ML20094F942

From kanterella
Revision as of 16:19, 12 May 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Annual Update of Projects Listed in Category (A,B & C) as Defined by Long Range Planning Program Integrated Schedule
ML20094F942
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 11/06/1995
From: Long R
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
6000-95-2804, C311-94-2439-1, NUDOCS 9511090154
Download: ML20094F942 (18)


Text

- . ,. . .

*l

'i

.GPU Nucleat Corporation ' ,

One Upper Pond Road 1 Sr. Parsippany, New Jersey 07054

.201-316-7000

)

TELEX 136482 .'_ j Writers Direct Dial Nurnbec

' November 6,1995 ]

.6000-95-2804-C311-94-2439-1 )

l

'i 1

1

'i

_ (U, S. Nuclear Regulatory Commis'sion SAtt: . Document Control Desk j

EWashington, DC. 20555 Gentlemen: .

Subject:

Three Mile Island Nuclear Station, Unit No. l'(TMI-1) l

  • ' Docket No. 50-289

' Operating License No. DPR-50 Long Range Planning Program (LRPP)

- Annual Update of Integrated Schedule "ABC" Project Listing Pursuant to License DPR-50 Condition No. 2.c.9, GPU Nuclear (GPUN) Corporation hereby submits the required annual update of projects listed in each category (A, B, and C) as defined by the LRPP integrated schedule. The attachments to this letter include: 1) the ABC project listing; and,2) a summary of changes since the last submittal forwarded by GPUN Letter No. C311-94-2141, dated November 7,1994. An abstract of the attachments follows:-

1,1  ; Attachment A - A new project listing of Category A, B, and C projects annotated

by an asterisk (*) to identify new projects and by a double asterisk (**) to identify

' changes in Budget Authorization (B/A) number assignments. Completed projects have been removed from the schedule listing. Remaining projects are ongoing or r

. are scheduled consistent with cycle / year commitments. Any changes in schedule are reflected on Attachments A and B.

GS0053 9511090154 951106 PDR- ADDCK 05000289 N' P._.- . ,_ _;PDR. ,,. 7 .

k i

, ' GPU Nuclear Corporation is a subsidiary of General Public Utilities Corporation

m  : ~

y w.N ,

1 a 4000 h5-2804:

C311-95-2439-1 Page 2 - .)

< T.: 2. - Attachment B - A summary listing of Category A'and B projects which have been completed,' deferred, changed in scope, or otherwise changed with explanations,  ;

t as appropriate.1The listing also contains Category C project completions. Changes

to the Category C scope.lor schedule do not impact the Category A and' B

~

~

schedules.

l Pursuant'to the LRPP for TMI-1, GPU Nuclear will assume that the NRC is in agreement with the above Category A and B changes, unless we are notified otherwise within 15 days .

of receipt.-

l l

Sincerely,  ;

pw

. L. Long Vice President and Director

. Services Division GMG/ pip i

i l

1 cc:- 1 Administrator, Region 1;

.TMI-1 Senior Project Manager -

TMI Senior. Resident Inspector  !

l 0

j

. + -

3 1

J ATTACHMENT A-TMI-1 PROJECT LISTING

- INTEGRATED SCHEDULE

. ANNUAL UPDATE .

(NOVEMBER,1995)

I e

4 Y t

'I \, .

,.('

t

. ~ - z - _ - . _

4

_ a y-ig &

., A- s ~' n. t 'J' , .

l' * #.-

0 Nif::  ! ' s .

,'~

'T M'li.:1-';P.:R'O-J E'C T- .L I S;T I<N OJ .1 " ,.0,.

1.s Ns eM .

n

o. .
.~ -w* c -..,4 g, ' w a ~-' y p n '?' '

> ^' ,

x

/ LEGEND / '"

. N R- O :-l . N T. E G R - A -T E ' D : S C H: 0 D:D L.E~  %. ' '

4

, q-_....& _

- s -

^

*1 NEW PROJECTS  !------...--.--......--..-.---------.---.5 '

?*

' **...BA NUfeER CHANGE c: '

~

+

r.L

~

~ CATEGORY.'A'. PROJECTS' . .

,W-.

u. .l ._ y . - *, . 1 .

" 3 jSORT..BY CATEGORY / CYCLE /BA,.

....___......... ..__......... ........_ __.... ............ .......___ .........._...... ___ . ... ... fSTATUS'AS ... ....__....__.... OF:.11/01/1995 1

4 s

~

' 0BS ' :- BA ' .. l CLASSIFICATION'
n. - <

" DESCRIPTION ' CYCLE /--'

sNUPBER-

.... . ...... ......................... ............ .......................... YEARS - ,

~ 1~-412662- '-

!TMiiSECURITY.(LVI/DBX) ENHANCEMENTS ~11 > NRR

-~

u

> {:s _ ~

~ UPGRADE VEHICLE BARRIER SYSTEM (VBS)'

aAT:TMI-TO MEET NRC~ REGULATIONS ilo CFR'73 .-_

y-

, 3 .

f:_

l 3

~

," y) <--

i

P

-)

t -

h' L

fi o

l-I e.s ~

l..

.- ,1

..s.- . m .

p -

JTMI L.:1-S T I C G -

~

.1 P'R O J.E C T _ .

.....-- ........................... ...- s -

- LEGEND . ' . . .

- - . . . . . . . ' NRC - I N T E G R'A T E D- - S C H E D"U LJES -

"' * 'NEW PROJECTS. -


C

    • :-BA MUPBER CHANGE ^

CATEGORY 'B' PROJECTS. * .

SORT.BY CATEGORY / CYCLE /BA- STATUS ^AS:OF.11/01/1995-OBS - BA DESCR1PTION CYCLE / CLASSIFICATION

- MUMBER- YEARS.

2.f.412552 ' *

' MOD 1FiCATIONS FOR'SEISNIC QUALIFICATION I11- iNRR?

, - Att MOOS TO COMPLY WITH SEISMIC QUAL TO INCL

' MODS IN DIESEL GENERATOR BLDG. COMMITTED COMPLETION DATE FOR PROJECT IS 12R.

'3 - 123321 REACTOR BLDG TENDON SURVEILLANCE: PROG- 12 NRR-

~ PROVIDE CONTRACTOR AND PLANT SUPPORT FOR

, SURVEILLANCE PROGRAM.

REF. NUREG 135.1;TS 4.4.2.1

,. 41 123ABC OTSG TUBE PLUGGING 12R NRR PLUG OTSG TUBES AS NECESSARY. PLAN IN-

CLUDES NEW PLUGS AND REPLACEMENT OF EX- ..

ISTING PLUGS. REF. TS 4.19 ~ - 1.

5 123334 ILRT 12R.. . NRR INTEGRATED REACTOR BUILDING LEAK RATE

+

TEST.PER TS 4.4.1.1.

6 112696B ISI INSPECTIONS (12R) 12R NRR ASME SECT XI INSPECTIONS; AUGMENTED ISI TO COMPLY WITH 10CFR50.55A 7 ~ 12696C OTSG EDDY CURRENT TESTING 12R NRR ECT OF SAMPLE INSPECTION GROUP. 21%

PER OTSG PER EPRI SG INSP GUIDELINES k T.S. 4.19.

8 128AEK P1PE. WALL._ THINNING MONITORING 12R NRR

. AUGMENTED INSPECTIONS TO DETECT EROSION /

-CORROSION DEGRADATION OF SINGLE AND TWO PHASE SYSTEMS..REF. GL 89-08

.,_.-m. .- . _ . - . _ - . . . . . - -__._.__m_m__.m_..

._.m___m .m___mm._m ___.m.__m,-.,m_'u_._m u _. mm s- - .* a- 'av.---

  • w wv n e - e < * - -%

.r .

g _

s - -

, ;- 7 ,

PROJECT

' ~

t

.T M I . 1* L.I S T iso G?

_ 77

.LEGE90D

- r- c..--.- -

N R C. I N T~E G R A T E D: S C H.E;D U L:ET

, '*;.NEW PROJECTS-

~

- .~

      • E BA 810 PEER CHANGE CATEGORY 'B' PROJECTS 1 . . -.

" SORT BY CATEGORY / CYCLE /BA

' STATUS AS OF- 11/01/1995'-

- CLASSIFICATION 1 m OBS - . BA ' DESCRIPT1ON CYCLE /

s NUPEER YEARS: y-L- L9' 412552

  • M00'lF1 CATIONS FOR SEISMIC QUAL 1FiCATION 12R .NRR ALL.

' MODS TO COMPLY WITH SEISMIC QUAL TO RE.

c

-. SOLVE USI-A46 AND GL 87-02.

-:10 L123ABC OTSG TUBE PLUGGING 13R- NRR PLUG OTSG TUBES AS NECESSARY. PLAN.IN- 'l

.CLUDES NEW PLUGS AND REPLACEMENT OF EX-ISTING PLUGS. REF. TS 4.19 ]

f11 -126LL3' OTSG EDDY CURRENT TESTING - 13R 13R NRR ' .!

ECT OF SAMPLE' INSPECTION GROUP. 217,PER OTSG PER EPRI SG INSP CUIDELINES

~

AND T.S. 4.19.

12 ~ 126LL6 'ISI INSPECTIONS'- 13R 13R^ NRR' ASME: SECT Xl INSPECTIONS; AUGMENTED ISI TO COMPLY WITH 10CFR50.55A 13- 128AEL . PIPE, WALL TH1NNING MONITORING 13R -NRR AUGMENTED INSPECTIONS TO DETECT EROSION /

CORROSION DEGRADATION OF SINGLE AND TWO PHASE SYSTEMS. REF GL 89-08 87-96

~

_ 14 128108 TF SEISMIC' QUAL OF EQUIPMENT (SQUG) NRR' SCOPE,WALKDOWNS AND EVALUATIONS FOR SQUG PROGRAM AS REQUIRED BY NRC GL 87-02 & LAl 87-9084.

'15 128097 SQUG USERS GROUP. PROGRAM ~ 88-96 NRR=

SEISMIC QUALIFICATION UTILITY '

GROUP PARTICIPATION REF USI.A46 ; GL 87-02

-m_uww_ h__,_ T___m_at._._.tca_2_ _ _ _ _ - _ _ _ _ _ _ _ - - - w ---.+a a._--'-

__s ' Y~:

  • ' . . . , ,_"M:

, . -. . + . . . .~ . ~. +> ,-

(. g_

_ . 5, A n

, _ , s.

~

2 T M l - R P R G J E C T . - L I S T . I ' Q G -

....... ................................ ,y

1y.

3

  1. ~ *

, LEGENO-SCHEDULE.s

> n..... 4  : NRC ~l N T E C'R A T /D- .

~,'

' ' S,

? - : NEW PROJECTS - -~~------------- ----- - - - - - - - - - - - - - - ~

~

"**( BA NUpWER CHANGE -

^

. CATEGORY 'B' PROJECTS-- K ^ #ai STATUSLAS'OE 11/01/1995-h i SORT BY CATEGORY / CYCLE /BA'-

....................................................................................... ....... ................................; r>

^ -. OBS . -

BA' ' DESCRIPTION CYCLE / CLASSIF1 CATION NUMBER YEARS- ;f

................ ................ .........-- - - = = . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

16' 128152 - -MOV PROGRAM 90-95 NRR

~

DEVELOP & IMPLEMEi4T MOV PROGRAM TO MEET

.GL 89-10.

REF. MEMO C311-90-3132,C311-89-2117 17 .419280 '* S IMUL ATOR MOD I F I CAT IONS - E' i (EARS > 95 ' _ - NRR 1 UPGRADE SIMULATOR CONSISTENT WITH CNTRL ROOM MOOS REF. 10 CFR 55.45

.18 41F315

  • REPLICA PLANT PROCESS COMFUTER REFLACEME 96-00 NRR-INSTALL A NEW RPPC TO INTERFACE WITH THE SIMULATOR AND PERFORM SIMILA*.

FUNCTIONS AS THE PPC (RG 1.149)

--19 '41995G SIMULATOR MODIF! CATIONS - OUTYEARS 96-99 NRR UPGRADE SIMULATOR CONSISTENT-WITH CNTRL ROOM MOOS REF. 10 CFR 55.45

, .w - .

= , _ , ,

.w

^

mM  ;.,,

_4 x~ ,

^

w ,. j- , s _

+ .a ; ': R; 3

y '< : .

W3 '

iT.Mft"-ilf P,Cl CEJ.E CLT" 'L:1 3:T ? t i:.0 G [,

' W

- ~ T ~ " , M C%,.

~' ' ~

wf+s . . . . . d. .

7 u . .,' ' * - ~ ~.

y 'yQ' M7

V W my

~ ~

-*:~-----------*--------------~-~~--~

a :x--

2: ,

Q: ' M (EEE; JV~

~

It .%-

.M w

. s?". s . -e - '"4,].g',o.

S C'H'E D[U.L;ET

  • T W

_ ;---- . T .,

- N R C I l N T. E G' R AIT- E D. - =. -

h, * *

-_1

~ ,l' M NEW PROJECTS' ---------------~------~~-~~-------------i ." ' -

,1, j w i- 1**

BA NUISER CHANGE ~.

_~ + ~

u. ~

w p- '

~ -

= '

Q

"'~ -

' ~

i CATEGORY *C'_PROJECTSi '

- - ~

.r /- , .. . . _'

, .......................... ............................. ... ........................... ........'....... ...... .. STATUS.ASl0Fs... 3D Hs

.M11/01/1995'T ...........< _ y

! SORT-BY CATEGORY / CYCLE /BA. , ,

g n"

- OBS , JBA4 1 . DESCRIPTION CYCLE / '. CLASSIFICATION '~

YEARS 1 7leUPSERr

= ...................................... . .................................................... ....

...... .................;; EM  :'>

s ~

~

~. ,, N-\.

520 .1281757.,~. ASSMNT & UPGRD OF U9IDRGRND TANKS / PIPING :10 (CARRYOVER). 5 ERR .. fl's

__g .: - 1

I-ASSESS APPLIC-TANK / PIPE SYS. 'Il-INIT

, TEST-& MONITORING. IIl-UPGRADE AS REQO.

3 '

'i .- <

6C ' .(REF-40 CFR 112) 7

- - - 21 2 4126121- ' PERM DEMIN-SYST/ MISC WASTE EVAP-INSTALL' 10 (CARR.oVER)-. GWC - - .

MOOS'TO L'tQUID RADWASTE PROCESSING SYS, . -

'DURING 11R RAMP UP BY RAYTHEON'

{ N Y

122 1412664 ** ROOF REPLACEMENTS

, 11 ' IRC g' s

-VARIOUS ROOF REPLACEMENTS.' e f

o

.m k

239 418ABM

  • PLANT PRESERVATION (V PROGRAM ?11 tmC : -

.s

. , .- c 9

7 PAINTING OF. UNPAINTED PORTIONS OF THE _

u.

PLANT = > _

2' e

y

, t; 4 .,

~

. - J 286 ? 418822. CONTROL' TOWER RENOVATIONS-- 4TH FLOOR 11 FACL UPGRADE FACIL FOR IkC MAINT & OPS INSIDE .i N

~

UNIT 1 CONTROL TOWER.EL 355' TO BE RENO- '

VATED k CONSTRUCT INTERMED FLR'(365')

-i

25i419727' PROVIDE STORAGE CAPABILITY 11 . GWC

'[

-PROVIDE FACILITIES-FOR IS TELEPHONE L PERSONNEL, WASTE MANAGEMENT k OTHER '

DIYlSIONS _

?26: 419742 TMI-PAVING

~

s 11 GWC .

r VARIOUS PAVING PROJECTS e

E

~>

~~

, t m

e e

s' , a

!~ .p!t .; ,,;_ i_. . ; ;; L L ; A _ fj _ . ; ,. d n , ., a _ g n inc .g ; _ n

[-= . . ..

..,_.. ._ ; . .L

. _ _ _ _ . _ _. ._ _ ._._ _ _ .L _ , - .m._ .._. ... . _ , . ; .

=

3 7= , . _ ,. ,

T M i .1 ~P.R-O J E C T. L I;C T...ll 0 @ ' ,  ;

a . -

s

= --

_ LEGElm J- 2-N R.C I N T E G R'A-T E D S C H:ElD'U L-iF -

- *H

- , "*: NEW PROJECTS- ---. -.-...----.--..-------------------..-- . -

    • -BA NUMBER. CHANGE. .;.

~

~ ~

-CATEGORY 'C' PROJECTSi O -

U TUS/AS'OF 11/01/1995 ~

1 SORT BY. CATEGORY / CYCLE /BA'.....................................__..............___............__.................................STA ........----.............. .- ,

~ OBS - BA>  : DESCRIPTION- CYCLE / -CLASSIFICATION.

~

H9

'NUteER~ YEARS 27.1 412664 ** ROOF REPLACEMENTS 12 MRC~ ~

.VARIOUS ROOF REPLACEMENTS -

.28- 418ABM

  • PLANT PRESERVATION (BOP) PROGRAM 12 MRC' PAINTING OF PREVIOUSLY UNCOATED PORTIONS c'

OF THE PLANT 29 419742 TMl PAVING ' 12 . GWC i

VARIOUS PAVING PROJECTS a

30 123ABD REACTOR REFUELING 12R MRC' m

LOAD FUEL ASSEMBLIES FOR 650 EFPD _

31 123ABR

  • CRDM.FLG CASKETS / THERM BARRIERS

'12R ~MRC REPLACE 75 THERMAL BARRIERS AS A MIM-IMUM NUMBER. FLANGE GASKETS REQUIRING REPLACEMENT WILL BE INCLUDED.

32 ~123ABT ** RX BUILDING PRESERVATION 12R NtC RB AB PAINT / COAT AREAS IN RB I NCLUDE: ICaeNS PIPE; STEEL, WALLS, HANDRAILS; FLOORS;RB - ~

LINER. RU/RD=12OO-1500FT IN AUXBLDG 33 123LLL OTHER OUTAGE RELATED ACTIVITIES 12R ALL.

ALL' OUTAGE RELATED ACTIVITIES SUCH AS INSPECTIONS, REPAIRS, SURVEILLANCES _

MINOR MODIFICATIONS, MOD SUPPORT, ETC.

- . - _ _ , _ _ - - _ _ - - -. . . . - . - - - . - - . .-.------.._..-.-.--.a....-..-.-.--- ... - - - - . _ ~

,  : ~= : .

s7, ev. ,,

4 f  : T M .'l - .1 ; . P _ R O. J E C T i L~- I S T 11. 0 C ..

D-~

q

~ ~

.m .

'tc ^

. LEGEND


N R C~ l N T'E G R'A~T E D S C H E O U L-E- -

4 K+> -NEW PROJECTS -......'...-......----..-------------------- - ' '

+

    • BA M*JMBER CHANGE ,

~

  • 5 CATEGORY 'C' PROJECTS-- -

e

. a

~ SORT'BY CATEGORY / CYCLE /BA STATUS AS OF,11/01/1995

-CBS' 'BA DESCRIPTION CYCLE /- - CLASSIFICATION: -

' NUpBER . YEARS-

~

34-.123335.- . REPLACE MAIN STEAM LINE INSULATION 12R' MRC REPLACE DEGRADING INSULATION ON MAIN

-- STEAM L I NE -

T

~- 3 5 416ABC-

  • RC-P SEAL INSPECTION (2 CARTRIDGE KITS) 12R MRC-INSPECT / REPLACE SEALS (CARTRIDGE AND #1 SEALS) AS NECESSARY
36 418813 INCORE DETECTOR REPLACE 12R MRC REPLACE 43 INCORE DETECTORS'THAT ARE PROJECTED TO HAVE REACHED THE END OF LIFE AND ALSO THE REMAINING 9.

37 412648 RADWASTE STOKAGE CAPABIL PHASE 2- 13 NRR' PROCURE EQUIP & CONSTRUCT STORAGE FACILITY FOR LLRW STORAGE

-IEN 90-09 GL 81-38

~38- 123ABD REMTOR REFUELING 13R MRC' LOAD :UEL ASSEMBLIES FOR 650 EFPD 39 ~ 123ABR

  • CRDM FLG GASKETS / THERM BARRIERS 13R .MRC REPLACE REMAINING THERMAL BARRIERS AND FLANCE GASKETS 40 123MMM OTHER OUTAGE RELATED ACTIVITIES 13R ALL

-ALL

- OUTAGE RELATED ACTIVITIES SUCH AS

. INSPECTIONS, REPAIRS, SURVEILLANCES MINOR MODIFICATIONS, MOD SUPPORT, ETC. ~

-_.__:-:--_ - . _ . _ _ - _ _ _ . - _ . = _ _ _ - _ _ _ . _ - . _ . - - . . . . - . - . - . . . .- ... . , :- . . - .- .- ~.-- . . - .. . . .. . ~

' - - - " -2  ?:a:: . y;yw.

- ;~ L

~

gr ~ . n .

-~

p.. <

+

, ,y .

V

.r . , ,

~ ^

4.

4

. T M.1- ~1.-Ps ROJECT Ic i B :+T " 1. C3 G u  :.  ; - 7 -

,  ; . . L.

x. , ,~

n t

y , , ~

~ M -

J * . ' '

'LEGElWI . .

9 fY r M .... ; , "

N R C l N T.E.G REA~T E D : S C H E DTU C ED-- .

(

._ 2,

/NEW PROJECTS

' ------------------------------------------- P_ ,

"5-

~ ,

._1**;- BA'NUMER CHANGE ,

u ww ~ .

^x S,,, , .

CATE00RY.?C'IPROJECTS}-

1;; :L -

. jSORT BY CATEGORY / CYCLE /BA-STATUS?AS.0F[11/01/1995/

Wiiv:- +

?

s ... ........................ ............................. ..... ......_....... .............. '

OBS, ' BA-- - DESCRIPTION CYCLE /.- CLASSIFICATION. ' -e>oi* !

, 'NUM ER" _ YEARS. t

. _  ; . tw _

  • RC-P SEAL' INSPECTION (2 CARTRIDGE'K1TS) '13R 'IWtC 141: 418ABC- 4

& INSPECT / REPLACE SEALS-(CARTRlDGE AND #1 - _ . . . .

4 SEALS) AS MECESSARY _

_ / -: ,

~-:

L42i.128114,- -

88-98 [MRC

.EPRI. STEAM GENERATOR RELIABILITY PROGRAM 1

C

^

'CO-FUNDING FOR EPRI SGRP TASK 404. ,-

+  ;; ,

p. s TMI APPENDIX Vill QUALIFICATION 91-99 J NRR .

43'. 126223 ,

~ "

SUBSCRIPTION FEE FOR PROGRAMS DEVEL BY ,

EPRI.& OTHERS FOR CONTRACTOR QUAL k ._

- CERT:0F UT NDE INSPECTORS PER APP Vill -

+

44~ 128163 . DRAWING ENHANCEMENTS '92-96 ' letc ; - n REPLACE CABLE MANAGEMNT PROCESS.FOR ELEC CABLES WITH ELECTRONICS. REDRAW MANUAL. .

~ --- .. .

FLOW DIAGRAMS IN CAD FORMAT. _

45- 412592 - ' TMI CONF IGURAT10N MANAGEMENT - DBD 92-98 92-98 ERR- - -

DESIGN BASIS RECONSTITUTION 1992 t

?

?

46 '128177, THERMO-LAG IRE BARRIER EVALUATIONS _ 93-96  ? MRR tSUPPORT' EVALUATIONS OF.THERMO-LAG 330-1 FIRE. BARRIER SYSTEMS TO ACHIEVE COMPLl- .

ANCE W/ 10CFR50 APP R AT TMI-1 _c .

~47 126109 BWOG GLRA PROGRAM 93-97 .MRC-s +

. PARTICIPATE IN AND PROVIDE SUPPORT FOR c - ,

< THE BWOG GENERIC LICENSE RENEWAL

= 'APPLICATIDN-(GLRA) PROGRAM _ _

i -

m~

J-y

m. _ _ _ - , . - -. - . - - -_.m.,----M.m_.__-mmm.-,_--m--m._.-..m_m_xmmm- =s _m-_.e.-_mm.-=._- -+w. wn+w w e .'.m g

--.r... -%.e-+,e-n .w- ..w + yew m- es e Nw ee s .w -

u w.e m .,m--s- 2,ew e.me.--se. ga. .wi

.m .-e-,-vm3. s-ww.*w w s.

, . .g .  ; -

.s.

^ l' TMi - 1 iP.R G J E..C-T _ L el t S' Tri N C ':

/_ &

, LEGEND. > - .

, - i .O

~:------: N R C' i N T E G R'A'T E'D S C H-E D U LlE- T-C'- NEW PROJECTS- ------------------------------------------- > < 2

~~ 24 JJ '- . **' BA NUlWER CHANGE

  1. 7 . CATEGORY.'C' PROJECTS. .

~ -

_. STATUS AS OF 11/01/1995.. ~

SORT.BY CATEGORY / CYCLE /BA BA' DESCRIPTION, CYCLE / CLASSIFICATION  ;-

OBS; s

~

-;.. 2:

.NUfBER - YEARS

' : _ s SIMULATOR. COMPUTER UPGRADE 93-98 MRC 48f410260 UPGRADE THE TMI SIMULATOR COP' PLEX TO EM-ABLE INTEGRATION OF FUTURE PLANT MODS TO ^

COMPLY WITH SIMULATOR CERT REQUIREMENTS.

93-99 IDE-

!49[412619_ CPU /IPU UPGRADE FOR PLANT PROCESS COMPUT UPGRADE PLANT PROCESS COMPUTERS CPU AND IPU BOARDS (18) WITH A SINGLE BOARD.

94-99 REL'

50 - 12610 t ' PLANT L1FE ASSURANCE /EXTEMSIOM

~ SUPPORT OF STUDIES'BY GPUN & BWOG ,

FOR FEASIBILITY OF EXTENDING OPERATING LIFE.

128163' BtW OWNER'S GROUP 94-99 GWC 1

~51 PARTICIPATION IN B&W OWNERS GROUP PROGRAM

    • SECURITY EQUIPMENT - TMI 95 MRC 52 ~419754 REPLACEMENT OF TURNSTILES, VITAL AREA DOOR, CCTV CAMERAS, PRTABLE RADIOS, HAND -

GUNS, LEATHER GEAR ac SLIDE GATE OPERATOR 53 -12F312- '

  • TMI-1 POWER UPRATING EVALUATION /LICENSIM 95/96 -REL-DETERMINE FEASIBILITY AND DETERMINE MODS MECESSARY TO RELICENSE AND OPERATE THE ,

TMI' REACTOR AT 27T2 MWT. L.

54 '412624 CORE MONITORING SYSTEM UPGRADE "96 ERR, INSTALL NEW FIXED MARGIN TS SFTWARE THAT WHEN USED WITH.EXIS1tNG NAS WILL PROVIDE ADDED OPERATING. SAFETY MARGIN

s y; -

,, , . .- , , e

.: ~ .
gy. .

r y, W -

'T'M I .I1 P..R'O'J I

..........E'C:T .f..tLS;T-7 1.

Q'O .

- J 4 #2

$ LEGEND. -

~

. f. s2

.' ~

  • ~

. *^

NRC I N T E G R A T.E D-1S'C H_E-D O L F -s-.

~-.... ^ _

  • f.NEW PROJECTS- ' . . - - . . - - - - . . . - - . - - . . ~ . - - - - . . . . * - - - . - - >_ _
[ " - ~

f ~ m

'** . BA:MUpeER CHANGE -"~ * '

W 1 CATECORY ?Ct. PROJECTS -- 4 -s-

.. . . .:: e

'- STATUS AS'OF;11/01/1995:

- ^ ' SORT BY CATECORY/ CYCLE /BA. '

' 08S:. " BA-'

DESCRIPTION CYCLE / ~

?CLASSIFICATIONl  ; 4.-?

NUMBER YEARS .s

.;;x - .........__........ .................._......... .__......................__...................... .................................> -

55; 412All..

  • THERMO-LAG BARRIER NODIFICATIONS 1.96-99 NRR-

- INSTALL MODS TO BRING THE THERMO-LAG -

9 L

. 330-1 FIRE BARRIER SYSTEMS INSTALLED INTO. COMPLIANCE W/10CFR50 APPENDIX R

.- ~ '56 '4197SO: SECURITY EQUIPMENT'- TMl 96 99.. MRC'

%! ~

' REPLACEMENT OF TURNSTILES, VITAL AREA-

. DOOR, CCTV CAMERAS, PRTABLE RADICS, HAND

GUNS, LEATHER GEAR & SLIDE GATE OPERATOR

-57 s128ADV CONFIG MGMT-SSFl - 96/98 . ISM- .;.

+

PERFORM ONE SAFETY SYSTEM FUNCTIONAL .

- lNSPECTION. PREPARE DRAFT DESIGN BASIS

- DOCUMENT IF REQUIRED.

97-99 58- 128AEl'  : REACTOR CAVITY DOSIMRTRY - 12R NRR

SHIP IRRADIATED CAVITY DOSIMETRY REMOVED IN 12R AND ANALYZE 59
126L13 MAINTENANCE TRAINING ANALYSIS 98 ' MRR :

- DEVELOP-ANALYSIS FOR IMPO ACCREDITED -

PROGRAMS.

4 A

mini.--_s_. . _ m.m,u__aum_o-uim.om_as --_ -_w__m--m_u__-re.mu_m9-+Cw a - _ _ _ _ _ A ---Y Y e4 4 ___wwme e.-. e-* ia.$f Tv 7me w **w-W gets w'4* 1 y yWh.u==4a m.fWm'Ve 4Rw Tr'w1Fe- F 4 4 m Wv W F1_-h..en

_. - ._- - . ____ __ , __ _ . ~ _ _ . _ . _

f j

l C ,

ABC Classifications a) Meet NRC Reauirements'(NRR) - Activities that a) must be carried out'to fulfill .

l specific NRC requirements or b) have been committed to the NRC by the Company or c) am such that if not accomplished would result in an NRC non-compliance even j though the specific activity is not required by the NRC.

b) Meet Environmental Reauirements (ERR) - Activities that a) are specifically required .

by environmental regulatory agencies (State and Federal) or b) have been committed l

~

' to environmental agencies by the Company or t.) are such that if not accomplished.  !

would result in a regulatory non-compliance even though the specific activity is not ,

{ - required by an environmental regulatory agency.

c) Meet Other ' Reauirements (ORR) - Activities not covered by the NRC or e i environmental requirements but that are required by local, state, or federal ordinances, codes, court order or lawsuit settlement, or other guidance to which the i' Company is committed or if not accomplished would result in a violation of that

- ordinance, code or guidance, court order, etc.  ;

i d). Increase Safety Marrins (ISM) - Activities that, if implemented, will improve nuclear  :

plant or personnel safety but are neither.. required for regulatory compliance nor  ;

required by safety regulations, codes or guidance.

l e) Decrease Environmental Effects (E) - Activities that, if implemented, will result in [

!" an improved environmental quality but are neither required for regulatory compliance  :

nor required by environmental regulations, codes or guidance. l f) Imorove Radiolonical Conditions (RAD) - Activities that, if implemented, will result in improved radiological conditions, lower man-rem exposure rates, or radwaste  :

control / reduction but are neither required for regulatory compliance nor required by radiological regulations, codes or guidance.

g) Maintain Reliabilitv/ Capability (MRC)- Activities that, if implemented, will maintain power production at existing levels by preventing deterioration of plant systems 'or l equipment. Includes activities in response to national codes and standards, insurance  !

policies, equipment vendor specifications or nuclear industry high unavailability  :

equipment data without which the plant could not operate prudently. i h) Improve Reliabilitv/ Capability (REL) - Activities that, if implemented, will increase

. power generation by improving availability or capacity factor to maximize energy  ;

= output. .

O

[

I

5 E h M

d' "

ABC Classifications -i (continued) ,

i) Imorove Operational Effectiveness (IOE) - Activities that, if implemented, will s improve ~ staff efficiency or provide' a direct economic payback in terms of reduced -

operating / maintenance costs.

j) Imorove' Personnel Facilities (FAC) - Activities that, if implemented, wil'1 improve i working conditions and the usefulness of personnel facilities.

t k) Provide Continnenc_ v / Blanket (CUI) - Activities that, if implemented, will provide management flexibility to respond in a timely manner to emergent work requirements or the ongoing requirements to procure, replace or repair minor items essential to -

support routine . operations.

1) Imoroves Heat Rate Performance (HRP) - Activities, that, if implemented, will  ;

increase power production by enhancing the heat rate efficiency.

. m). General Workine Conditions (GWC) - Activities, tools, and equipment that if implemented will improve working conditions, but will not demonstrate a direct economic payback.

i f

i i

i

r--'--^ - - - - - - ~ ' ' - - ~ ' ~ -

5 ATTACHMENT B -'

CHANGES TO TMI-1 NUCLEAR GENERATING STATION INTEGRATED SCHEDULE ANNUAL UPDATE (NOVEMBER 1995)

CATEGORY A PROJECTS l i

Additions: None i

Completions: None

  1. ~

Deletions: None

' Schedule Changes: 412662 Scheduled completion date is 2/29/96 per letter C311-

, 95-2047 dated 2/17/95.

S 9

a 4

i e

i i

s

A

/~ SCHMENT B (continued) ,

t .TEGORY B PROJECTS Additions: As noted by

  • next to the prqject title in Attachment A. 4 t

- Completions: 123321 R.B. Tendon Surveillance Pmgram 10/11R 123328 OTSG Tube Plugging 126254- OTSG Eddy Current Testing 10/11R .

126255 TMI Inservice Inspection - 11R 128176 ISI Check Valve Non-Intrusive Testing 128186 Pipe Wall Thinning Monitoring 412617 TMI IPE External Events 419266 Simulator Modifications - TMI (1994)  ;

- Deletions: None Schedule Changes: None B/A Number Changes: None l

j l

A'ITACHMENT B (continued)

CATEGORY C PRO.1ECTS 4

Additions: . As denoted by

  • next to the prqject title.

Completions: 122031 Demobilization South of the Dike i 123262 Reliability Centered Mintenance Program

, 123329 11R Fuel Movement for 11R Core Imd

123331 CRDM Flange Gasket Replacement

[. _

123GGG Other Outage-Related Activities i 128166- Component Data Base Expansion

! 128170 Guidelines for Abnormal Transient Prog l 128173 Cavity Dosimetry Analysis l' 128174 Replacement of Ozone Depleting Chemicals

. 128181 Simulator Enhancements

! 128187 Rx Building Crane Refurbishment l 412609 Digital Turbine Control System (DTCS)

F 412615 ' Additional Permanent Maint. Platforms 412618 TMI Accident Management Guidelines-412626 Upgrade Source Range Nuclear Ir.str (NI)

. 412629 Aux. Fuel Bridge Variable Freq. Drive Sys.

412643 Flood Panels l

412646 Motor Operated Valve Mods GL 89-10 412652 Hester Drain Pipe Replace-Eros / Corr I

412655 Rx Building Supplemental Holst i 412660 TMI Roof Replacements - 1994 418808 Rc-P Cartridge Seal Conversion (2 pumps) 418821 Plant Preservation BOP - 1994/1995

[ 419259 EOF /JIC Consolidation

! 419742 . TMI Paving 995100 Mobile XFMO On-Site Storage l Deletions: 128AEC Drawing Enhancements - Cancelled 4

412552 Modifications for Seismic Qualification - Changes to a Category B Project 412631 Pressurizer Heater Bundle Replacement - Cancelled 412634 TMI RCP Motor Standby Stator and Rotor - Cancelled 418750 Service Building Addition - Cancelled 419707 . Sand Blasting and Painting Facility - Cancelled l

41994C - Replace Build 8ng 400 - Cancelled  !

B/A Number Changes: As denoted by ** next to the project title.

. - _ _ _ - - _