Div 1/2 Mod Design Description for New TMI-1 Radwaste Demineralizer Sys Three Mile Island Unit 1,Nuclear Generating Station, Rev 2
ML20100L658
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 05/25/1995
From: Ross M
GENERAL PUBLIC UTILITIES CORP.
To:
Shared Package
ML20100L599 List:
References
MDD-T1-232-B-DI, MDD-TI-232-B-DIV-1-2, NUDOCS 9603040372
Download: ML20100L658 (24)


Text

_ _ _ _ _ _ _ _ _ . . _ _ .- _ _ __. . _ . , . _ _ _ . _ , . _ . ___. ..m. _ _ . _ . .

Iu a e r- ..

teY-25-1995 14898 FROM TMI/1

. .. ... vi.,e,,i,n ~ . .

TF ENG PRCUECTS-. ,

p .,. f ,. ,.r - /dJF/3o2FY I MDD.T1 N B DIV 1/2 REV w ..w .

i iM tbb r i

l I I

i  ;

I i

i ,

REGULATORY REQUIRED i  !

i i i

DMSION 1/2 l .

MODIFICATION DESIGN DESCRIPTION '1 POR  !,

i was awr-1/W sTr  :

onwrwrmurren syntax I  !

t i I e==== urr. rar um trnrts i l f mer. nam azugnaTim stAtrons  !

  • t 1

i  !

t ,

i i

I I I j

~hil d q

! ,_ . - = ,. \^

_A zr B h m r. /ahhm.  !

0o,.0o 0. ~

j ,

j '

  1. I APP.0 VAL _7 i -

DATE k ,

,  : l

/ ',

wwwmre

besed O*ie A 9603040372 960220 7;'s ~

gDR ADOCK0500g9 ,

DOCUMENT CENTEP

TO cw oe r.w.

my.25-1995 14:08 FROM TMI/1 TF DG PROJECTS I

i l

1 Nuolear M& ""\ u MODIFICATION DESIGN DESCRIPTIbN E New TMI-1 R&DifASTE DEMINERALIZER SYSTDi:

APPROVNL  ! DATE i PEV SlJtWARYOF N i 4

Incorporated ISR and RTR cosunents.

, ,[ q 1

El 451*Nbyb>

2 Spelling and reference dorrections. p I

[ fQ Added equipment data. I //i~

Added ALC-P-12 minimum flow protection.

Reworded demineralized water use limitation.

)

e l

)

I i

l  !

l l .

I, I

l i

I I

' 1 3

i i

i i t

I

(

- l 4 /  ! I i i

_a

- . - . . . - - . .- - . . . - . - -~ . . . . . -

i i

?

MDD-T1-232-8 DIV1/2 >

Rev. 2 May 25, 1995 ,

Page 2 of 22 TABLE OF CONTENTS 1

1.0- FURPOSE AND SCOPE . . . . . . . . . . . . . . . . . . . . . . . . 3 1.1 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . 3 1.2 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

2.0 REFERENCES

. . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 i 2.1 (Deleted) . . . . . . . . . . . . . . . . . . . . . . . . . 5l ,

2.2 Regulatory evides . . . . . . . . . . . . . . . . . . . . . 5 2.3 Industry Standards . . . . . . . . . . . . . . . . . . . . 5 2.4 0 FUN Standards . . . . . . . . . . . . . . . . . . . . . . 5 2.5 eruN Documents . . . . . . . . . . . . . . . . . . . . . . 5 3.0 FUNCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 4.0 DESIGN REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . 6 I 4.1 Process Requirements: Radwaste Processing System in CCB . . 6 4.2 Configuration and Essential Features . . . . . . . . . . . 7 4.3 Chemical Adjustment . . . . . . . . . . . . . . . . . . . . 7 4.4 Interfacing Systems . . . . . . . . . . . . . . . . . . . . 8 l 4.5 Structural Requirements . . . . . . . . . . . . . . . . . . 8 4.6 Mechanical Requirements . . . . . . . . . . . . . . . . . . 8  ;

4.7 Electrical Requirements . . . . . . . . . . . . . . . . . . 8 4.8 Instrumentation and control . . . . . . . . . . . . . . . . 9 4.9 Environmental conditions . . . . . . . . . . . . . . . . . 10 4.10 Radiological Conditions . . . . . . . . . . . . . . . . . . 11 4.11 Thermal Requirements . . . . . . . . . . . . . . . . . . . 12 4.12 Materials . . . . . . . . . . . . . . . . . . . . . . . . . 12 4.13 Maintenance . . . . . . . . . . . . . . . . . . . . . . . . 12 4.14 Surveillance and In-Service Inspection . . . . . . . . . . 12 4.15 Testing Requirements . . . . . . . . . . . . . . . . . . . 12 4.16 Eumas Factors . . . . . . . . . . . . . . . . . . . . . . . 13 4.17 Safety, Realth and Security Requirements . . . . . . . . . 13 4.18 Quality Classification . . . . . . . . . . . . . . . . . . 13 4.19 guality Assurance . . . . . . . . . . . . . . . . . . . . 13 j

5.0 DESIGN DESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . 14 l 5.1 Detailed System Description . . . . . . . . . . . . . . . . 14 5 6.0 OPERATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 6.1 Normal Operations . . . . . . . . . . . . . . . . . . . . . 19 19

6.2 Infrequent Operations . . . . . . . . . . . . . . . . . . .

6.3 Transient Operations . . . . . . . . . . . . . . . . . . . 19 7.0 CASUAI.TY EVENTS AND RECOVERY . . . . . . . . . . . . . . . . . . . 19 7.1 Casualty Events . . . . . . . . . . . . . . . . . . . . . . 19 7.2 Design Features to Mitigate Effects of Casualty Events . . 20 7.3 Recovery Procedures . . . . . . . . . . . . . . . . . . . . 20 l

8.0 MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 e

e APPENDIX A REQUIREMENTS FOR A RENTED RADWASTE SYSTEM IN THE CCS . . . 21 j

t e

}

005/016

MDD-T1-232-5 DIV1/2 Rev. 2 l

May 25, 1995 Page 3 of 22 a

1.0 PURPOSE AND SCOPE r

This modification is to

' l. Provide the ability to install a liquid radwaste treatment I system in the Chemical cleaning Building. This system is to be capable of processing miscellaneous waste from TMI-l and THI-2 d or water from the TMI-1 Condenser. The design requirements for .

i this system are found in Appendix A of this document. l 1

2. Provide the ability to incorporate the two tanks in the OTSG Chemical Cleaning Building (CCB) into the TMI liquid Radwaste 4
System. These tanks are designated as CC-T-1 and CC-T-2.
3. Provide cross connections on Evaporator Condensate Domineralisers WDL-K-3A/B to enable them to be used in series as well as parallel to polish evaporator distillate. The cross connections are to allow either domineralizer to be the lead bed.
4. Provide the ability to use the TMI-2 Processed Water Storage Tanks to store secondary water from the condenser during i refueling. The ability to process this water is also to be provided.

~

5. Provide the ability to receive and process OTSG draindown during refueling.
6. Provide ability to transfer water from the Clean Water Tank in

' the CCB to:

)

(a): the river for release, l

(b): the WECST's for release, or l (c): the Waste Evaporator Condensate Domineralizers for additional processing

7. Provide ability to transfer water from the WECST's to the CCB for additional storage or processing.

l The designations "EPICOR-II Building" and "0TSG Chemical Cleaning Building

^

(CCB)" refer to the same structure at different times in its history.

1.1 Purpose

. 1.1.1 THI-1 Radwaste 1

The TMI-l Miscellaneous Waste Evaporator is the normal method l

of liquid radwaste processing at TMI. This modification will reduce the radionuclides (except tritium) released to the river with the evaporator distillate. This modification will also provide the ability to place a treatment system in parallel with the Miscellaneous Waste Evaporator to process the normal liquid radwaste from TMI-1, if required.

005/016

l, l

. MDD-T1-232-5 DIVl/2 Rev. 2 May 25, 1995 l

4

' Page 4 of 22 k-

- 1.1.2 TMI-l Condensate'(refueling) l A significant fraction of the liquid activity released by TMI l

is through the secondary side during refueling. The activity

concentration is low due to the large volume associated with secondary side release. This modification will allow the secondary side water to be contained for processing before reuse in the plant or release to the environment. Ultimate release to the environment is important to the plant in that it provides for tritium control.

I 1.1.3 TMI-l condensate (abnormal)

In the event of a primary-to-oecondary system leak in excess i

of that which can be processed by ordinary means, the plant  !

4 will have to be shut down and the condensate system l decontaminated. This modification will allow the condensate .

system to- be processed through a portable treatment system l

! once the condensate temperature is lowered to acceptable .

j levels. l

! 1.1.4 THI-2 Radweste ,

q.

' Now that THI-2 has entered PDMS (Post Defueling Monitored

! Storage), there should only be minimal rainwater inleakage to be processed. This liquid must be processed, as necessary.

l Processing should be in equipment located either on the Unit I side or in the CCB.

! 1.2 Scope s

The piping around the Evaporator Condensate Domineralizers will be

. modified to enable either domineraliser to be the lead bed in a j series configuration. Currently the beds can only be operated

{ singly or in parallel.

The EPICOR-II system has been removed from the CCB. In its place will be provided the ability to install a rented multi-bed j

si'uiceable pressurised domineraliser system or other treatment l 1

system. Any domineraliser system will have facilities for a burial j liner /MIC to receive spent resin from the domineralizers. It will also have provisions to enable the burial liner /MIC to be dewatered Shielding will be provided for the domineralizers and j remotely.

spent resin liner / HIC. Controls, power, and monitoring / alarms for 7

i building operation are to be moved from the current EPICOR control shack and isolated areas to the office area and/or the messantne in 2

the CC3. Controls for a rented domineraliser system will be located in accordance with the needs of the system.

l Numerous pipe connections will be required. some pipe connections and isolations will be made in the TMI-2 Auxiliary Building in order j to simplify pipe runs. A pipe connection will be required in the TMI-l Auxiliary Building between the clean water return line and .the

' pipe leading to the TMI-l Waste Evaporator Condensate Test Tanks. }

~

j Three flanges or pipe cape in the TMI-l Turbine Building will be j modified to enable hose connections for condensate system cleanup.

t .

3 j 005/016

' " -

  • n' , , -n, ,. , __

l 1

l I. MDD-T1-232-5 DIV1/2 i Rev. 2 l i May 25, 1995 Page 5 of 22 1 \

4 The two large tanks in the CCB (CC-T-1 and CC-T-2) will be tied into the TMI-1 WDL System to provide surge capacity for of f spec and i cleaned water.

i

2.0 marsRENCES ,

Unless stated otherwise, the latest issue of the Codes and Standards

! referenced in this MDD shall be the one is effect.

h 2.1 (Deleted) ,

Regulatory Guides 2.2 i

2.2.1 Regulatory Guide (R.G. ) 8.8, "Information Relevant to Ensuring i

that Occupational Radiation Exposures at Nuclear Power Stations will be as Low as is Reasonably Achievable" 2.2.2 R.G. 1.143, " Design Guidance for Radioactive Waste Management Systems, Structures and Components Installed in Light-Water-4 Cooled Nuclear Power Plants", Revision 1, 1979 4

2.3 Industry standards ,

2.3.*1 ANSI B31.1, "American Standard Code for Power Piping", 1967 I Edition i

2.3.2 USAS 531.7, Draft Pobruary 1968 Edition 2.3.3 ASME,Section VIII J

2.4 GPUN Standards i

f 2.4.1 GPUN Flan No. 1000-PLN-7200.01, GPUNC Operational Quality Assurance Plan for Three Mile Island Unit 1 and Oyster Creek"

\

! 2.4.2 GPUN Specification SP-1101-41-003, Installation of Electrical Equipment-Three Mile Island Nuclear Station, Unit 1" 2.4.3 GPUN Specification SP-9000-44-00i, " Instrument and control

Installation" 2.5 GPUN Documents i

2.5.1 SD-3526-004, THI-2 System Description for Auxiliary Building l

Emergency Liquid Clean-up System (EPICOR-II), Rev 10, July 1992 i

l 2.5.2 ES-001, "GPUN Engineering Classifications" i

2.5.3 ES-004, " Human Engineering Guide" l-3.0 FUNCTIONS i

3.1 The new configuration will enable processing for release, consistent with the ALARA concepts 3.1.1 Water from the TMI-1 Miscellaneous Waste Storage Tank

, (WDL-T-2) 005/016 ^

. . - -. -. - - _ _ . - -- . - - . _ . ~ ~ . . - - - . - .. - .

4 l.

4 MDD-T1-232-5 DIV1/2 .

Rev. 2 May 25, 1995

' Page 6 of 22 i.

+

3.1.2 Water from the TMI-2 Miscellaneous Waste Holdup Tank (2-WDL-l T-2) 3.1.3 Water from the TMI-1 Condenser 3.1.4 Water from OTSG outage draindown i 3.2 The new configuration will enable processing to the extent required j for reuse:

3.2.1 Water from the THI-1 Condenser l 3.2.2 Water from OTSG outage draindown 1

i

! 4.0 Daszen msgUIREMENTS 4.1 Process Requirements: Radweste Processing system'in CCB

! 4.1.1 Domineralised water must be supplied to the CCB from TMI-1 at rates up to 15 gym and pressure of 80+/-20 peig.

4.1.2 Air must be supplied to the CCB from TMI-1 at rates up to 80 SCFM and 100+/-10 peig. The current designation of the air lines in the EPICOR Building is " service air". The actual air

}

supply is " Instrument Air" from TMI-1.

1 I 4.1.3 Radioisotope discharge from the system will be such as to stay within the annual radiological dose to the public imposed by 10CFR50, Appendix I (Reference 2.1.3).

! 4.1.4 The system has the capability to reprocess water that is outside the quality suitable for discharge to the Susquahanna

! River.

>' 4.1.5 Radwaste Feed Throuah Miscellaneous Waste Evanorator The normal flow path for liquid miscellaneous waste will be from the Miscellaneous Waste storage Tank, through the Miscellaneous Waste Evaporator, through the Evaporator Condensate Domineralizers, and to the Waste Evaporator condensate Stor&ge Tanks for release to the river. This path will be maintained as long as the evaporator-domineralizer combination can process the input flow.

l 4 4.1.6 ==&aste read to T - rary Trea*==nt system

.This flowpath will only be used if the liquid radwaste cannot,

! or should not, be processed through the Miscellaneous Waste Evaporator. Radweste feed can be supplied to a rented Treatment System from the TMI-1 Miscellaneous Waste Storage s

Tank (1-WDL-T-2), the TMI-2 Miscellaneous Waste Holdup Tank, the PWST System, the TMI-1 Turbine Building Sump, and the TMI-1_ Main Condenser. Feedwater to the system is shown en l

f , Drawings 1E-232-21-001, Sheets 1 and 3.

i

4 4

4 1.

i .

MDD-T1-232-B DIvl/2 Rev. 2 May 25, 1995 Page 7 of 22

~

4.1.6.1 " Normal" Peed If a temporary treatment unit is used, the normal feed to the I system from both TMI-l and TMI-2 is displayed on Drawing 3E-232-21-001, sheet 3. Liquid radweste from -the TMI-1 Miscellaneous Waste storage Tank (1-NDL-T-2) would be pumped by the TMI-l Miscellaneous Waste Transfer Pumps (1-WDL-P-7A/B) to the of f-spec Tank in the CCB or to the THI-2 Miscellaneous 3

i Waste Moldup Tank (2-WDL-T-2) where it would mix with any 1 water collected from TMI-2 sumps. Prom there, the mixture would be pumped to the Radwaste Domineraliser Building by the TMI-2 Miscellaneous Waste Tank Pumps (2-WDL-P-6A/B). These flow path needs can be met by the existing pumps. Part of the i

i original design bases for the 1-WDL-P-7A/B pumps wac to be l able to transfer water from the TMI-l Miscellaneous Waste Tank I i

to the TMI-2 Miscellaneous Waste Tank. The 2-WDL-P-6A/B Pumps l had previously transferred water from 2-WDL-T-2 to the EPICOR-j II system.

f 4.1.6.2 Plant shutdown OTs0 draindown would be pumped by the Powdex sump Pumps to a PWsT or to CC-T-1 for processing. Condenser water would be transferred to a PWST for processing before either being l

a released overboard or returned to the plant for reuse.

4.1.6.3 "Absormal" Peed Abnormal feed would consist of processing TMI-1 condensate l

following a primary-to-secondary leak in excess of that which can safely be processed by the existing TMI-1 Condensate

!- Powdex system. This flowpath is shown on Drawing 3E-232 ;

00, sheet 1. A portable pump connected by home to the new

' hose connection off the suction header for the condensate Pumps (00-P-1A/5/C) would discharge to the new hose connection

' on the portion of the 10-inch Chemical Cleaning line that i

extends to the Domineralleer Building. Untreated water would P

not be transferred to the PWST's.

4.1.7 Air will remain available to the THI-2 air operated valves j associated with the waste transfer.

4.2 Ceafiguration and Essential Peatures 4.2.1 The Clean Water and off specification Water Receiving Tanks 1 are the same as were used for the EPICOR-II system.

}

l 4.2.2 The control Room for the CCs is located in the offices There - is a connecting doorway i

attached to the Building.

between the control Room and the Building so an operator may 90 from one to the other without exiting the structure.

4.3 Chemical Adjustment I 4.3.1 The ability will be provided to chemically adjust CC-T-1 and

. .CC-T-2.

l l

/

i . .

i  !

i 8

i I NDD-T1-232-8 DIV1/2

. Rev. 2 May 25, 1995 Page 8 of 22 l t >

?

. 4.4 Interfacing Systems 4.4.1 Radwaste Systems

[

I 4.4.1.1 TMI-1 Liquid Radwaste System (232) i 4.4.1.2 TMI-2 Liquid Radwaste System d 4.4.2 TMI-1 Condensate System (421) 4.4.3 Steam Generator Chemical cleaning System (593)

!~ 4.4.4 Dominera11 sed water System (523) 4.4.5 Instrument Air System (852) l 4.4.6 Electrical Supply Systems 4.4.7 CCB Building NVAC Systems 4.4.8 TMI-2 Processed Water Storage Tank System l 4.5 Structural Requirements I 4.5.1 The existing EPICOR-II Control Shack shall be abandoned in  !

place,after usable equipment is relocated l 4.6 Mechanical Requirements

! 4.6.1 The TNI-1 Liquid Radweste System is classified as N-3.

1 Therefore, pipe fabrication for the modification around the j Evaporator Condensate Domineralizers and at interfaces with a rented treatment system will be in accordance with ANSI B31.7 l (Reference 2.3.2) rather than ANSI B31.1 (Reference 2.3.1) as

promulgated by Regulatory Guide 1.143 (Reference 2.2.2).

i Piping within vendor supplied skids should be in accordance l with ANSI 331.1.

4.6.2 New pumpe on unprocessed water tanks should be magnetically coupled when solids content is expected to be high.

i

[

4.6.3 A minimum flow orifice is provided on the recirculation line from ALC-P-12 back to CC-T-1 in order to assure the 50 GPM minimum flow required by ALC-P-12. The orifice is sized for 60 GPM at the autoff head of the pump (238 ft).

4.7 Electrical Requirements I 4.7.-1 All electrical installation shall be in accordance with the

specific site conditions may dictate otherwise. Such

) .

conditions will be documented, evaluated, and approved by EP&I.

1 l

i

. . 1

-_. -. . - - - ~- . _ - _ - . . _ _ _ _ _ - - _ _ - -

I 2 l l

< l l

MDD-T1-232-5 DIV1/2 i Rev. 2 l May 25, 1995

Page 9 of 22 i 4.7.2 Electrical power is supplied to the CCS from 750 KVA Unit 1

2 substation USS 2-33 located on the messanine floor at  ;

elevation 305' in the southeast corner of the TMI-2 Turbine Building. 480V power from Uss 2-33 is supplied to MCC 2-33A i currently located inside the EPICOR-II Control Shack. As part l i of PDMS, this will be repowered from Unit substation 2-32 in the Auxiliary Building at elevation 328'. The MCC in the

! EPICOR shack will have to be relocated to the new CCB control

' room.  ;

4.7.3 The CCS NVAC system f an and heaters, the transfer pump ( ALC-P- I i

5), building sump pump, the 20 ton hoist, agitators / mixers,  !

MOVs, and the new transfer pump are powered from MCC-2-33A.

A 480-120/208 VAC, 25 KVA transformer, supplied from MCC 2-33A, supplies all other system electrical loads in the CCB 4

from power panel MP 2-33A. This one-line configuration may i remain although the equipment must be moved to the CCB -

1 l

i Building. \

l I 4.7.4 Existing cable and conduit from the EPICOR Control Shack will

- be abandoned in place. This includes the cables, tray and conduit runs from the control Shack to the CCB, as well as any

other connections to the control shack.

' 4.7.5 The CCB lighting and HVAC systems will be left intact and not altered by this modification.

4.7.6 New electrical loads in the CCB should consist primarily of an l

additional transfer pump, ALC-P-12 (460v, 23.8 amps), two l t

chemical transfer pumps (120v, 2 amp estimate each), the new i control panel in the office area and a vendor control panel l

(480v, 3 amp estimate).

4.8 Instrumentaties and Control

' 4.8.1 All instrument and control equipment installation shall be in

accordance with SP-9000-44-001 (Reference 2.4.3).

4.8.2 controls and instrumentation related to monorail operation and 4

building environment shall be moved from the current Control shack to the office areas attached to the CCB. The new control room will be set up in these offices.

' 4.8.3 Information on instrumentation and control of a temporary i

treatment system will be supplied when the contract for the d system is bid and let.

4.8.4 The new transfer pump in the CCB will be operated from the CCB control Room with automatic shutoff on low level in CC-T-1.

' 4.8.5 The CCB control Panel is to provide a satellite alarm to the l

' TMI-1 Control room designated separately from any PDMS alarm.

j

1 ,

4 I '

MDD-T1-232-5 DIV1/2 Rev. 2 May 25, 1995  !

Page 10 of 22 l 4.9 Enviremmental Conditions i

4.9.1 Atmospheric conditions in the CCB 4.9.1.1 The highest and lowest recorded outside temperatures

' t in the area are 104 F and -14 F, respectively (Section 2.5.2 of the updated FSAR dated 7/90). The minimum inside temperature for the CCB is to be 40F to provide a margin against freezing. There is no maximum limitation.

4.9.1.2 Mumidity may range from 40 percent to 100 percent as i

determined by atmospheric conditions.  :

' 4.9.1.3 The CCB will continue to be serviced by the existing filtered air system currently in effect.

4.9.2 Flood Conditions 1 . 4.9.2.1 The CCB is protected from flood by being within the  !

site dike system.

4.9.3 Seismic conditions 4.9.3.1 According to the Section 1.3.1.7 of the system Description for BPICOR-II (Reference 2.5.1), the CCB has a seismic bathtub. The building, therefore, provides the

, ( seismic requirements of Regulatory Guide 1.143.

d 4:

4.9.3.2 Radwaste piping for this system shall either be l seismically evaluated and constructed or the lack of inherent seismic protection shall be compensated for by locating the

' piping in a structure with seismic bathtub or by placing the process pipe in a guard pipe. Allowable deviations to this criterion ares

1. Cleaned processed water return pipe from the Radwaste

, Processing Unit need not be supported to retain pressure integrity in the event of an earthquake. Reg. Guide

1.143 (Reference 2.2.2) would normally require this .
However, Section B of the Reg Guide states that the
i. purpose of the Guide is to " provide reasonable assurance that... radioactive waste management... systems are designed, constructed, installed, and tested of a level commensurate with the need to protect the health and safety of the public and plant operating personnel."

Use of non-seismic design is acceptable because the radiological concentration of this liquid is minimal as the water is slated for release to the environment in accordance with plant procedures.

2. The pipe set aside to transport contaminated condensate to the CCB, if necessary, is to be supported as Seismic III on the grounds that it will be rarely, if ever, used

' and it is to transfer water from the Turbine Building which, itself, is not a seismic structure.

l l

l l

l MDD-T1-232-5 DIVl/2 '

Rev. 2 May 25, 1995 Page 11 of 22 i 3. Piping for the purpose of transferring condensate to the PWST system will be a combination of existing pipe and some new interconnecting pipe. The existing piping will remain supported as is. New piping will be supported as l j

Seismic III. This is acceptable since the water to be '

transferred by this piping is currently sent to the i river via the Industrial Waste System. j 4.9.4 other Natural Phenomena 4.9.4.1 The upper, non seismic, portion of the CCB is not protected against the natural phenomena, as mentioned in 10CFR50, Appendix A (Reference 2.1.2), criterion 2. This is acceptable in that the temporary radwaste processing system will not perform a Nuclear Safety Related function.

i 4.9.5 Lichtina l

4.9.5.1 Lighting within the CCB shall be in compliance ,

with the TMI-l lighting requirements.

2 4.10 Radiological conditions ,

4.10.1 All systems are to be operated and maintained in such a manner as to maintain exposures to plant personnel to levels which are "as low as is reasonably achievable",

in accordance with the guidelines given in Regulatory Guide 8.8 (Reference 2.2.1) . This consideration is not to imply .that the maximum possible quantity of radioactivity must be removed from the feed solutions to either the Evaporator condensate Domineralizers or any rented radwaste treatment system.

l i 4.10.2 The liquid radwaste system is assumed to process 550,000 gal / year of liquid radwaste (536,000 gal from TMI-l and l J 14,000 gal of rainwater from TMI-2). l 4.10.3 Radiological discharge concentrations from the system 1 are to assure compliance with the 10CFR50, Appendix I l (Reference 2.1.3) requirement that radwaste discharges to the environment be limited such that the " fencepost" individual not receive more than 3 Mr per year.

4.10.4 Rad Engineering must determine which, if any, of the l CCTV cameras and monitors must be maintained as part of i this modification. Those not used shall be abandoned in I place. It is acceptable to remove them if it is more convenient.

4.10.5 The radiological limitation for water stored in the Processed' Water Storage Tanks is limited by TMI Technical Specification 3.22.1.4 to 10 curies, excluding tritium and dissolved or entrained noble gases. This j limitation, per the Technical Specification, to for  ;

"Outside temporary tank". That would be comparab.e t:  !

I these tanks which are outside the radiologtea..,

controlled area.

- - .=. -- . = ~ . . - - - . - - -. .

) . .

MDD-T1-232-3 DIV1/2

' Rev. 2

' May 25, 1995 Page 12 of 22

- 4.10.6 The radiological limitation for water transferred from the TMI-1 side to the TMI-2 Miscellaneous Waste Holdup i

Tank is 1E-03 uCi/mi noble gases and 1E-06 uCL/ml iodine. This is to limit potential airborne contamination on the TMI-2 side since there is no continuous cleaning of the TMI-2 Auxiliary Building air.

4.11 Thermal maquirements j l 4.11.1 Teeperature of liquid sent to the domineralizer beds l shall be no greater than 140 degrees F in order to i protect the integrity of the ion exchange resin. l 1

j 4.11.2 The components in any rented processing system must be l

kept above the freezing temperature to keep the liquid i s

contents from solidifying. In order to provide a margin l l

of safety, 40 degrees F is hereby established as the minimum process temperature.

s 4.12 Materials 4

4.12.1 All metals added by this modification that are wetted by the process solution shall be in accordance with Regulatory Guide 1.143 (Reference 2.2.2).

4.12.2 All non-metals added by this modification that are wetted by the process solution shall be compatible with the process solutions.

4.13 Maintessace 4.13.1 This modification will require additional maintenance f for all new and rented equipment and reevaluation of

' maintenance procedures for existing and relocated associated equipment.

L

4.13.2 The 20-ton monorail system will require a complete preventative maintenance overhaul to refurbish the unit and to eliminate or reduce the frequency of system

. cutouts.

4.14 surveillance and In-service Inspection 4.14.1 Existing procedures for EPICOR-II surveillance and in-

' service inspection shall be revised to incorporate the modification changes.

4.15 Testing Requirements 4.15.1 The new portions of the system shall be initially hydro-

4.15.2 Subsequent system integrity testing is not envistened unless the system boundary is breached. Testing at that

- time will be determined by the nature of that breach.

i i

MDD-T1-232-5 DIv1/2

, Rev. 2 May 25, 1995 Page 13 of 22 4.15.3 All electrical equipment and installation shall be tested in accordance with the requirements of SP-1101-41-003 (Reference 2.4.2) and applicable manufacturer's instructions. This shall include, as a minimum, i

continuity and insulation tests and complete functional testing of all new and relocated equipment. Included also, as applicable, shall be instrument testing in accordance with SP-9000-44-001 (Reference 2.4.3).

4.15.4 The monorail system will require testing after the 1 refurbishment described in Section 4.13.

a 4.16 Euman Factors 4.16.1 The Human Factors Department shall be involved in the design of the Radwaste Domineralizer Building Control Room with the understanding that the control room location and dime.*.sions are fixed. GPUN Standard ES-004, " Human Engineering Guide" (Reference 2.5.3) shall be followed to the extent reasonable.

1 4.17 Safety, Esalth and security Requirements

, 4.17.1 Personnel access during system operation and movement of spent resin liners /HICs will be controlled by radeon under standard site procedures which are not in the

- scope of this modification.

4.17.2 The CCE is located within the RPA (Radiation Protection i Area) of the plant. No unique security programs are required.

4.18 Quality Classification 5 4.18.1 Upon completion of final design, the THI-1 Quality

  • Classification List must be updated in accordance with 2 Procedure EP-011.

4.19 Quality Assurance I 4.19.1 This system will be part of the TMI-1 Liquid Radwaste System. As such, it f alls under Regulatory Guide 1.143 (Reference 2.2.2) as amended in Section 2.2 of Appendix A and is considered " Regulatory Required".

4.19.2 This modification must comply with the requirements of the GPUN Operational Quality Assurance Plan (Reference 2.4.1). The QA scope, as defined in Regulatory Guide

, 1.143 (Reference 2.2.2) is limited to:

1. Design and Procurement Document Control
2. Control of Purchased Material 3.. Handling, Storage, and Shipping
4. Construction Inspections
5. Inspection, Test, and operating Status

.6. Identification and Corrective Action for Items of Nonconformance

k 1

MDD-T1-232-8 DIv1/2 .

Rev. 2 May 25, 1995 ,

' Page 14 of 22 I

i 5.0 DaaIou DasCRIPTIcu s

5.1 Detailed system Description 5.1.1 Eauinment Design Features (Note: Not all information is available) 5.1.1.1 Tanks i 1. TMI-1 Miscellaneous Waste Storage Tank (WDL-T-2)

Tank Details 4

Identification WDL-T-2 j Manufacturer Pittsburgh DesMoines Steel

  • Capacity 23,370 gal ,

Installation Horizontal i outer Diameter & Length 13'-9 3/4"; 17'-0" tan-tan shall Material as shell Thickness 3/8" 200* F Design Temperature 4 Design Pressure 25 peig i

Corrosion Allowance

Design Code ASME III - Class C Code stamp ASME Code j l

) 2. TMI-2 Miscellaneous Waste. Hold-Up Tank (2-WDL-T-2) l f

Tank Details l

Identification 2-WDL-T-2 j Manufacturer Richmond Engineering Co. j

. Capacity 19,518 gal. 1

Installation Horizontal l i Outer Diameter & Length 10'-9 1/4"; 32'-4 5/8" l l Shell Material SA-240, 304 ss l I' shell Thickness 3/8" Design Temperature 150' F

! Design Pressure 20 peig Corrosion Allowance Zero Design Code 1968 ASME,Sec III Class 3

. Code stamp ASME Code

3. Off-spec Water Receiving /satch Tank (CC-T-1)

Tank Details Identification CC-T-1 Manufacturer Chicago Bridge & Iron Co.

. Capacity 85,978 gal.

Installation Vertical outside Diameter & Length 21'-10"; 39'-0" shell Material 304 58 shell Thickness 13/32" to 11/16" i Design Temperature 250' F Design Pressure Full vacuum to 75 psig

-Corrosion Allowance Zero Design Code Code stamp yes

l MDD-T1-232-5 DIV1/2 Rev. 2

. May 25, 1995 Page 15 of 22 b'

4. Chemical Addition Tanks Identification

- Manufacturer Capacity l l

Installation Vertical outside Diameter & Length 4  !

Shell Material shell Thickness Design Temperature

Design Pressure Atmospheric Corrosion Allowance Design Code Code Stamp 5.1.1.2 Pumps 3
1. TMI-1 Waste Transfer Pumps (WDL-P-7A/B) i Pumo Details i l
Identification WDL-P-7B <

Manufacturer Ingersol Rand l l Model No. 1 CORV l l Type Centrifugal standard Material Designation Rated speed 3510 rpm Rated capacity 30 gym Rated Total Dynamic Head 97 ft Shutoff Head 106 ft Design Pressure, Casing Design Temperature 4

Lubricant Motor Details Manufacturer

! Type Enclosure Rated Morsepower 3 HP speed Lubricant / Coolant l

- Power Requirements

- Power Source l

2. TMI-2 Waste Transfer Pumps (WDL-P-6A/5)

Pumo Details Identification WDL-P-6A/B Manufacturer i

' Modei No. j Type Standard Material Designation

, Rated. Speed  ;

Rated Capacity  !

Rated ' total Dynamic Head j Shutoff Head l l

4 L . , .

1 i;

)

MDD-T1-232-8 DIV1/2 i Rev. 2 4 ,

May 25, 1995 i Page 16 of 22 i j

Design Pressure, Casing Design Temperature Lubricant

(

Motor Details

, Manufacturer i TYP*'

i Enclosure -

" Rated Horsepower

Speed Lubricant / Coolant 1 I

Power Requirements

) j

! Power Source i 3. Domineraliser Transfer' Pump (ALC-P-5) )

l Pumo Details 4

f' Identification ALC -P-5 Manufacturer Ingersol Rand Model No. 3x2x10 Type HOC, Group 2, ANSI A60 Type Horisontal Centrifugal l Standard Material Designation Col. DI 1

Rated Speed 1750 rpm j Rated capacity 200 gym j Rated Total Dynamic Head 100'

  • Shutoff Head 121' j Design Pressure, Casing 200 peig Design Temperature 110 C 1 Lubricant SAE 20 or 30 oil i

i Motor Details

! Manufacturer could Century Elec. Div.

Type . F-C 4 Enclosure TEFC Rated Horsepower 10 HP l

. Speed 1700 rpm i

Lubricant / Coolant Grease / Air Power. Requirements 480V AC/12.5A, 3 Phase, 60Hz l

' Power Source MCC 2-33A

4. Off-Spec Tank Transfer Pump (ALC-P-12)

Pump Details Identification ALC -P-12 j Manufacturer Peerless Model No. 8196 STP, 1.5 x 3-8 j

, Type Horisontal Centrifugal  ;

' Standard Material Designation 316 SS Rated Speed 3550 RPM j l

Rated Capacity 55 GPM 200 GPM i

' . Rated Total Dynamic Head 236 Ft 189 Ft j Shutoff Head 238 Ft l Design Pressure, Casing

- Design Temperature Lubricant

.. , - - .- v ,. , - , - .

l 1

HDD-T1-232-5 DIV1/2 Rev. 2 May 25, 1995

) Page 17 of 22

! Motor Details Manufacturer Emerson Type D Frame 254T Rated Horsepower 20

- Speed 3600 RPM 1 Power Requirements 460V, 3 PH, 60 HZ Power Source ,

MCC-2-33A i 1.15 Service Factor I Full Load Amp 23.8 q

Locked Rotor Amp 145.5 j Torque Rating 30.1 (rated) 47.9 lb-ft (locked rotor) 71.6 lb-ft (break down)

Insulation Class a
4. Chemical Addition Transfer Pumps i Pume Details t

Identification 4 Manufacturer Model No.

Type Positive Displacement i Standard Material Designation Rated Speed Rated Capacity Rated Total Dynamic Head Shutoff Head

" Design Pressure, Casing Design Temperature Lubricant J

Motor Detall_s Manufacturer TYP* i

. Enclosure ]

Rated Horsepower l Speed Lubricant / Coolant Power Requirements Power Source 5.1.1.3 Domineralizers This information will be supplied later af ter the contract for l

' this equipment has been bid and awarded.

5.1.1.4 Filters This information will be supplied later af ter the contract for i

this equipment has been bid and awarded.

l l

[

MDD-T1-232-5 DIV1/2 Rev. 2 May 25, 1995 Page 18 of 22 5.1.1.5 Lifting Systems

1. Monorail Hoist System Manufacturer Harnischfeger, Inc., P&H Model #36CS23E Capacity 20 ton

, Total Lift 25'-6."

Speed Holst 20 fpm maximum (90% load)

10 fpm medium 5 fpm low 1 fpm creep Trolley 50 fpm l r control i Hoist Quad - Speed Trolley Single Speed Power Supply 460V AC, 3 Phase, 60 Hz

. Power Source MCC 2-33A Control Voltage 110V AC

, Control Station Local and remote six

! pushbutton pendant control; i deadman type element control i Reeving Four part single reeved 5.1.1.6 CCB Building ventilation System

1. Nameplate Data MSA Filter Unit Identification ALC-E-H1 Heaters 60KW Chromalox Unit l Power 480V AC, 3 Phase, 60 Hz Catalog Number SCCP-080-3480 Type J 0-800 F Temp. Controller J 0-800 F High Limit with i Manual Roset Fan Internal Industrial Identification ALC-E-1 Capacity 8000 cfm Motor Rating 30 HP Power 460V AC, 3 Phase, 60 Hz ID Number P2803530-G7-XD Radiation Monitor Eberline Ping - 2A off Line Effluent Monitor Readout 3 Channela gaseoue, l particulate, iodine Power 110 V AC, 1 Phase, 60 Hz Sample movement self-contained sample / return Pump 5.1.2 Limitations. Set Points, and Precautions 5.1.2.1 Care must be taken when transferring water from

, the Clean Water Receiving Tank (CC-T-1) to the Waste Evaporator Condensate Storage Tanks (WDL-T-11A/B) to assure that the Storage Tanks do n:

overflow.

i MDD-T1-232-8 DIV2/2 Rev. 2 May 25, 1995 Page 19 of 22 J

. 6.0 OPERATIONS

, 6.1 Normal operations 3

6.1.1 The instructions for initial fill, startup, normal operation, shutdown, draining, and refilling of the modified Evaporator

  1. Condensate Domineralizer subsystem will come from the operations department. ,

6.1.2 The instructions for initial fill, startup, normal operation, f 1

shutdown, draining, and refilling of any rented radwaste processing system will come from the system supplier af ter the  ;

' contract for the system has been bid and lot. l 6.2 Infrequent operations The only infrequent operation of the system should be the processing of secondary side condensate. System configuration for this evolution is to be standardized in procedures l 6.3 Transiest Operations

. Transient operations are not expected for this system other than for normal startup and shutdown.

7.0 C.JUAI.TY EVENTS AND REOCVERY 7.1 Castalty Rvests 7.1.1 Loss of coolina

There is no process cooling for this system. Therefore, loss

' of cooling is not considered a casualty event.

7.1.2 system Leakaos and Ruotures i

With the minor exception of a small section of piping discussed above, the Evaporator Condensate Domineralizer System and any rented domineralizer system are to be housed within the confines of structures that are protected by seismic " bathtubs". The portion of the overall system which involves the PWST system will handis water that currently is released to the river through the Industrial Waste System.

4, Therefore, leaks and ruptures are not an item of concern for

, the general public.

l 7.1.3 Minh Radiation Level Radiation monitors are to be strategically located within the CCE. Existing alarms on the Control Snack panel shall be moved to the new panel in the CCB.

7.1.4 Fires and Chemical Reactions Fire detectors are strategically located within the CCB. The fire alare panel in the Control Shack will be moved to the new CCB Control Room area.

l

MDD-T1-232-5 DIV1/2 Rev. 2 May 25, 1995 Page 20 of 22 7.1.5 Abnormal Flow Abnormal flow to any temporary treatment system, whether too rapid or too slow, will be detected by the system control circuitry and will automatically shut down and isolate the system.

7.1.6 Abnormal Chemistry If feedwater chemistry to any rented radwaste treatment system becomes abnormal enough to endanger system operation, the System is to be secured and the water processed through the Miscellaneous Waste Evaporator.

7.1.7 Unit Trin operation of radwaste systems is independent of reactor operation. Therefore, Unit Trip has no ef fect on operation of

. any portion of this modification.

7.1.8 System. e - nent. or Control Malfunction This f actor cannot be evaluated for a rented treatment system until the contract for the system is bid and let.

The modification around the Evaporator Condensate Domineralisers consists of pipe and hand operated valves. The potential for failure is minimal and would be covered in standard operating procedures.

7.1.9 Loss of voltaae Loss of voltage would cause any rented system to shut down once the voltage becomes such that process control would be jeopardized.

7.2 Design Features to Mitigate Effects of Casualty Events This f actor will be evaluated after the contract for a rented treatment system is bid and let 7.3 Recovery Procedures Procedures will be required to recover from spills and dewatering difficulties. These procedures will be required to be developed by Operations.

l 8.0 MAINTENANCE 8.1 Preventative maintenance procedures shall be in place for all cwponents including those associated with rented equipment.

i

! . . j MDD-T1-232-B DIV1/2 l 2.

Rev. 2  :

May 25, 1995  !

Page 21 of 22  ;

AFFENDII &

EBOUIREMENTS FOR & EENTED R&DWASTE SYSTEM IN TEN CCB i  !

1 1.0 PROCESS REQUIREMENTS:  ;

1.1 Feed to the system from TMI-1 Radwaste is assumed to have the following chemical characteristics. These are the average values from samples taken from the TMI-1 Miscellaneous Waste Storage Tank during the period from 1/6/91 to 7/19/92:

! Boron: 347 ppe (range:35-1526 ppm) l Total Solids: 1782 ppm (range:100-10957 ppm) j Ph: 8.6 (range 4.12-11.95) 1.2 The system is limited t.o domineralized water at rates no greater

than 15 gym and pressure of 80+/-20 peig.

1.3 Not require air at rates greater than 80 SCFM and 100+/-10 peig.

i i

i- 2.0 MBCEANICAL REQUIREMENTS:

2.1 A temporary treatment system will be enounted on skids to the extent
practical. This is for convenience and is not a crucial requirement.

2.2 A temporary domineraliser system.shall be designed and constructed in accordance with Regulatory Guide 1.143 as adjusted and limited by the GPUN Operational QA Plan (Reference 2.4.1) . In accordance with Revision 7 of the GPUN Operational QA Plan, hose connections are i allowed for temporary connections.

! 2.3 Any tasporary treatment package must fit in the area vacated by the j EPICOR-II System.

) 2.4 Any temporary treatment system will be located behind shields and underneath the area supported by the Radweste Domineralizer Building monorail..

i 2.5 Any burial liner / HIC will be located behind a separate shield and i underneath the area supported by the same monorail. The liner / HIC i 1 will be closer to the barn doors so that when a liner / HIC is removed for burial or storage, it does not have to be transported over the 4 domineralisers. j 2.6 Any new component or assembly to be installed in the process area of  ;

1 the CCB must 1

2.6.1 Be liftable by the 20-ton building monorail hoist system; i 2.6.2 Fit through the bay doors serviced by the hoist; d

2.6.3 Fit through the 170" x 95 1/2" horizontal opening in t r.e grating outside the bay doors.

) 2.6.4 Satisfy any floor loading limitations for the bottom leve.  :!

i the CCB.

l I

MDD-T1-232-8 DIv1/2 Rev. 2 ,

May 25, 1995 l Page 22 of 22 l 3.0 RADIO!AGICAL RSQUIREMENTS:

3.1 Any temporary treatment system will be based on the following average input concentrations for Co-60, co-134, Co-137, and total beta /gasuna. These values are the average of concentrations in the TMI-1 Miscellaneous Waste Storage Tank during the period from 1/16/91 to 7/19/92. All concentrations are in uci/e1.

Co-60: 6.52 E-05; ranges (0.67-21.5)E-05 Cs-134: 7.1 E-04; ranges (1.4,7-26.3)E-04 Cs-137: 1.05 E-03; ranges (2.96-13.5)E-04 3.2 The system will further be based on the following average input  !

concentrations for Ag-110M, Co-57, Co-58, Mn-54, Nb-95, Nb-97, sb- )

122, sb-125, Sr-92, and En-95. These values are the average of '

concentrations in the TMI-1 Miscellaneous Waste storage Tank during i the period from 12/22/91 to 7/19/92. All concentrations are in uC1/ml.

Ag-110M: 1.13 E-04; ranges (1.66-30.4)E-05 Co-57: 6.63 E-05; ranges (1.3-27.8)E-05 Co-58: 9.02 E-03; ranges (0.38-69.8)E-03 Mn-54: 3.79 E-05; ranget(1.09-11.4)E-05 Nb-95: 9.72 E-04; ranges (one sample)

Nb-97: 8.76 E-05; ranger (1.07-34.8)E-05 Sb-122: 5.94 E-05; rangen(3.62-8.99)E-05 Sb-125: 1.07 E-04; ranges (one sample)

Sr-92: 9.7 E-05; ranges (3.06-191.0)E-06 En-95: 6.69 E-04; ranges (one sample) i l

3.3 Any rented treatment system (including any spent resin Liner / HIC) is to be located behind a shield to protect personnel. Shield thickness is to be such that contact radiation levels on the outside of the shields shall not cause the area to be classified as a "high radiation area" (i.e. it is to be less than 100 Mr/hr) when the domineralisers, etc are fully loaded.

4.0 MAINTEMANCE

4.1 The vendor for any rented equipment will be required to provide any ,

special tools or equipment needed to perform preventative or I corrective maintenance on the equipment it supplies.

DUGUMEN f C6N It:t1 u .y y y ,

E90ssoleer Technical Functions

. Safety / Environmental Determination and 50.59 Review 1 l (EP-016) g j Page 1 of 21 Unit 4

Document /ActivityTitle Shipment of Misc. Caste Evanormeer cone.nerne.= lSE Rev. No.  !

< 1 Document No. (if applicable) doc.Rev.No. lSE No. I15302-052 l

< Type of Activsty (modification, procedure, test, experiment, or document /:

1 Radwaste Shipment

1. Does this document involve any potential non-nuclear environmental concern? I Yes Z No To answer this question, review the Environmental Determination (ED) form. Any YES answer on the l

ED form requires an Environmental impact Assessment by Environmental Controls, per

1000 ADM 4500.03. If in doubt, consult Environmental Controls or Environmental Licensing for assistance.

' If all answers are NO, further environmental review is not required, in any event, continue with Question 2,  !

below.

2. is this activity / document listed Section I or 11 of the matrices in Corporate Procedure I Yes Z No 1000-ADM 1291.017 l i

if the answer to question 1 is NO, stop here. This procedure is not applicable, and no documentation is required. (if this activity / document is listed in Section IV of 1000 ADM 1291 review on a case-by case  ;

j basis to determine applicability.) If the answer is YES, proceed to question 3. ,

3. Is this a new activity / document or a substantive revision to an activity / document? X Yes Z No i l I j (See Exhibit 2, paragraph 3, this procedure for examples of non substantive changes.)

! If the answer to question 3 is NO, stop here and complete the approval section below. This procedure is ,

not applicable and no documentation is required. If the answer is YES. proceed to answer all remaining  ;

i questions. These answers become the Safety / Environmental Determination and 50.59 Review.  ;

r

4. Does this activity / document have the potential to adversely affect nuclear safety E Yes Z No l

or safe plant operations?

! 5. Does this activity / document require revision of the system / component description Eyes Z No j in the FSAR or otherwise require revision of the Technical Sepcifications or any other  ;

part of the SAR?

l

6. Does the activity / document require revision of any procedural or operating description E Yes Z No

- in the FSAR or otherwise require revision of the Technical Specifications or any other j~

part of the SAR?

i 7. Are tests or experiments conducted which are not described in the FSAM, the Z Yes 3 No

Technical Specifications or any part of the SAR?

i j

IF ANY OF THE ANSWERS TO QUESTIONS 4,5,8, OR 7 ARE YES, PREPARE A WRITTEN SAFETY j EVALUATION FORM.  ;

j If the answers to 4,5,6, and 7 are NO, this precludes the occurrence of an Unreviewed Safety Question or ,

i Technical Specifications change. Provide a written statement in the space provided below (use back of l

sheet if necessary) to support the determination, and list the documents you checked.

l NO, because:

l Documents checited:

8. Are the design criteria as outlined in TMI 1 SDD T1000 Div. I or OC SDD-000 Div.1 [ Yes i No j Plant Level Criteria affected by, or do they affect the activity / document? l

! If YES, indicate how resolved:

! APPROVALS (anInt name and abs / ,  ;

< Engmeer/Ongmeter T. M. Dempsey 7 /pt7. h w e g Date 6/ R b .

Seccen Meneger B. D. Elam /f [d % U U Dateh Date Responsible Technical Reviewer

@ Other Revieweris) Date