MN 5 5 08 9 heet __ 6

.J o S

of Adar

2. Pjant Prairie Island Unit j

name Same b) O SY9 W g

Ropeir Organlastion P.O.No J No.. etc.

Asorses M

3. Work Performed by Owner Type Code Symbol Stamp Authorization No.

MO j

Expiration Date MN Adorses

4. Identification of System O

M i #E

/W

~

(

J S. (a) Applicable Construction Code N e'/

19 Edition:

Addenda:

Code Case (b) Appilcable Edition of Section XI Utillred for Repairs or Replacements 19 E 7

6. Identification of Components Repelred or Reptocod and Replacement Components ASME Code National
Repaired, Stamped Name of Name of Manufacturer Board Other Year
Replaced, (Yes Component Manufacturer o.

N o.

Identification Built or Replacement or No)

Sr to *ss4f

/v-d b

h O h tc L 03 0uC

//M ~

~

EM I Y'

/3

  • tai /"d 30 hAc<

hr Y6w d o r-C yf/J

7. Description of Work O C k i T1 f.-

dA u (_

J

8. Tests Conducted: Hydrostatic 0 eaeumaticS Narninal Operating Pressure

'.]

Other O Pressure #8 3 a psi Test Temp. SV ~7

  • F

)

NOTE: Supplemental sheets in form of insts, sketches. or drawir.gs rnay be used, provided (1) size is 8% in. x 11 in., (2) Informa.

tion in items 1 through 6 on this report is included on esch sheet. and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82)

This Form (E00030) may be obtained from the Order Dept., ASME,345 E. 47th St., New York, N.Y.10017 4

s 29

1 w

~

.~l

.N. 'j

(

~

\\N r

FORM NIS-2 (Back)

9. Remarks.

Applicante Manufacturers cota Macarts to be.et.cn.d w

s.

CERTIFICATE OF COMPLIANCE We cert!fy that the statements made in the report are correct and this M'#

conforms to the rules of the ASME code, Swetion XI.

I Type Code Symbol Stamp Certificate Authortration No..

Expiration Care -

Signed Date Owner or Owner's Desagnee Title 19 l

CERTIFICATE OF INSERVICE INSPECTION

1. the undersign, holding a vall rnmission issued by the National ca&d of cite and Pressu V I Inspectors and the State and employed by-Md# b s' Wi/L _d/ r fd or P vince of-

/4 4d O 4 M

6'Cf C7~

at

.hm - ected the components described in this Owner's Report during the period /2' /M Y 7 to f/ I20 I

and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the aqu!ruments of the ASME Code,Section XI.

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be !! acte in any manner for any perwnal injury or property damage or a loss of any kind arising from or connected with this inspection.

hM f

f"y"

.n.c tors me.tur.

Commissions

~

r

~.r,.n.....ro. gta.... o. n.e..no nc o,s

.n ts N[4 26 is 79 c.te--

j i

U

., 4, 30

'i

[h FORM NIS-2 OWNER'S REPORT FOR REPA!RS OR REPt.ACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Northern States Power Co.

7 )3 f7 e.,,

N.,n.

1717 Wakonade Dr.

E, Welch, MN 5 5089 heet- /d of

=20 5

Addream

2. Plant Prairie Island Unit N.m.

Same W0 N M d N-Acornes g

Repelr Orgendastion P.O. No., Joe o.,etc.

3. Work Performed by Owner Type Code Symboi stamp M

Name Authorization No.

4./ N Empiretion Date M /Y Address

4. Identification of System O

"}f f

  1. 6"
5. (al Appilcable Construction Code 3r 19
Edition, Addenda Code Case (b) Applicable Edition of Section XI Utillred for Repairs or Replacements 19 [ 7
5. Identification of Components Repelred or Replaced and Replacement Components

.1 ASME

' Code

~

National

Repaired, Stamped Name of Name of Manufacturer Board Other Year
Replaced, (Yes Component Manufacturer Sense No.

No.

Identification Built or Replacement or Nol tYlodt(

l-cr a /kad ST f )(/-

_ [b UC.15s* l M

'f fjfz@

hb

~

Lhl Y cwe igm

..l

7. Description of Work a s /t e n t AI l 96 M Su u 94 r (!bCl c r 4hid d

U E

B. Tests Conducted: Hydrostatic Pneumatic Nominal Operating Pressure

'j Other O PressureM psi Test Temp.

W7

'F NOTE: Supplemental st.eets in form of Insts, sketches, or drawings may be used, provided (1) size is 8% in. x 11 in., (2) informa-tion In items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82)

This Form (E00030) may be obtained from the Order Deot., ASME,345 E. 47th St., New York, N.Y.10017 4

N

F 3

  • ' *j O

~

L FORM NIS.2 (Back)

9. Remarks-Applicante Manuf.ssur.< s care Reporgio be ets caso

~

j CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this ff Ai( conforms to the rules of the ASME Code, Section X1,

'***I'"* " "'"*

Type Coda Symbol Stamp Cer'tifical f Authorization No

_ Expiration Care Signed Date Owner or Owner's Designee. Title

-19 i

CERTIFICATE OF INSERVICE INSPECTION 1, the undersig holding a val commission issued by the Na lon.

ar fB Ler and P se essel Inspectors and the State or Pro ince of 1AMSo and employed by 0 #A o/ f*f IF2 D b.Y [0 M. O of I

have inspected the components described in this Owner's Report during the period Ia2 ' / A

  • 7 7 f'db'IN

. to and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the inspecter nor his employer makes any warranty, expressed or implied, cencernin examinations and corrective ineasures described in this Owner's Report. Furthermore, neither the inspector nor his empl shall be 11at:le in any manner for any personal injury or property damage or a loss of any kind arising from or connected with t Inspection.

t

/

s

,n.c m n. ur.

Commissions

~....n.....,........., o..n....no. n. o, s.m.n s Date V

19 t

Ov

. a..

f l

R c.

r---

6 i

t FORM NIS.2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS d

As Required by the Provisions of the ASME Code Section XI

1. Owner Northern States Power Co.

7N

@7 cete Name t

l717 Wakonade Dr.

E, Welch, MN 55089 sheet O of JO Aoorema

2. Plant. Prairie TSland Unit Same b0 i

Ao oraes Repetr Creenleeston P.O. No., Job No., etc.

3. Work Performed by._ _ Own e r Type Code symbol Stamp M

Authorization No.

A/N I

Expiration Date -

M /#

4. Identification of System I L44 iC 4 !

O U NI IO !

~

19 O Y Edition.

Addenda.

Code Case

6. (a) Applicable Construction Code (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19 k 7
6. Identification of Component: Repaired or Replaced and Replacement Components

~.

ASME Code O

National

Repaired, Stamped Name of

' Name of Manufacturer Board Other Year

Replaced, (Yes Component Manufacturer samo.

No.

Identification Built or Replacement or Nol I

tvid af W " WQ b,T 20 MBM Repa t <

Al

~

seray

1. Description of work 200kd dI bI E

%d : kS770 -kN3 0 A b 7 va+:. g u a c. c t p H'

8. Tests Conducted: Hydrostatic 0 Pneumatic Nominal Operating Pre sure h

(

Other O Pressure E d 3J psi Test Temp. f 7

'F 1

j NOTE: Supolemental sheets in form of lists. sketches, or drawings may be used, provided (11 size is BM in. x 11 in (2) informa.

tion In items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

112/82)

This Form (E00030) may be obtained from the Order Dept., ASME,345 E. 47th St., New York. N.Y.10017 l

i i 33

I

",N

~

.e

~~~f}

-(

FORM NIS.2 (Back)

9. Remarks Applicante Manufacturer's Desa Aeoorts to be attached

- - ~.

I l

CERTIFICATE OF COMPLIANCE i

j We certify that the statements made in the report are correct and this

-OU

  • conforms to the rules of the

. ASME Code, Section Xl.

Type Code Symbol Stamp 4

Certifi t of Authorization N

. Expiration Date Sign \\MW M3 Date-Owner or owner s Designee, Title

,t9 CERTIFICATE OF INSERVICE INSPECTION

l. the undersig, holding a alid commission i: sued by the N lon car of 84 ler and P surg esset inspectors and the State or P vin of M/lh o w and employed by Nf'df M
  • f II hod

[ E of have inspectej the components described in this Owner's Repo'rt during the period /2

  • M 'i I 8 'Ma
  • E 7

.. to

_ end state that I

to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Cvvner's Report in accordance with the regulrements of the ASME Coda,Section XI.

]

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personalinjury or propwrty damage or a loss of any kind arisin0 rom or connected with this f

inspection.

Commiuions N

k

~

u

/'

inspector's Sigiseture '

Nation =6 Boero, State. Province, and Endorsements

~

Date-.

Ll 4 Y

Sg 7

O 3Y

E

~..

4

[

FORM NIS 2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 7/3/h9

1. owner Northern States Power Co.

este N..

1717 Wakonade Dr.

E, welch, MN 55089 sheet # of dd Addrom

{

2. mem Prairie Island unit Same UO 00 NO Aeareas Plepair Creenlassion P.O. No., Jco No., etc.

NO

3. Work Performed by Owner Type Code symbol stamp Authorization No.

Al N 4

Expiration Date A/ N Adorses

4. Identification of System.

I

~

5. (a) Applicable Construction Code Et

/

19 Edition.

Addenda-Code Case (b) Applicable Edition of Section X1 Utilized for Repairs or Repiecements 19 U

6. Identification of components Repaired or Replaced snd Replacement Components e

ASME Code O

National R epaired, Stamped Name of Name of Manufacturer Board Other Year

Replaced, (Yes Component Manufacturer Serial No.

No.

Identification Built or Replacement or No)

N IW)bOAd Ordt ff fQpf s a f

{

,1 i

7. Description of work

& MoOE N N3 i

i

8. Tests conducted: Hydrostatic Pneumatic 0 Nominal Operating Pressure 0

-j Other O Pressure MO psi Test Temp.

$N

  • F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided fil size is 8% in. x 11 in (2) informa-tion In Items 1 through 6 on this report is included on each sheet, and Q) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82)

This Form (E000301 may be otsained from the Order Dept., ASME,345 E. 47th St., New York, N.Y.10017

'i i

N

-~

~.

(-

~.y

'. ~. ~f O

h 0

FORM NIS 2 (Back!

Ora hu(Y/ns b

q)M44"i^d

9. Remarks.

Oe E O n 4.

61 p

AcoLi. u.not surers o.te a.ooru.t. m. ana l

I l

~

l l

l l

j CERTIFICATE OF COMPL!ANCE We certify that the statements made in the report are correct and this I II conforms to the rules of the ASME Code,Section XI.

'''**8***'"***

\\

i Type Code Symbol Stamp s

Cartificat of Authorization No.

Empiration Cate l

(

Sign U

Cate O}

rawner or Owner's Designes. Title 19-CERT!FICATE OF INSERVICE INSPECTION t, the undersigned holding a vfild commission issued by the Na ional o rd of Boater and Pressure V ssel inspectors and the State or Provi ce of-If flf56 T L4 and employed by N OC & E Ele f YO N

of have inspected the components described la this Owner's Report during the period I A 'I1"7 7 D 10 *ii to and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASVE Code,Section XI.

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or croperty damage or a loss of any kind arising from or connected with this j

inspection.

Commissions Insoector's Signature National Board. State, Province, and Endorsements Date u

O is 79

/

l I

(

4 i

l l

.4.

[

FORM NIS 2 CWNER'S REPORT FOR REPAIRS OR REPLACEMENTS

(

As Required by the Provisions of the ASME Code Section XI

1. owner Northern States Power Co.

7, 47 49 e.,,

N.m.

1717 wakonade Dr.

E, Welch, MN 55089s3,,,

M,,

,Zo Accrees

[

2. Plant Prairie Island Unit Se m ese-brd' Same-Accrees

,g Mapeir Organiastion P.C. No., Job No., etc.

3. Work Performed bw Owner Type code Symbat Stamp MA MM Authorization No, Er iration Date NO
4. Identification of System.

N WN

' II

~

b

5. (a) Applicante Construction Code L

19

Edition, Addenda Code Case (b) Appilcable Edition of Section XI Utilized for Repairs or Replacements 19 E9
6. Identification of Cornponents Repelred or Replaced and Replacement Components ASME Code National Repaired.

Stamped Name of Name of Manufacturer Board Other Year

Replaced, (Yes Component Manufacturer Serial No.

N o.

Identification Built or Replacement or No)

$$5D usL k w nA NA

% ci U- %,

\\/

i

7. Description of Work C

ddIf1C 53

8. Tests Conducted: Hydrostatic Pneumatic 0 Nominai Ooer tiniaressure 0

-]

OtherO Pressure 99 80 psi Test Temp, SW

'F NOTE: Supplemental sheets in form of lists, sketches, or drawings rnay be used, provided111 size is 8% in. x 11 in., (2) informa.

tion in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

I12/82)

This Form (E00030) may be obtained from the Order Dept., ASME,345 E. 47th St., New York, N.Y.10017 i

t 37

W

.j

' - ~.1

~

O FORM NIS.2 (Back) n.,nas f acAint J hirn m TA e wa.,1 b do s As F, +

Appd f

fr m e, ante MenNacturer'shets Reports to be ettle ned

'40 99h/M L n'

n ws Cold en

$9D/(s2*7-. h..

g a

r wu r, IT1a un Ib N At <

l s

it Ove-de 5. htm b e LA J o A k

.I / J l

\\

6 CERTIFICATE OF COMPL!ANCE We certify that the statements mede in the report are correct and this II ASME Code,Section XI.

'****' d' '**'***'"*"' conforms to the rules of the Type Code Symbol Stamp Al b

)\\.{ h Certificpr of Authorization o.

Expiration Date -

N

. b bb E

Signe ' Owner or owner Designee, fitte 19 Date CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a val d commisslots issued by the Na ional e rd of goiler and Pressure ssel nspectors and the State or Progen o i99lIf50 4

=nd employed by

'* d bWM Of f*

-*T f5 NDe [ared, C [

of have inspected the components described in this Owners Report during the period M '/ b*

7 E*l 0

  • _ to and state that to the best of my knowledge and betief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirernents of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranry, expressed or impiled, concerning the examinations and corrective measures desenbad in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any menner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions N M kk*

Inspector's signature Nettonet Boero. state, Province. and Endorsements O

99 Date _ -

L4 s/

/

j I

38

m

r g.

j f

FORM NIS 2 OWNER'S REPCRT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI M

7

1. Owner Northern States Power Co.

case N.m.

_1717 Wakonade Dr. E, Welch, MN 5 5089sh.et o2a

,26 o,

Adorses

2. Plant Prairie Island Unit Nome same 990D 7/f Amorean

,g Mapetr orventescon P.O. No., Joe No., etc.

3. Work Performed by Ovner Type code symbol Stems M4 N***

Authorization No.

M4 I

,i Expiration Date NN Adareas

4. identification of System OA E ^ # A I~

E. (el Appilcoole Construction Code bUh 19 Y Edmon:

Addende Code Case (b) Appilcable Edition of Section XI Utilized for Repairs or Replacements 19 D

6. Identification of Components Repaired or Reptoced and Replacement Components l

i s

ASME Code National

Repaired, Stamped

)

Name of Name of Manufacturer Board Other Year

Replaced, (Yes Component Manufacturer Serial No.

N o.

Identification Built or Replacement or Nol

/

M4m j

b Mhcuk.

AJA A/

h i f p f/ $

[ey s s-ne cA doc 3

1 i

l 3

7. Description of Work Ni D

v

8. Tests Conducted: Hydrostatic Pneumatic Nominal Operating Pressure

^

N 7

'F

  • ]

Other Pressure MO psi Test Temp.

NOTE: Supplemental sheets in form of lists sketches, or drawings may be used, provided (Il size is 8% in, a 11 in (21 informe.

tion In Items 1 through 6 on this report is included on euch sheet, and (3) each sheet is numbered and the number of sheets is recorded et the top of this form.

(12/82)

This Form (E00030) may be obtained from the Order Dept., ASME 345 E.47th St., New York, N.Y.10017 l

._37.

1 j

~l

, e. y R.)

sEO FORM NIS 2 (Back) u99L d Mtr k L4

[/u 9 hI ~/

9. Remarks I

ofica'le man 88facturer's Deze Rep' orts to tle attacheo b

NorX C om-C-

CERTIFICATE OF COMPT.1ANCE We certify that the statements made in the report era correct and this - M,04 i f* conforms to the rules of the ASME Code,Section XI.

~

Type Code Symbol Stamp HA Cartifica of Authorization No.

Expiration Cate -

O E

Ok Sign -

-M Date -

Cwner or owner's Designee, Title

~

'19 CERTIFICATE OF INSERVICE INSPECTION t the undersigneg, holding a valid commission issued by the National

.nd empicyed by no Lrd o)foiler a id Preuure Vesselr spectors and the State in at l'ro nce of 191!WJC fs<

m Boi

. T r z

_of b#

.Ob a#

have inspected the components described in this Owner's Repert during the period

  • M' 7

I

'I to -

and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the recuirements of the ASME Code Section XI.

By signing this certificate neither the Inspector nor his emedayer makes any warranty, expressed or irnpiled, concerning examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personalInjury or property damage or a loss of any kind arising from or connected with this Inspection.

V~

Commissions snsoector's signature Nationes soara, State, Province, and Encorsements Date W 4 O

W y

- 3,

~

l

\\

4

  • a t'a

p l

NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT 1,1999 O(h APPENDIX A INTERVAL 3 PERIOD 2 INSPECTIONS BY ISO I

23 Pages

, Note: Pages 13 to 23 contain Section XI IWE and non-code inspection rault information. The information contained in this appendix is enmputer generated by the ISI database management system, includes IWE and other non-code inspection results. As allowed by 10CFR55a(g)(6)(ii)(B)(5) the containment inspection program (lWE) will be maintained and availaible for NRC audit and review at the plant site after September 9'",2001. The IWE and non-code inspection results listed within this appendix have not been reviewed or certified by the ANI inspector and are not covered by the form NIS-1 submitted with this summary report.

O l

i O

Prairio Island Nuclear Generating Inservice Inspection Report Log Morthern States Power Cosipany 1717 Wakonado Drive

/m Third Interval By Iso / Item 414 Nicollet Mall

\\

welch, Nu 55089 commercial service Dates December 16, 1973 Minneapolis, Mu 55401 ISO Item Report Number Method Results System Item Descrfption Exam Date ASME Section XI Item ISI-1A W-12 99-0048 PT iM CHARGING LINE

'B' ELBOW - PIPE 04/24/1999 8 9. 21 ISI-1A W-13 99-0044 PT NAD CHARGING LINE

'B' PIPE - HAI.P COUPLING 04/24/1999 B 9. 40 ISI-1A W-14 99-0045 PT NAD CHARGING LINE

'B' HALP COUPLING - PIPE 04/24/1999 8 9. 32 ISI-1B W-15 99-0046 PT NAD CHARGING LINE

'B' ELBOW - PIPE 04/24/1999 B 9. 21 ISI-1D H-1 99-0102 VT3 NAD CHARGING LINE

'B' RTGID HANGER 04/30/1999 P-A C1 I ISI-ID W-7 99-0103 PT NAD CHARGING LINE

'B' ELBOW - PIPE 04/30/1999 B 9, 21 ISI-1D W-9 99-0104 PT NAD CHARGING LINE

'B' ELBOW - PIPE 04/30/1999 8 9. 21 ISI-1E W-8 99-0255 PT NAD CHARGING LINE

'B' ELBOW - PIPE 05/10/1999 B 9.

21

'ISI-2 B-1 99-0011 VT1 NAD ACCUM. DISCHARGE

'A' BOLTS, STUDS, NUTS 04/19/1999 B 7.

70 ISI-2 H-1 99-0013 VT3 IND ACCUM. DISCHARGE

'A' SPUBBER 04/19/1999 P-A C1 I i

Wear marks and frozen bearings ISI-2 H-1 99-0013R1 VT3

'NAD ACCUM. DISCHARGE

'A' SNUBBER 05/15/1999 P-A C1 I Repair and Engineering halpation ISI-2 H-2 99-0051 (A)

VT3 NAD l

ACCUM. DISCHARGE

'A' HYDR SNUBBER 04/26/1999 P-A C1 I Scope Expansion, ISI-2 H-3 99-0052 (A)

VT3 NAD ACCUM. DISCHARGE

'A' SPRING 04/26/1999 P-A 4. B10. 10 Scope Expansion ISI-2 W-3 99-0035 PT NAD ACCUM. DISCHARGE

'A' ELBOW - PIPE 04/22/1999 B 9.

11 ISI-2 W-3 99-0038 (7145 NAD ACCUM DISCHARGE

'A' ELBOW - PIPE 04/22/1999 B 9.

11 ISI-3C H-4 99-0314 VT3 NAD RHR LOOP

'A' ROD / CLAMP 05/14/1999 P-A C1 I ISI-3C W-4 99-0311 P'"

NAD RHR LOOP

'A' ELBOW - PIPE 05/14/1999 B 9.

11 ISI-3C W-4 99-0379 UT45 NAD RHR LOOP

'A' ELBOW - PIPE 05/19/1999 B 9.

11 ISI-5A W-7 99-0372 (A)

PT NU5 SPRAY TO PRESSURIZER VALVE - ELBOW 05/20/1999 8 9.

21 Scope Expansion _

ISI-5A W-13 99-0148 PT NAD

[

SPRAY TO PRESSURIZER PIPE - 45e ELDOW 05/03/1999 B 9. 21 0

\\

ISI-SB H-4 99-0149 VT3 NAD SPRAY TO PRESSURIZER ROD / CLAMP 05/03/1999 P-A C1 I ISI-5B W-2 99-0150 PT NAD SPRAY TO PRESSURIZER PIPE - ELBOW 05/03/1999 8 9. 21 07/29/19 Page 1

Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company 1717 Wakonado Drive Third Interval By Iso /Itam 414 Nico"61st Mall i

Welch, MN 55089 Commercial Service Dates December 16, 1973 Minneapolje, MN 55401 v

ISO Item Report Number Method Results System Item Description Exam Date ASKE Section XI Item ISI-5B W-4 99-0151 PT NAD SPRAY TO PRESSURIZER PIPE - ELBOW 05/03/1999 B 9.

21 ISI-SB W-16 99-0373 (A)

PT NAD SPRAY TO PRESSURIZER P1PE - ELBOW C5/20/1999 B 9. 21 Scopf_ Expansion ISI-SC W-3 99-0274 PT IND SPRAY TO PRESSURIZER PIPE - ELBOW 05/11/1999 B 9. 21 Linear indication ISI-SC W-3 99-0274R1 PT NAD SPRAY TO PERSSURIZER PIPE - ELBOW 05/16/1999

89. 21 Hinor buffing ISI-SC W-4 99-0275 PT NAD SPRAY TO PRESSURIZER ELBOW - PIPE 05/11/1999 B 9. 21 ISI-5D W-2 99-0374 (A)

PT NAD l

SPRAY TO PRESSURIZER NOZZLE - PIPE 05/19/1999 B 9. 21

]

Scope _yggansion l

ISI-5D W-B 99-0119 PT NAD SPRAY TO PRESSURIZER 45e ELBOW - PIPE 05/02/1999 8 9.

21 ISI-5D W-15 99-0375 (A)

PT NAD SPRAY TO PRESSURIZER PIPE - TEE 05/19/1999 8 9. 21 Scope _Egans ion ISI-7 W-1 99-0138 PT NAD RTD TAKE OFF

'A' CLD PIPE - HALF COUPLING 05/02/1999 B 9. 32 ISI-7 W-B 99-0140 PT NAD

[

j RTD TAKE OFF

'A' CLD ELBOW - PIPE 05/02/1999 B 9. 21 O

-ISI-7 W-21 99-0143 PT IND RTD TAKE OFF

'A' CLD PIPE - ELBOW 05/02/1999 B 9. 21 Linear Indi_ cation ISI-7 W-21 99-0143R1 PT NAD RTD TAKE OFF

'A' CLD PIPE - ELBOW 05/11/1999 B 9.

21 Hinor Buffing ISI-7 W-22 99-0139 PT NAD RTD TAKE OFF

'A' CLD ELB0W - TEE 05/02/1999 B 9, 21 l

ISI-9 B-1 99-0014 VT1 NAD SIS HIGH HEAD

'A' VALVE BOLTING 04/20/1999 B 7.

70 ISI-9 H-2 99-0015 VT3 NAD SIS HIGH HEAD ' A' HYDR SNUBBER / CLAMP 04/20/1999 F-A C1 1

-+-

ISI-9 W-10 99-0142 PT NAD SIS HIGH HEAD

  • A' ELBOW - NOZZLE 05/02/1999 B 9. 11 ISI-9 W-10 99-0146 UT45 NAD SIS HICH HEAD ' A' ELBOW - NCZZLE 05/02/1999 B 9. 11 Limited, Less_t.han 90%

ISI-9 W-11 99-0141 PT NAD SIS HIGH HEAD

'A' NOZZLE - PIPE 05/02/1999

89. 31 ISI-9 W-11 99-0145 UT45 GEO SIS HIGH HEAD

'A' NOZZLE - PIPE 05/02/1999 8 9.

31 Limited. Less than 90%

ISI-10 W-1 99-0053 PT NAD DRN (ON CROSSOVER) A PIPE TO HALF COUPLNG 04/26/1999 B 9.

32 f}

ISI-10 W-2 99-0054 PT NAD

/

DRN (ON CROSSOVER) A HALF COtJPLING - PIPE 04/26/1999 B 9. 40 ISI-10 W-5 99-0055 PT NAD DRN (ON CROSSOVER) A PIPE - ELBOW 04/26/1999 B 9. 21 07/29/19 Page 2

Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company es 1717 Wakonado Drive Third Interval By Iso / Item 414 Nicollet Kall g

g

[

Welch, MN $5089 Commercial service Dates December 16, 1973 Minneapolis, Nu 55401

\\%

ISO Item Report Number Method Results System Item Description Exam Date ASME Section II Item ISI-11A W-1 99-0256 PT NAD SEAL INJ LOOP ' A' PIPE - ELBOW 05/11/1999 B 9. 21 ISI-11B H-3 99-0012 VT3 NAD SEAL INJ LOOP

'A' RESTRAINT / CLAMP 04/19/1999 F-A C1 I 161-11B W-1 99-0300 PT NAD SEAL INJ LOOP ' A' PIPE - ELBOW 05/13/1999 B 9. 21 ISI-11B W-12 99-0259 PT NAD SEAL INJ LOCP

'A' ELBDW - PIPE 05/11/1999 B 9. 21 ISI-11B W-14 99-0260 PT NAD SEAL INJ LOOP

'A' VALVE - PIPE 05/11/1999 8 9. 40 ISI-11C H-8 99-0315 VT3 NAD SEAL INJ LOOP

'A' ANCHOR 05/14/1999 F-A C1 I ISI-lic W-12 99-0299 PT NAD SEAL INJ LOOP ' A' RED TEE - PIPE 05/13/1999 B 9. 21 ISI-11D H-6 99-0316 VT3 NAD SEAL INJ LOOP *A' ROD CLAMP 05/14/1999 F-A C1 I ISI-113 W-10 99-0298 PT NAD SEAL INJ LOCP ' A' PIPE - ELBOW 05/13/1999 B 9.

21 I

l ISI-12A W-5 99-0144 PT IND

}

REACTOR CDOLANT ' A' RED 400 ELBOW - NZZL 05/02/1999 B 9. 11

\\ _,/

Linear Indications ISI-12A W-5 99-0152 UT45 GEO REACTOR COOLANT ' A' RED dos ELBOW - NZZL 05/02/1999 B 9.

11 GEO, Limited Less than 90%

2 ISI-12A W-5 99-0144R1 PT NAD REACTCR COOLANT

'A' RED 400 ELBOW - N2ZL 05/18/1999 B 9. 11 i

Cype Acceptable ISI-12A W-5 99-0355 UTO NAD REACTOR COOLANT

  • A' RED 400 ELBOW - NZZL 05/18/1999 B 9. 11 Limited, Less than 904 ISI-12C W-1 99-0236 PT NAD REACTOR CDOLANT

'A' RC PUMP - PIPE 05/08/1999 B 9. 11 ISI-13B W-1 99-0028 PT NAD REACTOR COOLANT

'B' NOZZLE - 400 ELBOW 04/22/1999 B 9. 11 ISI-13B W-1 99-0041 UT45 NAD REACTOR COOLANT

'B' NOZZLE - 40e ELBOW 04/23/1999 B 9. 11 Limited, Less than 904 ISI-138 W-1 99-03B4 UTO NAD REACTOR COOLANT

'B' NOZZLE - 40s ELBOW 05/19/1999 B 9. 11 Limited, Greater than 90%

ISI-13B W-3 LS 2D 99-0029 PT NAD REACTOR COOLANT

'B' PIPE - ELBDW 04/22/1999 8 9. 11 ISI-13B W-3 LS 2D 99-0042 UT45 NAD REACTOR COOLANT

'B' PIPE - ELBOW 04/23/1999 B 9. 11 ISI-13B W-3 LS 2D 99-0383 UTO

~

NAD REACTOR COOLANT

'B' PIPE - ELBOW 05/19/1999 B 9. 11

./N ISI-14 B-1 99-0333 UTO NAD

(

RC PUMP 11 FUMP FLANGE BOLTS 05/16/1999 B 6.180 ISI-14

~

H'- 1A 99-0219 (A)

VT3 NAD RC PUMP 11 TIE BACK BOLT 9 1 05/07/1999 F-A C1 I Sggpe Erpansion 07/29/19 Page 3

Prairie Island Nuclear Generating Inservice Inspection Report Log Northezu St.ates Power Company 1717 wakonada Drive Third Interval By Iso / Item 414 Nicollet Mall g

Welch, MN 55089 Commercial Service Dates December 16, 1973 Minneapolis, MN 55401 o

ISO Item Report Number Method Results System Item Description Exam Date ASME Section XI Itma ISI-14 H-2 99-0178 VT3 NAD RC PUMP 11 TIE BACK 9 2 05/05/1999 F-A & B10. 20 ISI-14 H-2A 99-0183 VT3 IND RC PUMP 11 TIE BACK BOLT S 2 05/05/1999 F-A C1 I CetterJ in missing ISI-14 H-2A 99-0183R1 VT3 NAD RC PUMP 11 TIE EACK BOLT 9 2 05/14/1999 P-A C1 I Engineerin_g Evaluation ISI-14 H-2B 99-0179 VT3 NAD RC PUMP 11 TIE BACK PIN 9 2 05/05/1999 F-A C1 I ISI-14 H-3A 99-0220 (A)

VT3 NAD RC PUMP 11 TIE BACK BOLT S 3 05/07/1999 P-A C1 I Scope Expansion ISI-14 H-5 99-0185 VT3 IND RC PUMP 11 PAD 2 05/05/1999 F-A C1 I Debris in pin pocket ISI-14 H-5 99-0185R1 VT3 NAD RC PUMP 11 PAD 2 05/14/1999 F-A C1 I Eng_ineering Evaluation ISI-14 H-7A 99-0213 (A)

VT3 NAD l

RC PUMP 11 COLUMN TOP & PIN 9 1 05/07/1999 F-A C1 I Scope Expansion ISI-14 H-8 99-0180 VT3 NAD RC PUMP 11 CONNECTION 9 2 05/05/1999 F-A C1 I ISI-14 H-8A 99-0184 VT3 IND

[}

RC PUMP 11 COLUMN TOP & PIN 9 2 05/05/1999 F-A C1 I I

/

Contact with pump casing

)

ISI-14 H-BA 99-0184R1 VT3 NAD RC PUMP 11 COLUMN TOP & PIN 9 2 05/14/1999 F-A C1 1 Engineering Evaluation ISI-14 H-9A 99-0214 (A)

VT3 NAD RC PUMP 11 COLUMN TOP & PIN 9 3 05/07/1999 F-A C1 I Scope Expansion ISI-14 H-11 99-0181 VT3 NAD RC PCMP 11 BASE 9 2 05/05/1999 F-A C1 I ISI-14 H-11A 99-0182 VT3 NAD RC PUMP 11 COLUMN BOT & PIN 9 2 05/05/1999 F-A C1 I i

l ISI-14 PUMP #11 99-0177 Ifr0 NAD RC PUMP 11 FLYWHEEL KEYWAY & BORE 05/04/1999 TS 4.2-1 ISI-17 B-1 99-0034 VT1 NAD 12" ACCUMULATOR DSCH VALVE BOLTING 04/22/1999 B 7.

70 ISI-17 H-1 99-0033 (A)

VT3 NAD 12* ACCUMULATOR DSCH HYDR SNUBBER 04/22/1999 F-A C1 1 Scope Expansion,

__ISI-17 W1 99-0036 PT NAD 12' ACCUMULATOR DSCH VALVE - ELBOW 04/22/1999 B 9. 11 ISI-17 W-1 99-0040 UT45 NAD 12" ACCUMULATOR DSCH VALVE - ELBOW 04/22/1999 8 9.

11 Limited, Less than 90%

ISI-17 W-3 99-0037 PT NAD 12' ACCUMULATOR DSCH PIPE - ELBOW 04/22/1999 B 9.

11

.[h ISI-17 W-3 99-0039 UT45 NAD 12* ACCUMULATOR DSCH PIPE - ELBOW 04/22/1999 B 9. 11 ISI-18 B-1 99-0088 51 NAD 10 RHR RETURN LOOP 3 VALVE BOLTINO 04/28/1999 8 7. 70 07/29/19 Page 4

Prairie Island Nuclear Generating Inservice Inspection Report Log BiW bern States Power Company j 73 1717 WakonaAe Drive Third Interval By Iso / Item 414 Micollet Mall

(

Welch, MN 55099 Ccannercial service Dates December 16, 1973 Kinneapolir, lee $5401 i

i l

IBO Item Report Number Method Results Bystem Item Demeription Exas Date ASME Section II Item l

ISI-19A B-1 99-0087 VT1 NAD 8* RHR TAKE OFF

'B' VALVE BOLTING 04/28/1999 B 7. 70 l

ISI-19A H-9 99-0089 VT3 NAD 8' RHR TAKE OFF

'B' RICID RESTRAINT LUGS 04/28/1999 F-A C1 I 1

FSI-21 W-10 99-0017 PT NAD 3* RTD RETURN LOOP B PIPE - ELBOW 04/21/1999 8 9. 21 l

ISI-21 W-12 99-0018 PT NAD 3* RTD RETURN LOOP B NOZZLE - PIPE 04/21/1999 B 9. 32 ISI-22 W-1 99-0301 PT NAD i

2" RTD TAKEOFF CLD B PIPE - HALF COUPLING 05/13/1999 B 9.

32 ISI-22 W-6 99-0302 PT NAD 2* RTD TAKEOFF CLD B PIPE - VALVE 05/13/1999 89, 21 ISI-22 W-8 99-0303 PT NAD 2* RTD TAKEOFF CLD B PIPE - VALVE 05/13/1999 8 9. 21 ISI-23 H-3 99-0074 VT3 NAD l

2* RTD TAKEOFF HOT B RUP'T RESTRAINT 04/27/1999 F-A C1 I I

ISI-23 W-12 99-0073 PT NAD 2" RTD TAKEOFF HOT B PIPE - VALVE 04/28/1999 B 9. 21 ISI-23 W-15 99-0072 PT NAD l /

2* RTD TAKEOFF HOT B ELBOW - PIPE 04/28/1999 B 9. 21 l \\N i

ISI-24 H-2 99-0016 VT3 NAD i

2* SIS HIGH HEAD

'B' HYDR SNUBBER /CI. AMP 04/21/1999 F-A C1 1 ISI-24 W-12 99-0019 PT NAD 2* SIS HIGH HEAD

'B' PIPE - ELBOW 04/21/1999 B 9. 21 ISI-25 W-1 99-0021 PT NAD 2" CROSSOVER DR

'B' PIPE TO HALF CDUPLNG 04/21/1999 B 9.

32 ISI-25 W-4 99-0020 PT NAD l

2* CROSSOVER DR

'B' ELBOW - PIPE 04/21/1999 99, 21 ISI-27B W-5 99-0312 PT NAD SEAL INJ LOOP

'B' ELBOW - PIPE 05/14/1999 B 9, 21 ISI-27B W-7 99-0313 PT NAD SEAL IFL7 LOOP

  • B' VALVE - PIPE 05/14/1999 B 9. 21 ISI-27C H+ 4 99-0304 VT3 NAD SEAL INJ LOOP

'B' RIGID HANCEH 05/13/1999 F-A C1 I ISI-27C W-9 99-0319 PT NAD SEAL INJ LOOP

'B' PIPE - REDUCING TEE 05/15/1999 8 9. 21 ISI-28 W-6 99-0317 PT NAD 10" PRESSURIZER SURG BENT PIPE - REDUCER 05/14/1999 B 9. 11 ISI-2B W-6 99-0323 UT45 riAD 10" PRESSURIZER SURG BENT PIPE - REDUCER 05/15/1999 B 9.

11

^

f ISI-28 W-7 99-0318 PT NAD 10" PRESSURIZER SURG REDUCER - NOZZLE END 05/14/1999 B 5. 40

\\

ISI-28 W-7 99-0322 UT45 NAD 10' PRESSURIZER SUR3 REDUCER - NOZZLE END 05/15/1999 B 5. 40 07/29/19 Page 5

L

Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company 1717 wakonado Drive Third Interval By Iso /Itsi 414 Nicollet Mall g

Welch, MN 55089 Cennnercial Service Dates December 16, 1973 stinneapolis, MN 55401 ISO Item Report Nmaber Method Results System Item Description Exam Date ABME Section XI Item ISI-29B B-1 99-0279 VT1 NAD PRESS SAFETY LINE B FLANGE BOLTINO 05/12/1999 8 7. 50 ISI-298 W-6 99-00 2 PT NAD PRESS SAFETY LINE B ELBCW - PIPE 04/28/1999 B 9. 11 ISI-29B W.

6 99-0085 UT45 NAD PRESS SAFETY LINE B ELBOW - PIPE 04/28/1999 B 9.

11 ISI-29B W-7 99-0083 PT NAD PRESS SAFETY LINE B PIPE - ELBOW 04/28/1999 B 9. 11 ISI-29B W-7 99-0084 UT45 NAD PRESS SAFETY LDIE B PIPE - ELBOW 04/28/1999 B 9. 11 ISI-30A V-2 99-0086 VT1 NAD REACTOR VESSEL SIS A VALVE INT SURFACES 04/28/1999 B12. 50 ISI-308 B-1 99-0031 VT1 NAD REACTOR VESSEL SIS B VALVE BOLTING 04/22/1999 B 7. 70 ISI-30B B-2 99-0030 VT1 NAD REACTOR VESSEL SIS B VALVE BOLTING 04/22/1999

87. 70 ISI-30B H-2 99-0032 VT3 NAD REACTOR VESSEL SIS B ROD / CLAMP 04/22/1999 F-A C1 I ISI-308 V-1 99-0056 VT1 NAD REACTOR VESSEL SIS B VALVE INT CURFACES 04/26/1999 B12. 50 ISI-308 W-1 99-0070 PT NAD REACTOR VESSEL SIS B VALVE - PIPE 04/27/1999 B 9. 11 ISI-308 W-1 99-0071 UT45 NAD REACTOR VESSEL SIS B VALVE - PIPE 04/27/1999 8 9. 11 Limited, Greater than 90%

ISI-31 W-1 99-0098 PT NAD PRESSURIZER RELIEF NCZZLE - SAFE END 04/29/1999 B 5. 40 ISI-31 W-1 99-0101 UT45 NAD PRES 3URIZER RELIEF NO7ZLE - SAFE END 04/29/1999 B 5. 40 ISI-31 W-2 99-0099 PT NAD PRESSURIZER RE1.IEF SAFE-END / REDUCER 04/29/1999 B 9. 21 ISI. 31 W-3 99-0100 PT NAD PRESSURIZER RELIEF REDUCER - 459 ELBOW 04/29/1999 8 9. 21 ISI-32B W-11 99-0281 PT NAD AUXILIARY SPRAY PIPE - TEE 05/12/1999 B 9, 21 ISI-32B W-14 99-0282 PT NAD AUXILIARY SPRAY ELBOW - PIPE 05/12/1999 B 9. 21 ISI-32B W-15 99-0283 PT NAD AUXILIARY SPRAY PIPE - VALVE 05/12/1999 B 9, 40 ISI-33A W-2 99-0276 PT NAD LOW HEAD RV INJ

'A' PIFE - U 7 05/12/1999 B 9. 21

[

ISI-33A W-4 99 0277 PT NAD LOW HEAD RV INJ

'A' TEE - PIPE 05/12/1999 B 9. 21 ISI-34 H-1A 99-0218 (A)

VT3 NAD RC PUMP 12 TIE BACK BOLT e 1 05/07/1999 F-A C1 I Scope Expansion 07/29/1p Pate 6

Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company a

1717 Wahonada Drive Third Interval By Iso / Item 414 Nicollet 9 tall I

Welch, MN $5089

\\

Commercial Service Dates December 16, 1973 Kinneapolis, MN 55401 w

ISO 2 ten Report Drumber Method Results System Item Description Exam Date ASME 8ection II Item ISI-34 H-2A 99-0206 (A)

VT3 IND RC PUMP 12 TIE BACK BOLT 0 2 05/03/1999 F-A Cl I BrokenJ n i

ISI-34 H-2A 99-0206R1 (A)

VT3 NAD RC PUMP 12 TIE BACK BOLT S 2 05/14/1999 F-A C1 I Eng_ineering_ Evaluation ISI-34 H-3A 99-0217 (Al -

VT3 NAD RC PUMP 12 TIE BACK BOLT S3 05/07/1999 F-A C1 I Scepe Ewansjon ISI-34 H-7A 99-0215 (A)

VT3 NAD RC PUMP 12 COLUMN TCP & PIN 9 1 05/07/1999 F-A C1 I scope Expansion ISI-34 H-8A 99-0207 (A)

VT3 IND RC PUMP 12 COLUMN TOP & PIN 9 2 05/03/1999 F-A C1 I Contact with pump casing ISI-34 H-8A 99-0207R1 (A)

VT3 NAD RC PUMP 12 CCLUMN TOP & PIN 9 2 05/14/1999 F-A C1 I Engineering Evaluation IEI-34 H-9A 99-0216 (A)

VT3 NAD RC PUNP 12 COLUMN TOP & PIN 9 3 05/07/1999 F-A C1 I Scope Expansien ISI-41 W-3 99-0210 UTO NC PRESSURIZER BOTTOM HEAD / SHELL 05/14/1999 B 2. 11 Limited, Greater than 90t ISI-41 W-3 99-0211 UT45 NAD PRES 3URIZER BOTTOM HEAD / SHELL 05/14/1999 B 2.

11 Limited, Greater than 90%

ISI-41 W-3 99-0212 UT60 NAD PRESSURIZER BOTTOM HEAD / SHELL 05/14/1999 B 2. 11 7.imi t ed, Greater than 90%

ISI-42 B-1 99-0310BL VT1 NAD PRESSURIZER MANWAY STUDS 05/14/1999 B 7.

20 ISI-42 N-1 IR 99-0334 UTO NAD PRESSURIZER SURGE NOZZLE 05/16/1999 B 3.120

  • Nominal Beam Angle:

21 9deg.

ISI-42 N-3 IR 99-0118 UTO NAD PRESSURIZER RELIEF NOZZLE 04/30/1999 B 3.120 Various Beam angles 17.96 CW, 17.9* CCW, 11.6* CW and 11.6*CCW ISI-43A B-1 99-0272BL VT1 NAD STEAM CENERATOR 611 INLET MANWAY BCLTS 05/11/1999 B 7.

30 ISI-43A B-2 99-0273BL VT1 NAD STEAM GENERATOR til OUTLET MANWAY BOLTS 05/11/1999

37. 30 ISI-43A N-1 IN-IR 99-0049 MT NAD STEAM GENERATOR fil FEEDWATER NOZZLE 04/24/1999 NC IN 93-20 ISI-43A N-1 RING TEE 99-0050 VT3

~

NAD STEAM GENERATOR 911 FW RING TEE / SUPPORTS 04/24/1999 NC IN 93-20 ISI-43A N-5 IR 99-0354BL UTO NAD STEAM GENERATOR fil NOZZLE INNER RADIUS 05/18/1999 8 3.140 Beam Angle 298, Limited, Greater than 90%

ISI-43A W-A 99-0351 UTO NAD STEAM GENERATOR 611 TUBE SMEET / HEAD 04/26/1999 B 2.

40 Limited, Creater than 90%

ISI-43A W-A 99-0352 UT45 IND STEAM GENERATOR #11 TURE SHEET / HEAD 04/24/1999 B 2. 40 Limited, Greater than 90%,

Linear indicatione 07/29/19 Page 7

Prairie Island Nucinar Generating Inservice Inspection Report Log Northern States Power Company n

1717 Wakonada Drive Third Interval By Iso / Item 414 Nicollet Mall

[

Welch, MN 55089 commercial Service Dates December 16, 1973 Minneapolis, MN $5401

\\\\

ISO Item Report Number Method Results System Item Description Exam Date AKMr Section II Item ISI-43A W-A 99-0353 UT60 IND STEAM GENERATOR lil TUBE SHEET / HEAD 04/24/1999 B 2. 40 Limited, Greater than 90%.

Linear Indications ISI-43A W-A 99-0352R1 UT45 NAD STEAM GENERATOR #11 TUBE SHEET / HEAD 05/22/1999 B 2. 40 Flaw Evaluation ISI-43A W-A 99-0353R1 UT60 NAD STEAM GENERATOR til TUBE SHEET / HEAD 05/22/1999 B 2. 40 Flaw Evaluation ISI-43A W-B 99-0357 UTO NAD STEAM CENERATOR fil TUBESHEET - SHELL 05/10/1999 C 1. 30 ISI-43A W-B 99-0358 UT45 IND STEAM GENERATOR ell TUBESHEET - SHELL 05/10/1999 C 1. 30 Limited, Greater than 90%,

Linear Indications ISI-43A W-B 99-0359 M60 IND STEAM GENERATOR 911 TUBESHEET - SHELL 05/10/1999 C 1. 30 Limited, Greater than 90%.

Linear Indications ISI-43A W-B 99-0358R1 UT45 NAD STEAM GENERATOR til TUBESHEET - SHELL 05/22/1999 C 1. 30 Flaw Evaluat_i_on ISI-43A W-B 99-0359R1 UT60 NAD STEAM GENERATOR #11 TUBESHEET - SHELL 05/22/1999 C 1. 30 Flaw Evaluaticn ISI-43A W-F VT 99-0047 VT1 NAD STEAM GENERATOR til TRANS WELD INT VT 04/24/1999 NC IN 93-20 o

ISI-43B B-1 99-0285BL VT1 NAD STEAM GENERATOR #12 INLET MANWAY STUDS 05/12/1999 B 7. 30 ISI-43B B-2 99-02B4BL VT1 NAD STEAM GENERA *OR 812 OUTLET MANWAY STUDS 05/12/1999 B 7. 30 ISI-43B N-4 99-0173 MT NAD STEAM GENERATOR #12 TOP HEAD-TO-NOZZLE 05/04/1999 C 2. 21 ISI-43B N-4 99-0174 UTO NAD STEAM CENERATOR #12 TOP HEAD-TO-NOZZLE 05/C4/1999 C 2. 21 Iimited, Greater than 90%

f ISI-43B N-4 99-0175 UT45 NAD STEAM GENERATOR 912 TCP HEAD-TO-NOZZLE 05/04/1999 C 2, 21 Limited, Greater _than 90%

ISI-43B N-4 99-0176 UT60 NAD STEAM GENERATOR 612 TOP HEAD-TO-NOZZLE 05/04/1999 C 2. 21 Limited, Greater _than 90%

ISI-43B N-4 IR 99-0208BL UTO NAD STEAM GENERATOR 612 NOZZLE INNER RADIUS 05/06/1999 C 2. 22

  • Nominal beam angle per ISI-tTP-5E 27.2/31.7 &

_ 28.5/15.5.

ISI-43B N-6 IR 99-0043BL UTO NAD STEAM CENERATOR #12 NOZZLE INNER RADIUS 04/23/1999 B 3.140 29' angle, Limited, Greater than 90%

ISI. 43D H-1 99-0386 VT3 NAD STEAM GENERATOR 912 SNUBBER 05/19/1999 F-A C1 I A/

\\

ISI-43D H-2 99-0387 VT3 NAD

]

STEAM GENERATOR #12 SNUBBER 05/19/1999 F-A C1 I ISI-43D H-3 99-0388 VT3 NAD STEAM GENERATOR 612 SNUBBER 05/19/1999 F-A C1 I 07/29/19 Page 3

Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company 1717 Wakonada Drive Third Interval By Iso / Item die Nicollet Mall Welch, MN 55089 commercial Service Dates December 16, 1973 Minneapolis, MN 55401 ISO lten Report Number Method Results system Item Description Exam Date ASME Section XI Item ISI-43D H-4 99-0389 VT3 NAD STEAM GENERATOR #12 SNUBBER 05/19/1999 F-A CI I ISI-43D H-5 (SOUTH) 99-0186 VT3 NAD STEAM GENERATOR 912 SPRING 05/05/1999 F-A C1 I j

ISI-43D H-6 (NCRTH) 99-0187 VT3 NAD STEAM GENERATOR #12 SPRING 05/05/1999 F-A C1 I ISI-43D H-7 99-0188 VT3 NAD STEAM CENERATOR 912 PAD 05/19/1999 F-A C1 I ISI-43D H-8 99-0189 VT3 NAD STEAM GENERATOR 612 PAD 05/19/1999 F-A C1 1 ISI-43D H-22 99-0190 VT3 NAD STEAM CENERATOR #12 TOP CONNECTION 9 2 05/05/1999 F-A C1 I ISI-43D H-22A 99-0191 VT3 NAD e

STEAM GENERATOR #12 COLUMN TOP & PIN 9 2 05/05/1999 F-A C1 I ISI-43D H-22B 99-0192 VT3 NAD STEAM CENERATCR SI2 COLUMN BOT & PIN O 2 05/05/1999 F-A C1 I ISI-43D H-23 99-0193 VT3 NAD STEAM GENERATOR #12 TOP CONNECTILN 9 3 05/05/1999 F-A C1 I ISI-43D H-23A 99-0194 VT3 NAD

}

STEAM GENERATOR #12 COLUMN TOP & PIN w J 05/05/1999 F-A C1 I b

ISI-43D H-23B 99-0195 VT3 NAD STEAM GENERATOR 912 COLUMN BOT & PIN 9 3 05/05/1999 F-A C1 1 ISI-43D H-26 99-0196 VT3 NAD STEAM GENERATOR 912 BASE 9 2 05/05/1999 F-A C1 I ISI-43D H-27 99-0197 VT3 NAD STEAM GENERATOR 812 BASE 9 3 05/05/1999 F-A C1 I ISI-46 W-5 99-0257 PT NAD RCS DRAINDOWN ELBOW - PIPE 05/11/1999 B 9. 21 ISI-46 W-9 99-0258 PT NAD RCS DRAINDOWN VALVE - PIPE 05/11/1999 B 9. 21 ISI-47 W-2 99-0233 PT NAD PLO-CAP

'B' NOZZLE - PIPE

.2/07/1999 B 9. 11 ISI-47 W-2 99-0234 UT45 NAD PLO-CAP

'B' NOZZLE - PIPE 05/07/1999 B 9. 11 Limited. Less than 90%

ISI-47 W-2 l99-0235 UT60 NAD PLO-CAP

'B' NOZZLE - PIPE l05/07/1999 8 9.

11 ISI-48 VESSEL INTR 99-0238 VT3 IND REACTOR VESSEL VT INTL SURFACES 05/02/1999 B13. 10 1" contact area _

ISI-48 VESSEL INTR 99-023BR1 VT3 NAD REACTOR VESSEL VT INTL SURFACES 05/20/1999 B13. 10 Engineering Evaluation ISI-51A H-1 99-0328 (A)

VT3 NAD MAIN STEAM

'A' SEISMIC RESTRAINT 05/16/1999 F-A & C 3. 20 Scop _e Expansion ISI-51A H-2 99-0329 (A)

VT3 NAD MAIN STEAM

'A' SEISMIC RESTRAINT 05/16/1999 F-A & C 3. 20 Scope Expansion 07/29/19 Page 9

l Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company 1717 wakonado Drive Third Intenal By Iso / Item die Nicollet Mall k

Welch, MN 55089 commercial Service Dates December 16, 1973 Minneapolis, MN 55401 5

ISO Item Report Number Method Results system Item Description Exam Date ASME Section II Item ISI-51A H-3 99-0330 (A)

VT3 NAD MAIN STEAM

'A' SEISMIC RESTRAINT 05/16/1999 F-A & C 3. 20 Scope Expansion ISI-SIA H-4 99-0331 (A)

VT3 NAD MAIN STEAM

'A' SEISMIC RESTRAINT 05/16/1999 F-A k C 3. 20 Scope Expansion ISI-51A H-7 99-0343 MT NAD MAIN STEAM

'A' BEAR *G BRAK ASSY (3) 05/17/1999 F-A & C 3. 20 Limited, Less than 90%

ISI-51A H-7 99-0293 VT3 IND MAIN STEAM

'A' BEAR *G BRAK ASSY (3) 05/12/1999 F-A & C 3. 20 Gap at baseplate to wall ISI- $1A H-7 99-0293R1 VT3 NAD MAIN STEAM

'A' BEAR'G BRAR ASSY (3) 05/19/1999 F-A & C 3. 20 Engineering Evaluation ISI-51A H-8 99-0365 MT IND MAIN STEAM

  • A' ANCHOR ELBOW (B) 05/19/1999 P-A k C 3. 20 Linear Indication ISI-SIA H-8 99-0292 VT3 IND MAIN STEAM

'A' ANCHOR ELBOW (8) 05/12/1999 F-A 6 C 3. 20 cap at Baseplate to wa'.1 ISI-51A H-8 99-0292R1 VT3 NAD MAIN STEAM

'A' ANCHOR ELBOW (B) 05/19/1999 F-A E C 3. 20 Engineering Evaluation ISI-51A H-8 99-0365R1 MT NAD MAIN STEAM

'A' ANCHOR ELBOW (B) 05/22/1999 F-A & C 3. 20 Code Accept _able

_ISI-51A H-9 99-0297 HT NAD

['

MAIN STEAM

'A' SIESMIC RESTRAINT 05/17/1999 F-A & C 3, 20

(

ISI-51A W-7 LSU 2LSD 99-0342 MT NAD MAIN STEAM

'A' PIPE - 45 ELBOW 05/17/1999 C 5, 51 ISI-51A W-7 LSU 2LSD 99-0341 UT45 NAD MAIN STEAM

'A' PIPE - 45 ELBOW 05/17/1999 C 5. 51 ISI-51C H-3 99-0327 VT3 NAD 4

MAIN STEAM

'A' CONST SUPPORT 05/16/1999 F-A Cl II ISI-52 W-2 99-0391BL (A)

MT NAD FEEDWATER LOOP

'A' PIPE - ELBOW 05/20/1999 C 5. 51 & HELB Scope Expansi_on ISI-52 W-3 99-0392BL (A)

HT NAD FEEDWATER LOOP

'A' ELBOW - PIPE 05/20/1999 C 5. 51 E HELB Scop.e_Expan si on ISI-52 W-23 IN 93-20 99-0270 UT45 NAD FEEDWATER LOCP

'A' REDUCER - NCZZLE 05/10/1999 NC IN 93-20 ISI-52 W-23 IN 93-20 99-0271 UT60 GEO FEEDWATER LOOP

'A' REDUCER - NCZZLE 05/10/1999 NC IN 93-20 ISI-53D H-3 99-0007 VT3 NAD RMR SUCTION

'B' SNUBBER 04/16/1999 F-A C1 II ISI-53D H-4 99-0001 VT3 NAD RHR SUCTION

'B' RESTRAINT 04/14/1999 F-A C1 II ISI-53D H-5 99-0002 VT3 NAD RHR SUCTION

'B' RHR PUMP ' B ' BASE S1 04/14/1999 F-A C1 II g

ISI-53D W-12 LS UD 99-0005 PT NAD

)

RER SUCTION

  • B' PIPE - ELBOW 04/14/1999 C 5. 10 J

ISI-53D W-12 LS UD 99-0008 UT45 NAD RHR SUCTION

  • B' PIPE - ELBOW 04/16/1999 C 5. 10 07/29/19 Fage 10

Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company 1717 Wakonede Drive Third Interval By Iso / Item 414 Nicollet Mall l

J Welch, MN $5089 Cossaarcial Service Dates December 16, 1973 Minneapolis, MN 55401

\\

ISO Item Report Number Method Results System Item Description Exam Date ASME Section XI Item ISI-53D W-15 LS UD 99-0006 PT NAD RHR SUCTION

'B' ELBOW - PIPE 04/14/1999 C 5. 10 ISI-53D W-15 LS UD 99-0010 UT45 GEO 1

RHR SUCTION

'B' ELBOW - PIPE 04/16/1999 C 5. 10 1SI-53D W-19 LS D 99-0009 UT45 NAD RHR SUCTION

'B' FIANOE - REDUCER 04/16/1999 C 5. 10 ISI-53D W-19 LS D 99-0003 PT MAD RHR SUCTION

'B' F1ANGE - REDUCER 04/14/1999 C 5. 10 ISI- $5C W-22 99-0004 PT NAD

)

RHR PUMP

'B' DISCH 1" HEAT EXCH - PIPE 04/14/1999 C 2. 31 l

ISI-68A H-1 99-0339 MT NAD MAINSTEAM

'B' SIESMIC RESTRAINT 0$/13/1999 F-A & C 3. 20 Limited, Less than 90%

ISI-68A H-1 99-0147 VT3 NAD MAINSTEAM

'B' SIESMIC RESTRAINT 05/03/1999 F-A & C 3. 20 ISI-68A

-2 99-0340 MT NAD MAINSTEAM

'B' SEISMIC RESTRAINT 05/13/1999 F-A & C 3. 20 Limited, Less than 90%

ISI-68A H-2 99-0278 VT3 NAD MAINSTEAM

'B' SEISMIC RESTRAINT 05/12/1999 F-A & C 3. 20 ISI-68A H-3 99-0338 MT NAD

[

MAINSTEAM

'B' SEISMIC RESTRAINT 05/13/1999 F-A & C 3. 20 y

Limited, Less than 90%

ISI-68A H-3 99-0280 VT3 IND MAINSTEAM

'B' SEISMIC RESTRAINT 05/03/1999 F-A & C 3. 20 Jam Nut loose j

ISI-68A H-3 99-0280R1 VT3 NAD I

MAINSTEAM

'B' SEISMIC RESTRAINT 05/20/1999 F-A & C 3. 20 Repair and Engineering Evaluation ISI-68A W-1 LS 2D 99-0172 MT NAD MAINSTEAM

'B' NOZZLE - RED. ELBOW 05/04/1999 C 5. 50 ISI-6SA W-1 LS 2D 99-0209 UT45 NAD MAINSTEAM

  • B' NOZZLE - RED. ELBOW 05/06/1999 C 5. 50 ISI-68B H-1 99-0325 VT3 NAD MAINSTEAM *B' BEAR'G BRAK ASSY 05/16/1999 F-A & C 3. 20 ISI-68C W-11 99-0350 MT NAD MAINSTEAM

'B' PIPE - FIANGE NOZZLE 05/18/1999 C 5. 80 ISI-69 H-2 99-0294 VT3 NAD FEEDWATER LOOP

'B' SEISMIC RESTRAINT 05/13/1999 F-A & C 3. 20 ISI-69 H-9 99-0295 VT3 NAD FEEDWATER LOOP

'B' SEISMIC RESTRAINT 05/13/1999 F-A & C 3. 20 ISI-69 W-2 99-0393 (A)

MT NAD FEEDWATER LOOP

'B' PIPE - PIPE 05/20/1999 C 5. 51 Scope Expansion

+

ISI-69 W-3 99-0394 (A)

MT NAD FEEDWATER LOOP

'B' PIPE - ELBOW 05/20/1999 C 5. 51

[}

Scope Expansion

/

ISI-69 W-4 99-0376 MT IND FEEDWATER LOOP

'B' ELBOW - PIPE 05/20/1999 C 5. 51 Linear Indication ISI-69 W-4 99-0385 UT45 NAD FEEDWATER LOOP

'B' ELBOW - PIPE 05/20/1999 C 5. 51 07/29/19 P*88 11

T

(

Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company e ~%s 1717 Wahonado Drive Third Interval By Iso / Item 414 Micollet Hall Welch, MN 55089 ccennercial Service Dates December 16, 1973 Minneapolis, tal 55401 ISO Ithe Report Rumber Method Results Bretem Item Descriptian Exam Date ASME Section XI Item ISI-69 W-4 99-0376R1 M.*

NAD FEEDWATER LOOP

'B' ELBOW - PIPE 05/20/1999 C 5. 51 l

Examined after repair ISI-69 W-23 99-0239 MT NAD FEEDWATER LOOP

'B' PIPE-TO-SWEEPOLET 05/06/1999 C 5. 51 l

ISI-69 W-23 99-0296 UT45 NAD FEEDWATER LOOP

'B' PIPE-TO-SWEEPOLET 05/12/1999 C 5.

51 ISI-69 W-25 99-0237 MT IND j

FEEDWATER LOOP

'B' REDUCER - NOZZLE 05/08/1999 C 5. 21 l

Linear Indication l

1SI-69 W-25 99-0268 UT45 NAD FEEDWATER LOOP

'B' REDUCER - NOZZLE C5/10/1999 C 5. 21 ISI-69 W -2 5 99-0269 UT60 cEO i

FEEDWATER LOCP

'B' REDUCER - NOZZLE 05/10/1999 C 5. 21 ISI-69 W-25

'99-0237R1 MT NAD FEEDWATER LOCP

'B' REDUCER - N0ZZLE 05/20/1999 C 5. 21 Code Acceptable ISI-83D H-1 99-0366 MT NAD SI Pump 12 Support A 05/18/1999 F-A & C 3. 30 Limited, Less than 90%

ISI-833 H-1 99-0022 VT3 NAD i

SI Pump 12 Support A 04/21/1999 F-A & C 3. 30 ISI-83D H-2 99-0367 MT NAD SI Pump 12 Support B 05/18/1999 F-A & C 3. 30 Limited, Less than 904 ISI-83D H-2 99-0023 VT3 NAD i

SI Pump 12 Support B 04/21/1999 F-A & C 3. 30 151-83D H-3 99-0368 MT NAD SI Pump 12 Support C 05/18/1999 F-A & C 3. 30 Limited, Less than 904 i

ISI-83D H-3 99-0024 VT3

' ~

NAD l

SI Pump 12 Support C 04/21/1999 F-A & C 3. 30 1

ISI-83D H-4 99-0369 MT NAD SI Pump 12 Support D 05/18/1999 F-A & C 3. 30 Limited, Less than 90%

l ISI-83D H-4 99-0025 VT3 NAD I

SI Pump 12 Support 0 04/21/1999 F-A & C 3. 30 I

ISI-83D H-5 99-0370 MT NAD SI Pump 12 Support E 05/18/1999 F-A & C 3. 30 ISI-83D H-5 99-0026 VT3 NAD SI Pump 12 Support E 04/21/1999 F-A & C 3.

30 ISI-83D H-6 99-0371 KT NAD SI Pump 12 Support F C5/18/1999 F-A & C 3. 30 ISI-83D H-6 99-0027 VT3 NAD SI Pump 12 Support F 04/21/1999 F-A & C 3.

30 l

i i

ISI-978 H-2 99-0320 VT3 NAD SI 12 DISCHARGE BOX SUPPORT 05/15/1999 F-A C1 II j' }

ISI-97B W-11 99-0321 PT NAD

\\

/

SI 12 DISCHARGE ELBOW - PIPE 05/15/1999 C 5. 21 V

ISI-97B W-11 99-0377 UT45 NAD SI 12 DISCHARGE ELBOW - PIPE 05/19/1999 C 5. 21 07/29/19 Page 12

Frairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company q

1717 wakonada Drive Third Interval By Iso / Item die Nicollet Mall I

welch, MN 55089 Comunercial Service Dates December 16, 1973 Minneapolis, MN 55401 ISO Item Report Number Method Results System Item Description Exam Date ASME Section XI Item ISI-97C W-8 99-0324 PT NAD SI 12 DISCHARCE OK!72CE - PIPE 05/15/1999 C 5. 30 ISI-98C W-21 99-0332 PT NAD SI 11 DISCHARGE PIPE - TEE 05/17/1999 C 5. 21 PSI-98C W-21 99-0378 UT45 NAD SI 11 DISCHARGE PIPE - TEE 05/19/1999 C 5. 21 ISI-100A H-2 99-0326 VT3 NAD SI 11 DISCHARCE SADDLE SUPPORT 05/16/1999 F-A C1 II ISI-10CA W-23 99-0356 PT NAD SI 11 DISCHARGE PIPE - ELBOW 05/20/1999 C 5. 21 ISI-100A W-23 99-0390 UT45 NAD SI 11 DISCHARCE P!PE - ELBOW 05/20/1999 C 5. 21 ISI-301 C-30A 99-0203BL VT3 IND Primary Containment Penetration Surface 05/05/1999 E 1.

12 ISI-301 C-30A 99-0203BLR1 VT3 NAD Primary containment Penetration surface 05/21/1999 E 1.

12 ISI-301 C-30B 99-0202BL VT3 IND Primary Containment Penetration Surface 05/05/1999 E 1.

12 ISI-301 C-3CB 99-0202BLR1 VT3 NAD Primary Containment Penetration Surface 05/21/1999 E 1. 12 151-301 G-32-A 99-0120BL VT3 NAD Primary Containment Moist Barrier-outer 04/30/1999 E 5. 30 ISI-301 G-33-A 99-0121BL VT3 NAD Primary Containment Moist Barrier-cuter 04/30/1999 E 5. 30 ISI-301 G-38-A 99-0122BL VT3 NAD Primary Containment Moist Barrier-outer 04/30/1999 E 5.

30 ISI-301 G-39-A 99-0123BL VT3 NAD Primary Containment Moist Ba rrie r - out er 04/30/1999 E 5. 30 ISI-301 G-44-A 99-0124BL VT3 NAD Primary containment Meist Barrier-outer 04/30/1999 E 5.

30 ISI-301 G-45-A 99-0125BL VT3 NAD Primary Containment Moist Barrier-outer 04/30/1999 E 5. 30 ISI-301 G-49-A 99-0204BL VT3 NAD Primary Containment Moist Barrier-outer 05/02/1999 E 5. 30 ISI-301 G-50-A 99-0133BL VT3 NAD Primary Containment Moist Barrier-outer 05/02/1999 E 5. 30 ISI-301 G-51-A 99-0171BL VT3 NAD Primary Containment Moist Barrier-cuter 05/02/1999 E 5. 30 ISI-301 G-56-A 99-0137BL VT3 l NAD Primary Containment Moist Barrier-outer 05/02/1999 E 5. 30 O

ISI-301 G-57-A 99-0134BL VT3 hAD Primary Containment Moist Barrier-outer 05/02/1999 E 5.

30 ISI-301 S-32-A 99-0126BL VT3 IND Primary Containment Plate Surface 04/30/1999 E 1. 12 07/29/19 Page 13

\\

l l

l t

Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company i

! f-~%.

1117 wakonade Drive Third Interval By Iso / Item 414 Nicollet Mall j

l welch, MN 55089 Consercial Service Date: December 16, 1973 Kinneapolis, MN 55401 ili\\.

i ISO Item Report Number Method Results pyst em Item Descriptio-n Exam Date ASME Section XI Item 151-301 S-32-A 99-0126BLR1 VT3 NAD Primary containment Plate Surface 05/24/1999 E 1. 12 ISI-301 S-33-A 99-0127BL VT3 IND Primary Cor.tainment Plate surface 04/30/1999 E 1. 12 l

ISI-301 S-33-A 99-0127BLR1-VT3 NAD Primary Containment Plate Surface 05/24/1999 E 1. 12 ISI-301 S-38-A 99-0128BL VT3 IND Primary Containment Plate Surface 04/30/1999 E 1. 12 ISI-301 S-38-A 99-0128BLR1 VT3 NAD Primary Containment Plate Surface 05/24/1999 E 1. 12 ISI-301 S-39-A 99-0129BL VT3 IND Primary Containment Plate Surface 04/30/1999 E 1. 12 ISI-301 S-39-A 99-0129BLR1 VT3 NAD Primary Containment Plate Surface 05/24/1999 E 1.

12 151-301 S-44-A 99-0130BL VT3 IND Primary Containment Plate Surface 04/30/1999 E 1. 12 ISI-301 S-44-A 99-0130BLR1 VT3 NAD Primary Containment Plate Surface 05/24/1999 E 1. 12 ISI-301 S-45-A 99-0131BL VT3 IND

[

\\

Primary Containment Plate Surface 04/30/1999 E 1. 12

+-

ISI-301 S-45-A 99-0131BLR1 VT3 NAD Primary Containment Plate Surface 05/24/1999 E 1. 12 ISI-301

'~

S-49-A 99-0205BL VT3 IND Primary containment Plate Surface 05/02/1999 E 1. 12 15I-301 S-49-A 99-0205BLR1 VT3 NAD Primary Containment Plate surface 05/24/1999 E 1. 12 l

ISI-301 S-50-A 99-0135BL VT3 NAD Primary Containment Plate Surface 05/02/1999 E 1. 12 15I-301 S-51-A 99-0170BL VT3 NAD Primary Containment Plate Surface 05/02/1999 E 1. 12 I

ISI-301 S-56-A 99-0136BL VT3 NAD Primary Containment Plate Surface 05/02/1999 E 1. 12 l

ISI-301 S-57-A 99-0132BL VT3 IND Primary Containment Plate Surface 05/02/1999 E 1. 12 IS1-301 S-57-A 99-0132BLR1 VT3 NAD Primary Containment Plate Surface 05/24/1999 E 1. 12 ISI-302 B1 99-0345BL VT1 IND Primary Containment Bolted Connection 05/17/1999 E 8. 10 l

ISI-302 B1 99-0345BLR1 VT1 NAD Primary Containment Bolted Connection 05/24/1999 E 8. 10 151-302 C-60 99-0360BL VT3 IND Primary Containment Penetration Surface 05/18/1999 E 1. 12 ISI-302 C-60 99-0360BLR1 VT3 NAD Primary ContaLnment Penetration Surface 05/24/1999 E 1. 12 07/29/19 Page 14 l

I i

Prairie Zaland Nuclear Generating Ineezvice Inspection Report Log Northern States Power company 1717 Wakonada Drive Third Interval By Iso / Item 414 Nicollet Mall i

Welch, MN 55089 Commercial service Dates December 16, 1973 Minneapolis, MN 55401 ISO Item Report Number Method Results System Item Description Exam Date AEME Section XI Itam ISI-302 C-60-A 99-0361BL VT3 IND Primary Containment Penetration Surface 05/18/1999 E 1. 12 131-302 C-60-A 99-0361BLR1 VT3 NAD Primary Containment Penetration Surface 05/24/1999 E 1. 12 IsI-302 G-64A 99-0309BL VT3 IND Primary Containment Moist Barrier-outer 05/13/1999 E 5. 30 ISI-302 G-64A 99-0309BLR1 VT3 NAD Primary containment Moist barrier-outer 05/21/1999 E 5. 30 15I-302 G-65 99-030aaL VT3 IND Primary Containment Moist Barrier-inner 05/15/1999 E 5. 30 ISI-302 G-65 99-0306BLR1 VT3 NAD Primary Containment Moist Barrier-inner 05/21/1999 E 5. 30 ISI-302 G-66 99-0307BL VT3 IND Primary Containment Moist Barrier-inner 05/13/1999 E 5. 30 ISI-302 G-66 99-0307BLR1 VT3 NAD Primary containment Moist Barrier-inner 05/21/1999 E 5. 30 ISI-302 G1 99-0347BL VT3 NAD Primary Containment Seals & Gaskets 05/18/1999 E 5. 10 ISI-302 G2 99-0348BL VT3 NAD

[

Primary Containment Seals & Gaskets 05/18/1999 E 5. 10 1

ISI-302 5-64A 99-0349EL VT3 NAD Primary Containment Plate Surface 05/17/1999 E 1, 12 ISI-302 S-64A-A 99-0344BL VT3 NAD Primary Containment Plate surface 05/17/1999 E 1. 12

'ISI-302 S-65 99-0306BL VT3 IND Primary Containment Plate Surface 05/13/1999 E 1. 12 ISI-302 S-65 99-0306BLR1 VT3 NAD Primary Containment Plate Surface 05/24/1999 E 1. 12 ISI-302 S-66 99-0305BL VT3 IND Primary Containment Plate Surface 05/13/1999 E 1. 12 151-302 5-66 99-0305BLR1 VT3 NAD Primary Containment Plate Surface 05/24/1999 E 1. 12 ISI-303 B1 99-0362BL VT1 NAD Primary Containment Bcited Connection 05/19/1999 E 8. 10 ISI-303 B2 99-0382BL VT1 NAD Primary Containment Bolted Cnnnection 05/20/1999 E 8. 10 151-303 C-10 99-0224BL VT3 NAD Primary Containment Penetration Surface 05/07/1999 E 1. 12 151-303 C-18 99-0364BL VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 ISI-303 C-19 99-0381BL VT3 NAD Primary containment Penetration Surface 05/20/1999 E 1. 12 ISI-303 C-28A 99-0221BL VT3 NAD Primary Containment Penetration Surface 05/07/1999 E 1. 12 07/29/19 Page 15

Prairie Island muclear Generating Inservice Inspection Report Log Northern States Power Company f -+g 1717 wakanado Drive Third Interval By Iso /Itan 414 micollet mall Welch, MN 550s9 Commercial service Dates December 16, 1973 kunneapolis, MN 55401 Z80 Itaa Report Number Method Results system Item Description Exam Date AEME Section II Itaa ISI-303 C-28A-A 99-0115BL VT3 NAD Primary Containment Penetration Surface 04/30/1999 E 1, 12 ISI-303 C-29A 99-0225BL VT3 NAD Primary containment Penetration Surface 05/07/1999 E 1. 12 I-SI-3 03 C-29B 99-0226BL -

VT3 NAD Primary Containment Penetration Surface 05/07/1999 E 1. 12 ISI-3C3 C-32A 99-0246BL VT3 NAD Primary C;ntainment Penetration Surface 05/08/1999 E 1. 12 ISI-303 C-32A 99-0246BLR1 VT3 NAD Primary Containment Penetration Surface 05/20/1999 E 1. 12 ISI-303 C-32A-A 99-0116BL VT3 NAD Primary Containment Penetration Surface 04/30/1999 E 1. 12 ISI-303 C-32B 99-0247BL VT3 NAD Primary Containment Pentration Surface 05/08/1999 E 1, 12 ISI-303 C-33A 99-0248BL VT3 NAD Primary containment Penetration Surface 05/08/1999 E 1. 12 ISI-303 C-33A-A 99-0117BL VT3 NAD Primary Centainment Penetration Surface 04/30/1999 E 1.

12 ISI-303 C-338 99-0249BL VT3 NAD Primary Containment Penetration Surface 05/08/1999 E 1. 12 ISI-3C3 C-39 99-0227BL VT3 NAD Primary Containment Penetration Surface 05/07/1999 -

E 1. 12 ISI-303 C-39-A 99-0114BL VT3 NAD Primary Containment Penetration Surface 04/30/1999 E 1. 12 ISI-303 C-4 99-0222BL VT3 t'AD Primary containment Penetraticn Surface 05/07/1999 E 1. 12 151-303 C-4-A 99-0107BL VT3

~~^

IND Primary Containment Penetration Surface 04/30/1999 E 1. 12 ISI-303 C-4-A 99-0107BLR1 VT3 NAD Primary Containment Penetration Surface 05/24/1999 E 1. 12 15I-303 C-40 99-022 BBL VT3 NAD Primary Containment Penetration Surface 05/07/1999 E 1. 12 ISI-303 C-40-A 99-0113BL VT3 NAD Primary Centainment Penetration Surface 04/30/1999 E 1. 12 ISI-303 C-9 99-0223BL VT3 NAD Primary Containment Penetration Surface 05/07/1999 E 1. 12 ISI-303 G-68 99-0229BL VT3 NAD Primary Containment Moist Barrier-inner 05/07/1999 E 5. 30 ISI-303 G-71 99-0230BL VT3 NAD Primary Containment Moist Barrier-inner 05/07/1999 E 5. 30

/

'ISI-303 S-68 99-0231BL VT3 IND

/

Primary containment Plate Suface 05/07/1999 E 1. 12 ISI-303 S-68 99-0231BLR1 VT3 NAD Primary containment Plate Suface 05/24/1999 E 1. 12 07/29/19 Page 16

Prairie Island Nuclear Generating Inservice Inspection Report I.og Northern States Power Company 1717 wakonada Drive Third Interval By Iso /Itam 414 Nicollet Mall welch, MN 55089 commercial service Date December 16, 1973 Minneapolis, MN $5401 ISO Item Report Number Nothod Results pystem Item Description Exam Date ASME Section XI Item ISI-303 S-71 99-0232BL VT3 IND Primary Containment Plate Suriace 05/09/1999 E 1. 12 ISI-303 S-71 99-0232BLR1 VT3 NAD Primary Containment Plate Surface 05/24/1999 E 1. 12 LSI-304 C-24 99-0250BL..

VT3 IND Primary Containment Penetration Surf ace 05/08/1999 E 1. 12 ISI-304 C-24 99-0250BLR1 VT3 NAD Primary Containment Penetration Surface 05/24/1999 E 1. 12 ISI-304 C 34A 99-0251BL VT3 IND Primary Containment Penetration Sarface 05/08/1999 E 1. 12 ISI-304 C-34A 99-0251BLR1 VT3 NAD Primary Containment Penetration Surface 05/24/1999 E 1. 12 ISI-304 C-34A-A 99-0110BL VT3 IND Primary Containment Penetration Surface 04/30/1999 E 1. 12 ISI-304 C-34A-A 99-0110BLR1 VT3 NAD Primary Containment Penetration Surface 05/24/1999 E 1. 12 ISI-304 C-34B 99-0252BL VT3 NAD Primary Containment Penetration Surface 05/08/1999 E 1. 12 ISI-304 C-34B-A 99-01098L VT3 IND Primary Containment Penetration Surface 04/30/1999 E 1. 12 ISI-304

~

C-34B-A 99-0109BLR1 VT3 NAD Primary Containment Penetration Surface 05/19/1999 _

E 1. 12 ISI-304 C-34C 99-0253BL VT3 NAD Primary Cantainment Penetration Surface 05/08/1999 E 1. 12 ISI-304 C-34C-A 99-0108BL VT3 IND Primary containment Penetration Surface 04/30/1999 E 1. 12 I51-304 C-34C-A 9 9-0108 h LR1 VT3 MAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 ISI-304 C-42A 99-0254BL VT3

'~~

NAD Primary Containment Penetration Surface 05/08/1999 E 1. 12 ISI-304 C-42A-A 99-0111BL VT3 IND Primary Containment Penetration Surface 04/30/1999 E 1. 12 ISI-304 C-42A-A 99-0111BLR1 VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 ISI-304 C-50 99-0240BL VT3 NAD Primary Containment Penetration Surface 05/08/1999 E 1.

12

)

ISI-304 C-50-A 99-0112BL VT3 IND Primary Containment Penetration Sarface 04/30/1999 E 1. 12 ISI-304 C-50-A 99-0112BLR1 hT3 NAD Primary Containment Penetration Surface 05/19/1999 EI. 12 ISI-304 S-72 99 0241BL VT3 IND

(

Primary Cantainment Plate Surface 05/08/1999 E 1. 12 ISI-304 S-72 99-0241BLR1 Vf3 NAD Primary Containment Plate Surface 05/24/1999 E 1. 12 07/29/19 Page 17

Prairie Island Nuclear Generating Inservice Inspection Report Log Northern Statea Power Company 1717 Wakonada Drive Third Interval By Iso / Item 414 Nicollet Mall f

I welch, MN 55089 Commercial Service Dates December 16, 1973 Minneapolis, MN 55401

\\v ISO Item Report Number Method Results System Item Description Exam Date ASME Section XI Item ISI-305 C-13A 99-0289BL VT3 NAD Primary Containment Penetration Surface 05/12/1999 E 1. 12 ISI-305 C-13A-A 99-0078BL VT3 NAD Primary Containment Penetration Surface 04/27/1999 E 1. 12 PSI-305 C-17 99-0244BL VT3 IND Primary Containment Panetration Surface 05/08/1999 E 1. 12 ISI-305 C-17 99-0244BLR1 VT3 NAD Primary Containment Penetration surface 05/24/1999 E 1.

12 ISI-305 C-17-A 99-0077BL VT3 NAD Primary Containment Penetration Surface 04/27/1999 E 1.

12 ISI-305 C-2 99-0242BL VT3 NAD Primary containment Penetration surface 05/08/1999 E 1. 12 ISI-305 C-2-A 99-0076BL VT3 NAD Primary containment Penetration Surface 04/27/1999 E 1. 12 ISI-305 C-3 99-0243BL VT3 IND Primary containment Penetration Surface 05/08/1999 E 1. 12 ISI-305 C-3 99-0243BLR1 VT3 NAD Primary Containment Penetration Surface 05/24/1999 E 1. 12 ISI-305 C-3-A 99-0079BL VT3 NAD

[

\\.

Primary Containment Penetration Surface 04/27/3999 E 1. 12 ISI-305 C-34D 99-0201BL VT3 IND Primary Containment Penetration Surface 05/04/1999 E 1, 12 ISI-305 C-34D 99-0201BLR1 VT3 NAD Primary Containment Penetration Surface 05/24/1999 E 1. 12 151-305 C-34D-A 99-0090BL VT3 IND Primary Containment Penetration Surface 04/28/1999 E 1. 12 ISI-3C5 C-34D-A 99-009CBLR1 VT3 NAD Primary containment Penetration Surface 05/19/1999 E.

12 ISI-305 C-34E 99-0199BL VT3 NAD Primary Containment Penetratien Surface 05/04/1999 E 1. 12 I

4 ISI-305 C-34E-A 99-0091BL VT3 IND Primary Containment Penetration Surface 04/28/1999 E 1. 12 151-305 C-34E-A 99-0091BLR1 VT3-NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 151-305 C-34F 99-01988L VT3 NAD Prinary Containment Penetration Surface 05/04/1999 E 1. 12 ISI-305 C-34F-A 99-0092BL

~~

VT3 IND Primary Containment Penetration Surface 04/28/1999 E 1, 12 ISI-305 C-34F-A 99-0092BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12

['

ISI-305 C-35 99-0245HL VT3 IND

(

Primary Containment Penetration Surface 05/08/1999 E 1. 12 ISI-305 C-35 99-0245BLR1 VT3 NAD Prlmary Containment Penetration Surface 05/26/1999 E 1. 12 07/29/19 Page 13 j

J

Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States I'over Company p<w 1717 wakonade Drive Third Interval By Iso / Item 414 Nicollet Hall

[

welch, MN 55089 Commercial Service Dates December 16, 1973 Kinneapolis, MN 55401

\\.. /

s ISO Item Report Number Method Results Pyotem Item Description Exam Date ASME Section II Item ISI-305 C-35-A 99-0093BL VT3 IND Primary Containment Penetration Surface 04/28/1999 E 1. 12 l

ISI-305 C-35-A 99-0093BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 ISI-305 C-36D 99-0263BL VT3 IND Primary Containment Penetration Surface 05/10/1999 E 1. 12 l

ISI-305 C-36D 99-0263BLR1 VT3 NAD l

Primary Containment Penetration Surface 05/26/1999 E 1. 12 ISI-305 C-36E 99-0287BL VT3 IND Primary Containment Penetration Surface 05/12/1999 E 1. 12 ISI-305 C-36E 99-0287BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1.

12 ISI-305 C-37C 99-0262BL VT3 NAD Primary Containment Penetration Surface 05/10/1999 E 1. 12 ISI-305 C-37C-A 99-0094BL VT3 IND j

Primary Containment Penetration Surface 04/28/1999 E 1. 12

{

ISI-305 C-37C-A 99-0094BLR1 VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 ISI-305 C-37D 99-0261BL VT3 NAD f/

Primary Containment Penetration Surface 05/10/1999 E 1. 12 i

\\._

l ISI-305 C-37D-A 99-0095BL VT3 IND Primary containment Penetration Surface 04/28/1999 -

E 1. 12 l

151-305 C-37D-A 99-0095BLR1 VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 ISI-305 C-38C 99-0264BL VT3 NAD Primary Containment Penetration Surface 05/10/1999 E 1. 12 ISI-305 C-38C-A 99-0096BL VT3 IND Primary containment Penetration Surface 04/28/1999 E 1.

12 ISI-305 C-38C-A 99-0095BLR1 VT3 NAD Primary Containment Punetration Surface 05/19/1999 E 1.

12 ISI-305 C-38D 99-0265BL VT3 NAD Primary containment Penetration Surface 05/10/1999 E 1. 12 i

ISI-305 C-38D-A 99-0097BL VT3 IND l

Primary Containment Penetration Surface 04/28/1999 E 1. 12 ISI-305 C-3BD-A 99-0097BLR1 VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 ISI-305 C-42D 99-0266BL VT3 IND Primary Containment Penetration Surface 05/10/1999 E 1. 12 15I-305 C-42D 99-0266BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1.

12

  1. ~

f' ISI-305 C-42D-A 99-0081BL VT3 IND

( j Primary Containment Penetration Surface 04/27/1999 E 1. 12 ISI-305 C-41D-A 99-0081BLR1 VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1, 12 07/29/19 Page 19

Prairio Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company

-~g 1717 wakonado Drive Third Interval By Iso /Itan die Nicollet Mall

[V}

Nelch, MN 55089 commercial Service Dates December 16, 1973 Minneapolis, MN 55401 ISO Item Report Number Method Results System Item Description Exam Date ASME Section II Item 1

ISI-305 C-6A 99-0286BL VT3 NAD Primary Containment Penetration Surface 05/12/1999 E 1. 12 ISI-305 C-6A 99-0267BL VT3 NAD Primary Containment Penetration Surface 05/10/1999 E 1. 12 ISI-305 C-BA-A 99-0080BL VT3 NAD Primary Containment Penetration Surface 04/27/1999 E 1. 12 ISI-305 C-8B 99-0290BL VT3 NAD Primary Containment Penetration Surface 05/12/1999 E 1. 12 ISI-305 C-8B-A 99-0075BL VT3 NAD Primary Containment Penetration Surface 04/27/1999 E 1. 12 ISI-305 S-81 97-0200BL VT3 NAD Primary containment Plate Surface 05/04/1999 E 1.

12 ISI-305 S-82 99-0288BL VT3 IND Primary Containment Plate surface 05/12/1999 E 1. 12 ISI-305 S-82 99-02 8 8B LR1 VT3 NAD Primary Containment Plate Surface 05/26/1999 E 1, 12 ISI-305 S-82-A 99-0105BL VT3 IND Primary Containment Plate Surface 04/28/1999 E 1. 12 ISI-305 S-82-A 99-0105PLR1 VT3 NAD

/ \\

Prinery Containment Plate Surface 05/26/1999 E 1.

12 ISI-307 B1 99-0335BL VT1 NAD Primary Contninment Bolted Connection 05/15/1999 E 8.

10 ISI-307

~~~

B2 99-0346BL VT1 NAD Primary Containment Bolted Connection 05/18/1999 E 8, 10 ISI-307 C-27C 99-0166BL VT3 NAD Primary Containment Penetration Surface 05/04/1999 E1 12 ISI-307 C-27C-A 99-0106BL VT3 IND Primary Containment Penetration Surface 04/28/1999 E 1. 12 ISI-307 C-27C-A 99-0106BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 ISI-307

~b-27D 99-0161BL VT3 NAD Primary Containment Penetration Surface 05/03/1999 E 1.

12 ISI-307 C-28B 99-0160BL VT3 NAD Primary Containment Penetration Surface 05/03/1999 E 1. 12 ISI-307 C-288-A 99-0057BL VT3 NAD Primary Containment Penetration Surface 04/27/1999 E 1. 12 151-307 C-36B 99-0159BL VT3 NAD Primary Containment Penetration Surface 05/03/1999 E 1. 12 ISI-307 C-36B-A 99-0058BL "T3 NAD ~

Primary Containment Penetration Surface 04/27/1999 E 1. 12

/N ISI-307 C-37A

~

~ ~

99-0158BL VT3 NAD

(

Primary Containment Penetration Surface 05/03/1999 E 1. 12 151-307 C-37A-A 99-0059BL VT3 IND Primary Containment Penetration Surface 04/27/1999 E 1. 12 L

07/29/19 Page 20

f' I

Prairie Island Nuclear Cenerating Ineervice Inspection Report Log Northezu States Power Company l g 1717 wakonada Drive Third Interval By Iso / Item 414 Nicollet Mall Melch, MN 55089 Commercial Service Dates December 16, 1973 Minneapolia, MN 55401 Iso Item Report Number Method Results I

system Item Deserf ption Exam Date ASIM Section EI Item

(

ISI-307 C-37A-A 99-00598LR1 VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 l

ISI-307 C-37B 99-0167BL VT3 IND l

Primary Containment Penetration Surface 05/04/1999 E 1. 12 ISI-307 C-37B 9 9 e 0167BLR1 -

VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 I

ISI-307 C-37B-A 99-0040BL VT3 IND Primary Containment Penetration Surface 04/27/1999 E 1. 12 ISI-307 C-37B-A 99-0060BLR1 V*3 NAD l

Primary Containment Penetration Surface 05/20/1999 E 1.

12 ISI-307 C-38A 99-0155BL VT3 IND Primary Containment Penetration Surface 05/03/1999 E 1. 12 ISI-307 C-38A 99-0155HLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 l

ISI-307 C-38A-A 99-0061BL VT3 IND

(

Primary Containment Penetration Surface 04/27/1999 E 1. 12 l

I l

ISI-307 C-38A-A 99-0061BLR1 VT3 NAD

{

Primary containment Penetration Surface 05/19/1999 E 1. 12 i

ISI-307 C-38B 99-0168BL VT3 IND j

j Primary Containment Penetration Surface 05/04/1999 E 1. 12

(

/

i l

'ISI-307 C-38B 99-01688LR1 VT3 NAD l

Primary Containment Penetration Surface 05/26/1999 E 1. 12 e

l ISI-307 C-38B-A 9 b 62BL VT3 IND Primary containment Penotration Surface 04/27/1999 E 1. 12 l

ISI-307 C-38B-A 99-0062BLR1 VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 I

ISI-307 C-42L 99-0163BL VT3 NAD l

Primary Containment Penetration Surface 05/03/1999 E 1. 12 j

ISI-307 C-42P 99-0380BL VT3 IND Primary Containment Penetration Surface 05/20/1999 E 1.

12 l

I ISI-307 C-42P 9S-0380BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 ISI-307 C-42P-A 99-0063BL VT3 IND Primary Containment Penetration Surface 04/27/1999 E 1. 12 ISI-307 C-42P-A 99-0063BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 ISI-307 C-42G 99-0162BL VT3 NAD Primary containment Penetration Surface 05/03/1999 E 1. 12 ISI-307 C-43A 99-0157BL VT3 NAD Primtery Containment Penetration Surface 05/03/1999 E 1. 12 O

ISI 307 C-43A-A 99-0064BL VT3 NAD Primary Containment Penetration Surface 04/27/1999 E 1. 12 ISI-307 C-43A-A 99-0064BLR1 VT3 NAD Primary Con.ainment Penetration Surface 05/20/1999 E 1. 12 07/29/19 Page 21

l Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company x

1717 Wakonada Drive Third Interval By Iso / Item 414 Nicollet Wall Welch, nel 55089 Commazi:ial Service Dates December 16, 1973 Minneapolis, MN 55401 ISO Item Report Number Method Results system Item Description Exam Date AEME Section II Itma 151-307 C-43B 99-0156BL VT3 NAD Primary Containment Penetration Surface 05/03/1999 E 1.

12 151-307 C-43D-A 99-0065BL VT3 NAD Primary Containment Penetration Surface 04/27/1999 E 1. 12 ISI-307 C-43C 99-0154BL -

VT3 IND Primary Containment Penetration Surface 05/03/1999 E 1. 12 151-307 C-43C 99-0154BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 151-307 C-43C-A 99-0066BL VT3 IND Primary Containment Penetration Surface 04/27/1999 E 1. 12 ISI-307 C-43C-A 99-0066BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 ISI-307 C-43D 99-0153BL VT3 IND Primary Containment Penetration Surface 05/03/1999 E 1. 12 ISI-307 C-43D 99-0153BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 ISI-307 C-43D-A 99-0067BL VT3 IND Primary Containment Penetration Surface 04/27/1999 E 1, 12 ISI-307 C-43D-A 99-0067BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 hSI-307 C-44 99-0363BL VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12

=

ISI-307 C-46A 99-0164BL VT3 NAD Primary Containment Penetration Surface 05/04/1999 E 1. 12 151-307 C-46A-A 99-0068BL VT3 IND Primary Containment Penetration Surface 04/27/1999 E 1. 12 ISI-307 C-46A-A 99-0068BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 151-307 C-78 99-0165BL VT3 NAD Primary Containment Penetration Surface 05/04/1999 E 1. 12 181-307 S-93 99-0169BL VT3 IND Primary containment Plate Surface 05/04/1999 E 1. 12 ISI-307 S-93 99-0169BLR1 VT3 NAD Primary Containment Plate Surface 05/20/1999 E 1. 12 ISI-307 S+93-A 99-0069BL VT3 IND Primary Containment Plate Surface 04/27/1999 E 1. 12 ISI-307 S-93-A 99-0069BLR1 VT3 NAD Primary Containment Plate Surface 05/26/1999 E 1. 12 ISI-311 C-42B 99-0291BL VT3 NAD Primary Containment Penetration Surface 05/12/1999 E 1. 12 y

ISI-311 S-100 99-0336BL VT3 IND Primary Containment Plate Surface 04/27/1999 E 1. 12 ISI-311 S-100 9 9-033 6B LR1 VT3 NAD Primary Containment Plate surface 05/20/1999 E 1. 12 07/29/19 Page 22

r Prairie Island muclear Generating Inservice Inspection Report Log Northern States Power Company (s

1717 wakonada Drive Third Interval By Iso / Item 414 Nicollet Mall welch, MN 53089 Comunercial Sonica Dates December 16, 1973 Minneapolis, MN 55401 ISO Item Report humber Method Results System Item Description Enam Date AENE Section XI Item 152-311 S-101 99-0337BL VT3 Iht Primary Containment Plate Surface 04/27/1999 R 1, 12 ISI-311 S-101 99-0337BLR1 VT3 NAD Primary Containment Plate Surface 05/20/1999 E 1. 12 XH-5-8 14B North Patch 99-0397BL UTO NAD Feedwater Heater Shell Plate 05/25/1999 ASME Sec VIII XH-5-8 14B North Patch 99-0398BL UT45 NAD Feedwater Heater Shell Plate 05/25/1999 ASME Sec VIII XH-5-8 14B South Patch 99-0395BL UTO NAD Peedwater Heater Shell Plate 05/25/1999 ASME Sec VIII XH-5-8 14B South Patch 99-0396BL UT45 NAD Feedwater Heater Shell Plate 05/25/1999 ASME Sec VIII l

\\

V 07/29/19 Fate 23

i NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT 1,1999

~h (d

APPENDIX B INTERVAL 3 PERIOD 2 INSPECTIONS BY ASME ITEM NUMBER 23 Pages l

Note: Pages 8 to 18 contain Section XI IWE and non-code inspection result information. The i

information contained in this appendix is computer generat6d by the ISI database management I

system, includes IWE and other non-code inspection results. As allowed by i

10CFR55a(g)(6)(ii)(B)(5) the containment inspection program (IWE) will be maintained and availaible for NRC audit and review at the plant site after September 9'",2001. The IWE and non-code inspection results listed within this appendix have not been reviewed or certified by the ANI inspector and are not covered by the form NIS-1 submitted with this summary report.

l l

O l

l

[

O

Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company 1717 Wakonada Drive Third Interval By source Doc #

414 Nicollet Mall Welch, MN $5089 commercial service Dates December 16, 1973 Minneapo11s, MN $5401 Iso Item Report Number Method Results

{

pystem Item Description Exam Date ASME Section XZ Itam XH-5-8 14B South Patch 99-0395BL UTO NAD Feedwater Heater Shell Plate 05/25/1999 ASME Sec VIII XH-5-8 14B South Paten 99-0396BL 17T45 NAD Jeedwater Heater Shell Plate C5/25/1999 ASKE Sec VIII EH-5-8 14B North Patch 99-0397BL,,

UTO NAD Feedwater Heater Shell Plate 05/25/1999 ASME Sec VIII XH-5-8 14B North Patch 99-0398BL UT45 NAD Feedwater Heater Shell Plate 05/25/1999 ASME Sec VIII ISI-41 W-3 99-0210 UTO NAD PRESSURIZER BOTTCM HEAD / SHELL 05/14/1999 B 2. 11 Limited, Greater than 90%

ISI-41 W-3 99-0211 UT45 NAD PRES $URIZER BOTTCM HEAD / SHELL 05/14/1999 B 2.

11 Limited, Greater than 90%

ISI-41 W-3 99-0212 UT60 NAD PRESSURIZER BOTTOM HEAD / SHELL 05/14/1999 B 2. 11 Limited, Greater than 90%

ISI-43A W-A P9-0351 UTO NAD STEAM GENERATOR fil TUBE SHEET / HEAD 04/26/1999 B 2. 40 Jkimited, Greater than 90%

i ISI-43A W-A 99-0352 UT45 IND STEAM GENERATOR til TUDE SHEET / HEAD 04/24/1999 B 2. 40 Limited, Greater than 90%,

Linear indications

(

ISI-43A W-A 99-0353 UT60 IND I

STEAM GENERATOR #11 TUBE SHEET / HEAD 04/24/1999 B 2. 40 Limited, Greater than 901.

Linear Indications ISI-43A W-A 99-0352R1 UT45 NAD S*EAM GENERATOR #11 TUBE SHEET / HEAC 05/22/1999 B 2. 40 Flaw Evaluation ISI-43A W-A 99-0353R1 UT60 NAD STEAM CENERATOR eli TUBE SHEET / HEAD 05/22/1999 B 2. 40 Flaw Evaluation ISI-42 N-1IR 99-0334 UTO NAD PRES $URIZER SURGE 14CZZLE 05/16/1999 B 3.120

  • Nominal Beam Angle 21.9deg.

ISI-42 N-3 IR 99-0118 UTO NAD PRESSURIZER RELIEF NOZZLE 04/30/1999 B 3.120 Various Beam angles 17.9* CW, 17.9' CCW, 11.6' CW and 11.6*CCW ISI-43A N-5 IR 99-0354BL UTO NAD STEAM GENERATOR 811 NOZZLE INNER RADIUS 05/18/1999 8 3.140 Beam Angle 29'. Limited, Greater than 90%

ISI-43B N-6 IR 99-0043BL UTO NAD STEAM GENERATCR 912 NOZZLE INNER RADIUS 04/23/1999 B 3.140 29' angle, Limited, Greater than 90%

ISI-31 W-1 99-0098 PT NAD PRESSURIZER RELIEF NCZZLE - SAFE END 04/29/1999 B 5. 40 ISI-31 W-1 99-0101 UT45 NAD PRESSURIZER RELIEF NOZZLE - SAFE END 04/29/1999 B 5. 40 g, g ISI-28 W7 99-0318 PT NAD 10* PRF3SURIZER SURG REDUCER - NOZZLE END 05/14/1999 B 5. 40 ISI-'28 W-7 99-0322 UT45 NAD 10" PRESSURIZER SURG REDUCER - NOZZLE END 05/15/1999 8 5.

40 07/29/19 Page 1

Prairie Island Ruclear Generating Inservice Inspection Report Log Northern States Power Company 1717 Wakoanda Drive Third Interval By Source Doc #

414 Nicollet Mall p

Welch, MN 55089 Commercial Service Date: December 15, 1973 Minneapolis, MN $5401

/

180 Item Report Number Method Results System Item Description Exam Date ASME Section II Item ISI-14 B-1 99-0333 UTO NAD RC PUMP 11 PUMP FLANGE BOLTS 05/16/1999 B 6.180 ISI-42 B-1 99-3310BL VT1 NAD PRESSURIZER MANWAY STUDS 05/14/1999 B 7. 20 ISI-43B B-1 99-0285BL __

VT1 NAD STEAM GENERATOR 912 INLET MANWAY STUDS 05/12/1999 B ?. 30 ISI-43B B-2 99-0284BL VT1 NAD STEAM CENERATOR 412 OUTLET MANWAY STUDS 05/12/1999 8 7.

30 ISI-43A B-1 99-0272BL VT1 NAD STEAM CENERATOR fil INLET MANWAY BOLTS 05/11/1999 B 7. 30 ISI-43A B-2 99-0273BL VT1 NAD STEAM CENERATOR #11 OUTLET MANWAY BOLTS 05/11/1999 8 7. 30 ISI-29B B-1 99-0279 VT1 NAD PRESS SAFETY LINE B FLANGE BOLTING 05/12/1999 B 7. 50 ISI-2 B-1 99-0011 VT1 NAD ACCUM DISCHARGE

'A' BOLTS, STUDS, NUTS 04/19/1999 B 7. 70 ISI-9 B-1 99-0014 VT1 NAD SIS HIGif HEAD

'A' VALVE BOLTING 01/10/1999 B 7.

70 ISI-17 B-1 I99-0034

/T1 NAD T

12" ACCUMULATOR DSCH VALVE BOLTING 04/22/1999 B 7.

70 ISI-18 B-1 99-0088 VT1 NAD 10 RHR RETURN LOOP B VALVE BOLTING 04/28/1999 _

B 7.

70 ISI-19A B-1 99-0087 VT1 NAD 8" RHR TAKE OFF

'B' VALVE BOLTING 04/28/1999 B 7.

70 f

ISI-30B B-1 99-0031 VT1 NAD REACTOR VESSEL SIS B VALVE BOLTING 04/22/1999 B 7. 70 ISI-30B B-2 99-0030 VT1 NAD REACTOR VESSEL SIS B VALVE BOLTING 04/22/1999 B 7. 70 ISI-2 W-3 99-0035 PT NAD ACCUM. DISCHAROE

'A' ELBOW - PIPE 04/22/1999 B 9. 11 ISI-3C W-4 99-0311 PT NAD RHR LOOP

'A' ELBOW - PIPE 05/14/1999 B 9. 11 ISI-9 W-10 99-0142 PT NAD SIS HIGH HEAD

'A' ELBOW - NOZ LE 05/02/1999 B 9.

11 ISI-12C W-1 99-0236 PT NAD REACTOR COOLANT ' A' RC PUMP - PIPE 05/08/1999 B 9. 11 ISI-12A W-5 99-0144 PT IND REACTOR COOLANT

'A' RED 40e ELBOW - NZZL 05/02/1999 B 9. 11 Linear Indications ISI-13B W-1 99-0028 PT NAD REACTOR COOLANT

'B' NOZZLE - 40e ELBOW 04/22/1999 B 9. 11

,( O ISI-13B W-3 LS 2D 99-0029 PT NAD REACTOR COOLANT

'B' PIPE - ELBOW 04/22/1999 B 9. 11 J

ISI-17 W-3 99-0037 PT NAD 12* ACCUMULATOR DSCH PIPE - ELBOW 04/22/1999 B 9. 11 07/29/19 Page 3

i Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company r,s, 1717 Wakonada Drive Third Interval By Source Doc #

414 Micollet Hall p

Welch, MN 55089 Commercial Service Date December 16, 1973 Minneapolis, MN 55401 e

ISO Item Report Number Method Results System item Description Exam Date ASME Section II Item ISI-17 W-1 99-0036 PT NAD 12* ACCUMUI.ATOR DSCH VALVE - ELBOW 04/22/1999 B 9. 11 ISI-28 W-6 99-0317 PT NAD ' ' ~

10* PRESSURIZER SURG BENT PIPE - REDUCER 05/14/1999 8 9. 11 LSI-28 W-6 99-0323 UT45 NAD 10" PRESSURIZER SURC BENT PIPE - REDUCER 05/15/1999 B 9. 11 ISI-29B W-6 99-0082 PT NAD PRESS SAFETY LINE B ELBOW - PIPE 04/28/1999 B 9. 11 ISI-29B W-6 99-0085 UT45 NAD PRESS SAFETY LINE B ELBOW - PIPE 04/28/1999 B 9. 11 ISI-29B W-7 99-0083 PT NAD PRESS SAFETY LINE B PIPE - ELBCW 04/28/1999 B 9.

11 ISI-29B W-7 99-0084 UT45 NAD PRESS SAFETY LINE B PIPE - ELBOW 04/28/1999 B 9. 11 ISI-30B W-1 99-0070 PT NAD REACTCR VESSEL SIS B VALVE - PIPE 04/27/1999 B 9. 11 ISI-30B W-1 99-0071 UT45 NAD REACTOR VESSEL SIS B VALVE - PIPE 04/27/1999 B 9. 11 Limited, Creater than 90%

ISI-47 W-2 99-0233 PT lNAD

['

PLO-CAP ' B '

N0ZZLE - PIPE 05/07/1999 B 9.

11 k

ISI-47 W-2 99-0234 UT45 NAD PLO-CAP

'B' NOZZLE - PIPE 05/07/1999 B 9. 11 Limited, Less than 90%

ISI-3C W-4 99-0379 UT45 NAD RHR LOOP

'A' ELBOW - PIPE 05/19/1999 B 9.

11 ISI-13B W-1 99-0041 UT45 NAD REACTOR COOLANT

'B' NOZZLE - 40e ELBOW 04/23/1999 B 9.

11 Limited, Less than 90%

ISI-13B W-3 LS 2D 99-0042 UT45 NAD REACTOR COOLANT

'B' PIPE - ELBOW 04/23/1999 B 9.

11 ISI-17 W-1 99-0040 UT45 NAD 12' ACCUMULATOR DSCH VALVC - ELBOW 04/22/1999 B 9, 11 Limited, Less than 90%

ISI-17 W-3 99-0039 UT45 NAD 12' ACCUMULATOR DSCH P1FE - ELBOW 04/22/1999 B 9.

11 ISI-2 W-3 99-0038 UT45 NAD ACCUM. DISCHARGE

'A' ELBCW - PIPE 04/22/1999 B 9.

11 ISI-9 W-10 99-0146 UT45 NAD SIS HIGH HEAD

  • A' ELBOW - NOZZLE 05/02/1999 B 9. 11 Limited, Less_than 90%

ISI-12A W-5 99-0152 UT45 GEO REACTOR COOLANT

'A' RED 400 ELBDW - NZZL 05/02/1999 B 9.

11 C EO, Limited, Less than 90%

IS!- 47 W-2 99-0235 UT60 NAD PLO-CAP

'B' NOZZLE - PIPE 05/07/1999 8 9.

11

/'"'

ISI-12A W-5 99-0144R1 PT NAD REACTOR COOLANT

'A' RED 400 ELBOW - NZZL 05/18/1999 B 9.

11 Code _ Acceptable ISI-12A W-5 99-0355 UTO NAD REACTOR COOLANT

'A' RED 40e ELBOW - NZZL 05/18/1999 B 9.

11 Limited, Less than 90%

07/29/19 Page 3

1

Prairie Island Nuclear Generating Inservice Inspection Report Log Morthern States Power Company 1717 Wakonada Drive Third Interval By Source Doc 0 414 Nicollet Mall Welch, MN 55089 Cosenercial Service Dates December 16, 1973 Minneapolis, MN 55401 ISO Item Report Number Method Results system Item Description Exam Date ASME Section XI Item ISI-13B W-1 99-0384 UTO NAD REACTOR COOLANT

'B' NOZZLE - 40e ELBOW 05/19/1999 8 9. 11 Limited, Creater than 909 ISI-13B W-3 LS 2D 99-0383 UTO NAD REACTOR COOLANT

'B' PIPE - ELBCW 05/19/1999 B 9.

11 ISI-1A W-12 99-0046 PT NAD CHARGING LINE

'B' ELBOW - PIPE 04/24/1999

B 9. 21 ISI-IB W-15 99-0046 PT NAD CHAROING LINE

'B' ELBOW - PIPE 04/24/1999 B 9. 21 ISI-ID W-9 99-0104 PT NAD CHARGING LINE

'B' ELBOW - PIPE 04/30/1999 B 9. 21 ISI-1D W-7 99-0103 PT NAD CHARGING LINE

'B' ELBOW - PIPE 04/30/1999 B 9. 21 ISI-1E W. 8 99-0255 PT NAD CHARGING LINE

'B' ELBOW - PIPE 05/10/1999 B 9. 21 ISI-SA W-13 99-0148 PT NAD SPRAY TO PRESSURIZER PIPE - 45e ELBOW 05/03/1999 B 9. 21 ISI-SB W-2 99-0150 PT NAD SPRAY TO PRESSURIZER PIPE - ELBOW 05/03/1999 B 9. 21 ISI-5B W-4 99-0151 PT NAD

(

SPRAY TO PRESSURIZER PIPE - ELBOW 05/03/1999 B 9. 21 ISI-SC W-3 99-0274 PT IND SPRAY TO PRESSURIZER PIPE - ELBOW 05/11/1999 B 9, 21 Linear indication ISI-SC W-4 99-0275 PT NAD SPRAY TO PRESSURIZER ELBOW - PIPE 05/11/1999 B 9. 21 ISI-5D W-8 99-0119 PT NAD SPRAY TO PRESSURTZER 45e ELBOW - PIPE 05/02/1999 B 9. 21 ISI-7 W-21 99-0143 PT IND RTD TAKE OFF

'A' CLD PIPE - ELBOW 05/02/1999 8 9. 21 Linear Indication ISI-7 W-22 99-0139 PT NAD RTD TAKE OFF

  • A' CLD ELBOW - TEE 05/02/1999 B 9. 21 ISI-7 W-8 99-0140 PT NAD RTD TAKE OFF

'A' CLD ELBOW - PIPE 05/02/1999 8 9.

21 ISI-10 W-5 99-0055 PT NAD CRN (ON CROSSOVER) A-PIPE - ELBOW 04/26/1999 B 9.

21 ISI-11A W-1 99-0256 PT NAD SEAL INJ LOOP

'A' PIPE - ELBOW 05/11/1999

89. 21 ISI-11B W-12 99-0259 PT NAD SEAL INJ LOOP

'A' ELBOW - PIPE 05/11/1999 B 9. 21 ISI-11C W-12 99-0299 PT NAD SEAL INJ LOOP

'A' RED TEE - PIPE 05/13/1999 B 9. 21 ISI-11D W-10 99-0298 PT NAD

]

SEAL INJ LOOP

'A' PIPE - ELBOW 05/13/1999 8 9.

21 M

ISI-27B W-7 99-0313 PT NAD SEAL INJ LOOP

'B' VALVE - PIPE 05/14/1999 B 9. 21 07/29/19 Page 4

Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company 1717 Wakonada Drive Third Interval By Source Doc 9 414 Nicollet Kall Welch, MN 55089 Comunercial Service Dates December 16, 1973 minneapolis, MN 55401 ISO Item Report number Method Results System Item Description Enam Date AEME Section II Item ISI-27B W-5 99-0312 PT NAD SEAL INJ LOOP

'B' ELBOW - PIPE 05/14/1999 B 9. 21 ISI-27C W-9 99-0319 PT NAD SEAL INJ LOOP

'B' PIPE - REDUCING TEE 05/15/1999 B 9, 21 ISI-21 W-10 99-0017 PT NAD 3" RTD RETURN LOOP B PIPE - ELBOW 04/21/1999 '

B 9. 21 ISI-31 W-3 99-0100 PT NAD PRES $URIZER RELIEF REDUCER - 45e ELBOW 04/29/1999 B 9. 21 ISI-31 W-2 99-0099 PT NAD PRESSURIZER RELIEF SAFE-END / REDUCER 04/29/1999 B 9. 21 ISI-22 W-6 99-0302 PT NAD 2* RTD TAKEOFF CLD B PIPE - VALVE 05/13/1299 B 9. 21 ISI-22 W-8 99-0303 PT NAD 2* RTD TAKEOFF CLD B PIPE - VALVE 05/13/1999 B 9. 21 ISI-23 W-12 99-0073 PT MA5~~ '

2* RTD TAKEOFF HOT B PIPE - VALVE 04/28/1999 B 9. 21 ISI-23 W-15 99-0072 PT NAD 2" RTD TAKEOFF HOT B ELBOW - PIPE 04/28/1999 8 9. 21 ISI-24 W-12 99-0019 PT MAD 2* SIS HICH HEAD

'B' PIPE - ELBOW 04/21/1999 B 9. 21 ISI-25 W-4 99-0020 PT NAD 2" CROSSOVER DR

'B' ELBOW - PIPE 04/21/1999 B 9. 21 ISI-32B W-14 99-0282 PT a

NAD

]

AUXIIIARY SPRAY ELBOW - PIPE 05/12/1999 B 9. 21 ISI-328 W-11 99-0281 PT NAD AUXILLARY SPRAY PIPE - TEE 05/12/1999 B 9. 21 l

ISI-33A W-2 99-0276 PT NAD LOW HEAD RV INJ

'A' PIPE - TEE 05/12/1999 B 9. 21 ISI-33A W-4 99-0277 PT NAD LOW HEAD RV INJ

'A' TEE - PIPE 05/12/1999 8 9. 21 ISI-46 W-5 99-0257 PT NAD RCS DRAINDOWN ELBOW - PIPE 05/11/1999 B 9. 21 ISI-46 W-9 99-0258 PT NAD RCS DRAINDOWN VALVE - PIPE 05/11/1999 B 9. 21 ISI-115 W-1 99-0300 PT NAD SEAL INJ LOOP

'A' PIPE + ELBOW 05/13/1999 B 9. 21 ISI-SC W-3 99-0274R1 PT NAD SPRAY TO PRES $URIZER PIPE - ELBOW 05/16/1999 B 9. 21 Minor buffing ISI-7 W-21 99-0143R1 PT NAD RTD TAKE OFF

  • A' CLD PIPE - ELBOW 05/11/1999 B 9. 21 Hinor Buffing

/"'N ISI-5A W-7 99-0372 (A)

PT NAD SPRAY TO PRESSURIZER VALVE - ELBOW 05/20/1999 8 9. 21 Scepe_EEpa_nsion ISI-5B W-16 99-0373 (A)

PT NAD SPRAY TO PRESSURIZER PIPE - ELBOW 05/20/1999 B 9. 21 U90Ee_E3p_ansion Page 5

07/29/19

I Northern States Power Company Inservice Inspection Report Log Prairie Island Nuclear Generating 414 Nicollet Mall Third Interval By source Doc #

/

1717 Wakonada Drive Commuercial Service Dates December 16, 1973 Minneapolis, MN 55401 Welch, MN 55089 Report Number Method Reasits ISO Itest Item Description Exam Date ASMR Section II Item Fystem NAD ISI-5D W-2 99-0374 (A)

PT SPRAY TO PRESSURIZER NOZZLE - PIPE 05/19/1999 9 9. 21 Scep_e Expansion _

NAD 99-0375 (A)

PT ISI-5D W-15 SPRAY TO PRESSURIZER PIPE - TEE 05/19/1999 B 9. 21 Scope Expansion NAD 99-0141 PT 151-9 W-11

~

B 9. 31 SIS HICH HEAD

'A' NOZZLE - PIPE 05/02/1999 GEO W-11 99-0145 UT45 ISI-9 SIS HIGH HEAD

'A' NOZZLE - PIPE 05/02/1999 R 9. 31 Limited, Less thai 90%

NAD W-14 99-0045 PT ISI-1A CHARCING LINE

  • B' HALF COUPLING - PIPE 04/24/1999 B 9. 32 I

99-0138 PT NAD ISI-7 W-1 RTD TAKE OFF

'A' CLD PIPE - HALF COUPLING 05/02/1999 8 9. 32 NAD 99-0053 PT W-1 ISI-10 DEN (ON CROSSOVER) A PIPE TO HALF COUPLNG 04/26/1999 B 9. 32 l

NAD 99-0018 PT W-12 ISI-21 3* RTD RETURN LOOP B NOZZLE - PIPE 04/21/1999 8 9. 32 NAD 99-0301 PT W-1 ISI-22 2* RTD TAREOFF CLD B PIPE - HALF COUPLING 05/13/1999 B 9. 32

~

99-0021 PT NAD W-1 ISI-25 S

PIPE TO HALF COUPLNG 04/21/1999 B 9. 32 2* CROSSOVER DR

'B' 1

NAD 99-0044 PT W-13 151-1A CHARCING LINE

'B' PIPE - HALP COUPLING 04/24/1999 B 9. 40 NAD 99-0054 PT W-2 ISI-10 DRN (ON CROSSOVER) A HALF COUPLING - PIPE 04/26/1999

99. 40 NAD 99-0260 PT W-14 I$I-11B 05/11/2999 B 9. 40 VALVE - PIPE SEAL INJ LOOP

'A' NAD 99-0283 PT W-15 ISI-32B 05/12/1999 B 9. 40 AUXILIARY SPRAY PIPE - VALVE NAD 99-0056 VT1 V-1 ISI-30B REACTOR VESSEL SIS B VALVE IRT SURFACES 04/26/1999 B12. 50 NAD 99-0086 VT1 V-2 ISI-30A REACTOR VESSEL SIS A VALVE INT SURFACES 04/28/1999 B12. 50 IND VESSEL INTR 99-0238 VT3 ISI-48 VT INTL SURFACES 05/02/1999 B13. 10 REACTOR VESSEL 1* contact _ area NAD VESSEL INTR 99-0238R1 VT3 ISI. 48 VT INTL SURFACES 05/20/1999 B13 10 REACTOR VESSEL Engineering _Evahation NAD 99-0357 UTO W-B ISI-43A STEAM CENERATOR #11 TUBESHEET - SHELL 05/10/1999 C 1. 30 IND 99-0358 UT45 W-B ISI-43A STEAM CENERATOR 911 TUBESHEET - SHELL 05/10/1999 C 1. 30 Limited Greater than 900 Linear Indications IND 99-0359 UT60 WB N

ISI-43A STEAM CENERATOR #11 TUBESHEET - SHELL 05/10/1999 C 1. 30 Limited, Greater than 900 Linear Indications NAD 99-0358R1 UT45 W-B ISI-43A 05/22/1999 C 1. 30 STEAM GENERATOR 911 TUBESHEET - SHELL Flaw Evaluation Page 6

a9 ass n B

}

Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company

[ _

1717 Wakanado Drive Third Interval By Source Doc 9 414 Nicollet Mall Welch, MN 55089 commercial Service Dates December 16, 1973 Minneapolis, MN $5401

\\

130 Item Report Number Method Results Rystem Item Description Exam Date ASME Section II Item ISI 43A W-B 99-0359R1 UT60 NAD STEAM GENERATOR 911 TUBESHEET - SHELL 05/22/1999 C 1. 30 Flaw Evalu3 tion ISI-438 N-4 99-0173 KT NAD FTEAM GENERATOR 612 TOP HEAD-TO-NOZZLE 05/04/1999 C 2. 21 ISI-438 N-4 99-0174 UTO NAD STEAM GENERATOR 912 TOP HEAD-TO-NCZZLE 05/04/1999 C 2, 21 Limited, Greater than 90%

ISI-43B N-4 99-0175 UT45 NAD STEAM GENERATOR 912 TOP HEAD-TO-NOZZLE 05/04/1999 C 2. 21 Limited, Greater than 90%

ISI-43B N-4 99-0176 UT60 NAD STEAM GENERATOR 612 TOP HEAD-TO-NOZZLE 05/04/1999 C 2. 21 Limited, Greater than 909 ISI-438 N-4 IR 99-0208BL UTO NAD STEAM GENERATOR 612 NOZZLE INNER RADIUS 05/06/1999 C 2. 22

  • Nominal beam angle per ISI-UT-5E: 27.2/31.7 &

28.5/15.5.

ISI-55C W-22 99-0004 PT NAD RHH PUMP

'B' DISCH l' HEAT EXCH - PIPE 04/14/1999 C 2. 31 ISI-53D W-19 LS D 99-0009 UT45 NAD RRR SUCTION

'B' FLANGE - REDUCER 04/16/1999 C 5. 10 ISI-53D W-19 LS D 99-0003 PT NAD RHR SUCTION

  • B' FLANGE - REDUCER 04/14/1999 C 5. 10 ISI-53D W-12 LS UD 99-0005 PT NAD j

RHR SUCTION

'B' P!PE - ELBOW 04/14/1999 C 5.10 ISI-53D W-15 LS UD 99-0006 PT NAD RHR SUCTION

  • B' ELBOW - PIPE 04/14/1999 C 5. 10 ISI-53D W-25 LS UD 99-0010 UT45 GEO RHR SUCTION

'B' ELBOt' - PIPE 04/16/1999 C 5. 10 ISI-b3D W-12 LS UD 99-0000 UT45 NAD RER SUCTION

'B' PIPE - ELBOW 04/16/1999 C 5. 10 ISI-69 W-25 99-0237 MT IND FEEDWATER LOCP

'B' REDUCER - NOZZLE 05/08/1999 C 5. 21 Linear Indication ISI-69 W-25 99-0268 UT45 NAD FEEDWATER LOOP

'B' REDUCER - NOZZLE 05/10/1999 C 5. 21 ISI. 97B W-11 99-0321 PT NAD SI 12 DISCHARGE ELBDW - PIPE 05/15/1999 C 5. 21 ISI-97B W-11 99-0377 UT45 NAD SI 12 DISCHARGE ELBOW - PIPE 05/19/1999 C 5. 21 131-100A W-23 99-0356 PT NAD SI 11 DISCHARGE PIPE - ELBOW 05/20/1999 C 5. 21 ISI-100A W-23 99-0390 UT45 NAD SI 11 DISCHARGE PIPE - ELBOW 05/20/1999 C 5. 21 I

IEI-98C W-21 99-0332 PT NAD

/'~'A SI 11 CISCHARGE PIPE - TEE 05/17/1999 C 5. 21 ISI-9BC W-21 99-0378 UT45 NAD SI 11 DISCHARGE PIPE - TEE 05/19/1999 C 5, 21 ISI-69 W-25 99-0269

~~~

UT60 GEO FEEDWATER LOOP

'B' REDUCER - N0ZZLE 05/10/1999 C 5. 21 07/29/19 Page 7

Prairie Island Nuclear Oenerating InnerM ee Inspection Report Log Northern States Power Company 1717 Wakonada Drive Third Interval By Source Doc #

414 Nicollet Mall f

welch, MN 55089 commercial service Dates December 16, 1973 Minneapolis, MN 55401 i

ISO Item Report Number Method R6sults System Item Description Exam Date ASME Section II Item ISI-69 W-25 99-0237R1 MT NAD FEEDWATER LOOP

'B' REDUCER - NOZZLE 05/20/1999 C 5. 21 Code Acceptable ISI-97C W-8 99-0324 PT NAD SI 12 DISCHARGE ORIFICE - PIPE 05/15/1999 C 5. 30 ISI-68A W-1 LS 2D 99-0172 MT NAD MAINSTEAM

'B' NOZZLE - RED. ELBOW 05/04/1999'~

C 5. 50 ISI-6BA W-1 LS 2D 99-0209 UT45 NAD MAINSTEAM *B' N0ZZLE - RED. ELBOW 05/06/1999 C 5. 50 ISI-69 W-23 99-0239 MT NAD FEEDWATER LOOP

'B' PIPE-TO-SWEEPCLET 05/08/1999 C 5.

51 ISI-51A W-7 LSU 2 LED 99-0342 MT NAD MAIN STEAM

'A' P!PE - 45 ELBOW 05/17/1999 C 5. 51 ISI-51A W-7 LSU 2LSD 99-0341 UT45 NAD MAIN STEAM

'A' PIPE - 45 ELBOW 05/17/1999 C 5. 51

_ _ -ISI-69 W-23 99-0296 UT45 NAD FEEDWATER LOOP

'B' PIPE-TO-SWEEPOLET 05/12/1999 C 5. 51 ISI-69 W-4 99-0376 MT IND FEEDWATER LOOP

'B' ELBOW - PIPE 05/20/1999 C 5. 51 Linear, Indication ISI-69 W-4 99-0385 UT45 NAD FEEDWATER LOOP

'B' ELBOW - PIPE 05/20/1999 C 5. 51 ISI-69 W-2 99-0393 (A)

MT NAD FEEDWATER LOOP

'B' PIPE - PIPE 05/20/1999 C 5.

51 Scope Expansi.on ISI-69 W-3 99-0394 (Al MT NAD FEEDWATER LOOP

'B' PIPE - ELBOW 05/20/1999 C 5. 51

+. SS_ ope _ Expansion ISI-69 W-4 99-0376R1 MT NAD FEEDWATER LOCP

'B' ELBOW - PIPE 05/20/1999 C 5. 51 Examined after repair ISI-52 W-2 99-0391BL (A)

MT NAD FEEDWATER LOOP

'A' PIPE - ELBOW 05/20/1999 C 5. 51 & HELB Scope Expansion ISI-52 W-3 99-0392BL (A)

HT NAD FEEDWATER LOOP

'A' E!JIOW - PIPE 05/20/1999 C 5. 51 & HELB Scope Expansion ISI-68C W-11 99-0350 MT NAD MAINSTEAM

'B' PIPE - FLANGE NCZZLE 05/18/1999 C 5.

83 ISI-305 C-2 99-0242BL VT3 NAD Primary Containment Penetration Surface 05/08/1999 E 1.

12 151-307 C-27C 99-0166BL VT3 NAD Primary Containment Penetration Surface 05/04/1999 E 1. 12 ISI-301 C-30A 99-0203BL VT3 IND Primary Containment Penetration Surface 05/05/1999 E 1. 12 1S1-301 C-30B 99-0202BL VT3 IND Primary Containment Penetration Surface 05/05/1999 E 1. 12 ISI-302 C-60 99-0360BL VT3 IND

]

Primary Containment Penetration Surface 05/18/1999 E 1. 12 d

l ISI-303 C-10 99-0224BL VT3 NAD Primary Containment Penetration Surface 05/07/1999 E 1. 12 1

0 07/29/19 Page 3

Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company 1717 wakonada Drive Third Interval By Source Doc #

414 Nicollet Mall O%

Welch, NW 55089 Commaarcial Service Dates December 16, 1973 Minneapolis, MN 55401 ISO Item Report Number Method Resulte system Item Description Exam Date ASME section II Item ISI-303 C-18 99-0364BL VT3 NAD Primary Containmant Penetration Surface 05/19/1999 E 1. 12 13I-303 C-19 99-0381BL VT3 NAD Primary Containment Penetration Surface 05/20/1999 E 1. 12 162-303 C-28A 99-0221BL,-

VT3 NAD Primary Containmant-Penetration Surface 05/07/1999 E 1. 12 ISI-303 C-28A-A 99-0115BL VT3 NAD Primary Containment Penetration Surface 04/30/1999 E 1. 12 ISI-303 C-29A 99-0225BL VT3 NAD Primary Containment Penetration Surface 05/07/1999 E 1. 12 ISI-303 C-298 99-0226BL VT3 NAD Primary Containment Penetration Surface 05/07/1999 E 1. 12 ISI-303 C-32A 99-0246BL VT3 NAD Primary Containment Penetration Surface 05/08/1999 E 1. 12 ISI-303 C-32A-A 99-0116BL VT3 NAD Primary Containment Penetration Surf ace 04/30/1999 E 1, 12 ISI-303 C-32B 99-0247BL VT3 NAD Primary containment Pentration Surface 05/08/1999 E 1. 12 ISI-303 C-33A 99-0248BL VT3 NAD h

Primary Containment Penetration Surface 05/08/1999 E 1. 12 ISI-303 C-33A-A 99-0117BL VT3 NAD Primary Containmant Penetration Surface 04/30/1999 -

E 1. 12 ISI-303 C-33B 99-0249BL VT3 NAD j

Primary Containment Fenetration Surface 05/08/1999 E 1. 12 ISI-303 C-39 99-0227BL VT3 NAD Prinary Containment Penetration Surface 05/07/1999 E 1. 12 ISI-303 C-39-A 99-0114BL VT3 NAD Primary Containment Penetration Surface 04/30/1999 E 1. 12 ISI-303 C-4 99-02:2BL VT3 NAD Primary Containment Penetration Surface 05/07/1999 E 1. 12 ISI-303 lC-4-A 99-0107BL VT3 IND l

Primary Containment l Penetration Surface 04/30/1999 E 1. 12 i

ISI-303 C 40 99-0228BL VT3 NAD Primary Containment Penetration Surface 05/07/1999 E 1. 12 152-303 C-40-A 99-0113BL VT3 NAD Primary Cantainment Panetration Surface 04/30/1999 E 1. 12 ISI-303 C-9 99-0223BL VT3 NAD Primary Containment Penetration Surface 05/07/1999 E 1. 12 ISI-304 C-24 99-025tBL VT3 IND l

Primary Containment Penetration Surface 05/08/1999 E 1. 12

  1. ~

/

ISI-304 C-34A 99-0251BL VT3 IND

\\

Primary Containment Penetration Surface 05/08/1999 E 1. 12 ISI-304 C-34A-A 99-0110BL VT3 INb Primary Containment Penetration Surface 04/30/1999 k 1. 12 07/29/19 Page 9

4 Prairie Island Nuclear Generating Inservice Inapaction Report Log Northern States Power Company

,f-1717 Nakonsde Drive Third Interval By Source Doc 8 414 Nicollet Mall l

Welch, MN 55089 Commercial Service Dates December 16, 1973 Kinneapolis, MN 35401 k

ISO Item Report Number Method Resulta system Item Description Exam Date AEME Section II Item 151-304 C-34B 99-0252BL VT3 NAD Primary Containment Penetration Surface 05/08/1999 E 1. 12 ISI-304

""C-34B-A 99-0109BL VT3 IND Primary Containment Penetration Surface 04/30/1999 E 1.

12 161-304 C-34C 99-0253BL __

VT3 NAD Primary Containment Penetration Surface 05/08/1999 E 1. 12 ISI-304 C-34C-A 99-01085L VT3 IND Primary Containment Penetration Surface 04/30/1999 E 1. 12 ISI-304 C-42A 99-0254BL VT3 NAD Primary Containment Penetration Surface 05/08/1999 E 1.

12 151-304 C-42A-A 99-0111&L VT3 IND Primary Containment Penetration Surface 04/30/1999 E 1.

12 ISI-304 C-50 99-0240BL VT3 NAD Primary Containment Penetration Surface 05/08/1999 E 1.

12 ISI-304 C-50-A 99-0112BL VT3 IND Primary Containment Penetration Surface 04/30/1999 E 1.

12 ISI-305 C-13A 99-0289BL VT3 NAD Primary Containment Penetration Surface 05/12/1999 E 1.

12 ISI-3C5 C-13A-A 99-0078BL VT3 NAD

/

Primary Containment Penetration Surface 04/27/1999 E 1.

12 E

'~'

'ISI-305 C-17 99-0244BL VT3 IND Primary Containment Penetration Surface 05/08/1999.

E 1, 12 ISI-305 C-17-A 99-0077BL VT3 NAD Primary Containment Penetration Surface 04/27/1999 E 1.

12 151-305 C-2-A 99-0076BL VT3 NAD Primary Containment Penetration Surface 04/27/1999 E 1.

12 ISI-305 C-3 99-0243BL VT3 IND Primary Containment Penetration Surface 05/08/1999 E 1.

12 ISI-3C5 C-3-A 99-0079BL VT3 NAD Primary Containment Penetration Surface 04/27/1999 E 1. 12

'iSI-305 C-34D

~

99-b301BL '

VT3 IND

~

Primary Containment Penetration Surface 05/04/1999 E 1.

12 ISI-305 C-34D-A 99-0090BL VT3 2ND

~

Primary containment Penetration Surface 04/28/1999 E 1. 12 ISI-3C5 C-34E 99-0199BL VT3

~~'

NAD Primary Containment Penetration Surf ace 05/04/1999 E 1.

12 ISI-305 C-34E-A 99-0091BL VT3

~

IND Primary Centainment Penetration Surface 04/28/1999 E 1. 12 ISI-305 C-34F 99-0198EL VT3 NAD Primary Containment Penetration Surface 05/04/1999 E 1. 12

'~'%

ISI-305 C-34F-A 99-0092BL VT3 IND

)

Primary Containment Penet;ation Surface 04/28/1999 E 1. 12 g

ISI-305 C-35 99-024tBL VT3 IND Primary Containment Penetration Surface 05/08/1999 E 1. 12 07/29/19 Page 10

)

Prairie Island Nuclear Generating Inmarvice Inspection Report 1.og Northern States Power Company rs 1717 Wakanado Drive Third Interval By Source Doc #

414 Nicollet kall f

I welch, MN 55089 Commercial Service Dates December 16, 1973 Minneapolis, MN 55401 k_

w ISO Itan Report Number Method Results System Item Description Exam Dete ASME Section II ftem 151-305 C-35-A 99-0093BL VT3 IND Primary Containment Penetration Surface 04/28/1999 E 1. 12 ISI-305 C-36D 99-0263BL VT3 IND Primary Containment Penetration Surface 05/10/1999 E 1. 12 161-305 C-3CE 99-0287BL VT3 IND Prinary Coreninment Penetration Surface 05/12/1999 E 1. 12 ISI-305 C-37C 99-0262BL VT3 NAD Primary Containmant Penetration Surface 05/10/1999 E 1. 12 1S1-305 C-37C-A 99-0094EL VT3 IND Primary Containment Penetration Surface 04/28/1999 E 1. 12 152-305 C-37D 99-0261BL VT3 NAD Primary containment Penetration Surface 05/10/1999 E 1. 12 151-305 C-370-A 99 0095BL VT3 IND Primary Containment Penetration Surface 04/28/1999 E 1. 12 151-305 C-380 99-0264BL VT3 NAD Primary Containment Penetration Surface 05/10/1999 E 1. 12 ISI-305 C-3BC-A 99-0096BL VT3 IND Primary Containment Penetration Surface 04/28/1999 E 1. 12 ISI-305 C-38D 99-0265BL VT3 NAD

'\\

Prinary Containment Penetration Surface 05/10/1999 E 1. 12 151-305 C-3 8D-A 99-0097BL VT3 IND Primary Containment Penetration Surface 04/28/1999 E 1. 12 ISI-305 C-42D 99-0266BL VT3 IND Primary Containment Penetration Surface 05/10/1999 E 1. 12 ISI-305 C-42D-A 99-0081BL VT3 IND Primary Contaitunent Penetration Surface 04/27/1999 E 1. 12 ISI-307 C-7B 99-0165BL VT3 NAD Primary Containment Penetration Surface 05/04/1999 E 1. 12 ISI-305 C-BA 99-0267BL VT3 NAD Primary Containment Penetration Surface 05/10/1999 E 1. 12 ISI-305 C-BA-A 99-0080BL VT3 NAD Primary Containmant Penetration Surface 04/27/1999 E 1. 12 151-305 C-8B 99-029CBL VT3 liAD Primary containment Penetration Surface 05/12/1999 E 1. 12 ISI-305 C-88-A 99-0075BL VT3 IUdI'~

Primary Containment Penetration Surface 04/27/1999 E 1. 12 151-307 C-27C-A 99-0106BL VT3 IND Primary Containment Penetration Surface 04/28/1999 E 1. 12 ISI-307 C-2'/D 99-0161BL VT3 NAD Primary Containment Penetration surface 05/03/1999 E 1. 12 ISI-307 C-2PB 99-0160BL

~

VT3 NAD g/"'*\\

(

Primary Containment Penetration surface 05/03/1999 E 1.

12 151-307 C-28B-A 99-0057BL VT3 NAD Primary Containment Penetration Surface 04/27/1999 E 1. 12 07/29/19 Page 11

]

Prairie Island Nuclear Generating Inmarvice Inepection Report Log Northern States Power Comipany 1717 Wakanada Drive Third Interval By Source Doc #

414 Nicollet Mall

[

Nelch, MN 55049 commercial Service Dates December 16, 1973 Ninneapolie, MN 55401 ISO Item Report Number Method Resulte System Item Description Exam Date AENE Section II Item ISI-307 C-36B 99-0159BL VT3 NAD Primary Containment Penetration Surface 05/03/1999 E 1.

12 181-307 C-36B-A 99-0058BL VT3 NAD Primary Containment Penetration Surface 04/27/1999 E 1. 12 181-307 C-37A 99-015aBL.

VT3 NAD Primary Containment Penetration Surface 05/03/1999 E 1. 12 ISI-307 C-37A-A 99-0059BL VT3 IND l

Primary Containment Penetratien Surface 04/27/1999 E 1. 12 ISI-307 C-37B 99-0167BL VT3 IND Primary Cnntainment Penetration Surface 05/04/1999 E 1. 12 1S1-307 C-379-A 99-0060BL VT3 IND Primary Containment Penetration Surface 04/27/1999 E 1. 12 ISI-307 C-38A 99-0155BL VT3 IND Primary Containment Penetration Surface 05/03/1999 E 1. 12 ISI-307 C-38A-A 99-0061BL VT3 IND Primary Containment Penetration Surface 04/27/1999 E 1. 12 ISI-307 C-3BB 99-0168BL VT3 IND Primary Containment Penetration Surface 05/04/1999 E 1. 12 ISI-307 C-38B-A 99-0062BL VT3 IND

/

Primary Containment Penetration Surface 04/27/1999 E 1. 12 k

ISI-307 C-42E 99-0163BL VT3 NAD j

Primary Containment Penetration Surface 05/03/1999 E 1, 12 151-307 C-42F 99-0380BL V73 IND Primary Containment Penetration Surface 05/20/1999 E 1. 12 ISI-307 C-42F-A 99-0063BL VT3 IND Primary containment Penetration Surface 04/27/1999 E 1. 12 ISI-307 C-42G 99-0162BL VT3 NAD Primary Containment Panetration Surface 05/03/1999 E 1.

12 ISI-307 C-43A 99-0157BL VT3 NAD Primary Containment Penetration Surface 05/03/1999 E 1. 12 ISI-307 C-43A-A 99-0064BL VT3 NAD Primary Containment Penetration Surface 04/27/1999 E 1. 12 ISI-307 C-43B 99-0156bL VT3 NAD Primary containment Penetration Surface 05/03/1999 E 1. 12 ISI-307 C-43B-A 99-0065BL VT3 NAD Primary Containment Penetration Sutface 04/27/1999 E 1. 12 ISI-307 C-43C 99-0154BL VT3 IND Primary Containment Penetration Surface 05/03/1999 E 1. 12 ISI-307

'C-43C-A 99-0066BL VT3 IND Primary Containment Penetration Surface 04/27/1999 E 1. 12

/Ng ISI-307 C-43D 99-0153BL VT3 IND

(

)

Primary Containment Penetration Surface 05/03/1999 E 1. 12 ISI-307 C-43D-A 99-0067BL VT3 IND Primary containment Penetration Surface 04/27/1999 E 1. 12 07/29/19 Page 12

F l

Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company 1717 Wakonada Drive Third Interval By source Doo #

414 Nicollet Mall g

Welch, MN $5009 Coasmarcial Service Dates December 14, 1973 Minneapolis, MN 55401

\\

ISO Item Report Number Method Results System Item Description Exam Date ARME Section II Itma ISI-307 C-44 99-0363BL VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 ISI-307 C-46A 99-0164BL VT3 NAD Primary containment Penetration Surface 05/04/1999 E 1. 12 ISI-307 C-46A-A 99-00688L -

VT3 IND Primary Containment Penetration Surface 04/27/1999 E 1. 12 ISI-311 C-42B 99-0291BL VT3 NAD Primary Containment Penetration Surface 05/12/1999 E 1. 12 ISI-301 S-38-A 99-012 BBL VT3 IND Prinary Containment Plate Surface 04/30/1999 E 1. 12 151-301 S-32-A 99-0126BL VT3 IND Primary Conteinment Plate Surface 04/30/1999 E 1.

12 ISI-301 S -3 3 - A 99-0127BL VT3 IND Primary Containment Plate Surface 04/30/1999 E 1. 12 25I-301 S-39-A 99-0129BL VT3 UTD Primary Containment Plate surface 04/30/1999 E 1. 12 151-301 S-44-A 99-013CBL VT3 IND Prinary Containment Plate SJrface 04/30/1999 E 1. 12 ISI-301 5-45-A 99-0131BL VT3 IND Primary Containment Plate Surface 04/30/1999 E 1. 12

~'

ISI-301 S-50-A 99-0135BL VT3 NAD Primary Containment Plate surface 05/02/1999 E 1. 12 ISI-301 S-51-A 99-0170BL VT3 NAD Primary containment Plate Surface 05/02/1999 E 1.

12 ISI-301 3-56-A 99-0136BL VT3 NAD Primary Containment Plate Surface 05/02/1999 E 1. 12 ISI-301 S-57-A 99-0132BL VT3 IND Primary Containment Plate surface 05/02/1999 E 1. 12 ISI-302 S-64A 99-0349BL VT3 NAD Primary Containment Plate Surface 05/17/1999 E 1. 12 ISI-302 S-65 99-0306BL VT3 IND Primary Containment Plate Surfaco 05/13/1999 E 1. 12 ISI-302 S-66 99-0305BL VT3 IND Primary containment Plate Surface 05/13/1999 E 1. 12 ISI-303 S-68 99-0231BL VT3 IND Primary Containment Plate Surace 05/07/1999 E 1. 12 151-303 S-71 99-0232BL VT3 IND Primary Containment Plate surf ace 05/09/1999 E 1. 12 ISI-304 S-72 99-0241BL VT3 IND Primary Containment Plate Surface 05/08/1999 E 1. 12

/\\

ISI-305 S-81 99-0200BL VT3 NAD

(

Primary Containment Plate Surface 05/04/1999 E 1. 12 ISI-305 P-82 99-0288BL VT3 IND Primary Containment Plate surfaco 05/12/1999 E 1. 12 07/25/19 Page 13

Prairie Island Nuclear Generating Inservice Inspection Report Log Northern Statee Power Company 1717 Wakonado Drive Third laterval my source Doc #

414 Nicollet Kall r~s

{

welch, MN 55089 commercial service Dates December 16, 1973 Minneapolis, MN 55401 D

ISO Item Report Number Method Resulte Byetem Item Description Exam Date ASME section XI Item ISI-305 S-82-A 99-0105BL VT3 IND Primary Containment Plate Surface 04/28/1999 E 1. 12 ISI-307 S-93 99-01698L VT3 IND Primary Containment Plate Surface 05/04/1999 E 1. 12 LSI-307 S-93-A 99-00698L VT3 IND Primary Containment Plate Surface 04/27/1999 E 1. 12 ISI-301 S-49-A 99-0205BL VT3 IND Primary Containment Plate Surface 05/02/1999 E 1. 12 ISI-305 C-6A 99-0286BL VT3 NAD Primary Containment Penetration Surface 05/12/1999 E 1. 12 ISI-302 S-64A-A 99-0344BL VT3 NAD Primary Containment Plate Surface 05/17/1999 E 1. 12 ISI-302 C-60-A 99-0361BL VT3 IND Primary Containment Penetration Surface 05/18/1999 E 1. 12 ISI-311 S 100 99-0336BL VT3 IND Primary Containment Plate Surface 04/27/1999 E 1. 12

)

i 151-311 S-101 99-03372L VT3 IND Primary Containment Plate Surface 04/27/1999 E 1. 12 151-307 C-37A-A 9 9-005 98 LR1 VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 181-307 C-37B-A 99-0060BLR1 VT3 NAD l

Primary Containment Penetration Surface 05/20/1999 E 1. 12 j

151-307 C-3BA-A 99-0061BLR1 VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 ISI-307 C-38B-A 99-0062BLR1 VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 ISI-305 C-34D-A 99-0090BLR1 VT3 NAD Primary containment Penetration Surface 05/19/1999 E 1.

12 ISI-305 C-34E-A 99-0091BLR1 VT3 NAD Primary Cor.tainment Penetration Surface 05/19/1999 E 1. 12 151-305 C-37C-A 99-0094BLR1 VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 ISI-305 C-37D-A 99-0095BLR1 VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 ISI-305 C-38C-A~

99-0096BLR1 VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 ISI-305 C-38D-A 99-0097BLR1 VT3 NAD Primary Containment Punetration Surface 05/19/1999 E 1. 12 151-304 C-34C-A 99-0108BLR1 VT3 NAD Primary Containment Panetration Surface 05/19/1999 E 1. 12 f"~'s ISI-304 C-34B-A 99- 01098LR1 VT3 NAD f

Primary Containment Penetration Surface 05/19/1999 E 1. 12 1S1-303 C-32A 99-0246BLR1 VT3 NAD Primary Containment Penetration Sarface 05/20/1999 E 1. 12 07/29/19 Page 14

r Prairie Island truclear Generating Inservice Inspection Report Log Northern states Power conqpany j-,s 1717 wakonada Drive Third Interval By Source Doc 8 414 Nicollet mall

[

\\

Welch, MN 55089 Commercial service Dates December 16, 1973 minneapolis, MN 55401

\\s. /

l Iso Item Report Number Method Results Bystaa Itam Description Exam Date AEME Section XI Item ISI-301 C-30B 99-0202BLR1 VT3 NAD Primary Containment Penetration Surface 05/21/1999 E 1. 12 ISI-301 C-30A 99-0203BLR1 VT3 NAD Primary Containment Penetration Surface 05/21/1999 E 1. 12 1SI-304 C-42A-A 99-0111BLR}.

VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 15I-304 C-50-A 99-0112BLR1 VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 ISI-305 C-42D-A 99-0081BLR1 VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 ISI-307 C-43A-A 99-0064BLR1 VT3 NAD Primary Containment Penetration Surface 05/20/1999 E 1. 12 1S1-301 S-32-A 99-0126BLR1 VT3 NAD Primary Containment Plate Surface 05/24/1999 E 1. 12 ISI-301 S-33-A 99-01278LR1 VT3 NAD Primary Containment Plate Surface 05/24/1999 E 1. 12 ISI-301 S-38-A 99-012BBLR1 VT3 NAD Primary Containment Plate Surface 05/24/1999 E 1. 12 151-301 S-39-A 99-0129BLR1 VT3 NAD k

Primary Containment Plate Surface 05/24/1999 E 1.

12 x+

ISI -3 01 S-44-A 99-0130BLR1 VT3 NAD Primary containment Plate Surface 05/24/1999 E 1. 12 ISI-301 S-45-A 99-0131BLR1 VT3 NAD Primary Containment Plate surface 05/24/1999

.E 1. 12 ISI-301 S-49-A 99-02 05B LR1 VT3 NAD Primary Containment Plate Surface 05/24/1999 E 1. 12 ISI-301 S-57-A 99-0132BLR1 VT3 NAD Primary Containment Plate Surface 05/24/1999 E 1.

12 151-302 C-60 99-0360BLR1 VT3 NAD Primary Containment Penetration Surface 05/24/1999 E 1.

12 151-302 C-60-A 99-0361ELR1 VT3 NAD Primary Containment Penetration Surfaco 05/24/1999 E 1.

12 ISI-302 S-65 99-0306BLR1 VT3 NAD Primary Containment Plate Surface 05/24/1999 E 1. 12 ISI-302 S-66 99-0305BLR1 VT3 NAD Primary Containment Plate Surface 05/24/1999 E 1. 12 l

j ISI-303 C-4-A 9 9 -0107BLR1 VT3

~~~

NAD Primary Containment Penetration Surface 05/24/1999 E 1. 12 151-303 S-68 99-0231BLR1 VT3 NAD Primary Containment Plate Suface 05/24/1999 E 1. 12 f'~*x ISI-303 S-71 9 9- 02 3 2B LR1 VT3 NAD k

Primary Containment Plate Surface 05/24/1999 E 1. 12 ISI-304 C-24 99-0250BLR1 VT3 NAD Primary Containment Penetration Surface 05/24/1999 E 1. 12 07/29/19 Page 15

Prairie Island Nuclear Generating Inservice Inspection Report Log Northezu States Power Company 1717 Wakonado Drive Third Interval By Source Doc #

414 Nicollet Mall

,s

)

Welch, MN 55009 Commercial Service Dates December 16, 1973 Kinneapolis, MN 55401 J

Z80 Item Report Number Method Results Bystem Item Description Exam Date ARME 5ection XI Item ISI-304 C-34A 99-0251BLR1 VT3 NAD Primary Containment Penetration Surface 05/24/1999 E 1. 12 ISI-304 C-34A A 99-0110BLR1 VT3 NAD Primary Containment Panetration Surface 05/24/1999 E 1. 12 151-304 S-72 99-0241BLR1,

VT3 NAD Primary Containment Plate Surface 05/24/1999 E 1. 12 I

ISI-305 C-17 99-0244BLR1 VT3 NAD Primary Containment Penetration Surface 05/24/1999 E 1. 12 1S1-305 C-3 99-0243BLR1 VT3 NAD Primary Containment Penetration Surface 05/24/1999 E 1. 12 152-305 C-34D 99-0201BLR1 VT3 NAD Primary containment Penetration Surface 05/24/1999 K 1.

12 ISI-311 S-100 99-0336BLR1 VT3 NAD Primary Containment Plate surface 05/20/1999 E 1. 12 ISI-311 S-101 99-0337BLR1 VT3 NAD Primary Containment Plate Surface 05/20/1999 E 1. 12 ISI-307 S-93 99-0169BLR1 VT3 NAD Primary Containment Plate' Surface 05/20/1999 E 1. 12 ISI-305 C-34F-A 99-0092BLR1 VT3 NAD f"'A Primary Containment Penetration Surface 05/26/1999 E 1.

12

'1S1-305 0-35 99-024SBLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1.

12 ISI-305 C-35-A 99-0093BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 ISI-305 C-36D 99-0263BLR1 VT3 NAD Primary Containment Penetration surface 05/26/1999 E 1. 12 ISI-305 C-36E 99-0287BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 ISI-305 C-42D 99-0266BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 ISI-305 S-R2 99-02BBBLR1 VT3 NAD' Primary Containment Plate Surface 05/26/1999 E 1. 12 ISI-305 S-B2-A 99-0105BLR1 VT3 NAD Primary Containment Plate Surface 05/26/1999 E 1.

12

~

ISI-307 C-27C-A 99-0106BLR1 VT3 NAD Primary Containment Panetration Surface 05/26/1999 E 1. 12 ISI-307 C-37B 99-0167BLR1 VT3 NAD~

Primary Containment Penetration Surface 05/26/1999 E 1. 12 ISI-307 C-30A 99-0155BLR1 VT3 NAD Primary Containment Penetration Sarface 05/26/1999 E 1. 12 yS ISI-307 C-3BB 99-0168BLR1 VT3 NAD V}

Primary Containmant Penetration Surface 05/26/3999 E 1. 12

(

ISI-307 C-42P 99-0380BLR1 VT3 NAD Primary Containme A Penetration Surface 05/26/1999 E 1. 12 s

07/39/19 Page 16

l Prairie Island wuclear Generating Inservice Inspection Report Log Northern States Power Company 1717 Wakonada Drive Third Interval By Source Doc #

414 Nicollet Mall

,..s welch, Ist 55089 commercial Service Dates December 16, 1973 Minneapo11a, MN $5401 ISO Item Report Number Method Results system Item Deecription Exam Date AsMr section II Item ISI-307 C-42F-A 99-0063BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 ISI-307 C-43C 99-0154BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 LSI-307 C-43C-A 99-006 6 B LR1, VT3 NAD Primary Containment Panetration Surface 05/26/1999 E 1. 12 ISI-307 C-43D 99-0153BLR1 VT3 NAD Primary Cont.ainment Penetration Surf ace 05/26/1999 E 1. 12 ISI-307 C-43D-A 99-0067BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 ISI-307 C-46A-A 99-0068BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1.

12 ISI-307 S-93-A 99-0069BLR1 VT3 NAD Primary Containment Plate Surface 05/26/1999 E 1.

12 ISI-302 G1 99-0347BL VT3 NAD Primary Containment Seals & Gaskets 05/18/1999 E 5. 10 ISI-302 G2 99-0348BL VT3 NAD Primary Containment Seals & Gaskets 05/18/1999 E 5. 10 ISI-301 G-32-A 99-0120BL VT3 NAD

['~'\\

Primary Containment Meist Barrier-outer 04/30/1999 E 5.

30

\\~ "

151-301 G-33-A 99-0121BL VT3 NAD Primary Containment Meist Barrier-outer 04/30/1999 E 5.

30 ISI-301 G-38-A 99-0122BL VT3 NAD Primary Containment Moist Barrier-outer 04/30/1999 E 5. 30 ISI-301 G-39-A 99-0123BL VT3 MAD Primary Containment Moist Barrier-outer 04/30/1999 E 5. 30 ISI-301 G-44-A 99-0124BL VT3 NAD Primary Containment Moist Barrier-outer 04/30/1999 E 5. 30 ISI-301 G-45-A 99-0125BL VT3 NAD Primary Containment Moist Barrier-outer 04/30/1999 E 5. 30 ISI-301 G-50-A 99-0133BL VT3 NAD Primary Containment Moist Barrier-outer 05/02/1999 E 5.

30 ISI-301 G 51-A 99-0171BL VT3 NAD Primary containment Meist Barrier-outer 05/02/1999 E 5.

30 ISI-301 G-56-A 99-0137BL VT3 NAD Primary Containment Moist Barrier-cuter 05/02/1999 E 5. 30 ISI-301 G-57-A 99-0134BL VT3 NAD Primary Containment Maist Barrier-outer 05/02/1999 E 5. 30 152-302 G-64A 99-0309EL VT3 IND Primary Containment Moist Barrier-cuter 05/13/1999 E 5. 30

. f "'N ISI-302 G-65 99-0308BL VT3 IND r

f Primary Containment Moist Barrier-inner 05/15/1999 E 5. 30 ISI-302 G-66 99-03078L VT3 IND Primary Containment Moist Barrier-inner 05/13/1999 E 5. 30 07/29/19 Page 17

7-l Prairie Island Nuclear Generating Inservice Inspection Beport Log Northern States Power Company 1

1717 h W aAa Drive Third Interval By Source Doc S 414 Micollet Mall Welch, MN 55089 commercial service Dates December 16, 1973 tH m=== polis, les 55401 ISG Item Beport number Method Results system Item Description Eman Date ASHE Section II Item ISI-303 G-68 99-02298L VT3 NAD Primary Containment Moist Barrier-inner 05/07/1999 E 5. 30 ISI-303 G-71 99-0230BL VT3 NAD Primary containment Moist Barrier-inner 05/07/1999 E 5. 30 ISI-301 G-49-A 99-0204BL,,

VT3 NAD Primary Containment Moist Barrier-outer 0$/02/1999 E 5. 30 153-302 0-65 99-0308BLR1 VT3 NAD Primary containment Moist Barrier-inner 05/21/1999 E 5. 30 ISI-302 0-64A 99-0309BLR1 VT3 NAD Primary Containment Moist Barrier-outer 05/21/1999 E 5. 30 ISI-302 G-66 99-0307BLR1 VT3 NAD j

Primary Containment Moist Barrier-inner 05/21/1999 E 5. 30 ISI-303 B1 99-0362BL VT1 NAD Primary Containment Bolted Connection 05/19/1999 E B. 10 l

151-303 B2 99-0382BL VT1 NAD l

Primary Containment Bolted Connection 05/20/1999 E 8. 10 ISI-307 B1 99-0335BL VT1 NAD Primary Containment Bolted Connection 05/15/1999 E 8. 10 ISI-307 B2 99-0346BL VT1 NAD Primary Containment Bolted Connection 05/18/1999 E 8. 10 I51-302 B1 99-0345BL VT1 IND l

Primary Containment Bolted Connection 05/17/1999,,

E 8. 10 ISI-302 B1 99-0345BLR1 VT1 NAD Tzimary containment Bolted Connection 05/24/1999 E 8. 10 ISI-2 H-3 99-0052 (A)

VT3 NAD ACCUM. DISCHARGE

'A' SPRING 04/26/1999 P-A & B10. 10 Scope Expansion ISI-14 H-2 99-0178 VT3 NAD RC PUMP 11 TIE BACK 8 2 05/05/1999 F-A & B10. 20 ISI-68B H-1 99-0325 VT3 NAD MAINSTEAM

'B' BEAR'O BRAK ASSY 05/16/1999 F-A & C 3. 20 ISI-51A H-7 99-0343 MT NAD MAIN STEAM

'A' BEAR'G BRAK ASSY (3) 05/17/1999 F-A & C 3. 20 Limited, Less than 904 ISI-51A H-7 99-0293 VT3 IND l

MAIN STEAM

'A' BEAR'G BRAK ASSY (3) 05/12/1999 P-A & C 3. 20 Gap at baseplate to wall

)

ISI-51A H-8 99-0365 MT IND j

MAIN STEAM

'A' ANCHOR ELBOW (B) 05/19/1999 F-A & C 3. 20 Linear Indication j

ISI- $1A H-8 99-0292 VT3 IND MAIN STEAM

'A' ANCHOR ELBCW (8) 05/12/1999 F-A & C 3. 20 j

Gap at Baseplate to wall

]

ISI-68A H-1 99-0339 MT NAD MAINSTEAM

  • B' SIESMIC RESTRAINT 05/13/1999 F-A & C 3. 20 I

Limited. Less than 90%

l.

ISI-68A -

H-1 99-0147 VT3 NAD i

MAINSTEAM

'B' SIESMIC AESTRAINT 05/03/1999 F-A & C 3. 20 ISI-68A H-2 99-0340 MT NAD MAINSTEAM

  • B' SEISMIC RESTRAINT 05/13/1999 F-A & C 3. 20 Limited, Less than 90%

87/29/19 Page 18 L

j

% et s

Prairie Island Bruclear Generating Insesvice Inspection Report Log Northern States Power Company 1717 WakonaSe Drive Third Interval By source Doc $

414 Micollet Mall

[,\\

welch, ami 55089 Ccammercial Service Dates December 16, 1973 Minneapolis, MN 55401

\\s_s ISO Itan Report Number Method Results Bystem Item Description Exam Date AEME section II Item ISI-68A H-2 99-0278 VT3 NAD I

MAINSTEAM

'B' SEISMIC RESTRAINT 05/12/1999 F-A & C 3. 20 ISI-68A H-3 99-0338 MT NAD MAINSTEAM

'B' SEISMIC RESTRAINT 05/13/1999 F-A & C 3, 20 Limited, Less than 90%

LSI-68A H-3 99-0280 VT3 IND MAINCTEAM

'B' SEISMIC RESTRAINT 05/03/1999 F-A & C 3. 20 Jam Nut loose Tri-69 H-2 99-0294 VT3 NAD FEEDWATER LOOP

'B' SEISMIC RESTRAINT 05/13/1999 F-A & C 3. 20 ISI-69 H-9 99-0295 VT3 NAD FEEDWATER LOOP

'B' SEISMIC RESTRAINT 05/13/1999 F-A & C 3. 20 ISI-51A H-9 99-0297 MT NAD MAIN STEAM

'A' SIESh!C RESTRAINT 05/17/1999 F-A & C 3, 20 ISI-51A H-1 99-0328 (A)

VT3 NAD MAIN STEAM

'A' SEISMIC RESTRAINT 05/16/1999 F-A & C 3. 20 Secpe_ Expan_s_ ion ISI-S LA H-2 99-0329 (A)

VT3 NAD MAIN STEAM

'A' SEISMIC RESTRAINT 05/16/1999 F-A & C 3. 20 Scppe _Expan.sion ISI- $1A H-3 99-0330 (A)

VT3 NAD MAIN STEAM

'A' SE!SMIC RESTRAINT 05/16/1999 F-A & C 3. 20 Scope __ Expansion ISI-51A H-4 99-0331 (A)

VT3 NAD

[I '\\

KAIN STEAM

'A' SEISMIC RESTRAINT 05/16/1999 F-A & C 3. 20

\\_,

SC PP8__ Expansion ISI-51A H-8 99-0292R1 VT3 NAD MAIN STEAM

'A' ANCHOR ELBOW (B) 05/19/1999 F-A & C 3. 20 Engineering Evaluation ISI-51A H-7 99-0293R1 VT3 NAD KAIN STEAM

'A' BEAR *G BRAK ASSY (3) 05/19/1999 F-A & C 3. 20 Engin_ep[ing Evaluation ISI-68A H-3 99-02BOR1 VT3 NAD KAINSTEAM

  • B' SE!$MIC RESTRAINT 05/20/1999 F-A & C 3, 20 Repair and Engineering Evaluati_on ISI-51A H-8 99-0365R1 MT NAD MAIN STEAM

'A' ANCHOR ELBOW (8) 05/22/1999 F-A & C 3. 20 Code Acceptable ISI-83D H-1 99-0366 MT NAD SI Pump 12 Support A 05/18/1999 F-A & C 3. 30 Limited, tass than 90%

IS!- 83D H-1 99-0022 VT3 NAD SI Pump 12 Support A 04/21/1999 F-A & C 3. 30

-ISI-83D H-2 99-0367 MT NAD SI Pump 12 Support B 05/18/1999 F-A & C 3. 30 Limited, Less than 90%

ISI-83D H-2 99-0023 VT3 NAD SI Pump 12 Support B 04/21/1999 F-A & C 3. 30 ISI-83D H-3 99-0368 MT NAD SI Pump 12 Support C 05/18/1999 F-A & C 3. 30 Li_mited._Less than 90%

ISI-83D H-3 99-0024 VT3 NAD SI Pump 12 Support C 04/21/1999 F-A & C 3. 30

~

g

/

ISI-83D H-4 99-0369 MT NAD

(

SI Pump 12 Support D 05/18/1999 F-A & C 3. 30 Limited, Less than 90%

ISI-83D H-4 99-0025 VT3 NAD SI Pump 12 Support D 04/21/1999 F-A & C 3. 30 l

07/29/19 Page 19

r l

Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company 1717 wakonada Drive Third Interemi By Source Doc #

414 Nicollet Mall

,, s*

i Welch, MN 55089 commercial Service Dates December 16, 1973 minneapolis, MN 55401 k

ISO Item Report Number Method Results 1

Bystem Item Dancription Exam Date AEME Section II Item ISI-83D H-5 99-0370 MT NAD SI Pump 12 Support E 05/18/1999 F-A & C 3. 30 l

ISI-83D H-5 99-0026 VT3 NAD SI Pump 12 Support E 04/21/1999 F-A & C 3. 30 ISI-630 H-6 99-0371 MT NAD SI Esump 12 Support F 05/18/1999 F-A & C 3. 30 ISI-83D H-6 99-0027 VT3 NAD S1 Pump 12 Support F 04/21/1999 F-A & C 3, 30 ISI-3C H-4 99-0314 VT3 NAD RHR LOOP

'A' ROD / CLAMP 05/14/1999 F-A C1 1 ISI-5B H-4 99-0149 VT3 NAD SPRAY TO PRESSURIZER ROD / CLAMP 05/03/1999 F-A C1 I ISI-9 H-2 99-0015 VT3 NAD SIS HIGH HEAD

'A' HYDR SNUBBER / CLAMP 04/20/1999 F-A C1 1 ISI-11B H-3 99-0012 VT3 NAD SEAL INJ LOOP ' A' RESTRAINT / CLAMP 04/19/1999 F-A C1 I ISI-11C H-8 99-0315 VT3 NAD SCAL INJ LOOP

'A' ANCHOR 05/14/1999 F-A C1 I ISI-11D H-6 99-0316 VT3 NAD SEAL INJ LOOP

'A' ROD CLAMP 05/14/1999 F-A C1 I ISI-17 H-1 99-0033 (A)

VT3 NAD 12' ACCUMULATOR CSCH HYDR SNUBBER 04/22/1999 P-A C1 I senpe__ Expansion 13I-19A H-9 99-0089 VT3 NAD 8' RHR TAKE OFF

'B' RIGID RESTRAINT LUGS 04/28/1999 F-A C1 I ISI-27C H-4 99-0304 VT3 NAD SEAL INJ LOOP

'B' RIGID HAN;ER 05/13/1999 F-A C1 I ISI-30B H-2 99-0032 VT3 NAD REACTOR VESSEL SIS B ROD / CLAMP 04/22/1999 F-A C1 I ISI-23 H-3 99-0074 VT3 NAD 2' RTD TAKECFF HOT B RUP'T RESTRAINT 04/27/1999 F-A C1 I ISI-24 H-2 99-0016 VT3 NAD 2

'B' HYDR SNUEBER/ CLAMP 04/21/1999 P-A C1 I ISI-14 H-11 99-0181 VT3 NAD RC PUMP 11 EASE 9 2 05/05/1999 F-A C1 I ISI-14 H-11A 99-0182 VT3 NAD AC PUMP 11 COLUMN BOT & PIN 8 2 05/05/1999 F-A C1 I ISI-14 H-2A 99-0183 VT3 IND RC PUMP 11 TIE BACK BOLT S 2 05/05/1999 F-A C1 1 Cotter pin missing ISI-14 H-2B 99-0179 VT3 NAD RC PUMP 11 TIE BACK PIN 9 2 05/05/1999 F-A C1 I CI ISI-14 H-5 99-0185 VT3 IND RC PUMP 11 PAD 2 05/05/1999 F-A C1 I Debris in pin _ pocket ISI-14 H-8 99-0180 VT3 NAD RC PUNP 11 CONNECTION 9 2 05/05/1999 F-A C1 I 07/29/19 Page 20

i Prairie Island Nuclear Generating Zaservice Inspection Report la Northern states Power Company r

5,

-s 1717 Wakonada Drive Thard Interval By Source Doc 8 414 Nicollet Mall g

{

Welch, MN 55089 commercist ser,1ce Dates December 16, 1973 Minneapolis, MN 55401

k Iso Item Report Number Method Results

_ System Item Description Exam Date ASME Section II Item ISI-303 G-68 99-0229BL VT3 NAD Primary Containment Moist Barrier-inner 05/07/1999 E 5. 30 151-303 G-71 99-0230BL VT3 NAD Primary Containment Moist Barrier-inner 05/07/1999 E 5. 30 L31-301 G-49-A 99-0204BL,,

VT3 NAD Primary Containment Moist Barrier-outer 05/02/1999 E 5. 30 ISI-302 G-65 99-0308BLR1 VT3 NAD Primary Containment Moist Barrier-inner 05/21/1999 E 5. 30 151-302 G-64A 99-0309BLR1 VT3 NAD Primary Containment Moist Barrier-outer 05/21/1999 E 5. 30 ISI-302 G-66 99-0307BLR1 VT3 NAD Primary containment Moist Barrier-inner 05/21/1999 E 5. 30 ISI-303 B1 99-0362BL VT1 NAD Primary containment Bolted Connection 05/19/1999 E 8.

10 ISI-303 B2 99-0382BL VT1 NAD Primary Containn.ent Bolted Connection 05/20/1999 E 8.

10 1S1-307 B1 99-0335BL VT1 NAD Primary Containment Bolted Connection 05/15/1999 E 8. 10 ISI-307 B2 99-0346BL VT1 NAD O'\\

Primary Containment Bolted Connection 05/18/1999 E 8.

10 ISI-302 B1 99-0345BL VT1 IND Primary Containment Bolted Connection 05/17/1999 E B.

10 l

ISI-302 B1 99-0345BLR1 VT1 NAD Primary Containment Bolted Connection 05/24/1999 E B.

10 ISI-2 H-3 99-0052 (A)

VT3 NAD ACCUM. CISCHARGE

'A' SPRING 04/26/1999 F-A & B10. 10 Se_ ope _ Expansion ISI-14 H-2 99-0178 VT3 NAD RC PUMP 11 TIE BACK 9 2 05/05/1999 F-A & B10. 20 ISI-68B H-1 99-0325 VT3 NAD MAINSTEAM

'B' BEAR *G BRAK ASSY 05/16/1999 F-A & C 3. 20 l

ISI-b1A H-7 99-0343 MT NAD MAIN STEAM

'A' BEAR'C BRAK ASSY (3) 05/17/1999 P-A & C 3. 20 Limited, Less than 90%

ISI-51A H-7 99-0293 VT3 IND MAIN STEAM

'A' BEAR *: BRAK ASSY (3) 05/12/1999 F-A & C 3. 20 Gap at baseplate to wall ISI- $1A H-8 99-0365 MT IND MAIN STEAM

'A' ANCHOR ELBOW (B) 05/19/1999 F-A & C 3. 20 Linear Indication ISI-SLA H-8 99-0292 VT3 IND MAIN STEAM

'A' ANCHOR ELBOW (8) 05/12/1999 F-A & C 3. 20 Gap at Baseplate to wall ISI-68A H-1 99-0339 MT NAD MAINSTEAM *B' SIESMIC RESTRAINT 05/13/1999 F-A & C 3. 20 Limited, Less than 90%

O

/

ISI-68A H-1 99-0147 VT3 NAD

(

MAINSTEAM

'B' SIESMIC RESTRAINT 05/03/1999 F-A & C 1. 20 ISI-68A H-2 99-0340 MT NAD MAINSTEAM

'B' SEISMIC RESTRAINT 05/13/1999 F-A & C 3. 20 Limited. Less than 90%

07/29/19 Page 18 J

w-Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company f,,

1717 wakonada Drive Third Interval By source Doc 4 414 Nicollet Hall

+

Welch, MN 55089 Commercial service Dates December 16, 1973 Minneapolis, MN 55401

\\

ISO Item Report Number Method Resnita Bystem Item Description Exam Date ASME Section XI Item ISI-68A H-2 99-0278 VT3 NAD MAINSTEAM

'B' SEISMIC RESTRAINT 05/12/1999 F-A & C 3. 20 ISI-68A H-3 99-0338 KT NAD KAINSTEAM *B' SEISMIC RESTRAINT 05/13/1999 P-A & C 3. 20 Limited, Less than 904 LSI-68A H-3 99-0280 KAINSTEAM

'B' SEISMIC RESTRAINT 05/03/1999,,

VT3 IND F-A & C 3. 20 Jam Nut loose ISI-69 H-2 99-0294 VT3 NAD FEEDWATER LOOP

'B' SEISMIC RESTRAINT 05/13/1999 F-A & C 3, 20 ISI-69 H-9 99-0295 VT3 NAD FEEDWATER LOOP

  • B' SEISMIC RESTRAINT 05/13/1999 F-A & C 3. 20 ISI-51A H-9 99-0297 MT NAD MAIN STEAM

'A' SIESMIC RESTRAINT 05/17/1999 F-A & C 3. 20 ISI-51A H-1 99-0328 (A)

VT3 NAD MAIN STEAM

'A' SE!SMIC RESTRAINT 05/16/1999 F-A & C 3. 20 Secpe Igyansion ISI-51A H-2 99-0329 (A)

VT3 NAD MAIN STEAM

'A' SEISMIC RESTRAINT 05/16/1999 F-A & C 3. 20 Scope Expansion ISI-51A H-3 99-0330 (A)

VT3 NAD KAIN STEAM

'A' SEISMIC RESTRAINT 05/16/1999 l'-A & C 3. 20 Scope _ Expansion ISI-51A H-4 99-0331 (A)

VT3 NAD

/' \\g MAIN STEAM

'A' SEISMIC RESTRAINT 05/16/1999 F-A & C 3. 20

(

)

Scope Expansion ISI-51A H-8 99-0292R1 VT3 NAD KAIN STEAM

'A' ANCHOR ELBOW (8) 05/19/1999 F-A & C 3. 20 Engineering _ Evaluation ISI-51A H-7 99-0293R1 VT3 NAD MAIN STEAM

'A' BEAR *G BRAK ASSY (3) 05/19/1999 F-A & C 3. 20 Engineering Evaluation ISI-68A H-3 99-0280R1 VT3 NAD MAINSTEAM

'B' SEISMIC RESTRAINT 05/20/1999 F-A & C 3. 20 Repair and Engineering Evaluation ISI-51A H-8 99-0365R1 MT"~ ~~~'

NAD KAIN STEAM

'A' ANCHOR ELBOW (8) 05/22/1999 F-A & C 3. 20 Code Acceptable ISI-83D H. 1 99-0366 MT NAD SI Pump 12 Support A 05/18/1999 F-A & C 3. 30 Limited, Less than 90%

ISI. 83D H-1 99-0022 VT3 NAD

{

SI Pump 12 Support A 04/21/1999 F-A & C 3. 30 j

ISI-83D H-2 99-0367 MT NAD SI Pump 12 Support B 05/18/1999 F-A & C 3. 30 Limited. Less than 90%

ISI-83D H-2 99-0023 VT3 NAD SI Pump 12 Support B 04/21/1999 F-A & C 3. 30 l

ISI-83D H-3 99-0368 MT NAD SI Pump 12 Support C 05/18/1999 F-A & C 3. 30 Limited, Less than 90%

ISI-83D H-3 99-0024 VT3 NAD SI Pump 12 Support C 04/21/1999 F-A & C 3. 30 r

ISI-83D H-4 99-0369 KT NAD SI Pump 12 Support D 05/18/1999 F-A & C 3. 30 Limited. Less than 90%

ISI-83D H-4 99-0025 VT3 NAD SI Pump 12 Support D 04/21/1999 F-A & C 3. 30 07/29/19 Page 19

I Prairie Island shaclear Generating Inservice Inspection Report Log Nor.thern itates Power Company g ~s 1717 Wakonada Drive Third Interval By source Doc #

414 Nicollet Mall

/

Welche MN 55089 Commercial Service Dates December 16, 1973 Minneapolis, MN 55401 ks ISO Item Report Number Method Results system Item Description Exam Date AEME Section II Item ISI-83D H-5 99-0370 MT NAD SI Pump 12 Support E 05/18/1999 P-A & C 3. 30 ISI-83D H-5 99-0026 VT3 NAD SI Pump 12 Support E 04/21/1999 F-A k C 3. 30 ISI-83D H-6 99-0371 SI Pump 12 Support F 05/18/1999,_

MT NAD F-A & C 3. 30 ISI-83D H-6 99-0G27 VT3 NAD SI Pump 12 Support F 04/21/1999 F-A & C 3. 30 ISI-3C H-4 99-0314 VT3 NAD RHR LOOP ' A' ROD / CLAMP 05/14/1999 F-A C1 I ISI-5B H4 99-0149 VT3 NAD SPRAY TO PRESSURIZER ROD / CLAMP 05/03/1999 F-A C1 I ISI-9 H. 2 99-0015 VT3 NAD SIS HICH HEAD

'A' HYDR SNUBBER / CLAMP 04/20/1999 F-A C1 I ISI-11B H-3 99-0012 VT3 NAD SEAL INJ LOOP

'A' RESTRAINT / CLAMP 04/19/1999 F-A C1 I ISI-11C H-8 99-0315 VT3 NAD SEAL INJ LOOP

'A' ANCHOR 05/14/1999 F-A C1 I ISI-11D H-6 99-0316 VT3 NAD l

/

SEAL INJ LOOP ' A' ROD CLAMP 05/14/1999 F-A C1 I N

ISI-17 H-1 99-0033 {A)

VT3 NAD 12" ACCUMULATOR DSCH HYDR SNUBEER 34/22/1999 F-A C1 I Scoge_ Expansion ISI-19A H-9 99-0089 VT3 NAD 8* RHR TAKE OFF

'B' RIGID RESTRAINT LUCS 04/28/1999 F-A Cl I ISI-27C H-4 99-0304 VT3 NAD SEAL INJ LOOP

'B' RIGID HANGER 05/13/1999 F-A C1 I ISI-30B H-2 99-0032 VT3 NAD REACTOR VESSEL SIS B ROD / CLAHP 04/22/1999 F-A C1 I ISI-23 H-3 99-0074 VT3 NAD 2' RTD TAKEOFF HOT B RUP'T RESTRAINT 04/27/1999 F-A C1 1 ISI-24 H-2 99-0016 VT3 NAD 2" SIS HIGH HEAD

'B' HYDR SNUBBER / CLAMP 04/21/1999 F-A C1 I ISI-14 H-11 99-0181 VT3 NAD RC PUMP 11 BASE 9 2 05/05/1999 F-A Cl I IS!- 14 H-11A 99-0182 VT3 NAD RC PUMP 11 COLLDc4 BOT & PIN 9 2 05/05/1999 F-A C1 I ISI-14 H-2A 99-0183 VT3 IND RC PUMP 11 TIE BACK BCLT 9 2 05/05/1999 F-A C1 I

_Co([e[_p_ig_missigg ISI-14 H. 2B 99-0179 VT3 NAD RC PUMP 11 TIE RACK PIN 9 2 05/05/1999 F-A C1 1

'ISI-14

~~~~

['(/

H-5 99-0185 VT3 IND

\\

RC PUMP 11 PAD 2 05/05/1999 F-A C1 I

(

Debris in f n pocket i

ISI-14 H-8 99-0180 VT3 NAD RC PUHP 11 CONNECTION 9 2 05/05/1999 F-A C1 1 07/29/19 Page 20

Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company

-s 1717 wakonada Drive Third Interval By source Doc 0 die Nicollet Mall

[V

\\

Welch, MN 55089 Commercial Service Dates December 16, 1973 Minneapolis, MN 55401 ISO Item Report Number Method Results System Item Description Exam Date AsME Section II Item ISI-14 H-BA 99-0184 VT3 IND RC PUMP 11 COLUMN TCP & PIN 9 2 05/05/1999 F-A C1 I Contact with, pump casing _ _

ISI-43D H -2 6 99-0196 VT3 NAD STEAM GENERATOR #12 BASE 9 2 05/05/1999 F-A C1 I ISI-43D H-228 99-0192 VT3 NAD STEAM GENERATOR 812 COLUMN BOT & PIN 6 2 05/05/1999 F-A C1 I ISI-43D H-27 99-0197 VT3 NAD STEAM GENERATOR #12

&ASE G 3 05/05/1999 P-A C1 I ISI-43D H-23B 99-0195 VT3 NAD STEAM GENERATOR #12 COLUMN BOT & PIN 9 3 05/05/1999 P-A C1 I ISI-43D H-22 99-0190 VT3 NAD STEAM GENERATOR 912 TOP CONNECTION 9 2 05/05/1999 F-A C1 I ISI-43D H-22A 99-0191 VT3

~

NAD STEAM GENERATOR 412 COLUMN TOP k PIN 9 2 05/05/1999 F-A C1 I ISI-43D H-23 99-0193 VT3 NAD STEAM GENERATOR #12 TOP CONNECTION 9 3 05/05/1999 F-A C1 I ISI-43D H-23A 99-0194 VT3 NAD STEAM GENERATOR 812 COLUMN TCP & PIN 6 3 05/05/1999 F-A C1 I ISI-1D H-1 99-0102 VT3 NAD CHARGING LINE

'B' RIGID HANGER 04/30/1999 F-A C1 I ISI-2 H-1 99-0013 VT3 IND ACCUM. DISCHARGE

'A' SNUBBER 04/19/1999 F-A C1 I Wear marks and frozen bearings ISI-43D H-1 99-0386 VT3 NAD STEAM GENERATOR 812 SNUBBER 05/19/1999 F-A C1 I ISI-43D H-2 99-0387 VT3 NAD STEAM GENERATOR #12 SNUBBER 05/19/1999 F-A C1 I ISI-43D H-3 99-03R8 VT3 NAD STEAM GENERATOR 612 SNUBBER 05/19/1999 F-A C1 I ISI-43D H-4 99-0389 VT3 NADI ~ ~~

STEAM GENERATOR #12 SNUBBER 05/19/1999 F-A C1 I ISI-43D H-5 (SOUTH) 99-0186 VT3 NAD STEAM GENERATOR 812 SPRING 05/05/1999 F-A C1 I ISI-43D H-6 (NORTH) 99-0187 VT3 NAD STEAM GENERATOR 912 SPRING 05/05/1999 F-A C1 I ISI-43D H-7 99-0188 VT3 NAD STEAM GENERATOR 912 PAD 05/19/1999 F-A C1 I ISI-43D H-8 99-0189 VT3 NAD STEAM GENERATOR #12 PAD 05/19/1999 F-A C1 I ISI-2 H-2 99-0051 (A)

VT3 NAD ACCUM. DISCHARGE

'A' HYDR SNUBBER 04/26/1999 F-A C1 I

[

\\

__ Scope _ Expansion g ~'j/

ISI-34 H-1A 99-0218 (A)

VT3 NAD RC PUMP 12 TIE BACK BOLT S 1 05/07/1999 F-A C1 I Scope Expansic.n ISI-34 H-3A 99-0217 (A)

VT3 NAD RC PUMP 12 TIE BACK BOLT S3 05/07/1999 F-A C1 I scope Expansion 07/29/19 Page 21

Prairie Island Nuclear Generating Inservice Inspection Report I.og Northern States Power Company 7-g 1717 wakonada Drive Third Interval Dy Source Doc 9 414 Nicollet Mall

/

)

Welch, MN 55089 Commercial Service Dates December 16, 1973 Minneapolis, NM 55401

\\

/

%- /

ISO Item Report Number Method Results System Item Description Exam Date ABME Section II Item ISI-14 H-1A 9'-0219 (A)

VT3 NAD RC PUMP 11 TIE BACK BOLT 9 1 05/07/1999 F-A C1 I scope _ Expansion ISI-14 H-3A 99-0220 (A)

VT3 NAD RC PUMP 11 TIE BACK BOLT 9 3 05/07/1999 F-A C1 I Scope _ Expansion ISI-3 4 H-8A 99-0207 (A),,

VT3 IND PC PUMP 12 COLUMN TOP & PIN 9 2 05/03/1999 F-A C1 I Contact with pump easing ISI-34 H-2A 99-0206 (A)

VT3 IND RC FUMP 12 TIE BACK BOLT 9 2 05/03/1999 F-A C1 I BrokerLpin ISI-14 H-7A 99-0213 (A)

VT3 NAD RC PUMP 11 COLUMN TOP & PIN 9 1 05/07/1999 F-A C1 I Scope _ Eppans ion ISI-14 H-9A 99-0214 (A)

VT3 NAD RC PUMP 11 COLUMN TOP & PIN 9 3 05/07/1999 P-A C1 I Scope Expansion ISI-34 H-7A 99-0215 (A)

VT3 NAD RC PUMP 12 COLUMN TOP & PIN 9 1 05/07/1999 F-A C1 I

_ Scope. Expansion ISI-34 H-9A 99-0216 (A)

VT3 NAD RC PUMP 12 COLUMN TOP & PIN # 3 03/07/1999 F-A C1 I Scope _ Expansion ISI-2 H-1 99-0013R1 VT3 NAD ACCUM. DISCHARCE

'A' SNLBBER 05/13/1999 P-A C1 I Repair and Engineering

,,,s Evaluation

[

j ISI-14 H-5 99-0185R1 VT3 NAD

( p/

RC PUMP 11 PAD 2 05/14/1999 F-A C1 I Engineering _Evaliation ISI-14 H-BA 99-0184R1 VT3 NAD RC PUMP 11 COLUMN TOP & PIN 9 2 05/14/1999 F-A C1 I Fngineering Evaluation ISI-34 H-BA 99-0207R1 (A)

VT3 NAD RC PUMP 12 COLUMN TOP & PIN 9 2 05/14/1999 F-A C1 I Engineering Evaluation ISI-14 H-2A 99-0183R1 VT3 NsD RC PUMP 11 TIE BACK BOLT 9 2 05/14/1999 F-A C1 I Engineering Evaluation ISI-34 H. 2A 99-0200R1 (A)

VT3 NAD RC PUMP 12 TIE BACK BOLT 9 2 05/14/1999 F-A C1 I Engineering Evaluation ISI-53D H-4 99-0001 VT3 NAD RHR SUCTION

'B' RESTPAINT 04/14/1999 F-A C1 II ISI-53D H-5 99-0002 V13 NAL RHR SUCTION *B' RHR PUMP ' B ' BASE S1 04/14/1999 F-A C1 II ISI-53D H-3 99-0007 VT3 NAD RHR SUCTION

'B' SNUBBER 04/16/1999 F-A C1 II ISI-97B H-2 99-0320 VT3 NAD SI 12 DISCHARGE BOX SUPPORT 05/15/1999 P-A C1 II ISI-100A H2 99-0326 VT3

~~

NAD SI 11 DISCMARGE SADDLE SUPPORT 05/16/1999 F-A C1 II ISI-51C H-3 99-0327 VT3 NAD MAIN STEAM

'A' CONST EUPPCRT 05/16/1999 F-A C1 II h

1

)

ISI-43A N-1 IN-IR 99-0049 MT NAD STEAM GENERATOR 811 FEEDWATER NOZZLE 04/24/1999 NC IN 93-20 ISI-A3A N-1 RING TEE 99-0050 VT3 NAD STEAM GENERATOR til FW RING TEE / SUPPORTS 04/24/1999 NC IN 93-20 07/29/19 Page l'

T Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company 1717 Wakonada Drive Third Interval my source Doc #

414 Nico11st Mall Welch, not 55089 ceanercial service Dates December 16, 1973 Minneapolis, MN 55401 V

ISO Item Report Number Method Results system Ttem Deecription Exam Date ABME Section If Ytem ISI-43A W-F VT 99-0047 VT1 NAD STEAM CDIERATOR ell TRANS WELD INT VT 04/24/1999 NC IN 93-20 ISI-52 W-23 IN 93-20 99-0270 UT45 NAD FEEDWATER 1,00P

'A' REDUCER - NOZZLE 05/10/1999 NC IN 93-20 1,SI. 52 W-23 IN 93-20 99-0271 FEEDWATER LOCP

'A' RECUCER ~ N0ZZLE 05/10/1999,,

UT60 GEO NC IN 93 20 ISI-14 PUMP #11 99-0177 UTO NAD RC PUMP 11 FLYWHEEL KEYWAY & BORE 05/04/1999 TS 4,2-1

[

t

\\

O 07/29/19 Pace 23

1 NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT 1,1999 (v)

APPENDIX C INTERVAL 3 PERIOD 2 INSPECTIONS BY INSPECTION REPORT NUMBER 23 Pages

, Note: Pages 1 to 23 also contain Section XI IWE and non-code inspection result information. The information contained in this appendix is computer generatbd by the ISI database management system, includes IWE and other non-code inspection results. As allowed by 10CFR55a(g)(6)(ii)(B)(5) the containment inspection program (IWE) will be maintained and availaible for NRC audit and review at the plant site after September 9*,2001. The IWE and non-code inspection results listed within this appendix have not been reviewed or certified by the ANI inspector and are not covered by the form NIS-1 submitted with this summary report.

O O

r-Prairie Island Wuclear Generating Inservice Inspection Report Log Northern States Power Company A,

1717 wakonade Drive Third Interval By Report 9 414 Nicollet Mall f

welch, MN 55099 Coasnercial Service Dates December 16, 1973 Minneapolis, MN 55401 ISO Item Report Number Method Resulta System Item Description Exam Date ASME Section KI Item ISI-53D H-4 99-0001 VT3 NAD RHR SUCTION

'B' RESTRAINT 04/14/1999 F-A C1 II ISI-53D H-5 99-0002 VT3 NAD kHR SUCTION

'B' RHR PUMP

'B' BASE S1 04/14/1999 F-A C1 II TSI-53D W-19 LS D 99-0003 PT NAD RHR SUCTION *B' FLANGE - REDUCER 04/14/1999 C 5. 10 j

ISI-55C W-22 99-0004 PT NAD RHR PUMP

'B' DISCH l' HEAT EXCH - PIPE 04/14/1999 C 2. 31 1

ISI- $3D W-12 LS UD 99-0005 PT NAD RHR SUCTION

'B' P1PE - ELBOW 04/14/1999 C 5. 10 ISI-53D W-15 LS UD 99-0006 PT NAD RHR SUCTION

'B' ELBOW - PIPE C4/14/1999 C 5. 10 ISI-53D H-3 99-0007 VT3 NAD RHR SUCTION

'B' SNUBBER 04/16/1999 F-A C1 II ISI-53D W-12 LS UD 99-0008 UT45 NAD RHR SUCTION

'B' PIPE - ELBOW 04/16/1999 C 5. 10 ISI-53D W-19 LS D 99-0009 UT45 NAD RHR SUCTION

'B' FLANGE - REDUCER 04/16/1999 C 5. 10 ISI-53D W-15 LS UD 99-0010 UT45 GEO RHR SUCTION

'B' ELBOW - PIPE 04/16/1999 C 5, 10 f VT1 ISI-2 B-1 99-0011 NAD ACCUM. DISCHARGE

'A' BOLTS, STUDS, NUTS 04/19/1999 9 7.

70 ISI-11B H+3 99-0012 VT3 NAD SEAL ITU LOOP

'A' RESTRAINT / CLAMP 04/19/1999 F-A Cl I ISI-2 H 1 99-0013 VT3 IND ACCUM. DISCHARGE

'A' SNUBBER 04/19/1999 F-A C1 I Wear marks and frozen bear _i_ngs ISI-2 H-1 99-0013R1 VT3 NAD ACCUH. DISCHARGE

'A' SNUBBER 05/15/1999 F-A C1 I Repair and Engineering j

Evaluation ISI-9 B-1 99-0014 VT1 NAD SIS HIGH HEAD

'A' VALVE BOLTING 04/20/1999 87 70 ISI-9 H-2 99-0015 VT3 NAD SIS HIGH HEAD

'A' HYDR SNUBBER / CLAMP 04/20/1999 F-A C1 I ISI-24 H-2 99-0016 VT3 NAD 2* SIS HIGH HEAD

'B' HYDR fNUBEER/ CLAMP 04/21/1999 F-A C1 I ISI-21 W-10 99-0017 PT NAD 3" RTD RETURN LOOP B PIPE - ELBOW 04/21/1999 B 9. 21 i

ISI-21 W-12 99-0018 PT NAD 3* RTD RETURN LOOP B NOZZLE - PIPE 04/21/1999 B 9. 32 ISI-24 W-12 99-0019 PT NAD e

2" SIS HICH HEAD

  • B' PIPE - ELBOW 04/21/1999 8 9. 21 ib ISI-25 W-4 99-0020 PT NAD 2' CROSSOVER DR

'B' ELBOW - PIPE 04/21/1999 B 9, 21 ISI-25 W-1 99-0021 PT NAD 2' CROSSOVER DR

'B' PIPE TO HALF COUPLNG 04/21/1999 B 9. 32 07/29/19 Pope 1

I Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company A

1717 Wakonado Drive Third Interval By Report S 414 Nicollet Mall g

Welch, amt 55089 Commercial Service Dates December 16, 1973 Minneapolis, amt 55401 ISO Item Report Pumber Method Results d

system-Item Description Enam Date AEME Section XI Item ISI-83D H-1 99-0022 VT3 NAD SI Pump 12 Support A 04/21/1999 F-A & C 3. 30 ISI-83D H-2 99-0023 VT3 NAD SI Pump 12.

Support B 04/21/1999 F-A & C 3. 30 ISI-83D H+ 3 99-0024 VT3 NAD S1 Pump 12 Support c 04/21/1999 F-A & C 3. 30 ISI-83D H-4 99-0025 VT3 NAD SI Pump 12 Support D 04/21/1999 F-A & C 3. 30 ISI-83D H-5 99-0026 VT3 NAD S1 Pump 12 Support E 04/21/1999 F-A & C 3. 30 ISI-83D H.6 99-0027 VT3 NAD S1 Pump 12 Support F 04/21/1999 F-A & C 3. 30 ISI-13B W. 1 99-0028 PT NAD REACTOR C001 ANT

  • B' N0ZZLE - 40e ELBOW 04/22/1999 B 9.

11 ISI-13B W-3 LS 2D 99-0029 PT NAD REACTOR COOLANT

'B' PIPE - ELBOW 04/22/1999 B 9. 11 ISI-30B B-2 99-0030 VT1 NAD REACTOR VESSEL SIS B VALVE BOLTING 04/22/1999 8 7. 70 ISI-30B B-1 99-0031 VT1-NAD REACTCR VESSEL SIS B VALVE BCLTING 04/22/1999 B 7. 70 ISI-30B H-2 99-0032 VT3 NAD REACTOR VESSEL SIS B RCD / CLAMP 04/22/1999 F-A C1 I ISI-17 H-1 99-0033 (A)

VT3 NAD 12" ACCUMULATOR DSCH HYDR SNUBBER 04/22/1999 F-A C1 I Scope _ Expansion ISI-17 B-1 99-0034 VT1 NAD 12* ACCUMULATOR DSCH VALVE BOLTING 04/22/1999 8 7. 70 ISI-2 W-3 99-0035 PT NAD ACCUM. DISCHARGE

'A' ELBOW - PIPE 04/22/1999 B 9. 11 ISI-17 W. I 99-0036 PT NAD 12* ACCUMULATOR DSCH VALVE - ELBOW 04/22/1999 8 9. 11 ISI-17 W-3 99-0037 PT NAD 12* ACCUMULATOR DSCH PIPE - ELBOW 04/22/1999 8 9. 11 ISI-2 W-3 99-0038 UT45 NAD ACCUN. DISCHARGE

'A' ELBOW - PIPE 04/22/1999 B 9. 11 ISI-17 W-3 99-0039 UT45 NAD 12* ACCUMULATOR DSCH PIPE - ELBOW 04/22/1999 B 9. 11 ISI-17 W. 1 99-0040 UT4$

NAD 12* ACCUMULATOR DSCH VALVE - ELBOW 04/22/1999 B 9. 11 Limited, Less than 904 l

ISI-13B W-1 99-0041 UT45 NAD REACTOR COOLANT

'B' N0ZZLE - 40s ELBOW 04/23/1999 B 9. 11 Limited, Less than 90%

O ISI-138 W-3 LS 2D 99-0042 UT45

~

NAD REACTOR COOLANT

'B' PIPE - ELBOW 04/23/1999 B 9. 11 ISI-43B N 6 IR 99-0043BL UTO NAD STEAM GENERATOR 912 N0ZZLE INNER RADIUS 04/23/1999 3 3.140 298 angle, Limited. Greater than 90%

07/29/19 Page 2

r Prairie Island Nuclear Generating inservice Inspection Report Los Northern States Power Company (N

1717 Makonada Drive Third Interval By Report #

414 Nicollet Mall

(

weich, MN 55089 ccommercial Service Dates December 16, 1973 Minneapolis, MN 55401 V

ISO Item Report Number Methced Results Byeten Item Description Exam Date ASMR section II Item ISI-1A W-13 99-0044 PT NAD CHARGING LINE

'B' PIPE - HALF COUPLING 04/24/1999 B 9.

40 ISI-1A W-14 99-0045 PT NAD CHARGING LINE

'B' HALF COUPLING - PIPE 04/24/1999 B 9. 32 ISI-IB W-15 99-0046 PT NAD CHARGING LINE

'B' ELBOW - PIPE 04/24/1999 B 9. 21 ISI-43A W-F VT 99-0047 VT1 NAD STEAM GENERATCR 911 TRANS WELD INT VT 04/24/1999 NC IN 93-20 ISI-1A W-12 99-0048 PT NAD CHARGING LINE

'B' ELBOW - PIPE 04/24/1999 B 9. 21 ISI-43A N-1 IN-IR 99-0049 MT NAD STEAM GENTRATOR #11 FEEDWATER WOZ LE 04/24/1999 NC IN 93-20 ISI-43A N-1 RING TEE 99-00$0 VT3 NAD STEAM GENERATOR fil FW RING TEE / SUPPORTS 04/24/1999 NC IN 93-20 ISI-2 H-2 99-0051 (A)

VT3 NAD ACCUM. DISCHARGE ' A' HYDR SNUBBER 04/26/1999 F-A C1 I Sc. ope Expansion ISI-2 H-3 99-0052 (A)

VT3 NAD ACCUM. DISCHARCE

'A' SPRING 04/26/1999 F-A in B10. 10 Scope Expansion ISI-10 W-1 99-0053 PT NAD DRN LON CROSSOVER) A PIPE TO HALF COUPLNG 04/26/I'999 B 9.

32 ISI-10 W-2 99-0054 PT NAD DRN (ON CROSSOVER) A HALF COUPLING - PIPE 04/26/1999 B 9.

40 ISI-10 W-5 99-0055 PT NAD DRN {0N CROSSOVER) A PIPh - ELPOW 04/26/1999 B 9. 21 ISI-30B V. 1 99-0056 VT1 NAD REACTOR VESSEL SIS B VALVE INT SURFACES 04/26/1999 B12. 50 ISI-307 C-2BB-A 99-0057BL VT3 NAD Primary Containment Penetration Surface 04/27/1999 E 1. 12 ISI-307 C-36B-A 99-005 BBL VT3 NAD Primary Containment Penetration Surface 04/27/1999 E 1. 12 ISI-307 C-37A-A 99-0059BL VT3 IND Primary Containment Penetration Surface 04/27/1999 E 1. 12 ISI-307 C-37A-A 99-0059BLR1 VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 ISI-307 C-37B-A 99-0060BL VT3 IND Primary Containment Penetration Surface 04/27/1999 E 1.

12 ISI-307 C-37B-A 99-0060BLR1 VT3 NAD Primary Containment Penetration Surface 05/20/1999 E 1. 12 ISI-307 C-36A-A 99-0061BL VT3 IND Primary Containment Penetration Surface 04/27/1999 E 1. 12 h

251-307 C-36A-A 99-0061BLR1 VT3 NAD 5

/

Primary Contaissent Penetration Surface 05/19/1999 E 1. 12 U

ISI-307 C-38B-A 99-0062BL VT3

~

IND Primary containment Penetration Surface 04/27/1999 E 1. 12 07/29/19 Page 3

r Prairie Island Nuclear Generating Inservice Inspection Report Los Northern States Power Company 1717 Wakonada Drive Third Interval By Repott 9 414 Nicollet Hall j

(

welch, MN 55089 commercial Service Dates December 16, 1973 Minneapolle, MN 55401

\\

ISO Item Report Number Method Resulte Fystem Item Description Exam Date ASME Section II Item ISI-307 C-38B-A 99-0062BLR1 VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 ISI-301 C-42F-A 99-0063bL VT3

!ND Primary Containment Penetration Surface 04/27/1999 E 1.

12 TSI-307 C-42P-A 99-0063 BLR1 -

VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 ISI-307 C-43A-A 99-0064BL VT3 NAD Primary Containment Patetration Surface 04/27/1999 E 1. 12 ISI-307 C-43A-A 99-0064BLR1 VT3 NAD Primary Containment Penetration Surface 05/20/1999 E 1. 12 ISI-307 C-43B-A 99-0065BL VT3 NAD Primary Containment Penetration Surface 04/27/1999 E 1. 12 ISI-307 C-43C-A 99-0066BL VT3 IND Primary Containment Penetration Surface 04/27/1999 E 1. 12 ISI-307 C-43C-A 99-0066BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 ISI-307 C-43D-A 99-0067BL VT3 IND Primary Containment Penetration Surface 04/27/1999 E 1.

12 ISI-307 C"-43D-A 99-0067BLR1 VT3 NAD

[

Primary Containment Penetration Surface 05/26/1999 E 1. 12 iN ISI-307 C-46A-A 99-0068BL VT3 IND Primary Containment Penetration Surface 04/27/1999 E1 12 ISI-307 C-46A-A 99-006BBLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 ISI-307 S-93-A 99-0069BL VT3 IND Primary Containment Plate Surface 04/27/1999 E 1. 12 151-307 S-93-A 99-0069BLR1 VT3 NAD Primary Containment Plate Surface 05/26/1999 E 1. 12 ISI-SCB W-1 99-0070 PT NAD REACTOR VESSEL SIS B VALVE - PIPE 04/27/1999 B 9.

11 ISI-30B W-1 99-0071 UT45 NAD REACTOR VESSEL SIS B VALVE - PIPE 04/27/1999 8 9.

11 Limited, Greater than 909 ISI-23 W-15 99-0072 PT NAD 2' RTD TAKEOFF HOT B ELBOW - PIPE 04/28/1999 B 9. 21 ISI-23 W-12 99-0073 PT NAD 2" RTD TAKEOFF HDT B PIPE - VALVE 04/28/1999 B 9, 21 ISI-23 H-3 99-0074 VT3 NAD 2* RTD TAKEOFF HOT B RUP'T RESTRAINT 04/27/1999 F-A C1 I ISI-305 C-88-A 99-0075BL VT3 NAD Primary Containment Penetration Surface 04/27/1999 E 1. 12

[

'ISI-305 C-2-A 99-0076BL VT3 NAD

\\

Primary Containment Penetration Surface 04/27/1999 E 1. 12 ISI-305 C-17-A 99-0077BL VT3 NAD Primary Containment Penetration Surface 04/27/1999 E 1. 12 07/29/19 Page 4

r Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company 1717 Wakonade Drive Third Interval By Report #

414 Nicollet mall l/

Welch, MN 55089 commercial Service Dates December 16, 1973 Kinner. polis, MM $5401

\\

ISO Item Report Number Method Resulta System Item Description Enam Date AEME Section YT Itam ISI-305 C-13A-A 99-0078BL VT3 NAD Primary Containment Penetration Surface 04/27/1999 E 1.

12 1S1-305 C-3-A 99-00798L VT3 NAD Primary Containment Penetration Surface 04/27/1999 E 1. 12 I31-305 C-8A-A 99-008cBL -

VT3 nAD Primary Containment Penetration Surface 04/27/1999 E 1. 12 ISI-305 C-42D-A 99-0081BL VT3 IND Primary Containment Penetration Surface 04/27/1999 E 1. 12 iSI-305 C-42D-A 99-0081BLR1 VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 ISI-29B W-6 99-0082 PT NAD PRESS SAFETY LINE B ELBOW - PIPE 04/28/1999 B 9. 11 ISI-29B W-7 99-0083 PT NAD PRESS SAFETY LINE B PIPE - ELBOW 04/28/1999 8 9.

11 ISI-29B W-7 99-0084 UT45 NAD PRESS SAFETY LINE B PIPE - ELBOW 04/28/1999 B 9, 11 ISI-29B W-6 99-0085 UT45 NAD PRESS SAFETY LINE B ELBOW - PIPE 04/28/1999 B 9. 11 ISI-30A V-2 99-0086 VT1 NAD f,< s.

REACTOR VESSEL SIS A VALVE INT SURFACES 04/28/1999 B12. 50

\\

ISI-19A B-1 99-0087 VT1 NAD 8" RHR TAKE OFF

'B' VALVE BOLTING 04/28/1999 8 7. 70 ISI-18 B-1 99-0088 VT1 NAD 10 RHR RETURN LOCP B VALVE BOLTING 04/28/1999 B 7.

70 ISI-19A H-9 99-0089 VT3 NAD 8" RHR TAKE OFF

'B' RIOID RESTRAINT LUGS 04/28/1999 F-A C1 I 15I-305 C-34D-A 99-0090BL VT3 IND Primary Containment Penetration Surface 04/28/1999 E 1.

12 ISI-305 C-34D-A 99-0090BLR1 VT3 NAD Primary containment Penetration Surface 05/19/1999 E 1. 12 ISI-305 C-34E-A 99-0091BL VT3 IND Primary Containment Penetration Surface 04/28/1999 E 1. 12 ISI-305 C-34E-A 99-0091BLR1 VT3 NAD Primary containment Penetration Surface 05/19/1999 E 1. 12 151-305 C-34F-A 99-0092BL VT3

~

'IND Primary Containment Penetration Surface 04/28/1999 E 1. 12 ISI-305 C-34F-A 99-0092BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 ISI-305 C-35-A 99-0093BL VT3 IND Primary Containment Penetration Surface 04/28/1999 E 1. 12

['

\\

151-305 C-35-A 99-0093BLR1 VT3 NAD

\\ _,/

Primary Containment Penetration Surface 05/26/1999 E 1. 12 ISI-305 C-37C-A 99-0094BL VT3 IND Primary Containment Penetration Surface 04/28/1999 E 1. 12 07/29/19 Page 5

Prairie Island Nuclear Generating Innervice Inspection Report Log Northern States Power Company

/"'N 1717 Wakonada Drive Third interval By Report 0 414 Nicollet kall f

)

Weach, MN 55009 Commercial service Dates December 16, 1973 Minneapolle, MN 55401

/

ISO Item Report Number Method Resulte System Item Description Exam Date ANNE Section II ftam 181-305 C-37C-A 99-0094BLR1 VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 ISI-305 C-37D-A 99-0095BL VT3 IND Primary Containment Penetration Surface 04/28/1999 E 1. 12 I-SI-3 05 C-37D-A 9 9-0095 BLR1 -

VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 ISI-305 C-38C-A 99-0096BL VT3 IND Primary Containmer.t Penetration Surface 04/28/1999 E 1. 12 181-305 C-38C-A 99- 0096B LR1 VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 ISI-305 C-3BD-A 99-009?BL VT3 IND Primary containment Penetration Surface 04/28/1999 E 1. 12 ISI-305 C-3BD-A 99-0097BLR1 VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 ISI-31 W-1 99-0098 PT NAD PRESSURIZER RELIEF NOZZLE - SAFE END 04/29/1999 B 5.

40 ISI-31 W-2 99-0099 Pr NAL PRESSURIZER RELIEF SAFE-END / REDUCER 04/29/1999 B 9. 21 ISI-31 W-3 99-0100 PT NAD b[

PRESSURIZER RELIEF REDUCER - 45e ELBOW 04/2S/1999 8 9. 21 ISI-31 W-1 99-0101 UT45 NAD PRESSURIZER RELIEF NCZZLE - SAFE Er7 04/29/1999 8 5. 40 ISI-1D H-1 99-0102 VT3 NAD CHARGING LINE

'B' RICID HANOER 04/30/1999 F-A C1 I ISI-1D W-7 99-0103 PT NAD CHARGING LINE

'B' ELBCW - PIPE 04/30/1999 89, 21 ISI-1D W-9 99-0104 PT NAD CHAROING LINE

'B' ELBOW - PIPE 04/30/1999 B 9. 21 151-305 S-82-A 99-0105BL VT3 IND Primary Containment Plate surface 04/28/1999 E 1. 12 ISI-305 S-82-A 99-0105BLR1 VT3 NAD Primary Containment Plate Surface 05/26/1999 E1 12 ISI-307 C-27C-A 99-0106BL VT3 IND Primary Containment Penetration Surface 04/28/1999 E 1, 12 151-307 C-27C-A 99-0106BLR1 VT3 WAD Primary Containment Panetration Surface 05/26/1999 E 1. 12 ISI-303 C-4-A 99-0107BL VT3

~'~IN5 Primary Containment Penetration Surface 04/30/1999 E 1. 12 ISI-303 C-4-A 99-0107BLR1 VT3 NAD Primary Containment Penetration Surface 05/24/1999 E 1, 12

[' '

1S1-304 C-34C-A 99-0108BL VT3

' ~ ~ ~' IND

(

Primary Containment Penetration Surface 04/30/1999 E 1. 12 1S1-304 C-34C-A 99-010BBLR1 VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 07/29/19 Page 6

1 Prairie Island Nuclear Omnerating Inservice Inspection Report Log Northern States Power Company jN 1717 wakonada Drive Third Interval By Report #

414 Nicollet Kall I

welch, MN 55089 Commercial service Dates December 16, 1973 Minneapolis, MN 55401 N _,

1 s

I ISO Item Report Number Method Results System item Description Exam Date ASME Section II Item ISI-304 C-34B-A 99-0109BL VT3 IND Primary Containment Penetration Surface 04/30/1999 E 1. 12 ISI-304 C-34B-A 99-0109BLR1 VT3 NAD Primary Contalnment Penetration Surface 05/19/1999 E 1.

12 161-304 C-34A-A 99-0110BL VT3 IND Primary Containment Penetration Surface 04/30/1999 E 1, 12 ISI-304 C-34A-A 99-0110BLR1 VT3 NAD Primary Containment Penetration Surface 05/24/1999 E 1, 12 ISI-304 C-42A-A 99-0111BL VT3 IND Primary Containment Penetration Surface 04/30/1999 E 1. 12 ISI-304 C-42A-A 99-0111BLR1 VT3 NAD Prinary Containment Penetration Surface 05/19/1999 E 1.

12 ISI-304 C-50-A 99-0112BL VT3 IND Primary containment Penetration Surface 04/30/1999 E 1. 12 ISI-304 C-50-A 99-0112BLR1 VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 181-303 C-40-A 99-0113BL VT3 NAD Primary Containment Penetration Surface 04/30/1999 E 1, 12 ISI-303 C-39-A 99-0114BL VT3 NAD

\\

Primary Containment Penetration surface 04/30/1999 E 1.

12

)

ISI-303 C-28A-A 99-0115BL VT3 NAD Primary Containment Penetration Surface 04/30/1999 E 1.

12 ISI-303 C-32A-A 99-0116BL VT3 NAD Primary Contginment Penetration Surface 04/30/1999 E 1, 12 ISI-303 C-33A-A 99-0117BL VT3 NAD Primary containment Penetration Surface 04/30/1999 E 1. 12 ISI-42 N-3 IR 99-0118 UTO iiAD PRESSL'RIZER RELIEF NCZZLE C4/30/1999 B 3.120 various Beam angles 17.9' CW, 17.9' CCW, 11.66 CW and 11.6*CCW ISI-SD W-8 99-0119 PT NAD

$ PRAY TO PRESSURIZER 45p ELBOW - PIPE 05/02/1999 B 9. 21 151-301 G-32-A 99-0120BL VT3 NAD Primary Containment Moist Barrier-outer 04/30/1999 E 5. 30 g_.__-

ISI-301 G-33-A 99-0121BL VT3 NAD Primary Containment Moist Barriar-cuter 04/30/1999 E 5. 30 ISI-301 G-36-A 99-0122BL VT3 NAD Primary Containment Moist Barrier-outer 04/30/1999 E 5. 30 ISI-301 G-39-A 99-0123BL VT3 NAD Primary Containment Maiat Barrier-outer 04/30/1999 E 5. 30 IFT-301 G-44-A 99-0124DL VT3

~

NAD

[

Primary containment Moint Barrier-outer 04/30/1999 E 5. 30

\\

151-301 G-45-A 99-0125BL VT3 NAD Primary Containment Moist Barrier-outer 04/30/1999 E 5.

30 ISI-301 S-32-A 99-0126BL

'VT3 IND Primary Containment Plate Surface 04/30/1999 E 1. 12 07/29/19 Page 7

Prairie Island Nuclear Generating Insarvice Inspection Report Log Northern statee PWor Cumpany 1717 wakonada Drive Third Interval By Report #

414 Nicollet Kall Welch, MN 55089 commercial service Dates December 15, 1973 Minneapolle, MN $$401

\\

ISO Item Report Number Method Resulte system item Description Exas Date ASME Section XI Item ISI-301 S-32-A 99-0126BLR1 VT3 NAD Primary Containment Plate Surface 05/24/1999 E 1. 12 ISI-301 S-33-A 99-0127BL VT3 IND Primary Containment Plate Surface 04/30/1999 E 1. 12 ISI-301 S-33 A 99-0127BLR1,

VT3 NAD Primary Containr>ent Plate surface 05/24/1999 E 1. 12 ISI-301 5-38-A 99-0128BL VT3 IND Primary Containment Plate Surface 04/30/1999 E 1. 12 ISI-301 S-38-A 99-012 8B LR1 VT3 NAD Primary Containment Plate Surface 05/24/1999 E 1. 12 ISI-301 S-39-A 99-01298L VT3 IND Primary containment Plate surface 04/30/1999 E 1. 12 151 301 S-39-A 99-012 9 B LR1 VT3 MAD Primary Containment Plate surface 05/24/1999 E 1. 12 ISI-301 S-44-A 99-0130BL VT3 IND Primary Containment Plate Sarface 04/30/1999 E 1. 12 ISI-301 b-44-A 99-013 0BLR1 VT3 NAD Primary containment Plate Surface 05/24/1999 E 1. 12 ISI-301 S-45-A 99-0131BL VT3 IND Primary containment Plate Surface 04/30/1999 E 1. 12 ISI-301 S-45-A 99-0131BLR1 VT3 NAD Primary Containment Plate surface 05/24/1999 E 1. 12 ISI-301 S-57-A 99-0132BL VT3 IND Primary containment Plate Surface 05/02/1999 E 1. 12 ISI-301 S-57-A 99-0132BLR1 VT3 NAD Primary Containment Plate Surface 05/24/1999 E 1.

12 ISI-301 G-50-A 99-0133BL VT3 NAD Primary containment Moist Barrier-outer 05/02/1999 E 5. 30 151-301 G-57-A 99-0134BL VT3 NAD Primary Containment Meiet Barrier-outer 05/02/1999 E 5. 30 ISI-301 S-50-A 99-0135BL VT3 NAD Primary Containment Plate Surface 05/02/1999 E 1. 12 ISI-301 S-56-A 99-0136BL VT3 NAD Primary Containmant Plate Surface 05/02/1999 E 1. 12 ISI-301 G-56-A 99-0137BL VT3 NAD Primary Containment Moist Barrier-cuter 05/02/1999 E 5. 30 ISI-7 W-1 99-0138 PT NAD RTD TAKE OFF

'A' CLD PIPE - KALP COUPLING 05/02/1999 B 9.

32 ISI-7 W-22 99-0139 PT NAD RTD TAKE OFP

'A' CLD ELBOW - TEE 05/02/1999 B 9. 21 ISI-7 W-8 99-0140 PT NAD RTD TAKE OFP

'A' CLD ELBOW - PIPE 05/02/1999 B 9. 21

~~ISI-9 W-11 99-0141 PT NAD SIS HION HEAD

'A' NOZZLE - PIPE 05/02/1999 8 9. 31 a

07/29/19 Page g

Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company 7-1717 Wakonada Drive Third Interval By Report 8 414 Nicollet Mall t

welch, MN 55089 Commercial Service Dates December 16, 1973 Minneapolis, MN 55401

\\

ISO Itan Report Number Method Results Byaten Itse Description Exam Date ARME Section XI Item ISI-9 W-10 99-0142 PT NAD SIS HIGH HEAD ' A' ELBOW - NOZZLE 05/02/1999 B 9. 11 ISI-7 W-21 99-0143 PT IND RTD TAKE OFF

'A' CLD PIPE - ELBOW 05/02/1999 8 9. 21 Linear Indication ISI-7 W-21 99-0143R1.-

PT NAD RTD TAKE CFF

'A' CLD PIPE - ELBOW 05/11/1999 B 9, 21 Minor Buffing ISI-12A W-5 99-0144 PT IND REACTOR COOLANT

'A' RED 40s ELBOW - NZZL 05/02/1999 B 9, 11 Linear Indications ISI-12A W-5 99-0144R1 PT NAD REACTOR CDOLANT

'A' RED 40s ELBOW - N7ZL 05/18/1999 B 9.

11 Code _ Acceptable ISI-9 W-11 99-0145 UT45 CEO SIS HIGH HEAD ' A' NCZZLE - PIPE 05/02/1999 8 9. 31 Li_mited, Less than 90%

ISI-9 W-10 99-0146 UT45 NAD SIS HIGH HEAD

  • A*

ELBOW - NOZZLE 05/02/1999 B 9. 11 Limited, Less than 90%

ISI-68A H-1 99-0147 VT3 NAD MAINSTEAM

'B' SIEEMIC RESTRAINT 05/03/1999 F-A & C 3. 20 ISI-SA W-13 99-0148 PT NAD SPRAY TO PRESSURIZER PIPE - 45e ELBDW 05/03/1999 B 9. 21 ISI-5B H-4 99-0149 VT3 NAD

/\\

SPRAY TO PRESSURIZER ROD / CLAMP 05/03/1999 F-A C1 I U

ISI-5B W-2 99-0150 PT NAD SPRAY TO PRESSURIZER PIPE - ELBOW 05/03/1999 B 9, 21 ISI-5B W-4 99-0151 PT NAD SPRAY TO PRESSURIZER PIPE - ELBOW 05/03/1999 B 9. 21 ISI-12A W-5 99-0152 UT45 GEO REACTOR COO [. ANT ' A '

RED 40e ELBOW - NIZL 05/02/1999 B 9.

Il CEO. Limited. Less than 90%

ISI-307 C-43D 99-C153BL VT3 IND Primary Containment Penetration Surface 05/03/1999 E 1.

12 151-307 C-43D 99-0153BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 ISI-307 C-43C 99-0154BL VT3 IND_

Primary Containment Penetration Surface 05/03/1999 E 1, 12 ISI-307 C-43C 99-0154BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12

..ISI-307 C-3BA 99-0155BL VT3 IND i

Primary Containmen~c Penetration Surface 05/03/1999 E 1. 12 l

ISI-307 C-38A 99-0155BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 1S1-307 C-438 99-015CBL VT3 NAD Primary Containment Penetration Surface 05/03/1999 E 1. 12

\\

13I-307 C-43A 99-0157BL VT3 NAD Primary containment Penetration Surface 05/03/1999 E 1. 12 ISI-307 C-37A 99-0158BL VT3 NAD Primary Containment Penetration Surface 05/03/1999 E 1. 12 07/29/19 Page 9

Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company fs 1717 wakonada Drive Third Interval my Report #

414 Nicollet Mall

[

Melch, MN 55089 commercial service Dates December 16, 1973 Minneapolie, MN $5401 ISO Item Report Number Nothod Raoults Syst em Itam Deecription Exam Date ASME Section II Item ISI-307 C-368 99-01598L VT3 NAD Primary Containment Penetration Surface 05/03/1999 E 1. 12 ISI-307 C-28B 99-016CBL VT3 NAD Primary containment Penetration Surface 05/03/1999 E 1. 12 I6I-307 C-27D 99-0161BL.-

VT3 NAD Primary Containment Penetration Surf ace 05/03/1999 E 1. 12 ISI-307 C-42G 99-0162BL VT3 NAD Primary Containment Penetration Surface 05/03/1999 E 1, 12 181-307 C-42E 99-0163BL VT3 NAD Prinary Containment Penetration Surface 05/03/1999 E 1. 12 ISI-307 C-46A 99-0164BL VT3 NAD Primary Containment Penetration Surface 05/04/1999 E 1. 12 151-307 C-7B 99-0165BL VT3 NAD Primary Containment Penetration Surface 05/04/1999 E 1. 12 ISI-307 C-27C 39-0166BL VT3 NAD Primary Containment Fenetration Surface 05/04/1999 E 1, 12 ISI-307 C-378 99-01678L VT3 IND Primary Containment Penetration Surface 05/04/1999 E 1. 12 151-307 C-37B 99-0167BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 ISI-307 C-388 99-016 BBL VT3 IND Primary Containment Penetration Surface 05/04/1909 E 1. 12 ISI-307 C-38B 99-0168BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 ISI-307

~

S-93 99-01698L VT3 IND Primary Containment Plate Surface 05/04/1999 E 1. 12 ISI-307 S-93 99-0169ELR1 VT3 lNAD Primary Containment Plate Surface 05/20/1999 E 1. 12 I

i 151-301 S-51-A 99-0170BL VT3 NAD Primary Containment Plate surface 05/02/1999 E 1. 12 151-301 G-51-A 99-0171BL VT3 NAD Primary containment Motet Barrier-outer 05/02/1999 E 5. 30 ISI-68A W-1 LS 2D 99-0172 MT NAD MAINSTEAM

  • B' NOZZLE - RED. ELBDW 05/04/1999 C 5. 50 ISI-43B N-4 99-0173 MT NAD STEAM GENERATOR 912 TOP HEAD-TO-NOZZLE 05/04/1999 C 2. 21 ISI-438 N-4 99-0174 UTO NAD STEAM GENERATOR #12 TOP HEAD-TO-NCZZLE 05/C4/1999 C 2. 21 Limited, Greater than 90%

ISI-43B N-4 99-0175 UT45 NAD STEAM GENERATOR 912 TOP HEAD-TO-NCZZLE 05/C4/1999 C 2, 21 Limited, Great er than 90%

[

ISI-43B N-4 99-0176 UT60

' NAD

(

STEAM GENERATOR 912 TCP HEAD-TO-NOZZLE 05/04/1999 C 2. 21 Limited. Greater than 90%

ISI-14 PUMP 911 99-0177 UTO

~

NAD RC PUMP 11 FLYWHEEL KEYWAY b BORE 05/04/1999 TS 4.2-1 07/29/19 Page 10

i b

Prairie Island Nuclear Generating 2nservice Inspection Report Log Northern States Power Ccumpany

[

1717 wakonada Drive Third Interval By Report #

414 Nicollet Mall

(

Melch, MN 55089 Commeercial service Date December 16, 1973 Minneapolis, R'I $5401

\\

ISO Item Report Number Method Results System Item Deseription Eaam Date A5ME Section XI Item ISI-14 H. 2 99-0178 VT3 NAD RC PUMP 11 TIE BACK 8 2 05/05/1999 F-A & BIO. 20 SI-14 H-28 99-0179 VT3 NAD RC PUMP 11 TIE BACK PIN 9 2 05/05/1999 F-A C1 I

-ISI-14 H-8 99-0180 VT3 NAD RC PUMP 11 CONNECTION 8 2 05/05/1999 F-A C1 I ISI-14 H-11 99-0181 VT3 NAD RC PUMP 11 BASE 9 2 05/05/1999 F-A C1 I ISI-14 H-11A 99-0182 VT3 NAD RC PUMP 11 COLUMN BOT & PIN O 2 05/05/1999 F-A C1 I ISI 14 H-2A 99-0183 VT3 IND RC PUMP 11 TIE BACK BOLT S 2 05/05/1999 F-A C1 I Cetter_ yin missing ISI-14 H-2A 99-0183R1 VT3 NAD RC PUPP 11 TIE EACK BOLT e 2 05/14/1999 F-A C1 I Engi_ne_ering Evaluation ISI-14 H-8A 99-0184 VT3 IND RC PUMP 11 COLUMN TOP & PIN S 2 05/05/1999 F-A C1 I contact with pump casing ISI-14 H-8A 99-0184R1 VT3 NAD RC PUMP 11 COLUMN TOP & PIN 9 2 05/14/1999 F-A C1 I Engineering Evaluation ISI-14 H-5 99-0185 VT3 IND RC PUMP 11 PAD 2 05/05/1999 F-A C1 I

(

Debris in pin _ pocket ISI-14 H-5 99-0185R1 VT3 NAD RC PUMP 11 PAD 2 05/14/1999 F-A C1 I Engineering Evalua,t_ ion ISI-43D H-5 (SOUTH) 99-0186 VT3 NAD STEAM GENERATOR 912 SPRING 05/05/1999 F-A C1 I ISI-43D H-6 (NORTH) 99-0187 VT3 NAD STEAM CENERATOR #12 S PRING 05/05/1999 F-A C1 I ISI-43D H-7 99-0188 VT3 NAD STEAM GENERATOR #12 PAD 05/19/1999 F-A C1 I ISI-43D H-8 99-0189 VT3 NAD STEAM GENERATOR #12 PAD 05/19/1999 F+A C1 I JSI-43D H-22 99-0190 VT3 NAD STEAM GENERATON 012 TCP CONNECTION e 2 05/05/1999 F-A C1 I ISI-43D H-22A 99-0191 VT3 NAD STEAM GENERATOR #12 COLUMN TOP & PIN 9 2 05/05/1999 F-A C1 I ISI-43D H-22B 99-0192 Yr3 NAD STEAW CENERATOR 912 COLUMN BOT & PIN 9 2 05/05/1999 F-A C1 I ISI-43D H-23 99-0193 VT3 NAD STEAM GENERATOR 912 TOP CONNECTION 0 3 05/05/1999 F-A C1 I ISI-43D H-23A 99-0194 VT3 NAD STEAM CENERATOR 612 COLUMN TOP & PIN 9 3 05/05/1999 F-A C1 1 ISI-43D H-23B 99-0195 VT3 NAD STEAM GENERATOR 812 COLUMN BOT & PIN 8 3 05/05/1999 F-A C1 I ISI-43D H-26 99-0196 Vr3 NAD STEAM GENERATOR #12 BASE 9 2 05/05/1999 F-A C1 I 07/29/19 Page 11

Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Contpany s

1717 wakonado Drive Third Interval By Report #

414 Nicollet Mall I

welch, MN 55089 commercial Service Dates December 16, 1973 Minneapolis, MN 55401 ISO Item Report Number Nothod Results pretos Item Description Exam Date ASME Section IT Item ISI-43D H-27 99-0197 VT3 NAD STEAM GENERATOR 412 BASE 9 3 05/05/1999 F-A C1 I 151-305 C-34F 99-0198BL VT3 NAD Primary Containment Penetration Surface 05/04/1999 E 1. 12 131-305 C-34E 99-0199BL _

VT3 NAD Primary Containment Penetration Surface 05/04/1999 E 1. 12 15I-305 S-31 99-0200BL VT3 NAD Primary Containment Plate Surface 05/04/1999 E 1. 12 151-305 C-34D 99-0201BL VT3 IND Primary Containment Penetration Surface 05/04/1999 E 1. 12 ISI-30S C-34D 99-0201BLR1 VT3 NAD Primary Containment Penetration Surface 05/24/1999 E 1.

12 ISI-301 C-30B 99-0202BL VT3 IND Primary Containment Penetration Surface 05/05/1999 E 1. 12 ISI-301 C-308 99-C202BLR1 VT3 NAD Primary Containment Penetration surface 05/21/1999 E 1. 12 ISI-301 C-30A 99-0203BL VT3 IND Primary Containment Penetration Surface 05/05/1999 E 1. 12 ISI-301 C-30A 99-0203BLR1 VT3 NAD

/

\\

Primary Contsinment Penetration Surface 05/21/1999 E 1. 12 I

ISI-301 G-49-A 99-0204BL VT3 NAD Primary Containmant Moist Ba r rier-out e r 05/02/1999 E 5. 30 151-301 S-49-A 99-0205BL VT3 IND Prinary Containment Plate Surface 05/02/1999 E 1.

12 ISI-301 S-49-A 99-0205BLR1 VT3 NAD Primary Containment Plate Surface 05/24/1999 E 1.

12 ISI-34 H-2A 99-0206 (A)

VT3 IND RC PUMP 12 TIE BACK BOLT S 2 05/03/1999 F-A C1 I Broken pin ISI-34 H-2A 99-0206R1 (A)

VT3 NAD RC PUMP 12 TIE BACK BOLT S 2 05/14/1999 F-A C1 I Engineering _Ryaluation ISI-34 H-8A 99-0207 (A)

VT3 IND RC PUMP 12 COLUMN TOP & PIN 9 2 05/03/1999 F-A C1 I Contact with pump casi_n3 ISI-34 H-8A 99-0207R1 (A)

VT3 NAD RC PUMP 12 COLUMN TOP & PIN 9 2 05/14/1999 F-A C1 I Engineering Evaluation ISI-43B N-4 IR 99-0208BL UTO NAD STEAM GENERATOR 812 NOZZLE INNER RADIUS 05/06/1999 C 2. 22

  • Nominal beam angle per ISI-UT-SE: 27.2/31.7 &

3 8 :5/J 5; 5.

ISI-68A W-1 LS 2D 99-0209 UT45 NAD MAINSTEAM

'B' NOZZLE - RED. elbow 05/06/1999 C 5. 50 ISI-41 W-3 99-0210 UTO NAD

  1. /

PRESSURIZER BOTTOM HEAD / SHELL 05/14/1999 B 2. 11 Limited, creater than 90%

ISI-41 W-3 99-0211 UT45 NAD PRESSUR1EER BOTTOM HEAD / SHELL 05/14/1999 B 2. 11 Limited, creater t han 90%

ISI-41 W-3 99-0212 UT60 NAD PRESSURIZER BOTTOM HEAD / SHELL 05/14/1999 B 2. 11 i

Limited, Creater than 90%

07/29/19 Page 12 l

Prairie Island leuclear Generating Inservice Inspection Report Los Northern States Power Company j'~'%g 1717 wakonase Drive Third Interval By Report 9 414 Nicollet mall

(

)

welch, MN 55089 Couemercial Service Dates December 16, 1973 Minneapolis, MN 55401

\\~ /

ISO Item Report Number Method Resnits System Item Description Exam Date ASME Section XI Item ISI-14 H-7A 99-0213 (A)

VT3 NAD BC PUMP 11 COLUMN TOP & PIN 9 1 05/07/1999 F-A '.1 I

Scg e Expansion ISI-14 H-9A 99-0214 (A)

VT3 NAD RC PUMP 11 COLUMN TOP & PIN 9 3 05/07/1999 F-A C1 I Scope _gxpansion ISI-34 H-7A 99-0215 ( A) -

VT3 NAD PC PUMP 12 COLUMN TOP & PIN 9 1 05/07/1999 F-A C1 1 Scope Expansion ISI-34 H-9A 99-0216 (A)

VT3 NAD PC PUMP 12 COLUMN TOP & PIN 9 3 05/07/1999 F-A C1 I Scope Expans_1.on ISI-34 H-3A 99-0217 (A)

VT3 NAD MC PUMP 12 TIE EACK BCLT S3 05/07/1999 F-A C1 I Scope _ Expansion ISI-34 H-1A 99-0210 (A)

VT3 NAD RC PUMP 12 TIE BACK BOLT 9 1 05/07/1999 F-A C1 I Scope _Expans ion IS1-14 H-1A 99-0219 (A)

VT3 NAD RC PUMP 11 TIE EACK BOLT 9 1 05/07/1999 F-A C1 I Scope Expansion ISI-14 H-3A 99-0220 (A)

VT3 NAD RC PUMP 11 TIE BACK BOLT S 3 05/07/1999 F-A C1 I Scope Expansi_on ISI-303 C-28A 99-0221BL VT3 NAD Primary Containment Penetration Surface 05/07/1999 E 1. 12 ISI-303 C-4 99-0222BL VT3 NAD f.

p Primary Containment Penetration Surface 05/07/1999 E 1. 12

\\

ISI-303 C-9 99-0223BL VT3 NAD Primary Containment Penetration Surface 05/07/1999 E 1.

12 151-303 C-10 99-0224BL VT3 NAD Primary Containment Penetration Surface 05/07/1999 E 1. 12 15I-303 C-29A 99-0225BL VT3 NAD Primary containment renetration Surface 05/07/1999 E 1. 12 IS1-303 C-29B 99-022fBL VT3 NAD Primary Containment Penetration Surface 05/07/1999 E 1. 12 I51-303 C-39 99-0227BL VT3 NAD Primary Containment Penetration Surface 05/07/1999 E 1, 12 ISI-303 C-40 99-0228BL VT3 NAD Primary Containment Penetration Surface 05/07/1999 E 1. 12 ISI-303 G-68 99-0229BL VT3 NAD Primary Containment Meist Barrier-inner 05/07/1999 E 5. 30 151-303

~

G-71 99-0230BL VT3 NAD Primary Containment Moist barrier-inner 05/07/1999 E 5. 30 ISI-303 S-68 99-0231BL VT3 IND Primary Containment Plate Suface 05/07/1999 E 1. 12 181-303 S-68 9 9-02 31BLR1 VT3 NAD l

Primary Containment Plate Suface 05/24/1999 E 1. 12 7s

. - - -ISI-303 S-71 99-0232BL VT3 IND Primary Containment Plate Surface 05/09/1999 E 1. 12 ISI-303 S-71 99-0232B LR1 VT3 NAD Primary Containment Plate Surface 05/24/1999 E 1. 12 07/29/19 Page 13

Prairie Island Nuclear Generating Inservice Inspection Report Log Northern states Power Company

[%

1717 Wakonada Drive Third Interval By Report #

414 Micollet Mall Welch, MN $5089 commercial service Dates December 16, 1973 Minneapolis, MN 55401 Is0 Item Report Number Method Results System Item Description Exam Date ASME Section II Item ISI-47 W-2 99-0233 PT NAD PI4-CAP

'B' NOZZLE - PIPE 05/07/1999 B 9. 11 ISI-47 W-2 99-0234 UT45 NAD PLO-CAP

'B' NOZZLE - PIPE 05/07/1999 89, 11 Limited, Less than 90%

TSI-47 W-2 99-0235 UT60 NAD PLO-CAP

'B' NOZZLE - PIPE 05/07/1999 B 9, 11 ISI-12C W-1 99-0236 PT NAD REACTOR COOIANT ' A' RC PLHP - PIPE 05/08/1999 B 9.

11 ISI-69 W-25 99-0237 MT IND FEEDWATER LOOP

'B' REDUCER - NOZZLE 05/08/1999 C 5, 21 Linear Indication ISI-69 W-25 99-0237R1 MT NAD FEEDWATER LOOP

'B' REDUCER - NOZZLE 05/20/1999 C 5, 21 Code Acceptable ISI-48 VESSEL INTR 99-0238 VT3 IND REACTOR VESSEL VT INTL SURFACES 05/02/1999 B13. 10 la contact area ISI-48 VESSEL INTR 99-023BR1 VT3 NAD REACTOR VESSEL VT INTL SURFACES 05/20/1999 B13, 10 Engineering Evaluation ISI-69 W-23 99-0239 MT NAD FEEDWATER I40P

'B' PIPE-TO-SWEEPOLET 05/08/1999 C 5. 51 ISI-304 C-50 99-0240BL VT3 NAD Primary Containment Penetration Surface 05/08/1999 E 1. 12

'V ISI-304 S-72 99-0241BL VT3 IND Primary Containment Plate surface 05/08/1999 E 1. 12 ISI-304 S-72 99-0241BLR1 VT3 NAD Primary Containment Plate Surface 05/24/1999 E 1. 12 1S1-305

$2 99-0242BL VT3 NAD Primary Containment Penetration surface 05/08/1999 E 1. 12 I51-305

'C-3 99-0243BL VT3 IND Primary Containment Penetration Surface 05/08/1999 E 1. 12 151-305 C-3 99-0243BLR1 VT3 NAD Primary Containment Penetration Surface 05/24/1999 E 1, 12 ISI-305 C-17 99-0244BL VT3 IND Primary Containment Penetration Surface 05/08/1999 E 1. 12 ISI-305 C-17 9940244BLd1 VT3 NAD Primary Containment Penetration Surface 05/24/1999 E 1. 12 ISI-305 C-35 99-0245BL VT3 IND Primary Containment Penetration Surface 05/08/1999 E 1. 12 ISI-305 C-35 99-0245BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 j

ISI-303 C-32A 99-0246BL VT3 NAD Primary Containment Penetration Surface 05/08/1999 E 1. 12 ISI-303 C-32A 99-0246BLR1 VT3 NAD

\\

Primary Containment Penetration Surface 05/20/1999 E 1. 12 ISI-303 C-328 99-0247BL VT3 NAD Primary Containment Pentration Surface 05/08/1999 E 1. 12 07/29/19 Page 14

Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company r"'N 1717 Wakanado Drive Third Interval my Report e 414 Nicollet Hall j

Welch, MN 55089 Ceemercial Service Dates December 15, 1973 Minneapolis, MN 55401 ISO Item Report Number Method Results System Item Description Exam Date ASME aection XI Itam ISI-303 C-33A 99-024 BBL VT3 NAD Primary Containment Penetration Surface 05/08/1999 E 1. 12 ISI-303 C-33B 99-0249BL VT3 NAD Primary Containment Penetration Surface 05/08/1999 E 1. 12 751-304 C-24 99-0250BL -

VT3 IND Primary Containment Penetration Surface 05/08/1999 E 1. 12 ISI-304 C-24 99-0250BLR1 VT3 NAD Primary Containment Penetration Surface 05/24/1999 E 1.

12 ISI-304 C-34A 99-0251BL VT3 IND Primary Containment Penetration Surface 05/08/1999 E 1. 12 ISI-304 C-34A 99-0251BLR1 VT3 NAD Primary Containment Penetration Surface 05/24/1999 E 1. 11 181-304 C-34B 99-0252BL VT3 NAD Primary Containment Penetration Surface 05/08/1999 E 1. 12 ISI-304 C-34C 99-0253BL VT3 NAD Primary Containment Penetration Surface 05/08/1999 E 1, 12 ISI-304 C-42A 99-0254BL VT3 NAD Primary Containment Penetration Surface 05/08/1999 E 1. 12 ISI-1R W-8 99-0255 PT NAD l

CHARGING LINE

'B' ELBOW - PIPE 05/10/1999 8 9. 21

\\

ISI. 11A W-1 99-0256 PT NAD SEAL INJ LOOP

'A' PIPE - ELBOW 05/11/1999 B 9, 21 ISI, 46 W-5 99-C257 PT NAD RCS DRAINDOWN ELBCW - PIPE 05/11/1999 8 9. 21 ISI-46 W-9 99-0258 PT NAD RCS DRAINDOWN VALVE - PIPE 05/11/1999 B 9. 21 ISI-11B W-12 99-0259 PT NAD SEAL INJ LOOP ' A' ELBOW - PIPE 05/11/1999 B 9.

21 ISI-11B W-14 99-0260 PT NAD SEAL INJ LOOP

'A' VALVE - PIPE 05/11/1999 B 9.

40 L

15I-305 C-37D

'99-0261BL VT3 NAD Primary Containment Penetration Surface 05/10/1999 E 1. 12 ISI-305 C-37C 99-0262BL VT3 NAD Primary Contatnment Penetration Surface 05/10/1999 E 1. 12

-151-305 C-36D 99-0263BL VT3 IND Primary Containment Penetration Surface 05/10/1999 E 1. 12 ISI-305 C-36D 99-0263BLR1 VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 l

_151-305 C-3BC 99-0264BL VT3 MAD Primary Containment Penetration Surface 05/10/1999 E 1. 12

\\

ISI-305 C-38D 99-0265BL VT3 NAD j/

Primary Containment Penetration Sur f ace 05/10/1999 E 1. 12 g

ISI-305 C-42D 99-0266BL VT3 IND Primary Containment Penetration Surface 05/10/1999 E 1. 12 07/29/19 Page 15

Frairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company p

1717 Wakonada Drive Third Interval By Report #

414 Nicollet Mall

{

Welch, MN 55009 ccusmarcial Service Dates December 16, 1973 Minneapolis, MN 55401 k

ISO Item Report Number Method Results System Item Description Exam Date ASME Section XI Item ISI-305 C-42D 99-0266BLR1 VT3 NAD Primary Containment Per.etration Surface 05/26/1999 E 1. 12 ISI-305 C-8A 99-0267BL VT3 NAD Primary Containment Penetration Surface 05/10/1999 E 1. 12 TSI-69 W-25 99-0268 UT45 NAD FEEDWATER LOOP

'B' REDUCER - NOZZLE 05/10/1999 C 5. 21 ISI-69 W-25 99-0269 UT60 CEO FEEDWATER LOCP

'B' REDUCER - NOZZLE 05/10/1999 C 5. 21 ISI-52 W-23 IN 93-20 99-0270 UT45 NAD FEEDWATER LOOP

'A' REDUCER - NOZZLE 05/10/1999 NO IN 93-20 ISI-52 W-23 IN 93-20 99-0271 UT60 GEO FEEDWATER LOOP

'A' REDUCER - NOZZLE 05/10/1999 NC IN 93-20

_ISI-43A B-1 99-0272BL VT1 NAD STEAM GENERATOR ell INLET MANWAY BOLTS 05/11/1999 B7 30 ISI-43A B-2 99-0273BL VT1 NAD STEAM GENERATOR 911 OUTLET MANWAY BOLTS 05/11/1999 B 7. 30 ISI-SC W-3 99-0274 PT IND SPRAY TO PRESSURIZER PIPE - ELBOW 05/11/1999 B 9. 21 Linear indication ISI-SC W-3 99-0274R1 PT NAD SPRAY TO PRESSURIZER PIPE - ELBOW 05/16/1999 B 9. 21

\\

Minor buffing ISI.

SC W-4 99-0275 PT NAD SPRAY TO PRESSURIZER ELBOW - PIPE 05/11/1999

89. 21 ISI-33A W-2 99-0276 PT NAD LOW HEAD RV INJ

'A' PIPE - TEE 05/12/1999 B 9. 21 ISI-33A W-4 99-0277 PT NAD LOW HEAD RV INJ

'A' TEE - PIPE 05/12/1999 B 9. 21 ISI-68A H-2 99-0278 VT3 NAD MAINSTEAM

'B' SEISMIC RESTRAINT 05/12/1999 F-A & C 3, 20 ISI-29B B-1 99-0279 VT1 NAD PRESS SAFETY LINE B FLANGE BOLTING 05/12/1999

87. 50 ISI-68A H-3 99-0280 VT3 IND MAINSTEAM

'B' SEISMIC RESTRAINT 05/03/1999 F-A & C 3. 20 Jam Nut loose ISI+ 68A H-3 99-0280R1 VT3 NAD MAINSTEAM

'B' SEISMIC RESTRAINT 05/20/1999 F-A & C 3. 20 Repair and Engineering Eva luati.e.n ISI-32B W-11 99-0281 PT NAD AUXILIARY SPRAY PIPE - TEE 05/12/1999 8 9. 21 ISI-32B W-14 99-0282 PT NAD AUXILIARY SPRAY ELBOW - PIPE 05/12/1999 B 9. 21 ISI-32B W-15 99-0283 PT NAD AUXILIARY SPRAY PIPE - VALVE 05/12/1999 8 9. 40

\\/

ISI-43B B-2 99-0284BL VT1 NAD STEAM GENERATOR 812 OtfrLET MANWAY STUDS 05/12/1999 B 7. 30 ISI-438 B-1 99-0285BL VT1 NAD STEAM GENERATOR 912 INLET MANWAY STUDS 05/12/1999 B 7.

30 07/29/19 Page 16

r Prairio Island helaar Generating Inservice Inspection Report Log Northern States Power Company

[#~

1717 Wakonada Drive Third Interval By Report S 414 Nicollet Mall Welch, MN 55089 commercial Service Dates December 16, 1973 Minneapolie, MN 55401 ISO Item Report Number Method Results system Item Description Exam Date AEME Section KI Item ISI-305 C-6A 99-0286BL VT3 NAD Primary Containment Penetration Surface 05/12/1999 E 1. 12 ISI-305 C-36E 99-0287BL VT3

ND Primary Containment Penetration Surface 05/12/1999 E 1. 12 ISI-305 C-36E 99-02 87BLR1 -

VT3 NAD Primary Containment Penetration Surface 05/26/1999 E 1. 12 ISI-305 S-82 99-0288BL VT3 IND Primary Containment Plate Surface 05/12/1999 E 1. 12 ISI-305 S-82 99-0288BLR1 VT3 NAD Primary antainment Plate Surface 05/26/1999 E 1. 12 ISI-305 C-13A 99-02898L VT3 NAD Primary Containment Penetration Surface 05/12/1999 E 1, 12 ISI-305 C-8B 99-0290BL VT3 NAD Primary Containment Penetration Surface 05/12/1999 E 1. 12 ISI-311 C-42B 99-0291BL VT3 NAD Primary containment Penetration Surface 05/12/1999 E 1. 12 ISI-51A H-8 99-0292 VT3 IND MAIN STEAM

'A' ANCHOR elbow (8) 05/12/1999 F-A & C 3. 20 w

ISI-51A_. _ _

Gag _at_ Baseplate to wall s

H-8 99-0292R1 VT3 NAD MAIN STEAM

'A' ANCHOR ELBOW (8) 05/19/1999 F-A & C 3, 20 Engi.neeri_ng Evaluation ISI-SIA H-7 99-0293 VT3 IND MAIN STEAM

'A' BEAR'G BRAK ASSY (3) 05/12/1999 F-A & C 3. 20 Gap _ at baseplate to_ wall ISI* 51A H-7 99-0293R1 VT3 NAD MAIN STEAM

'A' BEAR'G BRAK ASSY (3) 05/19/1999 F-A & C 3. 20 Rngineering_Eya_1_uation

_ISI-69 H-2 99-0294 VT3 NAD FEEDWATER LOOP

'B' SEISMIC RESTRAINT 05/13/1999 F-A & C 3. 20 ISI-69 H-9 99-0295 VT3 NAD F EEDWATER LOOP

'B' SEISMIC RESTRAINT 05/13/1999 F-A & C 3. 20 ISI-69 W-23 99-0296 UT45 NAD FEEDWATER LOOP

'B' PIPE-TO-SWEEPOLET 05/12/1999 C 5. 51 l

ISI-51A H-9 99-0297 MT NAD MAIN STRAM

'A' SIESMIC RESTRAINT 05/17/1999 P-A & C 3. 20 ISI-11D W-10 99-0298 PT NAD SEAL INJ LOOP ' A' PIPE - ELBDW 05/13/1999 8 9. 21 1

ISI-11C W-12 99-0299 PT NAD SEAL INJ LOOP ' A' RED TEE - PIPE 05/13/1999 B 9. 21 ISI-11B W-1 99-0300 PT NAD SEAL IRI LOOP ' A' PIPE - ELBOW 05/13/1999 8 9. 21 q

ISI-22 W-1 99-0301 PT NAD 2* RTD TAKEOFF CLD B PIPE - HALF COUPLING 05/13/1999 B 9. 32

/"%

/

\\

ISI-22 W-6 99-0302 PT NAD k,,,/

2* RTD TAKEOFF CLD B PIPE - VALVE 05/13/1999 B 9.

21 l

ISI-22 W-8 99-0303 PT NAD J

2* RTD TAKEOFF CLD B PIPE - VALVE 05/13/1999 8 9. 21 07/29/19 Page 17 i

Prairie Island holear Generating Inservice Inspection Report Log Northern States Power Company

(' \\

1717 Wahonada Drive Third Interval By Report #

414 Nicollet Mall Welch, Nu 55089 Commercial service Dates December 16, 1973 minneapolis, MN 55401 ISO Item Report Number Method Results system Item Description Exam Date AENE section XI Item ISI-27C H-4 99-0304 VT3 NAD SEAL TNJ LOOP

'B' RIGID RANGER 05/13/1999 F-A C1 I ISI-302 S-66 99-0305hL VT3 IND Primary Containment Plate Surface 05/13/1999 E 1. 12 I'SI-302 S-66 9 9-03 05BLR1 -

VT3 NAD Primary Containment Plate Surface 05/24/1999 E 1. 12 ISI-302 S-65 99-0306BL VT3 IND Primary Containment Plate Surface 05/13/1999 E 1. 12 ISI-302 S-65 99-0306BLR1 VT3 NAD Primary Containment Plate Surface 05/24/1999 E 1. 12 ISI-302 G-66 99-0307BL VT3 IND Primary Containment Moist barrier-inner 05/13/1999 E 5. 30 ISI-302 G-66 99-0307BLR1 VT3 NAD Primary Containment Moist Barrier-inner 05/21/1999 E 5. 30 ISI-302 G-65 99-0308BL VT3 IND Primary Containment Moist Barrier-inner 05/15/1999 E 5. 30 ISI-302 G-65 99-030BBLR1 VT3 NAD Primary Containment Moist Barrier-inner 05/21/1999 E 5. 30 1S1-302 G-64A 99-0309BL VT3 IND Primary Containment Moist Barrier-outer 05/13/1999 E 5. 30 ISI-302 G-64A 99-0309BLR1 VT3 NAD Primary Containment Moist Barrier-outer 05/21/1999 E 5. 30 ISI-42 B-1 99-0310BL VT1 NAD PRESSURIZER MANWAY STUDS 05/14/1999 B 7.

20 ISI-3C W-4 99-0311 PT NAD RHR LOOP ' A' ELBOW - PIPE 05/14/1999 8 9.

11 ISI-27B W-5 99-0312 PT NAD SEAL INJ LOOP

'B' ELBOW - PIPE 05/14/1999 B 9. 21 ISI-27B W-7 99-0313 PT NAD SEAL INJ LOOP "B'

VALVE - PIPE 05/14/1999 8 9. 21 ISI-3C H4 99-0314 VT3 NAD RRR LOOP

'A' ROD / CLAMP 05/14/1999 F-A C1 I ISI-11C H-8 99-0315 VT3 NAD SEAL INJ LOOP

'A' ANCHOR 05/14/1999 F-A C1 I q

ISI-11D H-6 99-0316 VT3 NAD SEAL INJ LOOP

'A' ROD CLAMP 05/14/1999 F-A C1 I ISI-28 W-6 99-0317 PT NAD 10" PRESSURIZER SURG BENT PIPE - REDUCER 05/14/1999 8 9.

11 ISI-28 W-7 99-0318 PT NAD 10* PRESSURIZER SURG REDUCER - NOZZLE END 05/14/1999 B 5.

40 l

D 5,,j)/

ISI-27C W-9 99-0319 PT NAD r

g SEAL INJ LOOP

'B' PIFE - REDUCING TEE C5/15/1999 B 9. 21 ISI-97B H-2 99-0320 VT3 NAD SI 12 DISCHARCE BOX SUPPORT 05/15/1999 F-A C1 II 07/29/19 Page 18 1

i Prairie Island Nuclear Generating Inservice Inspection Report Log Northern states Power Company fN 1717 Wakonada Drive Third Interval By Report #

414 Micollet Mall

\\

Welch, MN $5089 V

Commercial Service Dates December 16, 1973 Minneapolis, MN 55401 ISO Itaa Report Number Method Results System Item Description Exam Date ABME Section II Item IS1-97B W-11 99-0321 PT NAD SI 12 DISCHARGE ELBOW - PIPE 05/15/1999 C 5. 21 ISI-28 W-7 99-0322 UT45

'NAD 10" PRESSURIZER SURG REDUCER - NOZZLE END 05/15/1999 B 5. 40 PSI-2 8 N-6 99-0323 UT45 NAD 10" PRESSURIZER SURO BENT PIPE - REDUCER 05/15/1999 8 9. 11 ISI-97C W-8 99-0324 PT NAD SI 12 DISCHARGE ORIFICE - PIPE 05/15/1999 C 5. 30 ISI-68B H-1 99-0325 VT3 NAD MAINSTEAM

'B' BEAR'c BRAK ASSY 05/16/1999 F-A & C 3. 20 ISI-100A H-2 99-0326 VT3 NAD~~~

SI 11 DISCHARGE SADDLE SUPPORf 05/16/1999 F-A C1 II ISI-51C H-3 99-0327 VT3 5NAD MAIN STEAM

'A' CONST SUPPORT 05/16/1999 F-A C1 II ISI-51A H-1 99-0328 (A)

VT3 NAD MAIN STEAM

'A' SKISMIC RESTRAINT 05/36/1999 F-A & C 3. 20 Scope _ Expansion ISI-SLA H-2 99 0329 (A)

VT3 NAD MAIN STEAM

'A' SEISMIC RESTRAINT 05/16/1999 F-A & C 3.

20 Scopef>pansion ISI-51A H-3 99-0330 (A)

VT3 _

NAD MAIN STEAM

'A' SEISMIC RESTRAIIC 05/16/1999 F-A h C 3. 20

%.,/

Scope Expansion ISI-51A H-4 99-0331 (A)

VT3 -

NAD MAIN STEAM

'A' SEISMIC RESTRAINT 05/16/1999 F-A & C 3. 20 Scope,Extansion ISI-98C W-21 99-0332 PT NAD SI 11 DISCHARGE PIPE - TEE 05/17/1999 C 5. 21 ISL-14 B-1 99-0333 UTO NAD RC PUMP 11 PUMP FLANGE BOLTS 05/16/1999 B 6.180 ISI-42 N-1 IR 99-0334 UTO NAD PRESSURIZER SURGE NOZZLE 05/16/1999 B 3.120

  • Nominal Beam Angle 21.9deg.

15I-307 31 99-0335BL VT1 NAD Primary containment Bolted Connection 05/15/1999 E 8. 10 ISI-311 S-100 99-0336BL VT3 IND Primary Centainment Plate Surface 04/27/1999 E 1. 12 ISI-311 S-100 99-0336BLR1 VT3 NAD Primary Containment Piete Surface 05/20/1999 E 1. 12 151-311 S-101 99-0337BL VT3 IND Primary Containment Plate surface 04/27/1999 E 1. 12 ISI-311 S-101 99-0337BLR1 VT3 NAD Primary Containment Plate Surface 05/20/1999 E 1. 12 ISI-68A H-3 99-0338 MT NAD MAINSTEAM

'B' SEISMIC RESTRAINT 05/13/1999 F-A h C 3. 20

/

Limited, Less than 909 I

ISI-60A H.1 99-0339 MT NAD MAINSTEAM

'B' SIESMIC PESTRAINT 05/13/1999 F-A & C 3. 20 Limited, Less than 90%

ISI-6&A H-2 99-0340 MT NAD MAINSTEAM

'B' SEISMIC RESTRAINT 05/13/1999 F-A & C 3. 20 Limited, Less than 90%

l 07/29/19 Page 19 1

F l

i Prairie Island Nuclear Generating Innervice Inspection Report Log Northern States Power Company g'~'%

1717 Makonada Drive Third Interval By Report 8 414 Nicollet Mall I

Welch, MN 55089 commercial Service Dates December 16, 1973 Minneapolis, MN 55401 o

ISO Item Report Number Method Results system Itam bescription Exam Date AEME section XI Item ISI-51A W-7 LSU 2LSD 99-0341 UT45 NAD MAIN STEAM

'A' PIPE - 45 ELBOW 05/17/1999 C 5. 51 ISI- $1A W-7 LSU 2LSD 99-0342 MT NAD MAIN STEAM

'A' PIPE - 45 ELBCW 05/17/1999 C 5. 51 ISI-51A H-7 99-0343 MT NAD MAIN STEAM

'A' BEAR'G BRAK ASSY {3) 05/17/1999 F-A h C 3. 20 Limited. Less than 90%

ISI-302 S-64A-A 99-0344BL VT3 NAD Primary Containment Plate Surface 05/17/1999 E 1. 12 ISI-302 B1 99-0345BL VT1 IND Primary Containmer.t Bolted Connection 05/17/1999 E 8.

10

{

ISI-302 B1 99-0345BLR1 VT1 NAD Primary Containment Bolted Connection 05/24/1999 E 6. 10 ISI-307 B2 99-0346BL VT1 NAD Primary Containment Bolted Connection 05/18/1999 E 8.

10 ISI-302 G1 99-0347BL VT3 NAD Primary Containment Seals & Gaskets 05/18/1999 R 5. 10

_ISI-302 G2 99-034 BBL VT3 NAD Primary containment Seals & Gaskets 05/18/1999 E 5. 10 ISI-302 S-64A

'~99-0349BL VT3 NAD

/

I Primary Containment Plate Surface 05/17/1999 E 1. 12 151-68C W-11 99-0350 MT NAD MAINSTEAM

'B' PIPE - FLANGE NOZZLE 05/18/1999 C 5.

80 ISI-43A W-A 99-0351 UTO NAD STEAM GENERATOR 911 TUBE SHEET / HEAD 04/26/1999 B 2. 40 Limited. Greater than 90%

ISI-43A W-A 99-0352 UT45 IND STEAM GENERATOR 911 TUBE SHEET / HEAD 04/24/1999 B 2. 40 Limited, Greater than 90%,

Linear indications ISI-43A W-A 99-0352R1 UT45 NAD STEAM GENERATOR til TUBE SHEET / HEAD 05/22/1999 B 2. 40 Flaw Evaluation ISI-43A W-A 99-0353 UT60 IND STEAM GENERATOR 911 TUBE SHEET / HEAD 04/24/1999 B 2. 40 Limited, Greater than 90%.

Linear indications ISI-43A W-A 99-0353R1 UT60 NAD STEAM GENERATOR til TUDE SHEET / HEAD 05/22/1999 8 2. 40 Flaw Evaluation ISI-43A N-51R 99-0354BL UTO NAD STEAM GENERATOR eli NOZZLE INNER RADIUS 05/18/1999 B 3.140 Beam Angle 298, Limited, Greater than 90%

ISI-12A W-5 99-0355 UTO NAD REACTOR COOLANT ' A' RED 400 ELBOW - NZZL 05/18/1999 B 9. 11 Limited, Less than 90%

ISI-100A W-23 99-0356 PT NAD SI 11 DISCHARGE PIPE - ELBOW 05/20/1999 C 5. 21 ISI-43A W-B 99-0357 UTO NAD STEAM GENERATOR 911 TUBESHEET - SHELL 05/10/1999 C 1. 30 ISI-43A W-B 99-0358 UT45

ND STEAM GENERATOR 911 TUBESHEET - SHELL 05/10/1999 C 1. 30 Limited, Greater than 90%,

Linear Indications 07/29/19 Page 20

I l

I l

Prairie Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company

/N 1717 Wakonado Drive Third Interval By Report #

414 ulcollet Mall

]k welch, um 55089 Commercial Service Dates December 16, 1973 Minneapolis, MN 55401 ISO Item Report Number Method Results l

System Item Description Exam Date ASME Section II Item ISI-43A W-B 99-0358R1 UT45 NAD STEAM GENERATOR 911 TUBESHEET - SHELL 05/22/1999 C 1. 30 Flaw Evaluation ISI-43A W-B 99-0359 UT60 IND STEAM GENERATOR #11 TUBESHEET - SHELL 05/10/1999 C 1.

30 Limited, Greater than 90%,

Linear Indications 181-43A W-B 99-0359R1 UT60 NAD STEAM CENERATOR fil TUBESHEET - SHELL 05/22/1999 C 1. 30 Flaw Evaluatio_n ISI-302 C-60 99-0360BL VT3 IND Primary Containment Penetration Surfaco 05/18/1999 E 1. 12 ISI-302 C-60 99-0360BLR1 VT3 NAD Primary Containment Penetration Surface 05/24/1999 E 1. 12 ISI-302 C-60-A 99-0361BL VT3 IND Primary containment Penetration Surface 05/18/1999 E 1. 12 ISI-302

~~~

C-60-A 99-0361BLR1 VT3 NAD Primary Containment Penetration Surface 05/24/1999 E 1.

12 ISI-303 B1 99-0362BL VT1 NAD Primary Containment Bolted Connection 05/19/1999 E 8. 10 l

ISI-307 C-44 99-0363BL VT3 NAD Primary Containment Penetration Surface 05/19/1999 E 1. 12 ISI-303 C-18 99-0364BL VT3 NAD

\\s.

Primary Containment Penetration Surface 05/19/1999 E 1. 12 I

ISI-51A H-8 99 0365 MT IND MAIN STEAM

'A' ANCHOR ELBOW (B) 05/19/1999 F-A & C 3. 20 Linear Indicaticn i

ISI-51A H-8 99-0365R1 MT NAD MAIN STEAM

  • A' ANCHOR ELBOW (8) 05/22/1999 F-A & C 3. 20 Code Acceptable ISI-83D H. I 99-0366 MT KAD SI Pump 12 Suppo/t A 05/18/1999 F-A & C 3. 30 Limited, Less than 90%

ISI-83D H-2 99-0367 MT NAD SI Pump 12 Support B 05/18/1999 F-A & C 3. 30 Limited, tess than 90%

ISI-83D H-3 99-0368 MT NAD SI Pump 12 Support c 05/18/1999 F-A & C 3. 30 Limited, Less than 904 IS1-83D H-4 99-0369 MT NAD SI Pump 12 Support D 05/18/1999 F-A & C 3. 30 Limited. Less than 90%

ISI-83D H-5 99-0370 MT NAD SI Pump 12 Support E 05/18/1999 F-A & C 3. 30

"[SI-83D H-6 99-0371 MT NAD SI Pump 12 Support P 05/18/1999 F-A & C 3. 30 ISI-5A W7 99-0372 (A)

PT NAD l

SPRAY TO PRESSURIZER VALVE - ELBOW 05/20/1999 B 9, 21 Scope Expansion ISI-SS W-16 99-0373 (A)

PT NAD

-~s SPRAY TO PRESSURIZER PIPE - ELBOW 05/20/1999 B 9. 21 y

Scepe_ Expansion s,_/

ISI-50 W-2 99-0374 (A)

PT NAD SPRAY TO PRESSURIZER NOZZLE - PIPE 05/19/1999 B 9, 21 Scope Expansion ISI-SD W-15 99-0375 (A)

PT NAD SPRAY TO PRESSURIZER PIPE - TEE 05/19/1999 9 9. 21 Scope _ Expansion l

'07/29/19 Page 21 L

T l

Prairio Island Nuclear Generating Inservice Inspection Report Log Northern States Power Company O

1717 Wakonada Drive Third Interval By Report #

414 Nicollet Mall Welch, MN $5089 Cconnercial Service Dates December 16, 1973 Minneapolis, MN 55401 ISO Item Report Number Method Results Bystem Item Description Exam Date AsME Section II Item ISI-69 W-4 99-0376 MT IND FEEDWATER LOOP

'B' ELBOW - PIPE 05/20/1999 C 5. 51 Linear Indication ISI-69 W-4 99-0376R1 MT NAD FEEDWATER LOOP

'B' ELBOW - PIPE 05/20/1999 C 5.

51 Examined after repair TSI-97B W-11 99-0377 UT45 NAD SI 12 DISCHARGE ELBOW - PIPE 05/19/1999 C 5. 21 ISI-98C W-21 99-0378 UT45 NAD SI 11 DISCHARGE PIPE - TEE 05/19/1999 C 5. 21 ISI-3C W-4 99-0379 UT45 NAD RHR LOOP ' A' ELBOW - PIFE 05/19/1999 B 9.

11 ISI-307 C-42F 99-0380BL VT3 IND Primary Containment Penetration Surface 05/20/1999 E 1, 12 ISI-307 C-42F 99-0380BLR1 VT3 NAD 1

Primary contair. ment Penetrr';on Surface 05/26/1999 E 1. 12 ISI-303 C-19 99-0381BL VT3 NAD Primary containment Penetration Surface 05/20/1999 E 1.

12 l

151-303 B2 99-0382BL VT1 NAD 1

Pt imary Containment Bolted Connection 05/20/1999 E 8.

10 IS!- 13B W-3 LS 2D 99-0383 UTO NAD 7g

\\

REACTOR COOLANT

'B' PIPE - ELBOW 05/19/1999 B 9.

11

V ISI-13B W-1 99-03R4 UTO NAD REACTCR COOLANT

'B' NOZZLE - 40s ELBOW 05/19/1999 B 9.

11 Limited, Greater than 90%

ISI-69 W-4 99-0385 UT45 NAD FEEDWATER LOOP

'B' ELBOW - PIPE 05/20/1999 C 5. 51 ISI-43D H-1 99-0386 VT3 NAD STEAM GENERATOR #12 SNUBBER 05/19/1999 F-A C1 I ISI-43D H-2 99-0387 VT3 NAD STEAM GENERATOR #12 SNUBBER 05/19/1999 F-A C1 I ISI-43D H-3 99-03BP.

VT3 NAD STEAM GENERATOR 512 ENUBBER 05/19/1999 F-A C1 I ISI-43D H-4 99-0189 VT3 NAD STEAM GENERATOR 612 SNUBBER 05/19/1999 F-A C1 I ISI-100A W-23 99-0390 UT45 NAD SI 11 DISCHARGE PIPE - ELBOW 05/20/1999 C 5. 21 ISI-52 W-2 99-0391BL (A)

MT NAD FEEDWATER LOOP

'A' PIPE - ELBOW 05/20/1999 C 5. 51 6 HELB Scope Expansion ISI-52 W-3 99-0392BL (A)

MT NAD PEEDWATER LOOP

'A' ELBOW - PIPE 05/20/1999 C 5. 51 & KELB Scope Expan_sion

_ _ _ _ISI-69 W-2 99-039 (A)

MT NAD PEEDWATER LOOP

'B' PIPE - PIPE 05/20 19 C 5.

51 Scope Expansion

\\

ISI-49 W-3 99-0394 (A)

MT NAD

/

FEEDW/ TER LOOP ' B' PIPE - ELBOW 05/20/1999 C 5. 51 Scope _ Expansion XH-5-8 14B South Patch 99-0395BL UTO NAD Feedwater Heater Shell Plate 05/25/1999 ACME Sec VIII 07/29/19 Page 22 J

r~

1 Prairie Island nuclear Generating Inservice Inspection Re;crt Log Nort.hern States Power Company

/D 1717 Wakonada Drive Third Interval By Report #

414 Nicollet Mall f

Walch, MN 55089 Commercial service Dates December 16, 1973 Minneapolis, MN 55401 ISO Item Report Number Method Results pystem Item Description Enam Date ASME section II Item XH-5-8 148 South Paten 99-0396BL UT45 NAD Feedwater Heater Shell Plate 05/25/1999 ASME Sec VIII XH-5-8 14B North Patch 99-0397BL UTO NAD Feedwater Heater Shell Plate 05/25/1999 ASME Sec VIII XN-5-8 14B North Patch 99-0398BL UT45 NAD l

Feedwater Heater Shell Plate 05/25/1999 lASMESecVIII l

l I

i j

l O

07/29/19 Page 23

NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT 1,1999 APPENDIX D LIST OF SECTION XI VT-2 EXAMINATIONS 1 Page 4

O O

r l

[

ISI Pressure Tests-Prairie Island Unit 1 12-12-97 to 05-26-99 ISI PRESSURE TESTS-UNIT 1 CLASS I AND 2 SYSTEM CLASS DESCRIPTION PROCEDURE DRAWING # DATE Test l

Status RC 1

Reactor coolant 1070

.NF-39807 5/24/1999 SAT CC 2

component cooling il68.4A NF-39828-1 4/17/1999 SAT RH 2

Residual Heat i168.10 NF-39808 5/24/1999 SAT Removal MS 2

MAIN STEAM l168.11 NF-39820 5/24/1999 SAT SI 2

safetyinjection 1168.12 NF-39813 4/21/1999 SAT CS 2

containment spray 1168.14 NF-39824 5/l7/1999 SAT HC 2

Post LOCA 1168.15 NF-39830 5/6/1999 SAT RC 2

Reactor Hood Vent 9905380 NF-39807 5/24/1999 SAT SS 2

sampling system 1168.19 NF-39825 4/21/1999 SAT ZC-2 containment 1168.24 NF-39847 5/24/1999 SAT Penetration Si 2

safety lnjection Trch 1168.25 NF-39814 4/21/1999 SAT

'O tO xj 1

l 1

NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT 1,1999 APPENDIX E RESULTS OF STEAM GENERATOR EDDY CURRENT EXAMINATIONS 31 Pages O

i O

NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999

(m

()

RESULTS OF STEAM GENERATOR EDDY CURRENT EXAMINATIONS 9904 REFUEL OUTAGE During the April 1999 scheduled refueling outage 100% of all accessible tubes in steam generator 11 and 12 were examined fulllength as part of the inservice inspection. The examination was conducted utilizing the multifrequency eddy current technique. The inspection program was as follows:

~

1. Bobbin Coil Examinations - The bobbin coil technique was used to examine all tubes full length, except the U-Bend region of rows 1 and 2. These bobbin coil examinations were completed using magnetically biased 0.720 inch,0.700 inch and 0.680 inch diameter probes.
2. MRPC Examinations - The 0.680 inch and 0.650 inch dual motion Plus Point motorized rotating pancake coil (MRPC) technique was used to examine 100% of the U-Bend region of rows 1 and 2. The 0.720 inch 3-Coil (0.115" mid range pancake / Plus Point mid range / 0.080" high frequency shielded pancake) MRPC technique was used to examine 100% of the hot leg tubes from three inches above the secondary tube sheet face through the tube end. The 0.610 inch Dual (high / low frequency) Gimbaled Plus Point MRPC technique was used to examine the entire sleeve (from cleeve end to sleeve end) on all inservice sleeves, except for one sleeve which was obstructed, not tested and subsequently plugged.

The 0.600 inch and 0.560 inch (Plus Point mid range magnetically oiased) MRPC technique was used to examine 25% of the Asea Brown Boveri Combustion Engineering (ABBCE) Inconel 690 hot leg tube roll plugs and sleeve roll plugs.

3. Supplemental Examinations - The 0.720 inch and 0.640 inch 3-Coil MRPC technique was used to supplement the bobbin coil data to further c5aracterize all: absolute drift signals, copper deposit signals, lm other deposit signals, dent signals > 5.0 vohs at a support structure, indications not reportable > 1.5 e

volts at tube support plates, manufacturing bumish mark signals, mix residual indication signals, possible loose part signals, possible support ligament indication signals, non quantifiable indication signals, distorted indication signals, cold leg thinning indications equal to or greater than 40% through wall and cold leg thinning indications less than 40% through wall but equal to or greater than 1.5 volts.

The 0.720 inch magnetically biased 3-Coil MRPC technique was used to disposition MRPC permeability variation indications. The 0.610 inch magnetically biased Dual (high / low frequency) Gimbated Plus j

Point MRPC technique was utilized on sleeve weld indications and sleeves with excessive permeability variations.

4. Pre-Service Baseline Examinations - The 0.730 inch combination probe (bobbin / 0.115" mid range pancake / Plus Point mid range) was used to baseline examine and profile all tubes rerolled this outage.

The 0.610 inch Dual (high / low frequency) Gimbated Plus Point MRPC technique was used to examine the entire sleeve (from sleeve end to sleeve end) on all installed sleeves. The 0.610 inch magnetically biased Dual (high / low frequency) Gimbaled Plus Point MRPC technique was utilized on sleeve weld indications.

ABBCE was contracted to acquire and evaluate the eddy current data. Zetec, Inc. was subcontracted by ABBCE to perform primary manual data analysis. Framatome Technologies, Inc. was contracted to perform a completely independent evaluation of all data acquired by ABBCE utilizing manual analysis on all MRPC data and Computer Data Screening (CDS) of all bobbin coil data. The scope of all the work contracted was completed using remote positioning devices and the Zetec MlZ-30 digital test equipment along with associated acquisition and analysis software. The software utilized was Zetec, Inc. EDDYNET98 version 1.0 including Patch _E98_1.19.

p 1

l

NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 A summary of the distribution and disposition of indications can be found in Table 1.

A summary of the distribution and disposition of indications by tube can be found in Table 11.

Listsof: tubes left inservice less than the Technical Specification (< T. S.) repair limit, tubes left inservice using the Alternate Repair Criteria (ARC), tubes left inservice with the F* criteria without an additional reroll (F*0), tubes left inservice with the F* criteria with one additional reroll (F*1), tubes left inservice with the EF*

criteria with an additional elevated reroll (EF*), tubes left inservice by installing a sleeve and tubes plugged this outage can be found in Tables lil through IX respectively.

A summary of the total tubes plugged and sleeved to date (05/99) can be found in Table X.

TABLEI Distribution and Disposition of indications S/G NO.

< T. S.

ARC F*0 F*1 EF*

SLEEVE PLUG 11 181 315 250 6

19 0

11

]

12 44 144 4

6 0

182 77 TABLE 11 Distribution and Disposition of indications by Tube S/G NO.

< T. S.

ARC F*0 F*1 EF*

SLEEVE PLUG 11

-115 291 250 6

19 0

11 12 38 138 4

6 0

182 77 TABLE Ill

< T. S. Indications S/G NO. LEG ROW COL PERCENT LOCATION STATUS 11 H

1 2

33 TSH

+17.58

<TS 11 H

1 3

32 TSH

+17.49

<TS 11 H

1 4

7 TSH

+17.44

<TS 11 H

1 5

5 TSH

+17.43

<TS 11 C

28 11 35 010

+0.20

<TS 11 C

30 15 2

01C

+0.00

<TS 11 C

32 16 1

010

-0.03

<TS 11 C

33 16 15 01C

+0.03

<TS j

11 C

23 24 10 NV3

-0.06

<TS 11 C

42 28 8

03C

-0.25

<TS 11 C

40 30 22 NV4

+0.06

<TS 11 C

40 30 25 NV3

-0.17

<TS 11 C

42 30 31 03C

-0.33

<TS 11 C

42 31 4

01C

+0.34

<TS O

11 C

42 31 24 NV3

+0.00

<TS 2

NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 S/G NO. LEG ROW COL PERCENT LOCATION STATUS 11 C

42 31 6

03C

-0.17

<TS 11 C

20 32 15 NV4

+0.21

<TS 11 C

20 32 17 NV2

-0.21

<TS 11 C

44 33 22 03C

-0.22

<TS 11 C

39 35 22 07H

+37.64

<TS 11 C

36 38 21 NV2

+33.16

<TS 11 C

41 38 20 NV4

+5.80

<TS 11 C

26 39 23 NV3

-0.26

<TS 11 C

27 39 21 NV3

-0.35

<TS 11 C

27 39 31 NV2

+3.08

<TS 11 C

41 39 21 NV2

+38.86

<TS 11 C

43 39 27 NV2

+41.01

<TS 11 C

35 40 22 07H

+33.46

<TS 11 C

35 40 42 NV2

+1.30

<TS 11 C

40 41 25 NV2

+1.87

<TS 11 C

40 41 27 07H

+35.65

<TS 11 C

35 42 29 07H

+33.24

<TS 11 C

35 42 39 NV2

+1.73

<TS 11 C

36 45 22 NV4

+2.90

<TS 11 C

37 46 24 NV2

+34.22

<TS 11 C

36 47 20 NV2

+32.74

<TS p

11 C

36 47 27 NV4

+3.87

<TS 4

\\

11 C

35 48 28 NV2

+31.10

<TS 11 C

35 48 43 NV4

+3.48

<TS 11 C

41 48 28 NV3

-0.23

<TS 11 C

41 48 26 NV4

-0.17

<TS 11 C

41 48 31 NV1

-0.26

<TS 11 C

41 48 38 NV2

+0.23

<TS 11 C

41 49 28 NV2

+38.43

<TS 11 C

41 49 33 NV4

+4.88

<TS 11 C

43 49 38 NV4

+5.52

<TS 11 C

43 49 38 NV2

+40.39

<TS 11 C

29 50 20 NV4

+3.68

<TS 11 C

38 50 21 NV2

+35.56

<TS 11 C

38 50 24 NV2

+2.63

<TS 11 C

41 50 27 07H

+36.74

<TS 11 C

41 50 30 NV2

+2.55

<TS 11 C

35 51 21 NV4

+3.31

<TS 11 C

35 51 23 NV2

+31.98

<TS 11 C

36 51 21 NV2

+2.38

<TS 11 C

36 51 31 NV2

+33.28

<TS 11 C

38 51 31 NV2

+35.23

<TS 11 C

39 51 20 NV4

+5.05

<TS 11 C

39 51 22 NV2

+36.54

<TS 11 C

43 51 25 NV4

+6.02

<TS Q-

_ 11 C

43 51 31 NV2

+40.51

<TS i

3

NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 S/G NO. LEG ROW COL PERCENT LOCATION STATUS 11 C

38 52 21 NV4

+4.72

<TS 11 C

38 52 29 NV2

+35.44

<TS 11 C

40 52 24 07H

+36.64

<TS 11 C

40 52 24 NV4

+5.22

<TS 11 C

40 52 33 NV2

+37.48

<TS 11 C

40 52 35 NV2

+2.02

<TS 11 C

44' 52 9

010

-0.03

<TS 11 C

45 52 21 01C

-0.03

<TS 11 C

38 53 23 NV2

+2.10

<TS 11 C

38 53 27 NV4

+4.92

<TS 11 C

38 53 41 NV2

+35.13

<TS 11 C

40 53 20 NV2

+37.29

<TS 11 C

43 53 23 NV4

+5.65

<TS 11 C

43 53 26 NV2

+40.18

<TS 11 C

44 53 25 01C

-0.17

<TS 11 C

45 53 13 01C

-0.17

<TS 11 C

29 54 23 NV4

+1.40

<TS 11 C

29 54 26 NV2

+24.86

<TS 11 C

29 54 27 NV2

+1.77

<TS 11 C'

29 54 28 07H

+32.59

<TS 11 C

36 54 23 NV4

+4.86

<TS p

11 C

36 54 24 NV2

+33.23

<TS Q

11 C

36 54 36 NV2

+2.23

<TS 11 C

42 54 35 NV2

+39.62

<TS 11 C

42 54 38 NV4

+5.48

<TS 11 C

43 54 22 01C

-0.11

<TS 11 C

31 55 27 NV2

+27.25

<TS 11 C

37 55 23 NV2

+33.81

<TS 11 C

39 55 21 NV2

+35.96

<TS 11 C

43 55 21 NV2

+2.18

<TS 11 C

43 55 23 NV2

+40.37

<TS 11 C

43 55 30 NV4

+5.07

<TS 11 C

44 55 21 NV3

+0.11

<TS 11 C

44 55 23 NV2

-0.23

<TS 11 C

26 56 28 NV2

+21.56

<TS 11 C

26 56 37 NV4

+0.14

<TS 11 C

35 56 22 NV4

+2.51

<TS 11 C

36 56 30 NV2

+1.85

<TS 11 C

36 56 33 NV4

+2.66

<TS 11 C

41 56 22 NV4

+4.17

<TS 11 C

11 57 7

NV1

+0.00

<TS 11 C

35 57 31 NV2

+1.91

<TS 11 C

35 57 33 NV2

+31.78

<TS 11 C

36 57 25 NV4

+2.72

<TS 11 C

37 57 23 NV2

+1.80

<TS

, O 11 C

39 57 25 NV2

+35.89

<TS l

I 4

E I

NORTHERN STATES POWEP.

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 S/G NO. LEG ROW COL PERCENT LOCATION STATUS 11 C

39 57 27 NV4

+4.46

<TS 11 C

35 58 37 NV4

+3.52

<TS 11 C

38 58 25 NV2

+35.14

<TS 11 C

38 58 25 NV4

+5.82

<TS 11 C

38 58 38 07H

+35.00

<TS 11 C

38 58 42 NV2

+1.99

<TS 11 C

39 j 58 27 NV2

+2.27

<TS 11 C

39 58 33 NV2

+35.72

<TS 11 C

39 58 33 NV4

+5.64

<TS 11 C

41 58 46 NV2

+2.25

<TS 11 C

43 58 22 TSH

+1.15

<TS 11 C

44 58 25 TSH

+0.71

<TS 11 C

45 58 18 01C

-0.06

<TS 11 C

18 59 12 NV2

-0.20

<TS 11 C

18 59 15 NV1

-0.25

<TS 11 C

31 59 20 07H

+32.03

<TS 11 C

31 59 37 NV2

+1.44'

<TS 11 C

31 59 44 NV4

+5.58

<TS 11 C

31 59 45 NV2

+27.16

<TS 11 C

40 59 24 NV4

-0.23

<TS 11 C

40 59 40 NV4

+3.79

<TS 11 C

40 59 43 NV2

+2.04

<TS O.

11 C

40 59 45 NV2

+36.84

<TS 11 C

43 59 2

03C

-0.28

<TS 11 C

44 59 19 TSH

+1.56

<TS 11 C

44 59 25 TSH

+0.61

<TS 11 C

31 60 20 NV4

+1.61

<TS 11 C

31 60 21 NV2

+0.00

<TS 11 C

31 60 22 07H

+33.02

<TS 11 C

31 60 23 NV2

+1.38

<TS 11 C

31 60 33 NV2

+27.44

<TS 11 C

36 60 20 NV2

+32.68

<TS 11 C

36 60 42 NV2

+1.79

<TS 11 C

27 61 20 NV2

+22.98

<TS 11 C

27 61 22 NV2

+1.35

<TS 11 C

27 61 33 07H

+31.17

<TS 11 C

36 61 40 07H

+35.31

<TS 11 C

36 61 41 NV2

+32.43

<TS 11 C

36 61 43 NV2

+2.04

<TS 11 C

37 61 22 NV2

+33.48

<TS 11 C

40 61 23 NV2

+36.77

<TS 11 C

42 61 3

03C

+0.11

<TS 11 C

36 62 21 NV2

+32.26

<TS 11 C

38 62 25 NV4

+3.96

<TS 11 C

38 62 26 NV2

+34.48

<TS i

11 C

36 63 26 NV2

+32.19

<TS 5

l

~

NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 S/G NO. LEG ROW COL PERCENT LOCATION STATUS 11 C

33 64 22 NV2

+29.23

<TS l

11 C

30 65 21 NV2

+1.74

<TS 1

11 C

40 66 25 NV1

+0.00

<TS 11 C

40 66 27 NV2

+0.00

<TS 11 C

40 67 37 01C

+0.03

<TS 11 C

37 71 8

01C

+0.20

<TS 11 C

38 74 28 01C

+0.22

<TS 11 C

33 76 10 01C

-0.20

<TS 11 C

35 77 1

02C

+0.14

<TS 11 C

35 77 31 01C

-0.17

<TS l

11 C

29 80 22 01 0

-0.14

<TS 11 C

30 80 30 01C

-0.14

<TS 11 C

29 81 14 01C

-0.03

<TS 11 C

31 82 20 02C

-0.03

<TS 11 C

25 83 4

01C

-0.20

<TS 11 C

26 85 33 02C

-0.15

<TS 11 C

28 85 22 01 0

-0.22

<TS 11 C

24 86 27 01C 0.23

<TS 11 C

20 88 1

02C

-0.20

<TS 11 C

23 88 8

01C

-0.08

<TS 11 C

15 89 17 01C

-0.28

<TS O

11 C

19 89 31 01C 0.14

<TS 11 C

18 90 18 01C

-0.19

<TS 11 C

19 90 13 01C

-0.24

<TS 11 C

9 91 11 01C

-0.23

<TS 11 C

3 93 11 02C

+0.09

<TS 11 C

5 93 11 01C

+0.09

<TS 11 C

10 93 32 02C

-0.08

<TS 12 C

18 27 20 NV4

+2.18

<TS 12 C

41 29 37 NV2

+0.19

<TS 12 C

41 29 37 NV3

+0.22

<TS 12 C

18 30 20 NV2

+1.17

<TS 12 C

19 33 21 NV2

+0.33

<TS 12 C

19 33 21 07H

+24.13

<TS 12 C

41 35 19 NV4

+6.71

<T S 12 C

44 39 23 NV2

+0.00

<TS

-12 C

41 41 25 NV2

+0.00

<TS 12 C

41 41 25 NV4

+0.00

<TS 12 C

41 41 31 NV3

+0.00

<TS 12 C

41 41 37 NV1

+0.00

<TS 12 C

22 47 21 NV2

+17.00

<TS 12 C

38 48 22 NV4

+7.53

<TS 12 C

17 49 20 NV2

+11.94

<TS i

12 C

17 49 22 NV2

+1.12

<TS i

12 C

18 49 22 NV2

+1.51

<TS 12 C

41 i 50 22 NV2

+38.33

<TS f

6

NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 S/G NO. LEG ROW COL PERCENT LOCATION STATUS 12 C

24 52 20 NV2

+1.15

<TS 12 C

36 53 20 NV3

+16.34

<TS 12 C

46 53 21 01C

+0.30

<TS 12 C

22 57 20 NV2

+18.58

<TS 12 C

42 60 10 01C

+0.14

<TS 12 C

39 66 15 01C

+0.30

<TS 12 C

40 66 6

01C

+0.06

<TS 12 C

25 68 23 07H

+28.34

<TS 12 C

40 68 16 01C

+0.22

<TS 12 C

37 71 4

01C

+0.19

<TS 12 C

37 73 17 01 0

+0.17

<TS 12 C

29 80 7

01C

+0.14

<TS 12 C

30 81 36 01C

+0.36

<TS 12 C

28 83 1

01C

+0.11

<TS 12 C

22 84 8

01C

+0.18

<TS 12 C

25 84 5

01C

+0 00

<TS 12 C

27 84 5

01C

-0.17

<TS 12 C

22 86 3

01C

+0.14

<TS 12 C

23 86 16 01C

+0.08

<TS 12 C

26 86 1

01C

-0.14

<TS 12 C

19 87 17 01C

-0.17

<TS 12 C

24 87 1

01C

-0.08

<TS O

12 C

20 88 8

01C

-0.06

<TS 12 C

19 89 8

01C

+0.00

<TS 12 C

17 90 24 01C

+0.00

<TS ~

12 C

6 91 14 01C

-0.17

<TS TABLE IV ARC Indications S/G NO. LEG ROW COL PERCENT LOCATION STATUS 11 C

17 4

DSI 01H

+0.11 ARC 11 C

14 7

DSI 01H

+0.19 ARC 11 H

3 8

DSI 01H

+0.14 ARC 11 C

16 8

DSI 02H

+0.08 ARC 11 C

16 8

DSI 01H

+0.17 ARC 11 H

5 9

DS!

03H

+0.08 ARC 11 H

5 9

DSI 02H

+0.06 ARC 11 C

14 9

DSI 01H

+0.11 ARC 11 C

14 10 DSI 01H

+0.06 ARC 11 C

12 11 DSI 01H

+0.06 ARC 11 C

13 11 DSI 01H

+ 0.06 ARC 11 C

7 12 DSI 03H

+0.06 ARC O

11 C

22 12 DSI 01H

+0.03 ARC 11 C

7 13 DSI 02H

+0.11 ARC 7

NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 S/G NO. LEG ROW COL PERCENT LOCATION STATUS 11 C

10 13 DSI 01H

-0.08 ARC 11 C

13 13 DSI 02H

+0.11 ARC 11 C

16 13 DSI 01H

+0.08 ARC 11 C

27 13 DSI 03H

+0.03 ARC 11 C

9 14 DSI 02H

+0.11 ARC 11 H

6 15 DSI 03H

-0.03 ARC 11 C

18 15 DSI 04H

+0.17 ARC 11 C

27 15 DSI 03H

+0.22 ARC 11 C

18 16 DSI 01H

+0.14 ARC 11 C

34 16 DSI 01H

-0.29 ARC 11 C

7 17 DSI 02H

+0.09 ARC 11 H

4 18 DSI 06H

+0.00 ARC 11 H

6 19 DSI 01H

-0.06 ARC 11 C

15 19 DSI 04H

+0.06 ARC 11 C

8 20 DSI 01H

-0.03 ARC 11 C

31 20 DSI 04H

+0.11 ARC 11 C

31 22 DSI 01H

+0.08 ARC 11 C

19 23 DSI 02H

+0.17 ARC 11 C

22 23 DSI 03H

+0.08 ARC 11 C

31 23 DSI 02H

+0.20 ARC 11 C

31 23 DSI 01H

-0.03 ARC O

11 C

12 24 DSI 03H

+0.11 ARC 11 C

14 26 DSI 04H

+0.17 ARC 11 C

25 26 DSI 03H

+0.11 ARC 11 C

27 26 DSI 01H

+0.00 ARC 11 C

32 26 DSI 01H

+0.08 ARC 11 C

19 27 DSI 04H

+0.00 ARC 11 C

22 27 DSI 02H

+0.03 ARC 11 C

32 27 DSl 01H

+0.11 ARC 11 C

35 27 DSl 02H

+0.11 ARC 11 C

24 28 DSI 01H

+0.03 ARC 11 C

31 28 DSI 01H

+0.06 ARC 11 C

32 28 DSI 01H

+0.19 ARC 11 C

18 29 DSI 01H

+0.08 ARC 11 C

20 29 DSI 01H

+0.08 ARC 11 C

22 29 DSI 01H

+0.00 ARC 11 C

26 29 DSI 02H

+0.06 ARC 11 C

27 29 DSI 01H

+0.11 ARC 11 C

23 30 DSI 01H

+0.11 ARC 11 C

30 30 DSI 01H

+0.12 ARC 11 C

30 30 DSI 02H

+0.15 ARC 11 C

31 30 DSI 01H

-0.03 ARC 11 C

34 30 DSI 01H

+0.05 ARC 11 C

43 30 DSI 03H

+0.05 ARC 11 H

2 31 DSI 03H

+0.06 ARC O

11 C

19 31 DSI 02H

+0.17 ARC 8

NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 S/G NO.

LEG ROW COL PERCENT LOCATION STATUS 11 C

22 31 DSI 01H

+0.12 ARC 11 C

7 32 DSI 03H

+0.14 ARC 11 C

33 32 DSI 02H

+0.14 ARC 11 H

2 33 DSI 04H

-0.08 ARC 11 C

27 33 DSI 02H

+0.17 ARC 11 C

32 33 DSI 01H

+0.08 ARC

~

11 C

35 33 DSI 01H

+0.00 ARC 11 C

37 33 DSI 01H

+0.03 ARC 11 C

40 33 DSI 01H

+0.00 ARC 11 C

14 34 DSI 01H

+0.11 ARC 11 C

15 34 DSI 04H

+0.06 ARC 11 C

26 34 DSI 01H

+0.08 ARC 11 C

31 34 DSI 02H

+0.11 ARC 11 C

31 34 DSI 01H

+0.09 ARC 11 C

37 34 DSI 01H

+0.06 ARC 11 C

10 35 DSI 02H

-0.03 ARC 11 C

17 35 DSI 04H

+0.06 ARC 11 C

19 35 DSI 02H

+0.06 ARC 11 C

26 35 DS:

01H

+0.08 ARC 11 C

18 36 DSI 05H

+0.06 ARC 11 C

23 36 DSI 02H

+0.06 ARC 11 C

26 36 DSI 02H

+0.11 ARC O

11 C

29 36 DSI 01H

+0.11 ARC 11 C

34 36 DSI 01H

+0.08 ARC 11 C

35 36 DSI 02H

+0.11 ARC 11 C

43 36 DSI 01C

-0.29 ARC 11 H

4 37 DSI 05H

+0.06 ARC i

11 C

20 37 DSI 02H

-0.03 ARC 11 C

30 37 DSI 02H

+0.15 ARC 11 C

13 38 DSI 02H

+0.00 ARC 11 C

33 38 DSI 02H

+0.06 ARC 11 H

5 39 DSI 03H

-0.06 ARC 11 C

13 39 DSI 02H

+0.17 ARC 11 C

18 39 DSI 05H

+0.06 ARC 11 C

32 39 DSI 01H

+0.06 ARC 11 C

35 39 DSI 02H

+0.11 ARC 11 H

4 40 DSI 01H

+0.00 ARC 11 C

14 40 DSI 01H

+0.08 ARC 11 C

14 40 DSI 02H

+0.11 ARC 11 C

20 40 DSI 02H

+0.12 ARC 11 C

27 40 DSI 02H

+0.06 ARC 11 C

18 41 DSI 01H

+0.00 ARC 11 C

26 41 DSI 02H

+0.14 ARC 11 C

38 41 DSI 02H

+0M8 ARC 11 C

16 42 DSI 04H

+0.03 ARC 11 C

24 42 DSI 02H

+0.08 ARC l

a

NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 S/G NO. LEG ROW COL PERCENT LOCATION STATUS 11 0

34 42 DSI 02H

+ 0.11 ARC 11 C

17 43 DSI 01H

+0.06 ARC 11 C

25 43 DSI 02H

+0.03 ARC 11 C

27 43 DSI 02H

+0.17 ARC 11 C

37 43 DSl 03H

+0.23 ARC 11 C

38 43 DSI 04H

-0.11 ARC 11 C

19 44 DSI 04H

+0.03 ARC 11 C

42 44 DSI 02H

+0.14 ARC 11 H

6 45 DSI 02H

+0.00 ARC 11 H

6 45 DSI 05H

+0.03 ARC 11 C

16 45 DSI 02H

+0.03 ARC 11 C

18 45 DSI 02H

+0.03 ARC 11 C

27 45 DSI 03H

+0.25 ARC 11 C

41 45_

DSI 02H

+0.31 ARC 11 C

7 46 DSI 04H

+0.08 ARC 11 C

30 46 DSI 06H

+0.00 ARC 11 C

32 46 DSI 02H

+0.12 ARC 11 C

23 47 DSI 04H

+0.11 ARC 11 C

24 47 DSI 01H

+0.06 ARC 11 C

25 47 DSl 03H

+0.20 ARC 11 C

41 47 DSI 01H

+0.14 ARC 11 C

43 47 DSI 01H

+0.11 ARC O

11 H

5 48 DSI 02H

+0.03 ARC 11 H

6 48 DSI 05H

-0.06 ARC 11 C

9 48 DSI 02H

+0.12 ARC 11 C

25 48 DSI 01H

+0.06 ARC 11 C

25 48 DSI 03H

+0.06 ARC 11 C

29 48 DSI 02H

+0.14 ARC 11 C

30 48 DSI 04H

-0.03 ARC 11 C

11 49 DSI 02H

+0.09 ARC 11 C

18 49 DSI 02H

+0.00 ARC 11 C

27 49 DSI 01H

+0.00 ARC 11 C

27 49 DSI 06H

+0.00 ARC 11 C

30 49 DSI 02H

+0.14 ARC 11 C

31 49 DSI 05H

+0.14 ARC 11 C

8 50 DSI 02H

+0.03 ARC 11 C

15 50 DSI 02H

+0.14 ARC 11 C

42 50 DSI 01H

+0.08 ARC 11 C

8 51 DSI 01H

+0.03 ARC 11 C

10 51 DSI 02H

+0.00 ARC 11 C

27 51 DSI 01H

+0.08 ARC 11 C

28 51 DSI 01H

-0.05 ARC 11 C

8 52 DSI 02H

+0.08 ARC 11 C

14 52 DSI 02H

+0.06 ARC 11 C

17 52 DSI 01H

+0.06 ARC 11 C

18 52 DSI 02H

+0.06 ARC 10

F NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 S/G NO.

LEG ROW COL PERCENT LOCATION STATUS 11 C

23 52 DSI 02H

+0.08 ARC 11 C

29 52 DSI 04H

+0.17 ARC 11 C

16 53 DSI 02H

+0.08 ARC 11 C

17 53 DSI 02H

+0.12 ARC 11 C

22 53 DSI 01H

+0.08 ARC 11 C

23 53 DSI 02H

+0.12 ARC 11 C

24 53 DSI 03H

+0.14 ARC 11 C

26 53 DSI 02H

+0.11 ARC 11 C

29 53 DSI 02H

+0.22 ARC 11 C

10 54 DSI 02H

+0.11 ARC 11 C

11 54 DSI 05H

+0.17 ARC 11 C

12 54 DSI 05H

+0.06 ARC 11 C

17 54 DSI 02H

+0.03 ARC 11 C

18 54 DSI 01H

+0.05 ARC 11 C

22 54 DSI 02H

+0.15 ARC 11 C

27 54 DSI 01H

+0.11 ARC 11 C

27 54 DSI 02H

+0.14 ARC 11 C

32 54 DSI 02H

+0.18 ARC 11 C

16 55 DSI 05H

+0.09 ARC 11 C

18 55 DSI 01H

+0.06 ARC 11 C

23 55 DSI 01H

+0.11 ARC 11 C

30 55 DSl 04H

+0.11 ARC O

11 C

35 55 DSI 04H

+0.17 ARC 11 C

42 55 DSI 01H

+0.11 ARC 11 C

7 56 DSI 02H

+0.17 ARC 11 C

15 56 DSI 01H

+0.18 ARC 11 C

35 56 DSI 01H

+0.11 ARC 11 C

10 57 DSI 04H

+0.09 ARC 11 C

18 57 DSI 02H

+0.09 ARC 11 C

33 57 DSI 01H

+0.05 ARC 11 C

15 58 DSI 01H

+0.09 ARC 11 C

18 58 DSI 01H

+0.17 ARC 11 C

21 58 DSI 02H

+0.11 ARC I

11 C

30 58 DSI 04H

+0.22 ARC

{

11 H

3 59 DSI 02H

+0.00 ARC 11 H

5 59 DSI 05H

+0.00 ARC 11 C

8 59 DSI 02H

+0.14 ARC 11 C

16 59 DSI 01H

+0.06 ARC 11 C

17 59 DSI 03H

+0.09 ARC 11 C

21 59 DSI 03H

+0.17 ARC 11 C

23 59 DSI 01H

+0.11 ARC 11 C

26 59 DSI 05H

+0.11 ARC 11 C

30 59 DSI 03H

+0.19 ARC 11 C

30 59 DSI 02H

+0.22 ARC 11 C

12 60 DSI 03H

+0.20 ARC O

11 C

16 60 DSI 03H

+0.23 ARC 11

NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 S/G NO. LEG ROW COL PERCENT LOCATION STATUS 11 C

18 60 DSI 01H

+0.03 ARC 11 C

29 60 DSI 02H

+0.11 ARC 11 C

37 60 DSI 02H

+0.06 ARC 11 H

4 61 DSI 05H

+0.03 ARC 11 H

6 61 DSI 03H

+0.00 ARC 11 C

10 61 DSI 02H

+0.14 ARC 11 C

13 61 DSl 02H

+0.12 ARC 11 C

22 61 DSI 03H

+0.17 ARC 11 C

22 61 DSI 01H

+0.11 ARC 11 C

14 62 DSI 02H

+0.06 ARC 11 C

16 62 DSI 03H

+0.06 ARC 11 C

18 62 DSI 02H

+0.11 ARC 11 C

21 62 DSI 01H

+0.11 ARC 11 H

2 63 DSI 05H

+0.00 ARC 11 C

14 63 DSI 05H

+0.21 ARC 11 C

28 63 DSI 01H

+0.03 ARC 11 C

41 63 DSI 02H

-0.03 ARC 11 C

42 63 DSI 03H

+0.09 ARC 11 C

29 64 dst 03H

+0.23 ARC 11 C

39 64 dst 02H

+0.11 ARC 11 C

41 64 DS!

02H

+0.11 ARC O

11 C

41 64 DSI 03H

+0.14 ARC 11 C

18 65 dst 02H

+0.19 ARC 11 C

24 65 DSI 03H

+0.14 ARC 11 C

24 65 DSI 02H

+0.14 ARC 11 C

38 65 DSI 02H

-0.17 ARC 11 C

39 65 DSI 02H

+0.16 ARC 11 C

39 65 DSI 03H

+0.11 ARC 11 C

7 66 DSI 05H

+0.06 ARC 11 C

13 67 DSI 01H

+0.14 ARC 11 C

29 67 DSI 02H

+0.14 ARC 11 C

35 67 DSI 02H

+0.17 ARC 11 C

38 67 DSI 03H

+0.22 ARC 11 C

13 68 DSI 01H

+0.09 ARC 11 C

17 68 DSI 01H

+0.11 ARC 11 C

18 68 DSI 01H

+0.12 ARC

]

11 C

19 68 DSI 02H

+0.14 ARC 11 C

29 68 DSI 02H

+0.14 ARC 11 C

8 69 DSI 02H

+0.14 ARC 11 C

13 69 DSI 01H

+0.09 ARC 11 C

17 69 DSI 01H

+0.06 ARC 11 C

20 70 DSI 02H

+0.11 ARC 11 C

12 71 DSI 01H

+0.03 ARC J

11 C

19 71 DSI 03H

+0.19 ARC 11 C

23 71 DSI 02H

+0.08 ARC O

11 H

5 72 DSI 05H

+0.03 ARC 12 1

NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION.

PRAIRIE ISLAND UNIT #1,1999 S/G NO. LEG ROW COL PERCENT LOCATION STATUS 11 H

5 72 DSI 02H

+0.14 ARC 11 C

8 72 DSI 05H

+0.06 ARC 11 C

11 72 DSI 01H

+0.11 ARC 11 C

11 72 DSI 05H

+0.14 ARC 11 C

11 72 DSI 02H

+0.16 ARC 11 C

12 72 DSI 05H

+0.11 ARC 11 C

14 72 DSI 02H

+0.14 ARC 11 C

29 72 DSI 02H

+0.11 ARC 11 C

33 72 DSI 02H

+0.11 ARC 11 C

36 72 DSI 02H

+0.24 ARC 11 C

9 73 DSI 01H

+0.06 ARC 11 C

25 73 DSI 03H

+0.14 ARC 11 C

29 73 DSI 02H + 0.08 ARC 11 C

33 73 DSI 02H

+0.06 ARC 11 H

3 74 DSI 01H

-0.11 ARC 11 C

26 74 DSI 02H

+0.14 ARC 11 C

8 75 DSI 01H

+0.14 ARC 11 C

8 75 DSI 05H

+0.00 ARC 11 C

16 75 DSl 03H

+0.19 ARC 11 C

18 75 DSI 03H

+0.11 ARC 11 C

22 75 DSI 02H

+0.11 ARC 11 C

26 75 DSI 02H

+0.16 ARC 11 C

14 76 DSI 02H

+0.08 ARC 11 C

15 76 DSI 02H

+0.14 ARC 11 C

17 76 DSI 02H

+0.17 ARC 11 C

11 77 DSI 05H

+0.09 ARC 11 C

23 77 DSI 02H

+0.06 ARC 11 C

8 78 DSI 01H

+0.16 ARC 11 C

8 78 DSI 03H

+0.05 ARC 11 C

8 78 DSI 02H

+0.16 ARC 11 C

22 78 DSI 01H

+0.03 ARC 11 C

24 78 DSI 01H

+0.05 ARC 11 C

25 78 DSI 02H

+0.17 ARC 11 C

29 78 DSI 03H

+0.11 ARC 11 C

12 79 DSI 01H

+0.05 ARC 11 C

12 79 DSI 03H

+0.19 ARC 11 C

15 79 DSI 03H

+0.12 ARC 11 H

6 80 DSI 04H

-0.03 ARC 11 C

18 80 DSI 01H

+0.00 ARC 11 C

22 80 DSI 01H

+0.03 ARC 11 C

24 80 DSI 01H

+0.03 ARC 11 C

28 80 DSI 05H

+0.09 ARC 11 H

5 81 DSI 01H

+0.05 ARC 11 C

21 81 DSI 03H

+0.06 ARC 11 C

22 81 DSI 01H

+0.08 ARC 11 C

22 81 DSI 02H

+0.17 ARC 13

E NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 S/G NO. LEG ROW COL PERCENT LOCATION STATUS 11 H

3 82 DSI 03H

+0.03 ARC 11 C

9 82 DSI 05H' -0.09 ARC 11 C

17 82 DSI 02H

+0.17 ARC 11 C

19 82 DSI 01H

+0.06 ARC 11 C

22 82 DSI 01H

+0.20 ARC 11 C

22 82 DSI 02H

+0.23 ARC 11 H

4 83 DSI 03H

+0.03 ARC 11 C

8 83 DSI 04H

+0.22 ARC 11 C

20 84 DSI 03H

+0.19 ARC 11 C

26 84 DSI 02H

+0.06 ARC 11 H

6 85 DSI 03H

+0.08 ARC 11 0

16 85 DSI 02H

+0.11 ARC 11 C

18 86 DSI 01H

+0.06 ARC 11 C

19 86 DSI 02H

+0.12 ARC 11 H

6 87 DSI 04H

+0.06 ARC 11 C

12 87 DSI 02H

+0.11 ARC 11 H

3 88 DSI 02H

-0.03 ARC 11 H

4 88 DSI 01H

+0.06 ARC 11 C

7 88 DSI 03H

+0.17 ARC 11 H

3 90 DSI 05H

+0.00 ARC 11 H

4 90 DSI 02H

+0.08 ARC 11 C

11 90 DSI 02H

+0.03 ARC O

11 C

13 91 DSI 03H

+0.17 ARC 11 H

2 94 DSI 01H

+0.08 ARC 11 H

4 94 DSI 01H

+0.08 ARC 12 C

8 5

DSI 02H

+0.29 ARC 12 C

17 9

DSI 01H

+0.14 ARC 12 C

19 9

DSI 01H

+0.08 ARC 12 C

7 10 DSI 02H

+0.19 ARC 12 C

20 10 DSI 01H

+0.03 ARC 12 C

18 11 DSI 02H

+0.03 ARC 12 C

22 15 DSI 01H

+0.06 ARC 12 C

15 16 DSI 02H

+0.05 ARC 12 C

29 17 DSI 01H

+0.11 ARC 12 C

20 18 DSI 02H

+0.14 ARC 12 C

20 18 DSI 01H

-0.06 ARC 12 C

37 22 DSI 04H

-0.06 ARC 12 C

37 22 DSI 01H

+0.08 ARC 12 C

35 24 DSI 01H

+0.16 ARC 12 C

16 27 DSI 02H

+0.14 ARC 12 C

42 28 DSI 03H

+0.08 ARC 12 C

22 29 DSI 01H

+0.14 ARC 12 C

16 30 DSI 03H

+0.00 ARC 12 C

19 30 DSI 01H

+0.11 ARC 12 C

31 30 DSI 02H

+0.16 ARC 12 C

32 30 DSI 01H

+0.14 ARC 14

NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 l

S/G NO.

LEG ROW COL PERCENT LOCATION STATUS 12 C

19 31 DSI 03H

+0.00 ARC 12 C

20 31 DSI 03H

+0.03 ARC 12 C

41 31 DSI 01H

+0.03 ARC 12 C

27 32 DSI 01H

+0.08 ARC 12 C

31 32 DSI 02H

+0.19 ARC 12 C

33 32 DSI 01H

+0.06 ARC 12 C

40 32 DSI 02H

+0.03 ARC 12 C

10 33 DSI 03H

+0.17 ARC 12 C

21 33 DSI 01H

+0.05 ARC 12 H

2 34 DSI 04H

+0.00 ARC 12 C

10 34 DSl 01H

+0.17 ARC 12 C

21 34 DSI 01H

-0.08 ARC 12 C

25 34 DSI 01H

+0.08 ARC 12 C

34 35 DSI 03H

+ 0.08 ARC 12 C

36 35 DSI 02H

+0.08 ARC 12 C

41 35 DSI 03H

+0.03 ARC 12 C

42 35 DSI 02H

+0.19 ARC 12 C

22 36 DSI 01H

+0.11 ARC 12 C

28 36 DSI 01H

+0.05 ARC 12 C

36 38 DSI 02H

+0.11 ARC 12 C

19 39 DSI 02H

+0.00 ARC l

12 C

23 39 DSI 01H

+0.03 ARC 12 C

43 39 DSI 02H

+0.08 ARC 12 C

42 40 DSI 03H

-0.03 ARC 12 C

12 42 DSI 01H

+0.05 ARC 12 C

28 42 DSI 01H

+0.11 ARC 12 C

15 43 DSI 01H

+0.11 ARC 12 C

5 44 DSI 01H

+0.05 ARC 12 C

11 44 DS) 01H

+0.11 ARC 12 C

12 44 DSI 04H

+0.11 ARC i

12 C

25 44 DSI 02H

+0.08 ARC 12 C

33 45 DSI 01H

+0.17 ARC 12 C

29 46 DSI 01H

+0.17 ARC 12 C

38 47 DSI 01H

-0.05 ARC 12 C

23 48 DSI 04H

+0.08 ARC 12 C

25 48 DSI 02H

+0.08 ARC 12 C

26 49 DSI 02H

+0.14 ARC 12 C

26 49 DSI 01H

+0.11 ARC 12 C

39 49 DSI 03H

+0.05 ARC 12 C

13 50 DSI 05H

+0.06 ARC 12 C

29 50 DSI 01H

+0.11 ARC 12 C

32 50 DSI 01H

+0.14 ARC 12 C

32 50 DSI 02H

+0.03 ARC 12 C

11 51 DSI 04H

+0.05 ARC 12 C

19 51 DSI 01H

+0.16 ARC

  1. O 12 C

26 51 DSI 02H

+0.08 ARC 15 2

NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 S/G NO. LEG ROW COL PERCENT LOCATION STATUS 12 C

29 51 DSI 02H

+0.14 ARC 12 C

39 51 DSI 01H

+0.00 ARC 12 C

26 52 DSI 02H

+0.05 ARC 12 C

28 52 DSI 02H

+0.00 ARC 12 C

17 54 DSI 01H

+0.08 ARC 12 C

30 54 DSI 02H

+0.14 ARC 12 C

26 55 DSI 05H

+0.06 ARC 12 C

28 55 DSI 04H

+0.11 ARC 12 C

31 55 DSI 02H

+0.08 ARC 12 C

32 55 DSI 01H 40.16 ARC 12 C

27 56 DSI 02H

+ 0.00 ARC 12 C

39 56 DSI 02H

+0.05 ARC 12 C

16 57 DSI 04H

+0.00 ARC 12 C

21 57 DSI 05H

+0.06 ARC 12 C

32 57 DSI 05H

+0.19 ARC 12 C

11 58 DSI 03H

+0.17 ARC 12 C

21 58 DSI 05H

+0.03 ARC 12 C

11 59 DSI 02H

+0.00 ARC 12 C

22 59 DSI 01H

+0.08 ARC 12 C

11 60 DSI 02H

+0.06 ARC 12 C

19 60 DS!

01H

+0.14 ARC O

12 C

24 60 DSI 02H

+0.08 ARC 12 C

34 60 DSI 01H

+0.08 ARC 12 C

12 61 DSI 03H

+0.03 ARC 12 C

20 61 DSI 01H

+0.19 ARC 12 C

26 61 DSI 01H

+0.08 ARC 12 C

31 61 DSI 02H

-0.08 ARC 12 C

32 61 DSI 02H

+0.16 ARC 12 C

35 61 DSI 01H

+0.08 ARC 12 C

21 62 DSI 01H

+0.03 ARC 12 C

9 63 DSI 02H

+0.00 ARC 12 C

11 63 DSI 02H

+0.14 ARC 12 C

19 63 DSI 01H

+0.11 ARC 12 C

19 64 DSI 04H

+0.11 ARC 12 C

25 64 DSI 03H

-0.03 ARC 12 C

20 65 DSI 02H

-0.03 ARC 12 C

20 65 DSI 03H

+0.19 ARC 12 C

20 66 DSI 01H

+0.19 ARC 12 C

30 66 DSI 01H

-0.03 ARC

_ 12 C

33 67 DSI 02H

+0.14 ARC 12 C

42 67 DSI 04H

+0.05 ARC 12 C

35 68 DSI 02H

+0.03 ARC 12 C

17 69 DSI 01H

+0.06 ARC 12 C

19 69 DSI 01H

+0.03 ARC 12 C

36 69 DSl 02H

+0.19 ARC O

12 C

16 70 DSI C2H

+0.11 ARC 16

)

NORTHERN STATES' POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 S/G NO.

LEG ROW COL PERCENT CATION STATUS 12 C

12 71 DSI 02H

+0.16 ARC 12 C

24

-71 DSI 02H

+0.08 ARC 12 C

16 72 DSI 02H

+0.05 ARC 12 C

18 72 DSI 01H

-0.03 ARC 12 C

18 72 DSI 02H

+0.11 ARC 12 C

19 72 DSI 01H

+0.17 ARC i

12 C

25 1 72 DSI 02H

+0.03 ARC 12 C

29 72 DSI 02H

+0.03 ARC 12 C

2 73 DSI 02H

+0.00 ARC 12 C

21 73 DSI 02H

+0.11 ARC 12 C

22 73 DSI 02H

+0.08 ARC 12 C

18 75 DSI 03H

+0.11 ARC 12 C

19 75 DSI 02H

+0.11 ARC 12 C

22 75 DSI 02H

+0.03 ARC 12 C

12 76 DSI 02H

+0.11 ARC 12 C

11 78 DSI 02H

+0.11 ARC 12 C

18 78 DSI 02H

-0.05 ARC 12 C

33 78 DSI 01H

+0.11 ARC 12 C

12 79 DSI 02H

+0.00 ARC 12 C

18 80 DSI 01H

-0.06 ARC 12 C

19 80 DSI 02H

+0.00 ARC O

12 C

21 82 DSI 02H

+0.00 ARC 12 C

25 82 DSI 02H

+0.00 ARC 12 C

15 83 DSI 02H

+0.05 ARC 12 C

17 84 DSI 02H

+0.00 ARC 12 H

3 85 DSI 02H

-0.06 ARC 12 C

26 85 DSI 01H

+0.22 ARC 12 H

5 92 DSI 03H

-0.03 ARC 12 H

6 93 DSI 03H

-0.05 ARC 12 H

6 94 DSI 03H

-0.11 ARC 12 C

7 94 DSI 03H

+0.03 ARC TABLE V F*OTubes S/G NO.

LEG ROW COL PERCENT LOCATION STATUS 11 H

1 9

sal TRH

-2.80 TO-2.70 F'O 11 H

8 9

SCI TRH

-2.56 TO-2.51 F*0 11 H

1 12 SAI TRH 2.70 TO-2.62 F*0 11 H

2 12 SAI TRH

-2.47 TO-2.43 F*0 11 H

6 12 MAI TRH

-2.52 TO-2.44 F*0 11 H

2 13 SAI TRH

-2.53 TO-2.44 F*0 11 H

1 14 SAI TRH

-2.67 TO-2.59 F*0 0

11 H

2 14 SAN TRH

-2.59 TO-2.36 F*0 11 H

3 14 SAN TRH 2.47 TO-2.39 F*0 17

r NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 (O/

S/G NO. LEG ROW COL PERCENT LOCATION STATUS 11 H

1 15 MAI TRH

-2.76 TO-2.62 F*0 11 H

1 16 SAI TRH

-2.81 TO-2.66 F*0 11 H

1 17 mal TRH

-2.69 TO-2.60 F*0 11 H

2 17 MAN TRH

-2.67 TO-2.56 F*0 11 H

1 18 SAI TRH

-2.68 TO-2.61 F*0 11 H

1 19 SAI TRH

-2.73 TO-2.61 F'O 11 H

1 20 MAI TRH N2.69 TO-2.59 F*0 11 H

10 20 SAI TRH

-2.80 TO-2.62 F*0 11 H

1 21 sal TRH

-2.70 TO-2.63 F*0 11 H

3 21 MAN TRH

-2.80 TO-2.57 F*0 11 H

10 21 MAI TRH

-2.59 TO-2.50 F*0 11 H

1 22 MAI TRH

-2.49 TO-2.40 F*0 f

11 H

3 22 sal TRH

-2.53 TO-2.46 F*0 11 H

1 23 SAI TRH

-2.87 TO-2.76 F*0

)

11 H

6 23 MAI TRH

-2.54 TO-2.47 F*0 11 H

1 24 SAI TRH

-2.82 TO-2.74 F*0 11 H

2 24 MAI TRH

-2.52 TO-2.44 F*0 11 H

1 25 MAN TRH

-2.78 TO-2.70 F*O 11 H

2 25 sal TRH

-2.54 TO-2.46 F*0 11 H

3 25 mal TRH

-2.76 TO-2.69 F*0 11 H

4 25 MAN TRH

-2.59 TO-2.48 F*0 11 H

5 25 MAN TRH

-2.68 TO-2.55 F*0 I

11 H

10 25 SAN TRH

-2.57 TO-2.49 F*0 11 H

12 25 SAI TRH 2.62 TO-2.58 F*0 11 H

20 25 MAI TRH

-2.48 TO-2.37 F*0 11 H

21 25 sal TRH 2.57 TO-2.48 F*0 11 H

1 26 MAI TRH 2.74 TO-2.65 F*0 11 H

6 26 SAI TRH

-2.48 TO-2.41 F*0 11 H

7 26 sal TRH

-2.64 TO-2.56 F*0 11 H

8 26 SAI TRH

-2.65 TO-2.56 F*0 11 H

17 26 sal TRH

-2.53 TO-2.45 F*0 11 H

19 26 SAI TRH

-2.62 TO-2.54 F*0 11 H

20 26 MAI TRH

-2.54 TO-2.47 F*0 11 H

1 27 MAN TRH

-2.80 TO-2.62 F*0 11 H

2 27 MAI TRH

-2.62 TO-2.52 F*0 11 H

4 27 SAI TRH

-2.66 TO-2.58 F*0 11 H

5 27 SAI TRH

-2.72 TO-2.61 F'O 11 H

6 27 SAN TRH

-2.64 TO-2.52 F*0 11 H

7 27 sal TRH

-2.71 TO-2.60 F*0 11 H

19 27 MAI TRH

-2.51 TO-2.45 F'O 11 H

20 27 MAI TRH

-2.47 TO-2.36 F*0 11 H

1 28 SAN TRH

-2.73 TO-2.65 F*0 11 H

4 28 SAI TRH

-2.63 TO-2.51 F'O 11 H

5 28 SAI TRH

-2.76 TO-2.64 F*0 11 H

7 28 SAI TRH 2.62 TO-2.48 F*0 11 H

9 28 sal TRH

-2.65 TO-2.54 F*0 18 i

NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 S/G NO.

LEG ROW COL PERCENT LOCATION STATUS 11 H

12 28 sal TRH

-2.58 TO-2.49 F*0 11 H

16 28 SAI TRH 2.49 TO-2.42 F*0 11 H

19 28 SAI TRH

-2.49 TO-2.41 F*0 11 H

20 28 MAI TRH

-2.51 TO-2.43 F*0 11 H

1 29 MAN TRH

-2.90 TO-2.75 F*0 11 H

2 29 SAI TRH

-2.56 TO-2.48 F*0 11 H

S 29 SAN TRH

-2.70 TO-2.58 F*0 11 H

8 29 SAI TRH

-2.59 TO-2.47 F*0 11 H

12 29 MAI TRH 2.54 TO-2.43 F*0 11 H

18 29 SAI TRH

-2.56 TO-2.48 F*0 11 H

19 29 MAN TRH

-2.62 TO-2.48 F*0 11 H

20 29 MAI TRH

-2.54 TO-2.42 F*O 11 H

1 30 SAN TRH

-2.75 TO-2.61 F*0 11 H

5 30 SAN TRH

-2.66 TO-2.58 P*O 11 H

7 30 MAN TRH

-2.64 TO-2.47 F*0 11 H

9 30 SAN TRH

-2.78 TO-2.67 F*0 11 H

13 30 SAN TRH

-2.76 TO-2.71 F*0 11 H

14 30 MAN TRH

-2.59 TO-2.48 F*0 11 H

15 30 sal TRH

-2.61 TO-2.57 F*0 11 H

16 30 sal TRH

-2.59 TO-2.51 F*0 11 H

19 30 MAN TRH

-2.82 TO-2.72 F'O 11 H

20 30 MAI TRH

-2.54 TO-2.46 F*0 O-11 H

21 30 SAN TRH

-2.73 TO-2.63 F*0 11 H

1 31 MAN TRH 2.49 TO-2.33 F*0 11 H

5 31 SAN TRH

-2.71 TO-2.67 F*0 11 H

9 31 MAN TRH

-2.71 TO-2.65 F*0 11 H

10 31 MAN TRH

-2.74 TO-2.64 F*0 11 H

13 31 SAN TRH

-2.78 TO-2.67 F*0 11 H

15 31 MAN TRH

-2.44 TO-2.38 F*0 11 H

19 31 MAN TRH

-2.70 TO-2.62 F'O 11 H

21 31 SAN TRH

-2.68 TO-2.55 F*0 11 H

1 32 MAN TRH

-2.77 TO-2.61 F*0 11 H

4 32 SAI TRH

-2.52 TO-2.48 F*0 11 H

6 32 SAN TRH

-2.68 TO-2.54 F*0 11 H

8 32 sal TRH

-2.78 TO-2.67 F*0 11 H

13 32 SAN TRH

-2.58 TO-2.47 F*0 11 H

19 32 mal TRH

-2.73 TO-2.62 F*0 11 H

21 32 mal TRH

-2.54 TO-2.44 F*0 11 H

1 33 SAI TRH

-2.53 TO-2.45 F'O 11 H

2 33 SAN TRH

-2.47 TO-2.46 F*0 11 H

7 33 SAI TRH

-2.62 TO-2.54 F*0 11 H

11 33 SAI TRH

-2.60 TO-2.53 F*0 11 H

12 33 SAN TRH

-2.63 TO-2.53 F'O 11 H

13 33 sal TRH

-2.60 TO-2.51 F*0 11 H

14 33 MAN TRH

-2.71 TO-2.60 F*0 0

11 H

16 33 SAI TRH

-2.56 TO-2.45 F*0 19

-)

NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 S/G NO. LEG ROW COL PERCENT LOCATION STATUS 11 H

17 33 sal TRH

-2.56 TO-2.49 F*0 11 H

18 33 SAN TRH

-2.65 TO-2.49 F*0 11 H

19 33 SAN TRH

-2.68 TO-2.61 F*O 11 H

1 34 SAN TRH 2.71 TO-2.56 F*0 11 H

6 34 SAN TRH

-2.64 TO-2.55 F*0 11 H

7 34 sal TRH

-2.93 TO-2.85 F'O 11 H

8 34 sal TRH ' 2.53 TO-2.45 F*O 11 H

9 34 SAN TRH

-2.57 TO-2.52 F*0 11 H

10 34 MAI TRH

-2.62 TO-2.51 F*0 11 H

11 34 MAI TRH

-2.61 TO-2.54 F*0 11 H

12 34 MAI TRH 2.60 TO-2.47 F'O 11 H

13 34 SAN TRH

-2.60 TO-2.50 F*0 l

11 H

17 34 sal TRH

-2.57 TO-2.49 F*0 11 H

19 34 MAI TRH

-2.72 TO-2.62 F*0 11 H

1 35 SAN TRH

-2.87 TO-2.73 F*0 11 H

2 35 SAN TRH

-2.61 TO-2.52 F*0 11 H

12 35 SAI TRH

-2.58 TO-2.50 F*0 11 H

13 35 SAI TRH

-2.57 TO-2.51 F*0 11 H

14 35 SAI TRH

-2.70 TO-2.62 F*0 11 H

15 35 SAN TRH

-2.42 TO-2.39 F*0 11 H

16 35 sal TRH

-2.74 TO-2.63 F'O 11 H

1 36 MAN TRH

-2.60 TO-2.31 F'O 11 H

2 36 MAI TRH

-2.48 TO-2.33 F*0 11 H

4 36 SAI TRH

-2.60 TO-2.52 F*0 j

11 H

5 36 SAI TRH

-2.48 TO-2.45 F*0 11 H

13 36 MAN TRH

-2.69 TO-2.49 F*0 11 H

14 36 MAI TRH

-2.61 TO-2.50 F*0 11 H

15 36 SAI TRH

-2.55 TO-2.50 F*0 11 H

16 36 MAN TRH

-2.71 TO-2.58 F*0 11 H

20 36 sal TRH

-2.70 TO 2.59 F*0 11 H

21 36 SAN TRH

-2.62 TO-2.46 F*0 11 H

1 37 MAI TRH

-2.59 TO-2.38 F*0 11 H

2 37 MAN TRH

-2.57 TO-2.45 F*0 11 H

6 37 mal TRH

-2.55 TO-2.42 F'O 11 H

9 37 SAN TRH

-2.59 TO-2.50 F*0 11 H

11 37 SAI TRH

-2.55 TO-2.44 F*0

.11 H

16 37 MAN TRH

-2.78 TO-2.59 F*0 11 H

19 37 SAI TRH

-2.75 TO-2.66 F*0 11 H

1 38 SAN TRH

-2.55 TO-2.47 F*O 11 H

4 38 MAI TRH

-2.61 TO-2.53 F*0 11 H

8 38 MAN TRH

-2.77 TO-2.64 F*O 11 H

9 38 MAI TRH

-2.62 TO-2.52 F*0 11 H

13 38 SAN TRH

-2.64 TO 2.55 F*0 11 H

14 38 mal TRH 2.74 TO-2.55 F*O 11 H

15 38 SAI TRH

-2.62 TO-2.53 F*0 11 H

16 38 SAN TRH

-2.73 TO-2.60 F*0 20

]

NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 S/G NO.

LEG ROW COL PERCENT LOCATION STATUS 11 H

21 38 SAI TRH

-2.64 TO-2.52 F*0 11 H

22 38 SAN TRH 2.71 TO-2.68 F*0 11 H

1 39 MAN TRH

-2.43 TO-2.32 F*0 11 H

2 39 MAN TRH

-2.52 TO-2.42 F*0 11 H

4 39 sal TRH

-2.61 TO-2.54 F'O 11 H

7 39 MAN TRH

-2.42 TO-2.32 F*0 11 H

12 39 SAI TRH

-2.70 TO-2.62 F*0

~

11 H

14 39 sal TRH

-2.74 TO-2.68 F*0 11 H

15 39 SAI TRH

-2.46 TO-2.38 F*0 11 H

20 39 SAN TRH

-2.96 TO-2.74 F*0 11 H

21 39 sal TRH

-2.68 TO-2.58 F*0 11 H

22 39 SAN TRH 2.64 TO-2.43 F*O 11 H

35 39 SAN TRH

-2.66 TO-2.53 F*0 11 H

1 40 MAN TRH

-2.57 TO-2.44 F*O 11 H

5 40

- SAI TRH

-2.40 TO-2.32 F*0 11 H

9 40 MAI TRH

-2.57 TO-2.46 F*0 11 H

13 40 MAI TRH

-2.46 TO-2.38 F*0 11 H

14 40 SAI TRH

-2.70 TO-2.67 F*0 11 H

15 40 SAI TRH

-2.47 TO-2.37 F*0 11 H

19 40 MAI TRH

-2.66 TO-2.57 F*0 11 H

20 40 MAI TRH

-2.81 TO-2.64 F*0 0

11 H

22 40 SAN TRH

-2.67 TO-2.52 F*0 11 H

1 41 SAN TRH

-2.49 TO-2.38 F*0 11 H

4 41 SAN TRH

-2.80 TO-2.69 F*0 11 H

12 41 sal TRH

-2.75 TO-2.63 F*0 11 H

15 41 MAI TRH

-2.44 TO-2.29 F'O 11 H

16 41 sal TRH

-2.69 TO-2.62 F'O 11 H

17 41 sal TRH

-2.49 TO-2.42 F*0 11 H

18 41 SAN TRH

-2.71 TO-2.61 F*0 11 H

20 41 SAN TRH 2.91 TO-2.72 F*0 11 H

4 42 MAI TRH

-2.74 TO-2.59 F*0 11 H

12 42 MAI TRH

-2.72 TO-2.57 F*0 11 H

14 42 sal TRH

-2.73 TO-2.66 F*0 11 H

16 42 sal TRH

-2.70 TO-2.60 F*0 11 H

19 42 SAI TRH 2.51 TO-2.40 F*0 11 H

20 42 SAN TRH

-2.66 TO-2.51 F*0 11 H

21 42 SAN TRH

-2.47 TO-2.37 F*0 11 H

1 43 SAN TRH

-2.60 TO-2.46 F*0 11 H

2 43 SAI TRH

-2.68 TO-2.57 F*0 11 H

6 43 MAI TRH

-2.69 TO-2.56 F*0 11 H

7 43 MA!

TRH

-2.39 TO-2.34 F*0 11 H

8 43 SAI TRH.

2.68 TO-2.62 F*0 11 H

12 43 SAI TRH

-2.66 TO-2.61 F*0 11 H

17 43 MAN TRH

-2.61 TO-2.50 F*0 11 H

22 43 SAN TRH

-2.69 TO-2.55 F*0 0

11 H

1 44 SAN TRH

-2.77 TO-2.65 F*0 21

NO'RTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 S/G NO.

LEG ROW COL PERCENT LOCATION STATUS 11 H

5 44 SAI TRH 2.54 TO-2.47 F*0 11 H

6 44 SAI TRH

-2.62 TO-2.52 F*0 11 H

10 44 MAN TRH

-2.87 TO 2.60 P0 11 H

12 44 SAI TRH

-2.63 TO-2.56 F*0 11 H

14 44 MAI TRH

-2.73 TO-2.66 F*0 11 H

16 44 MAI TRH

-2.72 TO-2.68 F*0 11 H

17 44 MAI TRH

-2.71 TO-2.49 P0 11 H

19 44 MAN TRH

-2.56 TO-2.43 P0 11 H

21 44 SAN TRH

-2.57 TO-2.43 F*0 11 H

22 44 SAN TRH

-2.57 TO-2.47 F*0 11 H

1 45 SAN TRH

-2.66 TO-2.48 F*0 11 H

6 45 SAN TRH

-2.56 TO-2.43 F*0 11 H

8 45 sal TRH

-2.70 TO-2.59 F*O 11 H

9 45 SAI TRH

-2.49 TO-2.42 F*0 11 H

10 45 SAI TRH 2.72 TO-2.58 F*O 11 H

12 45 sal TRH

-2.60 TO-2.53 P0 11 H

14 45 MAI TRH

-2.95 TO-2.72 F*0 11 H

15 45 MAI TRH

-2.79 TO-2.70 F*0 11 H

17 45 SAI TRH 2.62 TO-2.52 F*0 11 H

19 45 MAN TRH 2.70 TO-2.51 F*0 11 H

21 45 MAI TRH

-2.94 TO-2.78 F*0 0'

11 H

4 46 MAI TRH

-2.87 TO-2.75 P0 11 H

6 46 sal TRH

-2.79 TO-2.72 P0 11 H

7 46 MAI TRH 2.67 TO-2.61 F*0 11 H

11 46 sal TRH

-2.71 TO-2.66 P0 11 H

21 46 MAN TRH

-2.76 TO-2.54 F*0 11 H

19 47 SAI TRH

-2.67 TO-2.60 P0 11 H

22 47 SAI TRH

-2.68 TO-2.57 F*0 11 H

1 48 SAN TRH

-2.91 TO-2.79 F*0 11 H

1 49 sal TRH

-2.47 TO-2.42 F*0 11 H

2 49 MAI TRH

-2.55 TO-2.32 F*0 11 H

1 50 MAN TRH 2.70 TO-2.60 F*0 11 H

1 51 SAN TRH

-2.58 TO-2.47 F*0 11 H

1 52 MAI TRH

-2.69 TO-2.52 P0 11 H

1 54 MAN TRH

-2.64 TO-2.55 F*0 11 H

1 55 SAN TRH

-2.56 TO-2.39 F*0 11 H

5 55 MAN TRH

-2.48 TO-2.40 F*O 11 H

1 56 SAN TRH

-2.52 TO-2.40 P0 11 H

1 57 SAI TRH

-2.48 TO-2.36 F*0 11 H

1 58 SAI TRH

-2.63 TO-2.51 P0 11 H

1 59 SAI TRH

-2.65 TO-2.56 P0 11 H

1 60 SAI TRH

-2.53 TO-2.46 P0 11 H

4 60 sal TRH

-2.46 TO-2.39 F*0 11 H

19 60 MAN TRH

-2.37 TO-2.21 F*0 11 H

2 62 SAI TRH

-2.43 TO-2.28 P0 0

11 H

12 63 SAN TRH

-2.65 TO-2.54 F*0 22

NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 S/G NO. LEG ROW COL PERCENT LOCATION STATUS 11 H

11 64 sal TRH

-2.57 TO-2.50 P0 11 H

1 68 SAN TRH

-2.71 TO-2.64 P0 11 H

1 70 MAN TRH

-2.76 TO-2.58 P0 11 H

1 71 sal TRH

-2.73 TO-2.65 P0 11 H

1 72 SAN TRH 2.76 TO-2.63 P0 11 H

1 73 SAN TRH

-2.72 TO-2.65 PO 11 H

1 74 SAI TRH

-2.74 TO-2.62 P0 11 H

1 75 SAI TRH

-2.75 TO-2.67 P0 11 H

1 76 SAN TRH

-2.72 TO-2.64 P0 11 H

1 78 SAN TRH

-2.81 TO-2.62 F*0 11 H

1 87 SAN TRH

-2.67 TO-2.47 P0 12 H

5 2

sal TRH

-2.43 TO-1.96 P0 12 H

27 10 SAI TRH

-2.93 TO-2.87 P0 12 H

25 68 sal TRH

-2.60 TO-2.46 P0 12 H

10 88 SCI TRH

-2.68 TO-2.61 P0 TABLE VI P1 Tubes S/G NO. LEG ROW COL PERCENT LOCATION STATUS 11 H

23 17 SAN 1BH

-2.07 TO-1.84 P1 11 H

8 27 SAD 1BH

-1.12 P1 11 H

30 46 SAD 1BH

-1.02 P1 11 H

5 56 SAN 1BH ' -1.37 TO-1.29 P1 11 H

5 57 SAD 1BH

-1.07 P1 11 H

8 78 MAN 1BH

-2.98 TO-2.28 P1 12 H

34 31 MAN 1BH

-1.17 TO-1.08 P1 12 H

37 38 MAN 1BH

-1.25 TO-1.11 P1 12 H

31 46 SAN 1BH

-1.10 TO-1.03 P1 12 H

31 47 MAD 1BH

-1.00 P1 12 H

32 47 MAD 1BH

-0.81 F*1 12 H

4 71 MAN 1BH

-1.55 TO-1.19 P1 TABLE Vil EP Tubes S/G NO. LEG ROW COL PERCENT LOCATION STATUS 11 H

9 26 SAI TRH

-0.02 TO+0.02 EF*

11 H

13 29 sal TRH

+0.21 TO+0.35 EP 11 H

7 31 SAI TRH

-0.02 TO+0.02 EP 11 H

14 32 sal TRH

+0.23 TO+0.32 EP 11 H

10 33 mal TRH 40.18 TO+0.39 EP 11 H

14 34 SAI TRH

+0.19 TO+0.24 EF*

23

r NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 S/G NO. LEG ROW COL PERCENT LOCATION STATUS 11 H

4 37 sal TRH

+0.09 TO+0.17 EF" 11 H

14 37 sal TRH

+0.02 TO+0.14 EF*

11 H

4 40 SAI TRH

+0.12 TO+0.15 EF*

11 H

10 40 SCI TRH

-1.23 TO-1.09 EF*

11 H

4 44 mal TRH

+0.18 TO+0.30 EF*

11 H

16 50 SA!

TRH

+1.91 TO+2.25 EF*

11 H

17 51 SAI TRH

~ 1.82 TO+2.04 EF*

+

11 H

20 53 SVI TRH

+0.69 TO+0.74 EF*

11 H

5 54 sal TRH

+0.10 TO+0.17 EF*

11 H

12 60 SAI TRH

+0.22 TO+0.33 EF*

11 H

8 66 MAI TRH

-0.03 TO+0.04 EF" 11 H

6 74 SAI TRH

-0.04 TO+0.03 EF*

11 H

7 87 sal TRH

+0.01 TO+0.22 EF*

TABLE Vill Tubes Sleeved 04/99 outage S/G NO. LEG ROW COL PERCENT LOCATION STATUS 12 H

3 8

SAI TRH

+6.29 TO+8.11 SLV 12 H

8 8

sal TRH

+5.59 TO+9.74 SLV O

12 H

20 10 SAI TRH

+4.75 TO+8.53 SLV

\\

l 12 H

15 11 sal -

TRH

+5.59 TO+6.76 SLV 12 H

12 12 MAI TRH

+0.52 TO+10.62 SLV@

12 H

18 12 SAI TRH

+5.19 TO+8.81 SLV 12 H

2 13 SAI TRH

+0.60 TO+7.47 SLV 12 H

2 14 SAI TRH

+1.74 TO+2.33 SLV 12 H

3 14 mal TRH

+0.03 TO+0.20 SLV 12 H

14 14 SAI TRH

+0.12 TO+0.18 SLV 12 H

14 15 SAI TRH

+0.25 TO+0.34 SLV 12 H

23 15 mal TRH

+0.02 TO+0.08 SLV 12 H

24 15 sal TRH

+4.46 TO+10.34 SLV 12 H

26 16 SAI TRH

+9.13 TO+9.78 SLV 12 H

3 17 MAI TRH

+0.07 TO+0.18 SLV 12 H

6 17 sal TRH

+0.03 TO+0.15 SLV 12 H

23 17 mal TRH

-0.05 TO+0.13 SLV@

12 H

25 17 sal TRH

+0.48 TO+3.22 SLV 12 H

26 17 SAI TRH

+1.78 TO+3.85 SLV 12 H

3 18 mal TRH

+0.04 TO+0.18 SLV 12 H

2 19 MAI TRH

+0.06 TO+0.16 SLV 12 H

15 19 MAI TRH

+0.03 TO+0.18 SLV 12 H

16 19 mal TRH

+0.08 TO+0.19 SLV 12 H

19 19 MAI TRH

+0.06 TO+0.22 SLV 12 H

11 20 SAI TRH

+0.12 TO+0.19 SLV O

12 H

14 20 mal TRH

+0.05 TO+0.19 SLV 12 H

12 21 SAI TRH

+0.12 TO+0.15 SLV 24

e r

NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 G

Q S/G NO. LEG ROW COL PERCENT.

LOCATION STATUS 12 H

15 21 SAI TRH

+0.13 TO+0.21 SLV 12 H

4 22 sal TRH

+0.04 TO+0.20 SLV 12 H

14 22 SAI TRH

+0.09 TO+0.20 SLV 12 H

16 22 SAI TRH

+0.04 TO+0.19 SLV 12 H

29 22 MAI TRH

+0.07 TO+0.19 SLV 12 H

18 23 mal TRH

+0.13 TO+0.18 SLV 12 H

7 24 SAI TRH

+6.93 TO+7.64 SLV 12 H

11 24 SAI TRH

+0.10 TO+0.20 SLV 12 H

20 24 MAI TRH

+0.05 TO+0.15 SLV 12 H

27 24 MAI TRH

+0.08 TO+0.19 SLV 12 H

14 25 SAI TRH

+0.08 TO+0.19 SLV 12 H

31 25 SAI TRH

+0.16 TO+0.22 SLV 12 H

22 26 mal TRH

+0.07 TO+0.20 SLV 12 H

32 26 SAI TRH

+0.06 TO+0.14 SLV 12 H

2 27 SAI TRH

+0.02 TO+0.18 SLV 12 H

17 27 sal TRH

+0.11 TO+0.16 SLV 12 H

19 27 MAI TRH

+0.42 TO+2.43 SLV 12 H

34 27 sal TRH

+0.05 TO+0.20 SLV l

12 H

3 28 SAI TRH

+0.04 TO+0.11 SLV 12 H

36 28 MAI TRH

+0.09 TO+0.16 SLV 12 H

3 29 sal TRH

+0.09 TO+0.20 SLV 12 H

18 29 SAI TRH

+0.23 TO+0.26 SLV 12 H

18 30 sal TRH

+3.65 TO+4.97 SLV 12 H

24 30 mal TRH

+0.10 TO+0.17 SLV 12 H

29 30 sal TRH. +0.06 TO+0.16 SLV 12 H

12 31 SAI TRH

+3.63 TO+4.77 SLV 12 H

22 31 SAI TRH

+1.13 TO+5.90 SLV@

12 H

29 31 MAI TRH

+0.03 TO+0.15 SLV 12 H

31 31 sal TRH

+0.05 TO+0.12 SLV 12 H

21 32 sal TRH

+0.05 TO+0.15 SLV 12 H

30 32 SAI TF.H

+0.07 TO+0.13 SLV 12 H

29 33 sal TRH

+0.06 TO+0.17 SLV 12 H

5 35 mal TRH

+0.22 TO+0.34 SLV 12 H

13 35 mal TRH

+4.69 TO+8.76 SLV 12 H

36 35 sal TRH

+0.11 TO+0.19 SLV 12 H

25 36 sal TRH

+0.82 TO+1.10 SLV f

12 H

29 36 SAI TRH

+0.08 TO+0.18 SLV 12 H

36 36 MAI TRH

+0.06 TO+0.20 SLV 12 H

5 37 SAI TRH

+0.10 TO+0.27 SLV 12 H

8 37 SAI TRH

+0.08 TO+0.23 SLV 12 H

22 38 SAI TRH

+0.03 TO+0.15 SLV 12 H

8 39 mal TRH

+0.25 TO+0.35 SLV 12 H

19 39 SAI TRH

+4.02 TO+5.51 SLV 12 H

21 39 sal TRH

+0.11 TO+0.19 SLV 12 H

25 39 sal TRH

+0.09 TO+0.21 SLV 12 H

26 39 SAI TRH

+0.13 TO+0.16 SLV 25 J

, NORTHERN STATES POWER

~

SUMMARY

REPORT INSERVICE INSPECTION

. PRAIRIE ISLAND UNIT #1,1999 S/G NO. LEG ROW COL PERCENT LOCATION STATUS 12 H

27 39 SAI TRH

+0.10 TO+0.13 SLV

_ 12 H

36 39 MAI TRH

+0.07 TO+0.13 SLV 12 H

5 40 MAI TRH 40.06 TO+0.16 SLV 12 H

22 40 sal TRH

+0.09 TO+0.22 SLV 12 H

25 40 mal TRH

+0.05 TO+0.12 SLV 12 H

33 40 MAI TRH

+0.07 TO+0.14 SLV 12 H

34 40 mal TRH 40.11 TO+0.21 SLV 12 H

36 40 MAI TRH

+0.07 TO+0.20 SLV 12 H

5 41 SAI TRH

+0.22 TO+0.29 SLV 12 H

34 41 MAI TRH

+0.12 TO+0.19 SLV 12 H

5 42 SAI TRH

+0.09 TO+0.15 SLV 12 H

24 42 MAI TRH

+0.08 TO+0.22 SLV 12 H

22 43 MAI TRH

+6.09 TO+8.29 SLV 12 H

27 43 SAI TRH

+0.11 TO+0.24 SLV 12 H

36 43 MAI TRH

+0.08 TO+0.22 SLV 12 H

4 44 SAI TRH

+0.19 TO+0.28 SLV 12 H

9 44 SAI TRH

+0.17 TO+0.24 SLV 12 H

27 44 mal TRH

-0.05 TO+0.12 SLV 12-H 15 45 MAI TRH

+0.10 TO+0.24 SLV 12 H

26 45 SAI TRH

+0.09 TO+0.16 SLV 12 H

29 45 SAI TRH

+0.10 TO+0.15 SLV O

12 H

11 46 mal TRH

+0.10 TO+0.20 SLV 12 H

20 46 mal TRH

+5.46 TO+6.69 SLV 12 H

30 46 SVI TRH

+3.18 TO+3.25 SLV 12 H

32 46 SAI TRH

+0.08 TO+0.17 SLV 12-H 2

48 SAI TRH

+0.30 TO+0.37 SLV 12 H

4 49 MAI TRH

+1.14 TO+5.65 -

SLV 12 H

18 49 sal TSH

+0.08 TO+0.23 SLV 12 H

31 49 sal TRH

+0.17 TO+0.36 SLV 12 H

6 50 MAI TRH

+0.24 TO+0.37 SLV 12 H

9 50 MAI TRH

+0.22 TO+0.36 SLV 12 H

13 50 MAI TRH

+0.05 TO+0.21 SLV 12 H

26 50 mal TRH

+0.09 TO+0.31 SLV 12 H

31 50 MAI TRH

+0.04 TO+0.33 SLV 12 H

34 50 MAI TRH

+0.09 TO+0.18 SLV 12 H

5 51 MAI TRH

+4.79 TO+10.92 SLV 12 H

9 51 mal TRH

+0.25 TO+0.39 SLV 12 H

20 51 SAI TRH

+0.08 TO+0.19 SLV 12 H

6 52 mal TRH

+5.42 TO+9.03 SLV 12 H

14 52 mal TRH

+0.01 TO+0.16 SLV 12 H

21 52 MAI TRH

+0.09 TO+0.23 SLV 12 H

23 52 MAI TRH

+0.15 TO+0.29 SLV 12 H

27 52 SAI TRH

+0.13 TO+0.22 SLV 12 H

3 53 SAI TRH

+0.07 TO+0.15 SLV 12 H

8 53 SAI TRH

+0.26 TO+0.38 SLV (O

12 H

8 54 MAI TRH

+0.10 TO+0.22 SLV 26

NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 S/G NO. LEG ROW COL PERCENT LOCATION STATUS 12 H

13 54 SAI TRH

+1.19 TO+7.20 SLV 12 H

15 54 MAI TRH

+0.08 TO+0.21 SLV 12 H

20 54 MAI TRH

+0.06 TO+0.14 SLV 12 H

14 56 SAI TRH

+0.04 TO+0.18 SLV 12 H

17 56 sal TRH

+0.14 TO+0.22 SLV 12 H

24 56 MAI TRH

+0.10 TO+0.16 SLV 12 H

28 56 sal TRH

+0.13 TO+0.18 SLV 12 H

21 57 MAI TRH

+0.03 TO+0.16 SLV 12 H

35 58 SAI TRH

+0.10 TO+0.17 SLV 12 H

3 59 sal TRH

+0.28 TO+0.37 SLV 12 H

17 60 mal TRH

+0.05 TO+0.13 SLV 12 H

20 60 MAI TRH

+0.07 TO+0.16 SLV 12 H

23 60 sal TRH

+0.14 TO+0.21 SLV 12 H

3 61 SAI TRH

+0.12 TO+0.17 SLV 12 H

8 61 mal TRH

+0.11 TO+0.24 SLV 12 H

13 62 SAI TRH

+0.03 TO+0.22 SLV 12 H

31 62 MAI TRH

+0.15 TO+0.19 SLV 12 H

4 63 MAI TRH

+0.21 TO+0.35 SLV 12 H

5 63 sal TRH

+1.28 TO t3.51 SLV 12 H

8 63 sal TRH

+0.09 TO+0.17 SLV 12 H

11 63 SAI TRH

+10.12 TO+10.45 SLV 12 H

31 63 SAI TRH

+0.06 TO+0.16 SLV 12 H

5 64 SAI TRH

+0.05 TO+0.14 SLV 12 H

11 64 SAI TRH

+0.12 TO+0.19 SLV 12 H

12 64 MAI TRH. +0.05 TO+0.20 SLV 12 H

29 64 mal TRH

+0.17 TO+0.32 SLV 12 H

10 65 mal TRH

+0.14 TO+0.24 SLV 12 H

9 66 mal TRH

+0.07 TO+0.22 SLV 12 H

20 66 sal TRH

+0.27 TO+0.33 SLV 12 H

24 66 sal TRH

+0.27 TO+0.31 SLV 12 H

35 66 sal TRH

+0.10 TO+0.19 SLV 12 H

14 67 sal TRH

+0.09 TO+0.17 SLV 12 H

15 67 sal TRH

+0.05 TO+0.13 SLV 12 H

24 67 SAI TRH

+0.25 TO+0.35 SLV 12 H

30 67 MAI TRH

+0.12 TO+0.22 SLV 12 H

9 68 SAI TRH

+2.31 TO+2.92 SLV 12 H

14 68 SAI TRH

+0.08 TO+0.14 SLV 12 H

15 68 MAI TRH

+0.07 TO+0.13 SLV 12 H

31 68 SAI TRH

+0.09 TO+0.13 SLV 12 H

5 69 sal TRH

+0.26 TO+7.40 SLV 12 H

16 69 sal TRH

+1.05 TO+1.20 SLV 12 H

28 69 SAI TRH

+0.12 TO+0.22 SLV 12 H

10 70 SAI TRH

+8.94 TO+10.24 SLV 12 H

7 71 SAI 1RH

+0 07 TO+0.14 SLV 12 H

12 71 sal TRH

+0.08 TO+0.15 SLV O*

12 H

15 71 SAI TRH

+0.07 TO+0.16 SLV 27

T NORTHERN STATES POWER

SUMMARY

REPORT I

INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 O

V S/G NO.

LEG ROW COL PERCENT LOCATION STATUS 12 H

18 71 mal TRH

+0.26 TO+0.32 SLV 12 H

13 72 SAI TRH

+0.01 TO+0.04 SLV 12 H

4 73 MAI TRH

+0.08 TO+0.16 SLV 12 H

9 73 sal TRH

+0.08 TO+0.17 SLV 12 H

27 73 sal TRH

+2.34 TO+2.49 SLV 12 H

12 75 MAI TRH

+0.09 TO+0.13 SLV 12 H

17 76 sal TRH

+0.15 TO+0.26 SLV 12 H

15 78 SAI TRH

+0.10 TO+0.12 SLV 12 H

22 78 sal TRH

+4.66 TO+5.43 SLV 12 H

17 79 MAI TRH

+0.11 TO+0.22 SLV 12 H

4 80 sal -

TRH

+0.09 TO+0.15 SLV 12 H

13 81 MAI TRH

+0.79 TO+2.75 SLV 12 H

5 82 sal TRH

+0.08 TO+0.16 SLV 12 H

6 82 mal TRH

+0.06 TO+0.15 SLV 12 H

9 84 sal TRH

+0.09 TO+0.13 SLV 12 H

6 85 MAI TRH

+0.07 TO+0.14 SLV 12 H

9 85 SAI TRH

+0.18 TO+0.25 SLV

~

TABLEIX Tubes plugged 04/99 outage S/G NO. LEG ROW COL PERCENT LOCATION STATUS 11 H

1 1

HOT LEG PLUG REPLACED PLG2 11 H

29 17 sal 01H

+20.43 TO+20.45 PLG@

11 H

29 19 sal 03H

+12.84 TO+13.14 PLGT 11 H

29 23 sal 06H

+21.89 TO+22.04 PLG@

11 H

18 47 sal EBH

-0.56 TO+1.98 PLG@

11 H

19 48 MAI TRH

+0.70 TO+12.94 PLG@

11 H

45 50 HOT LEG PLUG REPLACED PLG2 11_ _H 45 51 HOT LEG PLUG REPLACED PLG@

11 a

11

_lj 19 52 SAI EBH

+0.28 TO+0.36 PLG@

C 34 77 42 01C

-0.23 PLG@

11 H

21 88 HOT LEG PLUG REPLACED PLG@

12 H

9 8

MCI WCH

-0.14 TO-0.04 PLG@

12 H

6 13 WZC WCH

-0.03 TO+0.05 PLG@

12 H

31 17 SAI TRH

+1.57 TO+2.54 PLG@

12 H

1 18 SAI TRH

+4.40 TO+8.80 PLG@

12 H

5 19 PVN TEH

+0.00 TO+27.09 PLGB 12 H

7 20 MCI WCH

+0.20 TO4 0.30 PLG@@

12 H

10 21 WZC WCH

-0.05 TO+0.23 PLG@

12 H

13 21 WZC WCH

-0.05 TO+0.18 PLGO 12 H

17 21 WZC WCH

-0.12 TO+0.30 PLG@

12 H

23 21 MCI WCH

-0.22 TO+0.05 PLG@@

O 12 H

8 22 WZC WCH

+0.02 TO+0.08 PLG@

12 H

10 22 WZC WCH

+0.03 TO+0.22 PLGO 28

I l

NORTHERN STATES POWER

SUMMARY

REPORT l

lNSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 S/G NO. LEG ROW COL PERCENT LOCATION STATUS 12 H

26 22 WZC WCH

+0.10 TO+0.35 PLG@

12 H

19 23 MCI WCH

-0.23 TO-0.01 PLG@

12 H

29 23 WZC WCH

-0.02 TO+0.26 PLG@

12 H

1 24 sal TRH

+0.38 TO+9.02 PLG@

12 H

2 24 WZC WCH

-0.15 TO+0.17 PLG@

12 H

4 24 WZC WCH

-0.09 TO+0.04 PLG@

12 H

6 25 WZC WCH

-0.11 TO+0.19 PLGO 12 H

18 26 WZC WCH

-0.06 TO+0.13 PLG@

12 H

4 27 mal WCH

-0.31 TO-0.10 PLGS 12 H

22 27 WZC WCH

-0.13 TO+0.21 PLG@

12 H

2 28 WZC WCH

-0.24 TO+0.20 PLG@

12 H

35 28 WZC WCH

-0.21 TO+0.24 PLG@

12 H

17 29 WZC WCH

+0.02 TO+0.17 PLG@

12 H

13 30 WZC WCH

-0.15 TO+0.06 PLG@

12 H

15 30 WZC WCH

-0.30 TO+0.15 PLG@@

12 H

3 32 WZC WCH

-0.17 TO+0.15 PLG@

12 H

14 33 WZC WCH

-0.22 TO-0.02 PLG@

12 H

17 33 MAI TSH

+0.24 TO+1.41 PLG@

12 H

6 34 WZC WCH

-0.15 TO+0.31 PLGO 12 H

6 35 WZC WCH 0.09 TO+0.10 PLG@@

12

-H 16 35 mal TSH

+0.59 TO+1.75 PLG@

O 12 H

44 36 SVi 03H

+0.13 TO+0.27 PLG@

12 H

7 37 WZC WCH

-0.01 TO+0.08 PLGO 12 H

7 38 WZC WCH

-0.17 TO+0.06 PLG@

12 H

13 38 WZC WCH

-0.07 TO+0.05 PLGT 12 H

3 39 WZC WCH

-0.09 TO+0.12 PLG@

12 H

7 39 WZC WCH

-0.07 TO+0.19 PLG@

12 H

6 40 WZC WCH

-0.06 TO+0.18 PLG:D 12 H

14 40 WZC WCH

+0.00 TO+0.15 PLG@

12 H

4 41 WZC WCH

-0.18 TO+0.09 PLG3 12 H

9 42 WZC WCH

-0.17 TO-0.05 PLG@

12 H

17 43 WZC WCH

-0.15 TO+0.26 PLG@

12 H

5 45 WZC WCH

-0.07 TO+0.15 PLG@

12 H

13 46 WZV WCH

-0.01 TO+0.11 Pl.G @

12 H

3 50 OBS PLG@

12 H

12 50 WZC WCH

-0.13 TO+0.14 PLG@

12 H

7 51 WZV WCH

-0.05 TO+0.07 PLG@

12 H

15 52 MCI WCH

-0.20 TO-0.03 PLG@

12 H

7 53 WZC WCH

-0.13 TO+0.11 PLG@

l 12 H

29 53 SCI WCH

+0.49 TO+0.67 PLG@@

12 H

6 54 WZV WCH

-0.01 TO+0.05 PLG@

l 12 H

1 55 sal TRH

+0.51 TO+1.49 PLG@

12 H

25 57 SCI WCH

+0.10 TO+0.25 PLG@@

12 H

4 58 WZC WCH

-0.03 TO+0.16 PLG@

I 12 H

15 58 WZC WCH

-0.02 TO+0.07 PLG3 12 H

24 59 SCI TEH

+25.59 TO+25.87 PLG@

l i

29 l

t

r NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 S/G NO. LEG ROW COL PERCENT LOCATION STATUS 12 H

9 60 MCI TEH

+25.46 TO+25.72 PLGS I

12 H

2 63 MCI WCH

-0.16 TO+0.00 PLGS 12 H

16 65 WZC WCH 0.04 TO+0.10 PLG@

12 H

8 66 sal WCH 0.26 TO+0.39 PLG@@

12 H

17 66 WZC WCH 0.10 TO+0.06 PLG@

12 H

7 67 WZC WCH 0.17 TO+0.07 PLG@

12 H

13 67 VOL WCH 40.20 TO+0.28 PLG@

12 H

2 70 WZC WCH 0.06 TO+0.13 PLGO 12 H

23 70 SCI TEH

+25.09 TO+25.24 PLG@

12 H

1 71 sal TRH

+7.89 TO+8.48 PLG@

12 H

1 72 SAI TRH

+0.11 TO+0.14 PLG@

12 H

11 73 WZC WCH 0.18 TO+0.09 PLGO 12 H

23 73 WZC WCH 0.14 TO+0.09 PLGO 12 H

9 75 WZC WCH 0.17 TO+0.09 PLGO 12 H

1 81 MAI TRH

+1.02 TO+4.66 PLG@

12 H

17 81 WZC WCH

-0.11 TO+0.13 PLGO 12 -

H 4

82 WZC WCH

+0.01 TO+0.19 PLGO 12 H

3 86 WZC WCH

-0.17 TO-0.00 PLG2 l

12 H

11 86 WZC WCH

+0.06 TO+0.22 PLG3

@ in-situ pressure tested

@ Westinghouse 1690 Mechanical plugs replaced due to unusual boric acid deposits

@ No qualified sizing technique or ARC available (includes sleeve channel head restrictions)

@ Failed elevated rerell

@ Exceeded Technical Specification repair depth

@ New potential damage mechanism in the parent tube at the upper sleeve joint

@ inservice sleeves with weld zone indications of inclusions or suckback

@ Not inspectable due to obstructions or excessive permeability variations

@ Sleeve Pull

@ Preservice sleeves with weld zone indications of inclusions or suckback TABLE X Total tubes plugged and sleeved to date (05/99)

S/G NO.

SLEEVED

% SLEEVED PLUGGED

% PLUGGED EQUlVALENT % PLUG 11 0

0 156 4.60 4.60 12 969 28.60 348 10.27 11.29 O

30

F NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT #1,1999 LEGEND OF FIELDS AND CODES FIELD EXPLANATIQN S/G NO.

Steam Generator Number (11 or 12)

LEG Channel head tested from (H = inlet & C = outlet)

ROW Row number of tube location COL Column number of tube location PERCENT Measured percent or three digit code see below LOCATION Physical 1.ocation of Indication - see below STATUS Repair status - see below ElgLQ CODii EXPLANATION PERCENT DSI Distorted Support Plate Indication MAD Multiple Axial Indication Not Detectable mal Multiple AxialIndication MAN Multiple AxialIndication No Change MCI Multiple Circumferential Indication MVI Multiple Volumetric Indication

)

NDD No Detectable Discontinuity OBS Obstructed PVN Permeability Vanation SAD Single AxialIndication Not Detectable sal Single AxialIndication SAN Single AxialIndication No Change j

SCI Single Circumferential Indication SVI Single Volumetric Indication VOL Volumetric indication WZC Weld Zone Circumferential WZV Weld Zone Volumetric LOCATION TEH Tube end hot (primary face)

TRH Top of roll expansion hot leg 1BH Bottom of Additional roll expansion #1 hot leg 2BH Bottom of Additional roll expansion #2 hot leg EBH Bottom of Elevated roll expansion hot leg TSH Tube sheet hot (secondary face)

WCH Weld Centerline hot leg 0?H

? = First through Seventh tube support plate on hot leg side NV7 7 = First through Forth new antivibration bar 0?C 7 = First through Seventh tube support plate on cold leg side TSC Tube sheet cold (secondary face)

TRC Top of roll expansion cold leg TEC Tube end cold (primary face)

STATUS

<TS Less Than the Technical Specification repair limit ARC Alternate tube support plate Repair Criteria F*0 Tube meets F* criteria with no additional roll expansion F*1 Tube meets F* criteria with one additional roll expansion F*2 Tube meets F* criteria with two additional roll expansions EF*

Tube meets EF* criteria with one elevated additional roll expansion SLV Tube Sleeved PLG Tube Plugged I

O 31 1

i NORTHERN STATES POWER

SUMMARY

REPORT INSERVICE INSPECTION PRAIRIE ISLAND UNIT 1,1999 O

APPENDIX F LIST OF SNUBBER INSERVICE TESTING 3 Pages d

O O

p Snubber Tests V

l Summary results of snubber visual inspections and functional testing for Prairie Island Unit 1, per Surveillance Procedure SP 1225 during refueling Outage 19. The examinations were conducted by Prairie Island Personnel.

Visual inspections (VT-3) were performed on 100% of Unit 1 snubbers during the April 1999 outage. No snubbers were determined to be inoperable as a result of visual q

inspections. Three safety related snubbers were removed for as-found testing due to being classified as unacceptable as a result of visualinspection. These were snubbers, 1-MSH-103B (WO 9905028), which had the rod wiper seal pulled out of the bushing,1-RCVCH-1293 (WO 9905029), which was subject to the same defect, and 1-SIRH-23B (WO9905067), which had damage to the manifold block from an interference with the base plate. The first two snubbers were reclassified as acceptable after passing a j

functional test. Snubber 1-SIRH-23B was a functional test failure. This snubber j

exhibited binding when compressed to less than 1-1/4" extension. However, it was

{

dete.rnined that this deficiency would not have prevented it from performing its safety related function. The following nonconformance reports document failure findings, NCR 19991651, NCR 19991365, and ISI discrepancy report 99-0013.

In total,47 safety related snubbers were functionally tested. This includes the following types, thirty five Basic Engineers, two Paul-Munroe, two ITT-Grinnell, and eight McDowell-Wellman 900 kip S/G snubbers. Two steam generator snubber valve h^

blocks were also tested. Snubber 1-SIRH-23B (PI-271) was the only failure noted. Due to the failure, the required sample size of Basic Engineers snubbers was increased to 20%, or 34. No decrease in visual inspection interval is required by Technical Specification 4.13. All snubbers removed for testing were pre-service inspected (VT-3) per D45.4 Snubber Removal and Installation Procedure, in addition to the above testing, seven non-safety related snubbers were changed out and functionally tested, all satisfactory. The following table summarizes the snubbers tested.

t O

1 of 3 i

c

TABLE: Snubber Tests BB! M WiBWiHIE EaB fig 1-MSH-106B PM2200 MS Pl - 502 PI - 502 SAT 1-MSH-106A PM2200 MS Pl - 503 Pl - 503 SAT 1-CCH-380 1 1/2 X 5 CC PI - 284 PI -1 SAT 1-RCRH-47A 4 X 5 ITT RC PI - 7701 PI - 565 SAT 1-RCRH-47B 4 X 5 ITT RC PI - 564 Pl - 7701 SAT 1-AFSH-22A 1 1/2 X 10 AF Pl - 313 Pl - 73 SAT 1-AFSH-36 1 1/2 X 10 AF Pl - 6 Pl - 366 SAT 1-RCRH-34 1 1/2 X 5 RC PI - 87 Pl - 535 SAT 1-RCRH-5A 1 1/2 X 5 RC Pl - 31 PI - 288 SAT 1-RHRRH-15 1 1/2 X 5 RHR Pl - 70 Pl - 144 SAT 1-RHRRH-27 1 1/2 X 5 RHR Pl - 435 Pi - 196 SAT 1-RHRRH-29A 1 1/2 X 5 RHR Pl - 427 PI - 221 SAT

)

1-RHRRH-29B 1 1/2 X 5 RHR Pl-378 Pl - 58 SAT 1 -RHRRH-41 1 1/2 X 5 RHR PI - 314 PI - 34 SAT 1-RHRRH-5 1 1/2 X 5 RHR PI - 135 Pi - 65 SAT 1-RPCH-146 1 1/2 X 5 RC Pl - 90 PI - 64 SAT 1-RPCH-147 1 1/2 X 5 RC PI - 355 Pl -- 71 SAT 1-RSlH-163 1 1/2 X 5 SI Pl - 415 Pl - 77 SAT 1-RSlH-167 1 1/2 X 5 S1 Pl - 449 Pl - 138 SAT 1-RSlH-414 1 1/2 X 5 Sl Pl - 390 Pl - 302 SAT 1-RSlH-442 1 1/2 X 5 S1 PI - 433 Pl - 225 SAT 1-RSlH-93 1 1/2 X 5 SI PI - 197 PI - 228 SAT 1-RSlH-95 1 1/2 X 5 S1 PI - 132 Pi - 202 SAT 1-RSlH-96 1 1/2 X 5 S1 PI - 80 Pl - 467 SAT 1-RSlH-98 1 1/2 X 5 S1 Pl - 436 Pl - 533 SAT 1-CCRH-70 1X5 CC PI - 339 Pl - 91 SAT 1-FWH-60A 2 1/2 X 5 FW Pl - 459 PI - 147 SAT 1-FWH-60B 2 1/2 X 5 FW Pl - 422 Pl - 477 SAT 1-CWH-405 2X5 CL Pi - 572 PI - 164 SAT 1-RCRH-16B 2X5 RC Pl - 563 PI - 478 SAT 1-RCRH-27A 2X5 RC Pl - 536 Pl - 50 SAT 1-RCRH-27B 2X5 RC Pl - 493 PI - 583 SAT 1-RCRH-51 2X5 RC PI - 177 PI - 337 SAT 1-RCRH-52 2X5 RC Pl - 5 PI - 136 SAT 1-FWH-68 3 1/4 X 5 FW PI - 475 Pl - 490 SAT 1-CWH-623 3/4 X 5 CL PI - 102 PI - 112 SAT 1-MSDH-29 3/4 X 5 MS Pl - 145 Pi - 146 SAT 1-RBDH-414 3/4 X 5 SB PI - 334 PI - 25 SAT 1-MSH-105B 4X5 MS PI - 524 Pi - 525 SAT 1-FWH-66 2 1/2 X 5 FW Pl - 154 PI - 256 SAT 1-FWH-70 2 1/2 X 5 FW PI - 137 PI - 148 SAT 2 of 3

/

I

'S 1-FWH-69 3 1/4 X 5 FW PI - 491 PI - 489 SAT x,)

11S/G01 900 kip SG

.003-4 25.12620.003-15 SAT 11S/G02 900 kip SG

.003-5 25.12620.003-8 SAT 11S/G03 900 kip SG

.003-6 25.12620.003-9 SAT 11S/G04 900 kip SG

.003-7 25.12620.003-1 SAT 12S/G01 900 kip SG

.003-10 25.12620.003-7 SAT 12S/G02 900 kip SG

.003-3 25.12620.003-11 SAT 12S/G03 900 kip SG

.003-8 25.12620.003-5 SAT 12S/G04 900 kip SG

.003-15 25.12620.003-6 SAT 11S/G02 valve block SG SG 19 SG 19 SAT 12S/G02 valve block SG SG 11 SG 11 SAT 1-FWH-64 31/4 X 5 FW PI -462 PI -542 SAT 1-MSH-103B 4X5 MS PI - 84 PI - 106 SAT 1-RCVCH-1 1/2 X 10 VC PI - 212 PI - 381 SAT 1293 1-SIRH-23B 2X5 St Pl - 271 Pl - 149 UNSAT