ML20100L597

From kanterella
Revision as of 13:59, 29 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Tabulation of TMI Worker Exposures by Work & Job Function Jan-Dec 1995, Rev 1 to SE-115302-052 & Rev 2 to MDD-T1-232-B Div 1/2
ML20100L597
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 02/28/1996
From: James Knubel
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20100L599 List:
References
6710-96-2081, NUDOCS 9603040337
Download: ML20100L597 (2)


Text

- . _ _ _ _ .

GPU Nuclear Corporation Q g Route 441 South P.O. Box 480  ;

Middletown. Pennsylvania 17057-0480 (717)944-7621 Writer's Direct Dial Nurnber:

(717) 948-8005 February 28, 1996

, 6710-96-2081 l f

U.S. Nuclear Regulatory Commission 4 Attn: Document Control Desk Washington, D.C. 20555

Dear Sir:

Subject:

Three Mile Island Nuclear Station Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 I l

Annual Report Attached is the 1995 Annual Report for Three Mile Island Nuclear Station, Unit 1 (TMI-1).

This report is being submitted in accordance with TMI Technical Specifications Sections 6.9.1.B.1 through 6.9.1.B.5 and 6.17. The attachments to this letter contain the following

. information:

Attachment 1 - A tabulation of the number of workers receiving exposums ,

gmater than 100 mrem /yr according to work and job functions (per T.S. section 6.9.1.B.1).

Attachment 2 - Aircraft. movement data from the Harrisburg International Airport for calendar year 1995 (per T.S. section 6.9.1.B.2).

Attachment 3 - Leak reduction program test information for the calendai vear 1995 (per T.S. 6.9.1.B.3).  ;

R Attachment 4 - Pressurizer power operated relief valve and pressurizer safety valve challenges for the calendar year 1995 (per T.S. section 6.9.1.B.4).

l 1

i 04010) 9603040337 960229 DR ADOCK0500g9 i

i-Attachment 5 - Results of specific activity analysis - primary coolant system (per T.S. section 6.9.1.B.5).

Attachment 6 - Major changes to radioactive waste treatment systems (per T.S.

section 6.17)

I 1

~

Sincerely, W

. Knubel Vice President and Director, TMI JSS Attachments l

cc: M. G. Evans - TMI Senior Resident Inspector

i. T. T. Martin - Administrator, Region I W. H. Hernan - TMI-1 Project Manager I

i I.

l.

__ -