Forwards Forms NIS-1, Owner Data Rept for ISI & NIS-2 Owner Data Rept for Repairs or Replacements. Table 1 of NIS-1 Provides Abstract of Exams Performed
ML20096D615
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 01/11/1996
From: James Knubel
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20096D620 List:
References
C311-95-2532, NUDOCS 9601190199
Download: ML20096D615 (1)


Text

.- -- - . - - _

l

' GPU Nuclear Corporation M ON Route 441 South P.O. Box 480 Middletown, Pennsylvania 17057-0480 (717)944-7621 Writers Direct Dial Nornbor:

Januagl}{95$f2 U.S. Nuclear Regulato y Commission Attn: Document Control Desk Washington, DC 20555

Dear Sir:

Subject:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Inservice Inspection (ISI) Data Reports Enclosed are GPU Nuclear's Forms NIS-1, " Owner's Data Report for Inservice Inspection" and NIS-2 " Owner's Data Report for Repairs or Replacements." The NIS-1 Form covers the ISI second interval examinations conducted between October 17,1993 and October 11,1995 in accordance with the ASME Code,Section XI,1986 Edition with no Addenda. These reports are being submitted in compliance with Subarticle IWA-6220 of the Code.

Table 1 of the NIS-1 provides an abstract of the examinations performed. Table 2 provides an abstract of the corrective measures recommended and taken. All conditions listed on l Table 2, where Code acceptance criteria were exceeded, were determined to be operable upon inspection and evaluation. Repairs were performed as indicated in the table to meet Code requirements. )

The NIS-2 reports cover repairs or replacements where the documentation was completed between December 1,1993 and December 18,1995. Reports completed after December 18,1995 will be included with our next submittal following the Cycle 12 refueling outage.

1 Sincerely, ,l 800Y J. Knubel Vice President and Director, TMI l MRK l

Attachment cc: NRC Region I Administrator TMI-1 Senior NRC Project Manager TMI Senior NRC Resident Inspector PA DOLI 'Ok;/f Hartford Steam Boiler I&I Co. $

9601190199 960111 I 4 PDR ADOCK 05000289 k l G PDR