OPERATLNG DATA REPORT DOCKET NO. 50-269 DATE 08-15-84 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 OPERATING STATUS Oconee 1 Notes
- 1. Unit Name:
- 2. Repor6ing Period: July 1. 1984 - July 31. 1984 Year-to-date and cumulative 2568 capacity factors are calcu-
- 3. Licensed Thermal Power (MWt):
934 lated using a weighted
- 4. Nameplate Rating (Gross MWe):
886 average for maximum
- 5. Design Electrical Rating (Net MWe): dependable capacity.
- 6. Maximum Dependable Capacity (Gross MWe): 899
- 7. Maximum Dependable Capacity (Net MWe): 860
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To which Restricted. if Any (Net MWe): Nw
- 10. Reasons For Restrictions,if Any:
This Month Yr.-to.Date Cumulative
- 11. Hours In Reporting Period 744.0 5111.0 98 816.0
- 12. Number Of Hours Reactor Was Critical 744.0 5086.I 69 626.7
- 13. Reactor Reserve Sh'utdown Hours
- 14. Hours Generator On.Line 744.0 5078.1 66 467.4
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 1 911 321 13 000 866 159 298 898
.17. Gross Electrical Energy Generated (MWH) 664 050 4 557 790 55 426 020
- 18. Net Electrical Energy Generated (MWH) 634 379 4 360 672 52 526 223
- 19. Unit Service Factor 100.0 99.4 68.7
- 20. Unit Availability Factor 100.0 99.4 68.7
- 21. Unit Capacity Factor (Using MDC Net) 99.2 99.2 62.9
- 22. Unit Capacity Factor (Using DER Net) 96.2 96.3 bl.z
- 23. Unit Forced Outage Rate 0.0 0.6 16.4
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Each1:
Refueling - October 1984 - 7 Weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. . Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8408220468 840731 (9/77)
~ - . -. . .. .. - .. - -.
4 AVERAGE DAILY UNIT POWER LEVEL DOCKET No. 50-269 UNIT Oconee 1 DATE 08-15-84 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 MONTH JULY. 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1- 860 17 853 2 860 18 852 3 858 19 852 4 856 20 852 5 856 21 852 6 856 22 852 7 856 23 851 8 856 24 851 9 855 25 852 10 855 26 853 11 854 27 852 12' 854 28 853 13 837 29 853 14 833 30 853-
'15 853 31 853 16 852 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the . nearest whole megawatt.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-269 UNIT NAME oconee i DATE 08/15/84 -
REPORT *) NTH July 1984 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 "s.
O c 'a en$ License y Cause & Corrective 32 "c a3E
- y Ns. Date ~. %h Event p, Action to 5E R m-5l E
a:
3g!
%S zwo
,&e, RB $E F Report # mu vu Prevent Recurrence 12p 84-07-13 S --
B --
CC VALVEX Turbine & Control Valve and Control Rod Drive PT's.
/
1 2 3 4 Reason: Method. Exhibit G - Instructions S e led A-Equipnent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Autmatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161)
E-Operator Training 4 License Examination F-Adninistrative 5
- G-Operational Error (Explain) Exhibit I - Same Source
.H-Other (Explain) l (97771
- l
p '
a.
.4 DOCKET NO: 50-269 UNIT: oconee 1 DATE: 08/15/84 t
NARRATIVE
SUMMARY
' Month: July 1984 Unit 1 operated at 100% all month except for turoine valve testing.
e 4
f 1
o
=
l i
,' y..,---,,-,, , ---.,,,.,,,,.,,..,.,.,.,,,,,-.,.,,~..--,.n. 4 .,,,-,,,-.n..n,.,,,,,,- - - , - . , _ . , , , , , . . - , , _ . , ..,, . . , , . , - - , - -
. MONTHLY REFUELING INFORMATION REQUEST e
- 1. ' Facility name: Oconee Unit 1 ,
- 2. Scheduled next refueling shutdown: October-1984 ,
- 3. Scheduled restart following refueling: December 1984 ,
- 4. Will refueling or resumption of operation thereafter require a technical specification change.or other license amendment? Yes ,
If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A .
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A ,
j 6.- Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of fuel assemblies (a) in the core: 177 .
(b) in the' spent fuel pool: 1086 .
- 8. Present licensed fuel pool capacity: 1312* ,
Size of requested or planned increase: .
- 9. Projected date of last refueling which can be accommodated by present licensed capacity: August 1991 .
Date: August 15, 1984 DUKE POWER COMPANY. .
Name of
Contact:
J. A. Reavis Phone: 704-373-7567
- Represents the combined total for Units 1 and 2.
OPERATING DATA REPORT DOCKET NO. 50-270 DATE 08-15-84 COstPLETED BY J.A. Reavis TELEPilONE 704-373-7567 OPERATING STATUS Oconee 2 Notes
- 1. Unit Name:
- 2. Reporting Period: Julv 1. 1984 - July 31. 1984 Year-to-date and cumulative
- 3. Licensed Thermal Power (5 twt): 2568 capacity factors are caled-
- 4. Nameplate Rating (Gross SIWE): 934 lated using a weighted
- 5. Design Electrical Rating (Net alWe): 886 average'for maximum
- 6. Staximum Dependable Capacity (Gross SIWE):
899 dependable capacity.
860
- 7. Niaximum Dependable Capacity (Net SIWE):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
-None
- 9. Power Level To which Restricted,If Any (Net 31We): None
- 10. Reasons For Restrictions.If Any:
This Stonth Yr..to.Date Cumulative
- 11. Hours in Reporting Period 744.0 5111.0 86 736.0
'12. Number Of Hours Reactor Was Critical 744.0 5111.0 62 424.47
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 744.0 511).0 61 271.2
- 15. Unit Resene Shutdown Hours
- 16. Gross Thermal Energy Generated (SIWH) 1 872 582 13 078 021 145 568 688
.~ 17. Gross Electrical Energy Generated (>lWH) 650 260 4 512 680 49 617 536
- 18. Net Electrical Energy Generated (SIWH) 622 468 4 328 173 47 139 742
- 19. Unit Service Factor 100.0 100.0 70.6
- 20. Unit Availability Factor 100.0 100.0 70.6
- 21. Unit Capacity Factor (Using SIDC Net) 97.3 98.5 63.0
- 22. Unit Capacity Factor (Using DER Net) 94.4 95.6 61.3
= 23. Unit Forced Outage Rate 0.0 , 0.0 15.3 24.: Shutdowns Scheduled Over Next 6 Stonths (Type. Date. and Duration of Each):
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation): Forecast - Achieved INITIAL CRITICALITY INITIAL ELECTRICITY l ' CO\l5tERCIA L OPERATION (9/77)
AVERAGE DAILY UNIT POWER LEVEL DOCKET No. 50-270 UNIT Oconee 2 DATE 08-15-84 COMPLETED BY J.A. Reayis TELEPHONE 704-373-7567 MONTH JULY. 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 842 17 836 2 843 18 837 3 834 19 837 4 840 20 837 5 840 21 837 6 830 22 837 7 827 23 836 8 838 24 835 9 838 25 835 10 838 26 835 11 837 27 835 12 838 28 835 13 838 29 836 14 838 30 835 15 839 31 835 16 837 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
UNIT SHUTDOWNS AND POWER REDUCTIONS, DOCKET NO. 50-270 UNIT NAME oconee 2 DATE 08/15/84 -
REPORT PONTH July 1984 COMPLETED BY J. A. Reavis
-TELEPHONE 704-373-7567
- 3 e oeng License y Cause & Corrective 32 "e m3E *
- N3. Date ~.a % uo i; g e
pg eof Event hmm h Action to N 55 E $65S Report # d?O $, 8 Prevent Recurrence 8P 84-07-03 S --
F --
ZZ ZZZZZZ Economic Dispatch Reduction 9P 84-07-06 s --
B --
CC VAVLEX Control and Stop Valve PT's
/
I
+ . . _ .
1- 2 3 4 Reason: Method: Exhibit G - Instructions
.i S e led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161)
E-Operator Training 4 License Examination F-Adninistrative 5 G-Operational Error (Explain) . Exhibit I - Same Source H-Other (Explain)
'(4/77) *- '
' 4 ';
=.
DOCKET NO: 50-270 UNIT: oconee 2 DATE: 08/15/84 NARRATIVE
SUMMARY
Month: July 1984 Unit 2 operated at 100% all month except for Turbine valve testing and an economic dispatched reduction.
A g o' er. -y - , , , . . . , - ,-,----v,- -r,, -
- . , , - - - , - , . , - . - . --,, . .., . - . . - , . . . - ~ v-, -,-r --m
,. MONTHLY REFUELING INFORMATION REQUEST
- 1. Facility name: Oconee Unit 2 ,
- 2. Scheduled next refueling shutdown: March 1985 .
- 3. Scheduled restart following refueling: May 1985 .
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes. .
If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A .
- 5. Scheduled date(s) for submit. ting proposed licensing action and supporting information: N/A .
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, e.gnificant changes in !
design or new operating procedures).
- 7. Number of fuel assemblies (a) in the core: 177 .
(b) in the spent fuel pool: 1086 .
- 8. Present licensed fuel pool capacity: 1312* ,
Size of requested or planned increase: .
- 9. Projected date of last refueling which can be accommodated by present
' licensed capacity: August 1991 .
DUKE POWER COMPANY Date: August 15, 1984 .
Name of
Contact:
J. A. Reavis Phone: 704-373-7567
- Represents the combined total for Units 1 and 2.
l
' OPERATING DATA REPORT DOCKET NO. 50-287
-DATE 08-13 COhlPLETED BY J.A. Reavis-TELEPHONE 704-373-7567 OPERATING STATUS r
I. Unit Name: -oconee 3 Notes
- 2. Reporting Period: LTiil y 1 - 14Aa Tulv 11 . 14A4 . Year-to-date and cumulative
- 3. Licensed Thermal Power (5 twt): 2568 capacity factors are calcu-
- 4. Nameplate Rating (Gross SIWE): 934- lated using a weighted
- 5. Design Electrica! Rating (Net atWe): 886 average for maximum 899 dependable capacity.
- 6. Staximum Dependable Capacity (Gross SIWE):
- 7. Sfaximum Dependable Capacity (Net AlWe): 860 S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To Which Restricted,If Any (Net 31 Wen ~
- 10. Reasons For Restrictions,if Any:
This Alonth Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744.0 5111.0 84 383'0. .
- 12. Number Of Hours Reactor Was Critical 74 4.0- 3 207.83 59 917.7
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line - 744.0 3 171.9 58 754.5
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (31WH) 1 923 123 7 859 450 143 352 014-
- 17. Gross Electrical Energy Generated (AlWH) 659 780 2 713 970 -49 528 564
~
- 18. Net Electrical Energy Generated (51WH) 632 164 2 588 968 47 156 086
- 19. Unit Service Factor 100.0 62.1 69.6
- 20. Unit Availability Factor . 100.0 62.1 69.6
-21. ' Unit Capacity Factor (Using alDC Net) 98.8 58.9 64.8
- 22. Unit Capacity Factor (Using DER Net) 95.9- 57.2 63.1
- 23. ' Unit Forced Outage Rate 0.0 1.1 14.6
- 24. Shutdowns Scheduled Over Next 6 Stonths (Type.Date,and Duration of Each1:
.None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status IPrior eo Commercial Operation): Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY CONIN!ERCIAL OPERATION (9/77)
,_t* -w 1 e---*-m -#_-w-w, .,--em.--.,-,,er.,yw+.,-,e.eS--r ,.g- .,aw-----,,t-*.--m---v- v-- .------w---. .--------n-, - . . , , - - - - + - - - - -
- AVERAGE DAILY UNIT POWER LEVEL
, DOCKET NO. 50-287 UNIT Oconee 3 DATE 08-15-84 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 MONTH JULY. 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 855 17 851 2 855 18 851 3 854 19 850 4 854 20 849 5 854 21 849 6 852 22 549 7 822 23 848 8 853 24 846
, 9 853 25 846
'10 853 26 848 11 852 27 348 12 852 28 847 r 13 852 29 848 14 852 30 847 15 852 31 847 16 852 INSTRUCTIONS- ~
On this-format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
)
e
? v-eei 9 -ww e- e--- mm= ---g-- $ v n, y,-,9 an.eeg- p.g5 .-y--y-y&w- - --w--m -e--W- ywmW,-m--ew
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-287 UNIT NAME' oconee 3 ~~
DATE 08/1s/84 REPORT ENTH July 1984 COMPLETED BY J. A. Reavis TELEPHONE '704-373-7567 "s_
4J c 'a en g License y Cause & Corrective 32 "a v5E
- 8 N3. Date % %b S .g g Event ,5,e, go, Action to F
$ o~
5S E oc
%.E b zmo Report # E'8 mo 8i- Prevent Recurrence oa 10p 84-07-06 s --
B --
CC VALVEX Turbine Valve PT's 11p 84-07-07 S --
F --
ZZ ZZZZZZ Economic Dispatch Reduction i
1 1
j 1
- 1
]
1 2 3 4
^
Reason: Method: Exhibit G - Instructions S led A-Equipnent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)
^ '
I D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161)
E-Operator Training 6 License Examination F-Adninistrative 5 G-Operational Error (Explain) Exhibit I - Same Source
, H-Other (Explain)
.(4/77)
DOCKET NO: 50-287 UNIT: Oconee 3 DATE: 08/15/84 NARRATIVE
SUMMARY
Month: July 1984 Unit 3 operated at 100% all month except for turbine valve testing and an economic dispatched reduction.
s
,o MONTHLY REFUELING INFORMATION REQUEST Oconee Unit 3
- 1. Facility name: ,
Scheduled next refueling shutdown: September 1985
- 2. ,
November 1985
- 3. Scheduled restart following refueling: ,
- 4. Will refueling or resumption of operation thereaf ter require a technical Yes specification change or other license amendment? ,
If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A .
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A .
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
177
- 7. Number of fuel assemblies (a) in the core: ,
(b) in the spent fuel pool: 104 ,
825 ,
- 8. Present licensed fuel pool capacity:
Size of requested or planned increase: .
- 9. Projected date of last refueling which can be accommodated by present licensed capacity: August 1991 ,
Date: August 15, 1984 .
DUKE POWER COMPANY Name of
Contact:
J. A. Reavis Phone: 704-373-7567
_ ~_
i OCONEE NUCLEAR STATION Monthly Operating Status Report
- 1. Personnel Exposure
~
For the month of June, no individual (s) exceeded 10 pecent of their allowable annual radiation dose limit.
- 2. The total station liquid release for June has been compared with the Technical Specifications annual value of 15 curies; the total release for June was less than 10 percent of this limit.
The total. station gaseous release for June has been compared with
'the derived Technical Specifications annual value of 15,000 curies; the total release for June was less than 10 percent of this limit. ,
o DUKE POWER Goximsy P.O. HOX 33180 CHARLOTTE. N.C. 28242 HALB. TUCKER Terzennoxz wwe rusasormy (704) 373-4531
====r-- August 15, 1984 Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk Re: Oconee Nuclear Station Docket Nos. 50-269, -270, -287
Dear Sir:
Please find attached information concerning the performance and operating status of the Oconee Nuclear Station for the month of July,1984.
Very truly yours, ldE 'Au/%
Hal B. Tucker JAR:scs Attachments cc: Regional Administrator American Nuclear Insurers U. S. Nuclear Regulatory Commission c/o Dottie Sherman, ANI Library Region II The Exchange, Suite 245 101 Marietta Street, NW, Suite 2900 270 Farmington Avenue Atlanta, Georgia 30323 Farmington, Connecticut 06032 Mr. Phil Ross Ms. Helen Nicolaras, Project Manager U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation MNBB-5715 U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Washington, D. C. 20555 Senior Resident Inspector INPO Reconds Center Oconee Nuclear Station Suite 1500 1100 Circle 75 Parkway M&M Nuclear Consultants Atlanta, Georgia 30339 1221 Avenue of the Americas New York, New York 10020 Ms. Judy Dovers Nuclear Assurance Corporation 5720 Peachtree Parkway Norcross, Georgia 30092
.rE 2. +
'le