Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP-EOF-1-1 Re Activation of Emergency Operation Facility & EPIP-TSC-1-1 Re Activation of Technical Support Ctr.Revised Table of Contents Encl
ML20073J092
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 03/18/1983
From:
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20073J061 List:
References
PROC-830318, NUDOCS 8304190183
Download: ML20073J092 (203)


Text

4 '

ew VOLUME III OMAHA PUBLIC POWER DISTRICT - FORT CALHOUN STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES TABLE OF CONTENTS

1. OPERATION SUPPORT CENTER Revision Last Review Procedure No. Title Date Date EPIP-OSC-1 Emergency Classification R1 7-14-81 EPIP-0SC-2 Emergency Plan Activation R5 7-09-82 7-09-82 EPIP-OSC-3 Notification of Unusual Event Actions R1 4-23-82 4-23-82 EPIP-OSC-4 Alert Event Actions R1 4-23-82 4-23-82 EPIP-0SC-5 Site Area Emergency Actions R1 1-14-82 1-14-82

( EPIP-OSC-6 General Emergency Actions R1 1-14-82 1-14-82 EPIP-0SC-7 Personnel Rescue R1 8-24-82 8-24-82 EPIP-0SC-8 Medical Assistance R1 11-10-82 l'l-10-82 EPIP-OSC-9 Emergency Repairs, Corrective Actions and Damage Control R1 4-23-82 4-23-82 EPIP-OSC-10 Initial Assessment of Plant i Parameters and Effluent Monitors

( to Determine Source Term R1 8-26-82 8-26-82 EPIP-OSC-11 Initial Dose Assessment Based on Plant Instrumentation R1 8-31-82 8-31-82 EPIP-0SC-12 Accidental Actuation of Early Warning Siren System R0 11-4-82

2. EMERGENCY OPERATION FACILITY Revision Last Review Procedure No. Title Date Date EPIP-EOF-1 Activation of Emergency Operation Facility R1 1-31-83 1-31-83 ISSl!E MAR 181983 4

3-18-83 8304190183 830413 DR ADOCK 0500028

TABLE OF CONTENTS (Continued)

Revision Last Review Procedure No. Title Date Date EPIP-EOF-2 Emergency Operation Facility Communication R1 9-22-82 9-22-82 EPIP-EOF-3 Emergency Instruments and Equipment R2 3-2-82 3-2-82 EPIP-EOF-4 Measurement of Airborne Radioactivity (Incorporated intoEPIP-EOF-6) R3 8-18-82 8-18-82 EPIP-EOF-5 Onsite Dose Assessment R3 8-18-82 8-18-82 (Incorporate:1 into EPIP-EOF-6)

EPIP-EOF-6 Onsite/0ffSite Dose Assessment R3 8-18-82 8-18-82 EPIP-EOF-7 Protective Action Guidelines R1 4-23-82 4-23-82 EPIP-EOF-8 Environmental Monitoring R1 5-13-82 5-13-82 EPIP-EOF-9 Personnel Accountability R2 8-31-82 8-31-82 EPIP-EOF-10 Personnel Decontamination R2 11-01-82 11-01-82 EPIP-EOF-11 Dosimetry and Records R1 9-14-82 9-14-82 EPIP-EOF-12 Site Security R1 1-06-83 1-06-83 EPT.P-E0F-13 Shift Supervisor /EDO to ED0 Transition R1 2-01-83 2-01-83 l EPIP-E0F-14 EDO to Recovery Manager Transition R1 11-10-82 11-10-82 EPIP-EOF-15 Determination of Contamination Release Through Plant Stack R1 11-10-82 11-10-82 EPIP-EOF-16 Continuing Dose Assessments Based On Plant Instrumentation R0 4-23-82 4-23-82 EPIP-EOF-17 Initiation of Public Warning R0 1-14-82 1-14-82 -

-EPIP-EOF-18 Offsite Radiological Surveys R2 5-04-82 5-04-82 1

ISSUED MAR 181983 11 3-18-83

_m_ _, -_ ,--

VOLUME III TABLE OF CONTENTS (Continued)

3. TECHNICAL SUPPORT CENTER Revision Last Review Procedure No. Title Date Date EPIP-TSC-1 Activation of Technical Support Center R3 2-15-83 2-15-83 l EPIP-TSC-2 Technical Support Center Communication R1 9-22-82 9-22-82 EPIP-TSC-3 Plant an.d Reactor Operation Support - Alert Classification R1 11-04-82 11-04-82 EPIP-TSC-4 Plant and Reactor Operation Support - Site Area Emergency Classification' R2 11-09-82 11-09-82 EPIP-TSC-5 Plant and Reactor Operation Support - General Emergency

( Classification R1 11-4-82 11-4-82 EPIP-TSC-6 Plant Engineering and Repair R1 11-10-82 11-10-82

~

ISSUED MAR 131383 3-18-83

V0LtJME III 1 TABLE OF CONTENTS (Continued)

4. RE-ENTRY AND REC 0VERY ORGANIZATION Revision Last Review Procedure No. Title Date Date EPIP-RR-1 Activation of Recovery Organization R3 1-31-83 1-31-83 EPIP-RR-2 Re-entry and Recovery Communication (DELETED) R0 2-20--81 1-27-83 EPIP-RR-3 Re-entry to Evacuated Area R1 1-06-83 1-06-83 EPIP-RR-4 Re-entry and Recovery On-Site NRC Coordination R1 1-31-83 1-31-83 EPIP-RR-5 Technical Specification Modifications R0 2-20-81 12-14-82 EPIP-RR-6 Population Exposure Projection R3 9-7-82 9-7-82 EPIP-RR-7 Recovery Decontamination R0 2-20-81 12-14-82 EPIP-RR-8 hasteManagement R1 1-06-83 1-06-83 EPIP-RR-9 Re-entry and Recovery Equipment Procurement R1 1-06-83 1-06-83 EPIP-RR-10 Recovery Organization's Recovery Manager R2 2-01-83 2-01-83 EPIP-RR-11 Recove' Organization's Techni.al Support Manager R1 2-01-83 2-01-83 EPIP-RR-12 Recovery Organization's Licensing Administrator R1 2-01-83 2-01-83 EPIP-RR-13 Recovery Organization's l Core Physics Coordinator R1 2-01-83 2-01-83 EPIP-RR-14 Recovery Organization's Systems Analysis / Procedure -

Support Coordinator R1 2-01-83 2-01-83 EPIP-RR-15 Recovery Organization's Shift Support Coordinator R1 2-01-83 2-01-83 4.

l ISSUED l MAR 181983 l 3-18-83 l

A VOLUME III TABLE OF CONTENTS (Conti nued)

4. REENTRY AND RECOVERY ORGANIZATION (Continued)'

Revision Last Review Procedure No. Title Date Date EPIPRR-16 Recovery Organization's Instrument and Control Support Coordinator R1 2-01-83 2-01-83 EPIPRR-17 Recovery Organization's Security and Technical Support Administrative Supervisor R2 2-01-83 2-01-83 EPIPRR-18 Recovery Organization's Plant Operations Manager R1 2-01-83 2-01-83 EPIPRR-19 Recovery Organization's Shift Operations Supervisor R1 2-01-83 2-01-83 EPIPRR-20 Recovery Organization's Instrument and Control Supervisor R1 2-01-83 2-01-83 EPIPRR-21 Recovery Organization's Maintenance / Quality Control Supervisor R1 2-01-83 2-01-83 EPIPRR-22 Recovery Organization's Health Physics / Chemistry Supervisor R1 2-01-83 2-01-83 EPIPRR-23 Recovery Organization's Procedure / Training Supervisor B4R1 2-01-83 2-01-83 EPIPRR-24 Recovery Organization's Emergency Coordinator R1 2-01-83 2-01-83 EPIPRR-25 Recovery Organization's ,

Dose Assessment Coordinator R1 2-01-83 2-01-83 EPIPRR-26 Recovery Organization's Environmental Survey and Analysis Coordinator R1 2-01-83 2-01-83 EPIPRR-27 Recovery Organization's Radiochemical Analysis Coordinator R1 2-01-83 2-01-83 v

MAR 131983

VOLUME III TABLE OF CONTENTS (Continued)

4. REENTRY AND REC 0VERY ORGANIZATION (Continued)

Revision Last Review -

Procedure No. Title Date Date EPIPRR-28 Recovery Organization's Dosimetry Coordinator R1 2-01-83 2-01-83 EPIPRR-29 Recovery Organization's Administrative Logistics Manager R1 2-01-83 2-01-83 EPIPRR-30 Recovery Organization's Administrative Support Coordinator R1 2-01-83 2-01-83 EPIPRR-31 Recovery Organization's Finance Coordinator R1 2-01-83 2-01-83 EPIPRR-32 Recovery Organization's Accommodations Support Coordinator R1 2-01-83 2-01-83 EPIPRR-33 Recovery Organization's Commissary Support Coordinator R1 2-01-83 2-01-83 EPIPRR-34 Recovery Organization's Communications Support Coordinator R1 2-01-83 2-01-83 EPIPRR-35 Recovery Organization's Human Resources Coordinator R1 2-01-83 2-01-83 EPIPRR-36 Recovery Organization's Material Managemert Coordinator R1 2-01-83 2-01-83 EPIPRR-37 Recovery Organization's Transportation Coordinator R1 2-01-83 2-01-83 i

! EPIPRR-38 Recovery Organization's

, Accounting Coordinator R1 2-01-83 2-01-83 -

. EPIPRR-39 Recovery Organization's Media Release Center Director R1 2-01-83 2-01-83 EPIPRR-40 Recovery Organization's E0F Information Specialist R1 2-01-83 2-01-83 ISSUED MAR 181933

s VOLUME III TABLE OF CONTENTS (Continued) -

4. RE-ENTRY AND RECOVERY ORGANIZATION (Continued)

Revision Last Review Procedure No. Title Date Date EPIP-RR-41' Recovery Organization's E0F Technical Liaison R1 2-01-83 2-01-83 EPIP-RR-42 Recovery Organization's ENC Infonnation Specialist R1 2-01-83 2-01-83 EPIP-RR-43 Recovery Organization's ENC Technical Liaison R1 2-01-83 2-01-83 EPIP-RR-44 Recovery Organization's Public Infonnation and Rumor Control Supervisor R1 2-01-83 2-01-83 EPIP-RR-45 Recovery Organization's Clerical Supervisor R1 2-01-83 2-01-83

( EPIP-RR-46 Recovery Organization's Internal Services Coordinator R1 2-01-83 2-01-83 EPIP-RR-47 Recovery Organization's Design and Construction Manager R1 2-01-83 2-01-83 EP IP-RR-48 Recovery Organization's Utility Engineering Director R1 2-01-83 2-01-83 EP IP-RR-49 Recovery Organization's l Architect Engineering Director R1 2-01-83 2-01-83 EPIP-RR-50 Recovery Organization's

< Director of Nuclear Steam Supply l_ System R1 2-01-83 2-01-83 EPIP-RR-51 Recovery Organization's Director of Construction R1 2-01-83 2-01-83 l EPIP-RR-52 Recovery Organization's

Construction Quality Assurance -

Director R1 2-01-83 2-01-83 EPIP-RR-53 Recovery Organization's Manager of Waste Management R1 2-01-83 2-01-83

ISSijED v, ,

MAR 181983 3-18-83

VOLUME III TABLE OF CONTENTS (Continued)

4. RE-ENTRY AND REC 0VERY ORGANIZATION (Continued)

Revision Last Review Procedure No. Title Date Date EPIP-RR-54 Recovery Organization's Radwaste/ Technical Support Coordinator R1 2-01-83 2-01-83 EPIP-RR-55 Recovery Organization's Scheduling / Planning Manager R1 2-01-83 2-01-83 EPIP-RR-56 Recovery Organization's Advisory Support Coordinator R1 2-01-83 2-01-83 EPIP-RR-57 Recovery Organization's Nuclear Fuel Supplier Representative R1 2-01-83 2-01-83 .

EPIP-RR-58 Recovery Organization's Architect Engineering Representative (Gibbs and Hill) R1 2-01-83 2-01-83 EPIP-RR-59 Recovery Organization's Architect Engineering Representative R1 2-01-83 2-01-83 EPIP-RR-60 Recovery Organization's Radiological Assessment ~

Representative R1 2-01-83 2-01-83 EPIP-RR-61 Recovery Organization's Site Representative R1 2-01-83 2-01-83 i EPIP-RR-62 Recovery Organization's

! NRC and FEMA Representative R1 2-01-83 2-01-83

{

i

(

viii l MAR 181993 i

3-18-83

~ -

VOLUME III TABLE OF CONTENTS (Continued)

5. PUBLIC INFORMATION Revision Last Review Procedure No. Title Date Date .

EPIP-PI-1 PUBLIC INFORMATION (Crisis Communication Plan) R2 9-14-82 9-14-82

~

! ISSUED MAR 181993 IX 3-18-83

VOLUME III OMAHA PUBLIC POWER DISTRICT - FORT CALHOUN STATION EMERGENCY PLAN IMPLEMENTING PROCEDUR~S TABLE OF CONTENTS

1. OPERATION SUPPORT CENTER Revision Last Review Procedure No. Title Date Date EPIP-0SC-1 Emergency Classification R1 7-14-81 EPIP-0SC-2 Emergency Plan Activation R5 7-09-82 7-09-82 EPIP-OSC-3 Notification of Unusual Event Actions R1 4-23-82 4-23-82 EPIP-OSC-4 Alert Event Actions R1 4-23-82 4-23-82 EPIP-OSC-5 Site Area Emergency Actions R1 1-14-82 1-14-82 EPIP-OSC-6 General Emergency Actions R1 1-14-82 1-14-82 EPIP-05C-7 Personnel Rescue R1 8-24-82 8-24-82 EPIP-OSC-8 Medical Assistance R1 11-10-82 11-10-82 EPIP-0SC-9 Emergency Repairs, Corrective Actions and Damage Control RO 4-23-82 4-23-82 EPIP-OSC-10 Initial Assessment of Plant Parameters and Effluent Monitors to Determine Source Term R1 8-26-82 8-26-82 EPIP-0SC-11 Initial Dose Assessment Based on Plant Instrumentation R1 8-31-82 8-31-82 EPIP-OSC-12 Accidental Actuation of Early Warning Siren System R0 11-4-82
2. EMERGENCY OPERATION FACILITY Revision Last Review Procedure No. Title Date Date EPIP-EOF-1 Activation of Emergency Operation Facility R1 1-31-83 1-31-83 ISS!)EE MAR 181983 3-18-83

TABLE OF CONTENTS (Continued)

^

Revision Last Review Procedure No. Title Date Date EPIP-EOF-2 Emergency Operation Facility-Communication R1 9-22-82 9-22-82 EPIP-EOF-3. Emerge'ncy Instruments and Equipment R2 3-2-82 3-2-82 EPIP-EOF-4 Measurement of Airborne Radioactivity (Incorporated into EPIP-E0F-6) R3 8-18-82 8-18-82 EPIP-EOF-5 Onsite Dose Assessment R3 8-18-82 8-18-82 (Incorporated into EPIP-EOF-6)

EPIP-EOF-6 Onsite/OffSite Dose Assessment R3 8-18-82 8-18-82 EPIP-EOF-7 Protective Action Guidelines R1 4-23-82 4-23-82 EPIP-EOF-8 Environmental Monitoring R1 5-13-82 5-13-82 EPIP-EOF-9 Personnel Accountability R2 8-31-82 8-31-82 EPIP-EOF-10 Personnel Decontamination R2 11-01-82 11-01-82 EPIP-EOF-11' Dosimetry and Records R1 9-14-82 9-14-82 EPIP-E0F-12. Site Security R1 1-06-83 1-06-83 EPIP-EOF-13 Shift Supervisor /EDO to EDO Transition R1 2-01-83 2-01-83 l EPIP-EOF-14 EDO to Recovery Manager Transition R1 11-10-82 11-10-82 EPIP-EOF-15 Determination of Contamination i Ralease Through Plant Stack R1 11-10-82 11-10-82 EPIP-EOF-16 Continuing Dose Assessments Based On Plant Instrumentation R0 4-23-82 4-23-82 -

EPIP-EOF-17 Initiation of Public Warning R0 1-14-82 1-14-82 -

EPIP-EOF-18 Offsite Radiological Surveys R2 5-04-82 5-04-82 ISSUED -

MAR 181083 11 3-18-83

VOLUME III TABLE OF CONTENTS (Continued)

3. TECHNICAL SUPPORT CENTER Revision Last Review Procedure No. Title Date Date EPIP-TSC-1 Activation of Technical Support Center R3 2-15-83 2-15-83 l EPIP-TSC-2 Technical Support Center .

Communication R1 9-22-82 9-22-82 EPIP-TSC-3 Plant and Reactor Operation Support - Alert Classification R1 11-04-82 11-04-82 EPIP-TSC-4 Plant and Reactor Operation Support - Site Area Emergency Classification R2 11-09-82 11-09-82 EPIP-TSC-5 Plant and Reactor Operation Support - General Emergency

( _. Classification R1 11-4-82 11-4-82 EPIP-TSC-6 Plant Engineering and Repair R1'11-10-82 11-10-82 f

w I

~

ISSJED "'

l MAR 181933 l 3-18-83 .

l l

~

    • ~{ ,

VOLuiE III TABLE OF CONTENTS (Continued)

4. RE-ENTRY AND RECOVERY ORGANIZATION .

Revision Last Review Procedure No. Title Date Date EPIP-RR-1 Activation. of Recovery Organization R3 1-31-83 1-31-83 EPIP-RR-2 Re-entry and Recovery Communication ~ (DELETED) R0 2-20--81 1-27-83 EPIP-RR-3 Re-entr/ to Evacuated Area R1 1-06-83 1-06-83 EPIP-RR-4 Re-entry and Recovery On-Site NRC Coordination R1 1-31-83 1-31-83 EPIP-RR-5 Technical Specification Modifications R0 2-20-81 12-14-82 EPIP-RR-6 Population Exposure Projection R3 9-7-82 9-7-82 EPIP-RR-7 Recovery Decontamination R0 2-20-81 12-14-82 EPIP-RR-8 Waste Management R1 1-06-83 1-06-83 EPIF -RR-9 Re-entry and Recovery Equipment Procurement R1 1-06-83 1-06-83 EPIP-RR-10 Recovery Organization's Recovery Manager R2 2-01-83 2-01-83 EPIP-RR-11 Recovery Organization's Technical Support Manager R1 2-01-83 2-01-83 EPIP-RR-12 Recovery Organization's Licensing Administrator R1 2-01-83 2-01-83 EPIP-RR-13 Recovery Organization's l Core Physics Coordinator R1 2-01-83 2-01-83 i

EPIP-RR-14 Recovery Organization's Systems Analysis / Procedure -

Support Coordinator R1 2-01-83 2-01-83 EPIP-RR-15 Recovery Organization's Shift Support Coordinator R1 2-01-83 2-01-83 ISSUED iv MAR 181983 3-18-83

1

. l l

l VOLUME III TABLE OF CONTENTS (Continued) l

4. REENTRY AND RECOVERY ORGANIZATION (Continued),

Revision Last Review Procedure No. Title Date Date EPIPRR-16 Recovery Organization's Instrument and Control Support Coordinator R1 2-01-83 2-01-83 EPIPRR-17 Recovery Organization's Security and Technical Support Administrative Supervisor R2 2-01-83 2-01-83 EPIPRR-18 Recovery Organization's Plant Operations Manager R1 2-01-83 2-01-83 EPIPRR-19 Recovery Organization's Shift Operations Supervisor R1 2-01-83 2-01-83 EPIPRR-20 Recovery Organization's Instrument and Control

(' Supervisor R1 2-01-83 2-01-83

~

EPIPRR-21 Recovery Organization's

. Maintenance / Quality Control Supervisor R1 2-01-83 2-01-83 EPIPRR-22 Recovery Organization's Health Physics / Chemistry Supervisor R1 2-01-83 2-01-83 EPIPRR-23 Recovery Organization's Procedure / Training Supervisor B4R1 2-01-83 2-01-83 EPIPRR-24 Recovery Organization's Emergency Coordinator R1 2-91-83 2-01-83 EPIPRR-25 Recovery Organization's Dose Assessment Coordinator R1 2-01-83 2-01-83 EPIPRR-26 Recovery Organization's Environmental Survey and .

Analysis Coordinator R1 2-01-33 2-01-83 EP!PRR-27 Recovery Organization's Radiochemical Analysis Coordinator R1 2-01-83 2-01-83 v

MAR 181983 l

VOLUME III 4 TABLE OF CONTENTS -

(Continued)

4. REENTRY AND RECOVERY ORGANIZATION (Continued)

Revision Last P.eview Procedure No. Title Date Date EPIPRR-28 Recovery Organization's Dosimatry Coordinator R1 2-01-83 2-01-83 ,

4 i EPIPRR-29 Recovery Organization's Administrative logistics Manager R1 2-01-83 2-01-83 EPIPRR-30 Recovery Organization's Administrative Support '

Coordinator R1 2-01-83 2-01-83 EPIPRR-31 Recovery Organization's Finance Coordinator R1 2-01-83 2-01-83 EPIPRR-32 Recovery Organization's _

l Accommodations Support

! Coordinator, R1 2-01-83 2-01-83 i . J EPIPRR-33 Recovery Organization's

, Commissary Support Coordinator R1 2-01-83 2-01-83 EPIPRR-34 Recovery Organization's i Communications Support Coordinator R1 2-01-83 2-01-83 i

EPIPRR-35' Recovery Organization's Human Resources Coordinator R1 2-01-83 2-01-83 EPIPRR-36 Recovery Organization's

, Material Management l Coordirstor R1 2-01-83 2-01-83 EPIPRR-37 Recovery Organization's Transportation Coordinator R1 2-01-83 2-01-83 l

EPIPRR-38 Recovery Organization's j Accounting Coordinator R1 2-01-83 2-01-83 -

I

. EPIPRR-39 Recovery Organization's Media Release Center Director R1 2-01-83 2-01-83  !

l EPIPRR-40 Recovery Organization's E0F Information Specialist R1 2-01 83 2-01-83 ISSllED MAR 181983 l

wy--- yg-,- ,,,-p.-.-- - -

.+

y.,,,p,y- ,y-. 93-, ,, #_m_i-,--,#_ ..., _ _ - . vg.---ie. . , _ - --, ..c. - --.w.- - - - - - w e -9 +

-VOLUME III TABLE OF CONTENTS (Continued)

4. RE-ENTRY AND RECOVERY ORGANIZATION (Continued)

Revision Last Review Procedure No. Title Date Date EPIP-RR-41 Recovery Organization's E0F Technical Liaison R1 2-01-83 2-01-83 EPIP-RR-42 Recovery Organization's ENC Infomation Specialist R1 2-01-83 2-01-83 EPIP-RR-43 Recovery Organization's ENC Technical Liaison R1 2-01-83 2-01-83 EPIP-RR-44 Recovery Organization's Public Infomatio^n and Rumor Control Supervisor R1 2-01-83 2-01-83 EPIP-RR-45 Recovery Organization's Clerical Supervisor R1 2-01-83 2-01-83

( EP IP-1tR-46 Recovery Organization's Internal Services Coordinator R1 2-01-83 2-01-83 EPIP-RR-47 Recovery Organization's Design and Ccnstruction Manager R1 2-01-83 2-01-83 EPIP-RR-48 Recovery Organization's Utility Engineering Director R1 2-01-83 2-01-83 EPIP-RR-49 Recovery Organization's Architect Engineering Director R1 2-01-83 2-01-83 EPIP-RR-50 Recovery Organization's Director of Nuclear Steam Supply System R1 2-01-83 2-01-83 EPIP-RR-51 Recovery Organization's Director of Construction R1 2-01-83 2-01-83 EPIP-RR-52 Recovery Organization's Construction Quality Assurance -

Director R1 2-01-83 2-01-83 EPIP-RR-53 Recovery Organization's Manager of Waste Management R1 2-01-83 2-01-83 ISSUED v, ,

MAR 181983 3-18-83

s VOLUME III TABLE OF CONTENTS (Continued)

4. RE-ENTRY AND RECOVERY ORGANIZATION (Continued)

Revision Last Review Procedure No. Title Date Tate EPIP-RR-54 Recovery Organization's

  • Radwaste/ Technical Support Coordinator R1 2-01-83 2-01-83 EPIP-RR-55 Recovery Organization's Scheduling / Planning Manager R1 2-01-83 2-01-83 4 EPIP-RR-56 Recovery Organization's Advisory Support Coordinator R1 2-01-83 2-01-83 EPIP-RR-57 Recovery Organization's Nuclear Fuel Supplier Representative R1 2-01-83 2-01-83 EPIP-RR-58 Recovery Organization's Architact Engineering Representative (Gibbs and Hill) R1 2-01-83 2-01-83 EPIP-RR-59 Recovery Organization's Architect Engineering _

Representative R1 2-01-83 2-01-83 EPIP-RR Recovery Organization's Radiological Assessment Representative R1 2-01-83 2-01-83 EPIP-RR-61 Recovery Organization's Site Representative R1 2-01-83 2-01-83 EPIP-RR-62 Recovery Organization's NRC and FEMA Representative R1 ?-01-83 2-01-83 ISSUED vm MAR 181983 3-18-83

VOLUME III TABLE OF CONTENTS (Continued)

5. PUBLIC INFORMATION Procedure No. Title te Date EPIP-PI-1~ PUBLIC INFORMATION (Crisis Communication Plan) R2 9-14-82 9-14-82 s

.5 6

r -

ISSUEB MAR 181993 IX 3-18-83 r

~ -

EPIP-EOF-1-f 1

Fort Calhoun Station Unit No.1 -

Emergency Plan Implementing Procedure EPIP-E0F-1 ACTIVATION OF EMERGENCY OPERATION FACILITY Method for quickly activating the Emergency Operation Facility for all Site and General Emergency Classifications and transferring response management functions from the plant site to this offsite facility. .

I.. PURPOSE This procedure provides the instructions to be followed by the Recovery Manager or his designee when site and general emergencies occur that require full activation of the Emergency Operation Facility.

II. PREREQUISITE _

A. The emergency has been internally classified by the Shift Supervisor with review and update by the Emergency Duty Officer.

B. Classification as " Site Area Einergency" or " General" emergency requires full mandatory activation of the Emergency Operation Facility.

Activation is optional for the " Alert" and " Notification of Unusual Event" classifications as determined by the Recovery Manager.

C. Personnel assigned duties in the Emergency Operation Facility have l

been adequately trained.

III. PRECAUTION A. Additional telephones should be acquired from storage and plugged into assigned jack outlets. The Northwestern Bell Telephone Company must activate those lines.

B. A duplicating machine should be acquired for distribution of information thru the Administrative Logistics Manager if not already available.

IV PROCEDURE

1. The Recovery Manager will acquire full emergency management responsiblities by formal transfer from the ED0 using EPIP-EOF-14.
2. Review EPIP-0SC-1 and update emergency classification as appropriate. .
3. Review EPIP-E0F-2 and complete actions required utilizing Administrative Logistics Manager for communication requirements.
4. Relieve Plant Operation Manager and/or Technical Suppurt Center Coordinator of all management functions involving coordination with offsite grcups. Establish coordination of radiological and environmental assessment through the Emergency Coordinator.

ISSUED JAN 311983 R1 1-31-83 f

- - - - -. r- ,,m...9. .-r-.- - - , , , - - , - - - - . - - - , , - , ,

y EPIP-EOF-1-2 IV. Procedure (Co'ntinued)

5. Verify accountability of the EOF staff and arrange shift coverage thru the Administrative Logistic Manager.
6. Verify actions of EPIP-EOF-3 thru 12 as required by accident classification have been initiated.
7. Establish ,connunication. links with Recovery Manager staff and State Emergency Operating Centers by dedicated telephone conference.
8. Initiate requests for offsite assistance in coordination with Technical Support Center Coordinator.
9. Brief OPPD General Manager and provide information to OPPD Media personnel for public release.
10. Verify security has been established for the E0F building control section.

1

11. Reviaw recommended public protectivo actions with Emergency Coordinator.
12. Conduct periodic briefings with staff, and/or Federal / State / County representatives prior to and/or shortly after major decisions.

~

h l

l ISSUED JAN 311963 R1 1-31-83

EPfP-E0F-12-1 Fort Calhoun Station Unit No.1 Emergeacy Plan Implementing Proce. dure EPIP-E0F-12 SITE SECURITY Method for maintaining site security during emergency conditions.

I. PURPOSE This procedure defines specific duties, responsibilities and authorities of security personnel. -

II. PREREQUISITE A. The Shift Supervisor has sounded the nuclear alarm.

III. RECAUTIONS A. Close surveillance must be maintained at gates opened for quick evacuation exit.

B. Only emergency vehicles, monitor team members and OPPD emergency support personnel have access to p,rotected areas. Any other entrance or exit requires prior authorization by these Security and Technical Support Administrative Supervisor.

IV PROCEDURE

1. Perform Security Procedure No. SCP-19, Emergency Evacuation-Procedure. SCP-19 is classified safeguards i nformation.
2. Maintain an accurate record of personnel entering and leaving the plant site.
3. Support personnel allowed access to the protected area must verify they are wearing security and dosimetry badges.
4. Call in additicnal eff-duty guards, if required, to ensure sufficient emergency security control.
5. Should any other security oriented emergency occur, refer to the applicable Security Procedure.

SSUED R1 1-06-83 JAN 6 1983

EPIP-E0F-13-1

. FORT CALHOUN STATION UNIT N0. 1 Emergency Plan Implementing Procedure EPIP-EOF-13 Shift Supervisor /EDO to EDO Transition

1. PURPOSE This procedure provides the instruction to be followed by Shift Supervisor's and ED0's regarding Shift Supervisor to EDO transition or ED0 to EDO transition.

II. PREREQUISITE A. The emergency has been placed into one of 4 classifications in accordance with Implementing Procedure EPIP-OSC-1.

B. Emergency Plan activation has taken place in accordance with Implementing Procedure EPIP-0SC-2.

III. PRECAUTIONS A. All significant events and actions shall be logged in the operations log book.

B. The relieving ED0 shall be fully briefed prior to assuming responsi- l bility and shall carry out the transition in accordance with this procedure.

C. The Technical Support Center (TSC) from which the ED0 shall . operate has been checked for habitability. For all emergency classifications, the EDO will report to the Technical Support Center (TSC).

IV. PROCEDURE A. Relieving ED0's shall review the following information during the Shift Supervisor to ED0 transition or ED0 to ED0 transition.

Review current plant status including present emergency classificati n.

Review any radiological release data, meteorological data, activity releases estimates, ad current maps and overlays.

Review latest radiation, contamination and airborne surveys (On-site and Off-site). ,

Review present activation status of Emergency Team and Technical Augmentation Staff.

Review present activation status of Recovery Organization (if activated).

R1 2-1-83 FEB 1 1983

EPIP-E0F-13-2 V. PROCEDURE (Continued)

Review status of any in-plant evacuation measures that may have been performed including an accountability of plant perscnnel and visitors.

Review status of any contaminatsd and/or injured personnel transported to UNMC or Blair Memorial Hospital for treatment.

Review emergency nocification status of outside emergency response organizations.

Review recommended protective actions that may have been transmitted to the States of Iowa and Nebraska.

Review the operations log book.

B. Upon review of all pertinent information the relieving ED0 will assume control of the emergency actions and interface with off-site support groups.

ISSUED FEB 1 1983 R1 2-1-83

1 EP ZP-TSC-1-1  :

Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure EP IP-TSC-1 ACTIVATION OF TECHNICAL SUPPORT CENTER Method for activation of the Technical Support Canter (TSC) for emergency operations assistance during Alert, Site Area and General Emergency classes.

I. PURPOSE This procedure provides the instruction for the TSC Manager and his staff to initiate support to the reactor operating personnel in admini-strative, communication, and technical evaluation functions.

II. PREREQUISITES A. The emergency has been classified as Alert, Site or General (Pro-cedure EPIP-0SC-1) by the Shift Supervisor or Emergency Duty Officer.

B. Personnel assigned operational, mechanical, electrical and radio-logical emergency support have been adequately trained.

III. PRECAUTIONS A. Although activating the TSC is optional for '. Notification of Unusual Event' emergency classes, it is advisable that TSC members report to the piant when notified to share their expertise.

B. The TSC is sized for 20 technical persons. The TSC Manager must limit off-site support to ensure optimum working space.

IV. PROCEDURE

1. Ensure members of the Technical Augmentation Staff and the Emergency Team have reported to the locations established in Attacament 1 to this EPIP.
2. Check and initiate operations of radiological equipment to ensure monitoring capability and continued habitability of TSC.

, 3. Establish communications with control room and emergency response facilities (EPIP-TSC-2).

l

4. Provide plant and reactor operation support in accordance with -

implementing procedures EPIP-TSC-3, 4, 5 and 6.

5. Relieve reactor operator of auxiliary duties and communications not l

directly related to reactor system manipulations.

ISSIB FEB 151983 R3 2-15-83 l

l

. EPIP-TSC-1-2 IV. PROCEDURE (Continued) *

6. Maintain emergency offsite support group coordination until activation of EOF has been confirmed.
7. Review technical data displays and plant records available. (A Safety. Parameter Display System will eventually standardize infcrma-tion for safety assessment.)
8. Provide detailed analysis and diagnosis of abnormal plant conditions to control room operations.
9. Evaluate cny significant release of r&dioactivity from the plant.
10. Maintain open communication with the control room and EOF.

~

11. Establish a long term schedule for staffing the TSC and control room with additional manpower if the emergency class is 1., creasing or a duration of more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is anticipated.

( .

l l

l l

1 l

]:m" 5*

. (

le 4 FEB 151933 i

R3 2-15-83

h g ATT. LENT 1

[@

u.

EM Reporting Locations for Emergency Team and TSC Staff Personnel '

"' t="9~

RM-IIV Rm-/IS Rkt-ilTl RM-l/8 i

I&C Supv. TSC Hanager Proc./Tng. Personnel Acct./

I&C Tech. Sec. & Tech. Spt. Admin. Supv. Supv. Clerical Spt.

Electrician (2) System Anal./ Proc. Spt. Coord. (Tag #17)

Maint./QC Supv. Core Physics Coord.

Gen. itaint. Fitter (1) Shift Spt. Coord.

I&C Spt. Coord.

Rh1-Il4-l Mgr. Rad. Sample Count pg jfg Waste Hgnt. Dosimetry EDO Issuance llRC (S) Phone Talker / (Tag #21A)

Recorder Switchboard Opera tor fg7 t

i gjn.//2 Tag #'s HP/ Chem. Supv. Honitor Coord.

Radio / Chem. Tech. Radio Opr.

f-9 f j

Reentry Teams 2A, 3A Rad. Chem. Tech. w.

Onsite Monitors 11-14 l m ==e i Offsite Monitors S-8 Dos'e Assess, womcy l

Rescue Squad Hon. 18 - Opr.

b1EN

~

El Rm- RM- Rm-  %

RMinl 109 y y llo . gog ti; d

?

0>

" r i32GAW Room l

Gate Monitor (Tag #9A/10A), Personnel Decon. (Tag #19) and the Outside Coordinator (Tag #22) will l

report to the Gener;al Services Building onsite unless directed otherwise.

EPIP-RR-1-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-1 ACTIVATION OF RECOVERY O'RGANIZATION Method. for activating a recovery organization to evaluate and coordinate emergency activities.

I. PURPOSE This procedure provides the instruction for initiating the Recovery and Re-entry organization to develop, evaluate and direct recovery operations.

II. PREREQUISITE A. lhe. Recovery Organization has been activated. Activation is initiated when one of the following is met:

(a) A Notification of Unusual Event or Alert emergency classification has been declared and the Recovery Manager, Emergency Coordinator, Plant Operations Manager and the Emergency Duty Officer agree that the Recovery Organization should be activated for possible ~

emergency escalation.

I

( (b) The event is elevated to a Site Area or General emergency classification.

B. The Emergency Operations Facility (EOF) has been activated. The EOF is the recovery management center during post-accident operation.

C. Members of the recovery or'ganization have been trained in emergency responsibilities.

III. PRECAUTIONS A. The recovery management center will be established at the E0F building located at the North Omaha Station site.

B. The position of Emergency Duty Officer at the TSC should be maintained' until transition of authority to the Recovery Manager has been per-

formed per EPIP-EOF-14 IV. PROCEDURE
1. Notify 0 PPD management for all emergencies by the programmed method -

detailed in Figure 1 of this procedure. Notification is originated by Fort Calhoun Station Shift Supervisor to the Plant Manager or his designee who contacts the management officer designated the Recovery Manager.

2. The Division Manager - Production Operations is designated the Recovery Manager. The Division Manager - Electric Operations is designated as the alternate.

f[g,"*,s,d%

M5Y k5 :. R3 1-31-83

, . 3 33

' ~

EPIP-RR-1-2

3. The Recovery Manager will:

(a) Begin activation of the Recovery Organization by notifying the Administrative Logistic Manager, as depicted in Figure 2 of this procedure. For an Alert emergency classification, the Administra-tive Logistics Manager will notify the Technical Support Manager to activate the Technical Support Center. The Administrative Logistics Manager will also place the following' members of the Recovery Organization on standby:

(1) Alternate for the Technical Support Manager, (2) Alternate for the Plant Operations Manager, (3) Alternate for the Emergency Coordinator, (4) Alternate for the Administrative Logistics Manager, (5) The Media Release Center Director.

(b) Contact the Emergency Duty Officer for current emergency status.

(c) Report to the Emergency Operations Facility and receive transfer of duties from the EDO, in accordance with implementing procedure EPIP-E0F-14, "EDO to Recovery Manager Transition".

(d) Direct all evaluations, decisions and actions required for effective recovery operations.

(e) Instruct the Administrative Logistics Manager to activate addi-tional responsibilities of the Recovery Organization as indicated by accident type and plant status, using the " Recovery Organiza-tion Call List". Appendix 1 of this procedure lists the indivi-duals to be notified for each emergency classification by position l

title or duty. The call list is maintained in each of OPPD's

! emergency facilities and distributed to the following individuals (listed by emergency organization titles):

(1) Recovery Manager (2) Administrative Logistics Manager (3) Plant Operation Manager (4) Technical Support Manager (5) Emergency Coordinator (6) Media Release Center Director (7) Design and Construction Manager (8) Manager of Waste Management (9) Scheduling / Planning Manager (10) Emergency Team Tag No.1/1A.

l (f) Establish communications and authority with the Technical Support l

Center and Operations Support Center. -

(g) Carry out additional responsibilities as detailed in implementing procedure EPIP-RR-10.

i ISSW--n 3

< R3 1-31-83

EPIP-RR-1-3

4. The Recovery Organization personnel are notified in accorriance with the scheme depicted in Figure 2 of this-procedure.

(a) The Administrative Logistics Manager will , notify:  !

Technical Support Manager Primary: Section Manager - Tschnical Services Alternate: Manager - Reactor and Computer Technical Services Plant Operations Manager Primary: Manager - Fort Calhoun Station Alternate: Section Manager - Operations Emergency Coordinator Primary: Manager - Radiological Fealth and Emergency Planning Alternate: Supervisor - Technical Services, Nuclear and Chenical Services Administrative Logistics Manager -

Primary: Manager - Administrative Services

, Alternate: D! vision Manager - Quality Assurance and

'.- Regulatory Affairs Media Release Center Director Primary: Division Manager - Public Relations ~

Alternate: Media r elations Manager Design and Construction Manager '

Primary: Division Manager - Engineering Alternate: Section Manager - Generating Station Engineering Manager of Waste Management Primary: Supervisor - Mechanical Technical Services Alternate: Engineer ' ort Calhoun Scheduling / Planning Manager Primary: Manager - Scheduling and Budgets .

Alternate: Section Manager - Engineering Services Advisory Support Coordinator Primary: Project Manager - Combustion Engineering, Inc.

, y y 7. r_s Alternate: Vice President - Gibbs and Hill JAN 3 i B33 R3 1-31-83 e

-+- w, ,n, - <- , - . , - , , -- -

~

EPIP-RR-1-4 (b) The Technical Support Manager will notify:

Licensing Administrator Primary: Licensing Administrator Alternate: Licensing Engineer

_ Core Physics Coordinator Primary: Reactor Engineer Alternate: Supervisor - Reactor Physics l Systems Analysis / Procedure Sucoort Coordinator Primary: Manager - Operations and Technical Services Alternate: Plant Engineer - Fort Calhoun Shift Support Coordinator Primary: Off-Shift Technical Advisor Alternate: Off-Shift Technical Advisor Instrument and Control Support Coordiantor Primary: Supervisor - I and C and Electrical Technical Services Alternate: Manager - GSE Electrical Engineering Security and Technical Support Administrative Supervisor Primary: Supervisor - Fort Calhoun Station Administrative

, and Security Services Alternate: Training Coordinator (c) The Plant Operation Manager will notify:

Shift Operations Supervisor Primary: Supervisor Operations - Fort Calhoun Alternate: Supervisor Technical - Fort Calhoun Instrument and Control Supervisor Primary: Supervisor - I and C and Electrical Field Maintenance Alternate: Instrument and Control Engineer Maintenance /Ouality Control Supervisor Primary: Supervisor Maintenance - Fort Calhoun Alternate: Supervisor Field Maintenance - Fort Calhoun G S(,L i .'. h h

[ i JAN 311933 R3 1-31-83

," ~

EPIP-RR-1-5 Health Physics / Chemist!ry Supervisor Primary: Supervisor - Ctemistry and Radiation Protection Alternate: Health Physicist Procedure / Training Supervisor Primary: Training Supervisor Alternate: Training Coordinator (d) The Emergency Coordinator will notify:

Dose Assessment Coordinator Primary: Senior Engineer - Technical Services Alternate: Health Physicist Environmental Survey and Analysis Coordinator Primary: Manager - Chemical and Environmental Technical Services Alternate: Supervisor - Environmental Science Radiochemical Analysis Coordinator Primary: - Plant Chemist - Fort Calhoun Alternate: ,

Supervisor - Chemical Services Dosimetry Coordinator Primary: Supervisor - Reactor Perfomance Analysis Alternate: Engineer - Reactor and Computer Technical Services Site Representative Primory: QA Engineer Alternate: QA Engineer Radiological Assessment Representative (Pickard, Lowe and Garrick)

Contact Pickard, Lowe and Garrick and request the following individuals:

l l Primary: Senior Consultant Alternate: Consultnat (e) The Administrative Logistics Manager will also notify: .

Administrative Support Coordinator Primary: Manager - Office Systems Alternate: Supervisor - Word Processing hf J

~

b a?

JAN 313g33 R3 1-31-83 1

~ . -

EPIP-RR-1-6 Finance Coordiator Primary: Manager - Treasury Alternate: Supervisor - Cash Management and Analysis Accomodations Support Coordinator Primary: Division Manager - Employee Relations Alternate: Manager - Safety Comissary Support Coordinator Primary: Division Manager - General Services Alternate: Manager - Facilities Services Comuinications Support Coordinator Primary: Manager - Communications Alternate: Field Supervisor - Communications Human Resources Coordinator-Primary: Manager - Employment and Compensation Alternate: Supervisor - Employment t

- Material Management Coordinator Primary: Division Manager - Material Management Alternate: General Stores and Supplics Specialist Transportation Cocidinntor

! Primary: Manager - Transportation and Construction Alternate: Field Supervisor - Transportation Accounting Coordinator

! Primary: Division Manager - Corporate Accounting Alternate: Supervisor - Plant and Contracts (f) The Media Release Center Director will notify his Recovery Organization Staff in accordance with the Public Infonnation Implementing procedure EPIP-PI-1.

(g) The Design and Construction Manager will notify:

Primary: Manager - Mechanical Engineering -

Alternate: Manager - Nuclear Engineering g m - -= m JAli 31 1233 R3 1-31-83

EPIP-RR-1-7 Architect Engineering Director Contact Stone and Webster and request the following individuals:

Primary: Project Manager - Stone and Webster Alternate: Project Engineer - Stone and Webster Director of Nuclear Steam Supply System Contact Combustion Engineering and request the following individual:

Primary: Project Manager - Combustion Engineering, Inc.

Alternate: Project Engineer - Combustion Engineering, Inc.

Director of Construction Primary: Manager - Construction Management Alternate: Manager - Civil Engineering Construction Quality Assurance Directror Primary: Supervisor - Procurement and Quality Assurance

. Alternate: Supervisor - Operations Quality Assurance (h) The Manager of Waste Management will notify:

( Radwaste/ Technical Support Coordinator Primary: Engineer - Technical Services Alternate: Engineer - Technical Services (i) The Advisory Support Coordinator will notify:

NRC and FEMA Emergency Response Teams Contact NRC and FEMA and request their Emergency Response Teams.

Nuclear Fuel Supplier Representative (Combustion Engineering, Inc.

Contact Combustion Engineering, Inc. and request the following l individuals:

( Primary: Senior Engineer i Alternate: Senior Engineer l

Architect Engineering Representative (Gibbs and Hill) .

Contact Gibbs and Hill and request the following individuals:

l Primary: Vice President

p%~,% Alternate
Senior Engineer JAN 31 }g33 R3 1-31-83

EPIP-RR-1-8 Architect Engineering Representative (Pickard, Lowe and Garrick)

Contact Pickard, Lowe and Garrick and request the following individuals: .

Primary: Senior Engineer Alternate: Senior Engineer

5. In the event the Administrative Logistics Manager is unable to contact either the primary or alternate to a Recovery Management Assignment, it will be the Administrative Logistics Manager's responsibility to ensure that the remaining members of the respective group are contacted and informed of the emergency.

6.- Reporting locations for the Recovery Organization are detailed in implementing procedures EPIP-RR-10 through EPIP-RR-62.

l l

i 1

1 i

T@%ii ~ W JAN 3 3 3333 R3 1-31-83

, --------------.___.-7 EPIP-RR-1-9

! . }

!l !lj l!lu! ll lal r i!l !ai 0l o  ! '

15 f {3 l

i n , . ., ,, ,, ,, ,, ,, l ,,

{s f___ _ __ _ _ _

s s I

~

= 3 15 E 35 h l 5 I l

., , . 1 8

i 1 1 e $ j I, k

  • f{a r.1 -

l 8

j

~

i}  ! !I I Irp ,Id!$It ,fl3 l3

~

I! lIj 58 '

lj

$8 l T  ?, y

[  ! l i 1 :1 1 i  : L 8 8 8 11 i --,

I it

, s

~

~

I. "-a

~

$l ~

.s Y e; jj em 11 2,

%u 5 i[t j{ L

@ '- I fM y R3 1-31-83 l FC4 i Omaha Public Power District SCHEDULE FOR EMERGENCY Fort Calhoun Station NOTIFICATION AND INFORMATION Unit #1

]

Emergenc'j Plan Figure t]

EPIP-RR-1-10 saa e -,too )

i v -sam. o.wa.w e ww.w .

t --

_l --)q~a .

) r..

--.c-

. y Ia , .- l u-c- , -

~

y -->t-----  : > 7  :... ". -:""' ~

I -- - I - . - - -

m : .t

-t . ' . 7 ay-

&c _

.~ -

pC Cm ,t.is g-asw._ t.o -- _ h -

e me c . .

E0p es e top it as u I.IC - sp e 4-~

ci e t.r "-

I W y tag weg be Asu.a e ts D.u a-. aas. O . pest 9 e v0.et1 i

^

C ms.m.o O 0.u

., e _

^ '-

9 n ' _- l C

22 4 .- _ i

.-e m

z -

cn - . -

l 4-- > T 2""" ~

,Q OL%i W

I

! @ R3 1-31-83 f.p:8) 1 Omaha Public Power District RECOVERY ORGANIZATION CALL TREE Fort Calhoun Station Unit #1 Emergency Plan Figure 2

EPIP-nR-1-il APPENDIX I RECOVERY ORGANIZATION CALL LIST Emergency Emergency Norwul Work Home Phone Initials

Classification Duty / Title Name Station No. Number Number of Caller Comments NOTIFICATION NOTE: Notification. of the individuals below is accomplished through EPIP-0SC-2 of UNUSUAL Plant EVENT Operations Manager Shift Operations Supervisor Recovery Manager Emergency Coordinator Core Physics Coordinator Maint./QC Supervisor I and C i Supervisor HP/ Chem j Supervisor
NOTE
Notification of the individuals below is accomplished through EPIP-0SC-2 Admin.

Logistics Manager ALERT Technical Support Manager

! Licensing Adminis.

l Sys Anal.

Procedure .

j Spt. Coord.

j Shift CONTACT: 0FF DUTY Support SHIFT TECHNICAL ADVISOR

'd' l if' Il Coordinator I . . . b(' ;' '

l '

I and C Sup-I portsCoord.

J Af131 1983 R3 1-31-83

l 2

1 3

- 8 1 -

R s R t

- n .

1 P e d I n n

e 3 P k a R E i C r e

t ,

s a

sr e l e r al a il ta h iC c n i If h .

o w s

n e o n i o t s

hr Pe o p

b em mu oN e

s H' o h

t r

o f

T k S r d I o e L Wr e t

c L lb a L

A am mu t

n C rN o o c N N IO s I i XT IA l a

DZ NI u EN d

  • PA . i PG y3 v AR cN i O n d en n Y go i R ri E et e V ma s n

O Et C S o p

E R s e

R e

e t a

m n a

N r e

t n g l e s -

l a

l a .

d i n A

  • r s . t r

n m I r a d cd o

d r /r e s o e o sd ndr ir e

a lao eo h n yt s l yt er eno mo yt .

ya/s rs T l

a

  • o* ca .c e r ca so mao eo r a p l

t tcti ui ctr ir nn sir R o nn so n C hC t n e ii rv dv ire t e ei it e rt ei AC oy c ei R i

T rnor er  : nogtag gd nsg aec gd re . md o . ir E h p a. nra rr 0rr et i vl e ce m!gn a it e0 i il

/ uhpe

  • y ccpp opt cpr aen eo dnrP Peo sn vra da so t t eeuu ru O eua l pa mo doa eeiN Nmo oe nun Dm ESA an oo RA DC i

S u STSS PS N TSM POMECALMMCDI IEC D

n o )

R 2 i t u 9 t O 9 yc a 'no AL 1

ci C EA 1 nf ( RR 3 AE ei gs T N T))

( q J I

rs R EE A ea E TG J I

ml L A S 1 EC

r"%

EPIP .d-1-13 APPENDIX I RECOVERY ORGANIZATION CALL LIST Energency Emergency Normal Work Home Phone Initials Classification Duty / Title Name Station No. Number Number of Caller Comments SITE AREA OR Radiological

~ GENERAL (Con't) Assess / Rep.

Pickard Lowe and Garrick) ___

Administrative Logistics ~

. Manager Administrative Support 4 Coordinator Finance Coordinator -

Accommodations Support Coord.

Commissary Support Coordinator Communications Support Coord. '

iluman Resources Coordinator l Material Mgmt.

Coordinator Transportation Coordinator Accounting Coordinator Media Release Center Dir. e EOF Information Specialist: Individual (s) for this position is notified under EPIP-OSC-2 EOF Technical Liaison: Individual (s) for this position is notified under EPIP-OSC-2 MRC Info.

Specialist Public Info.

i I I i'" jdj* ' "' ' and Rumor

': J Ali 31 1963 Control i Supervisor R3 1-31-83

EPIP-RR-1-14 APPENDIX I '

i RECCVERY ORGANIZATION CALL LIST Emergency Emergency hormal Work Home Phone Initials Classification Duty / Title Name Station No. Number Number of Caller Comnents -

SITE AREA OR Clerical GENERAL (Con't) Supervisor Internal ,

Services #

Coordinator Design and Construction Manager Utility Engineering

  • Director ,

Architect '

Engineering s s Director  ?

Director of s, s 3( - ,'

Nuclear Steam .

', > 1 Supply System '

I Director of '

l' Construction Construction <

QA Director Manager of '

Waste Material "

Radwaste Tech. -

l Support Coord.

Scheduling /

Planning Hgr.

Advisory Sup- s

<, port Coord. ,

(Combustico ,,. ,

Fngineering) -s

  • WRC ., , ,s -
  • . +

Representative - 1 FEMA 's * , i h,tIb3 H Representative -

s\

ID_

d dD L f ( Z s

JAf4 31 W~ . - , UJ, ,' R3 1 83 g I' Ur A g, ,

n

m

. EPIP .a<-1-15 s

APPEl.^ DIX I RECOVERY ORGANIZATION CALL LIST .

Emergency Emergency Normal Work Home Phone Initials Classification Duty / Title Name Station No. Number Number of Caller Comments StTE AREA PR Nuclear Fuel I GENERAL (Con't) Supplier Rep.

CE Architect Eng.

(Gibbs and Hill and Pickard, Lowe, and Garrick 1

l 3

'l((

aig lNUlLN .b JArd 31 j933 .

R3 1-31-83

EPlP-RR-2-1  !

Fort Calhoun . Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-2 RE-ENTRY AND RECOVERY COMMUNICATION DECETED DUPLICATION EPIP-EOF-2

(

(

ISSUED JAN 2 71983 R1 1-27-83

EPIP-RR-3-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-3 RE-ENTRY TO EVACUATED AREA Method to initiate re-entry into affected area of the plant during recovery operation.

I. PURPOSE .

This procedure provides the instruction for re-entry activities into affected plant area after emergency conditions have stabilized and long tem recovery is beginning.

II. PRERE0VISITE A. Radiation levels and airborno activity for the affected area has been determined by plant area and process monitors.

B. Personnel selected for re-entry will be trained and knowledgeable as a group in radiation protection, first aid, operation and maintenance functions.

III. PRECAUTIONS

~

A. Personnel rescue and lifesaving entries are guided by EPIP-OSC-7.

B. There shall be no entry into evacuated areas unless authorized by the Recovery Manager and Emergency Coordinator. ,

C. Re-entry personnel should not deviate from the planned program unless unanticipated conditions require perfoming an act which would reduce the emergency condition.

D. If field dose rate measurements during re-entry exceed pla'nned limits set by the Emergency Coordinator, the group will return to an area of lower radiation to evaluate alternate actions.

IV. PROCEDURE

1. Prepare a Radiation Work Pemit which shall include the approval of l the Recovery Manager and the Emergency Coordinator in addition to the nomal review.
2. The re-entry group shall consist of a minimim of two perscd2
3. Re-entry exposures may be authorized in accordance with 10 CFR 20 limits and guidelines established in EPIP-0SC-7.

1

4. Designate a leader in the re-entry group and conduct a briefing prior to dress-out and entrance.

ISSUED JAff 6 1863 R1 1-06-83

I l

EPIP-RR-3-?

1 IV. PROCEDURE (Continued) l

5. The route of the re-entry group to and from the affected area will be included in the RWP and briefing. j
6. Brief the re-entry group fully concerning the nature of the emergency, associated hazards, area limitations, special protective equipment, specific instructions, and possible contingencies.
7. Observe dosimeters frequently and withdraw to an area of low radia-tion exposure if necessary to maintain . approved limit.
8. Complete planned assignment as safely and quickly as possible.
9. Supervise the initial and subsequent entri~es closely until a detailed radiological assessment has been completed and appropriate controls implemented.
10. Immediately af ter return fran re-entry, follow personnel monitoring, decontamination, and bicassay procedures as specified by the Monitor Coordi nator.
11. Re-entry group should make a report on all observations including survey mapping after return to the assembly center.
12. The Recovery Manager shall evaluate existing conditions, data and controls and plan larger group actions utilizing the instruction '

in this procedure.

ISSUED JAN 6 1983 R1 1-06-83

EPIP-RR.-4-1 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure EPIP-RR-4 RE-ENTRY AND RECOVERY ON-SITE NRC COORDINATION I. PURPOSE To provide basic guidelines for coordination of all on-site NRC activity including communications, responsibilities and resource allocation.

II. PREREQUISITE A. A site of general emergency has occurred and the NRC has activated its Incident Response Plan (NUREG-0728).

B. 'The Technical Support Center (TSC) and Emergency Operations Facility (EOF) have beer. activated.

III. PRECAUTIONS A. The NRC's Incident Response Team's (IRT) composition size, expertise

',- and percieved responsibilities are expected to be dependent upon the type and magnitude of plant accident. In all cases, the relationship between OPPD and the NRC should be maintained at a professional level.

B. All communciations 6etween OPPD and the NRC should be documented where possible.

IV. PROCEDURE

1. During the initial period following the accident the shift supervisor or his designated communciations aide will provide all direct communi-cation with the NRC. Once an Emergency Duty Officer (EDO) has arrived and taken command at the TSC, the ED0 will assume responsibility for all NRC coordination. Conversely, the Recovery Manager will assume this responsibility once he has reported to the EOF and established his organization.
2. The on-site resident inspector will initially assume the responsibility of direct interface with OPPD. He will turnover his responsibility to the assigned Director of Site Operations (DS0) who will normally be ,

the IE Regional Office Director.

3. The DSO will coordinate all on-site NRC functions through the Recovery l Manager. Logistics support, including assignment of personnel in the TSC, EOF, corporate offices, or the control room, will be approved or arranged by the Recovery Manager, upon DSO request.

i.0 .s.

JAN 31 IS83 R1 1-31-83

~

y-- , -- -

EPfP-RR-4-2 IV, PROCEDURE (Continued)

4. If a Licensing Manager is assigned to the IRT, direct interface between OPPD's Licensing Department and the NRC representative will be implemented.
5. Any requests and/or recommendations made by the NRC personnel _to operations, technical, or support personnel should be responded to; however, the Recovery Manager should De appraised of such requests and/or recommendations.
6. The DSO should request logistical support directly through the Recovery Manager.
7. Although not anticipated, the NRC may decide to assume control of some or all responsibilities related to the plant operation and/or the emergency response function. If this does occur, the Recovery Manager will continue to direct actions of OPPD personnel related to the recovery and in support of the NRC. The Operations Manager will continue to direct his operational personnel in support of the NRC.

)

e 9

e

!SSijED JAN 311983 R1 1-31-83 i

EPIP-RR-8-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-8 WASTE MANAGEMENT Method for management of radioactive waste during recovery operations. ,

-1. PURPOSE This procedure provides an instruction for the !1anager of Waste Manage-ment and his staff to. collect, process, and control radioactive wastes

- to ensure minimal effect to the public during post-accident recovery operations.

~

~

II. PRERE0VISITE A. An evaluation has been made to determine operability of equipment in the plant radwaste system.

B. Fort Calhoun Station Ooerating Instructions, Waste Disposal section; Administrative Procedures for Waste Releases, S.0. T-2, T-3, T-4, and T-12; and Radiation Protection Manual, Procedure HP-3, are available to provide normal operation guidance.

III. PRECAUTIONS A. All waste disposal operattons require pre-planning and appro. val be-fore performance and must be in conformance with regulatory limita-tions for effluent release and shipping:

(a) Fort Calhoun Station Technical Specifications (b) Title 10, Code of Federal Regulations, Part 20 (c) Title 49, Code of Federal Regulations, Part 170 - 190 IV. PROCEDURE

1. Establish a staff if the plant staff cannot process waste by the normal syustems and procedures.
t. 2. Ensure experienced plant radwaste operators and health physics l

technicians are represented on the waste management staff.

3. Operate radwaste system as designed if waste accumulation is not due to inoperability of equipment. l
4. Initiate development of plans which utilize existing equipment and procedures to the greatest extent with additional equipment and procedures utilized to provide operability.

dSUEE R1 1-06-83 JAN 6 1983

n~ c -q EPIP-RR-8-2 IV. PROCEDURE (Continued)

  • 5. Consider procurement of' temporary storage facilities to ensure

. wastes ~are not released due to undercapacity.

6. Evaluate advisability of procuring or building specialized mobile waste processing units.; ,
7. Evaluate need for specialized shipping containers or shielded casks.
8. Coordinate waste processing activities to avoid conflict with other recovery activities. ,
9. Schedule solid waste shipments to avoid large accumulation of processed waste on site. .,
10. Establish procedural methjods to minimize the quantities of waste generated during recovery activities.
11. Control liquid and waste releases to normal regulatory limits and ensure the Recovery Manager and his organization are notified prior to performance of the effluent release.
12. Ensure all waste shipments and effluent releases are fully authorized and documented prior to performance.

AN 6 1983 R1 1-06-83 9

s EPIP-RR-9-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-9 RE-ENTRY and REC 0VERY EOUIPMENT PROCUREMENT I. PURPOSE To provi[de a procedure for the acquisition of material and equip-ment to assess and monitor actual or potential off-s:te consequences of a radiological emergency condition.

II. PRERE0VISITE A. The Fort Calhoun Station emergency recovery organization must be activated prior to using this procedure.

B. The Administrative Logistics Manager and his designated alternate must be thoroughly familiar with all portions of the Fort Calhoun Radiological Emergency Response Plan directly involving equipment procurement.

C. Authorization by the Omaha Public Power District Board of Directors and the General Manager has been obtained. ~

III. PRECAUTIONS None.

IV. PROCEDURE

1. The Administrative Logistics Manager will respond to requests from the Recovery Manager for the acquisition of materials and equipment.

NOTE: To the extent consistent with the requirements of the recovery organization, the District s existing procurement procedures will be followed.

2. Upon receipt of a request from the Recovery Manager, a

" Requisition on Purchasing" will be initiated which will l

include the required material specifications, quantities, l special requirements and shipping instructions if special instructions are required. The preparation of the requisition and specifications will be coordinated with the requesting recovery organization department, e.g. ,

engineering, operations, etc. -

3. Tne Administrative Logistics Manager or a member of his staff will hand-carry the requisition to the Recovery Manager for signature.

ISSUED JAN 6 1983 qi 1_ng_g3

~

EPTP-RR-9-2 IV. PAGCEDURE (Continued)

4. The requisition will then be hand-carried to the Material Management Coordinator in the recovery organization. This function will normally be perfomed by the Division Manager

- Material Management.

5. The Material Management Coordinator will assign a person to expedite the acquisition of the requested material. The expeditor will keep the Administrative Logistics Manager informed of any problem (s) with the acquisition of the requested material.
6. In the event the requested material cannot be obtained, the expeditor is authorized to contact the manager of the requesting recovery organization department and attempt to identify acceptable alternative (s). If an acceptable alternative is agreed to, the expeditor must obtain the approval of the Division Manager - Material Management prior to vendor authorization. .The Material Management Coordinator is authorized to alter the original requisition up to a maximum of 10% increase in cost. Increases above this must be approved by the Recovery Manager through the Administrative Logistics Manager.

7 .' In the event the material cannot be obtained, the Material Management Coordinator will infom the Administrative Logistics Manager who will inform the Recovery Manager.

8. The expeditor will monitor the activities associated with the requisition until delivery has been confirmed by the requesting recovery organization department.

1 i

l ISSUED JAN 6 1983 R1 1-06-83

EPZP-RR-10-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-10

, RECOVERY ORGANIZATION'S REC 0VERY MANAGER ,

I. PURPOSE The purpose of this procedure is to detail assignment and responsi-bilities of personnel in the Recovery Organization filling the position of Recovery Manager. -

II. PREREQUISITE Develops a long term recovery plan and' schedule in cooperation with the Advisory Support Group and the Recovery Organization Managers /

Coordinators.

III. PRECAUTIONS None I

V. PROCEDURE

Upon activation of the Recovery Organization, those individuals assigned to the position of Recovery Manager shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

(

  • ISSUED FEB 1 1983 R2 2-01-83

EPIP-RR-10-2 Fcrt Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-10 APPENDIX 1 REC 0VERY MANAGER A. Personnel Assignment Primary (Job Title)

Divi:; ion Manager - Production Operations Alternate (Job Title) ,

Division Manager - Electric Operations B. Reporting Location Emergency Operations Facility C. Reports To Assistant General Manager - With responsibility of Production Operations {

D. Supervises / Coordinates

1. Technical Support Manager 2.. Plant Operations Manager
3. Manager of Waste Management
4. tesign and Construction Manager
5. Emergency Coordinator
6. Administrative Logistics Manager
7. Scheduling / Planning Manager 8 Advisory Support Coordinator
9. Media Release Center Director E. Primary Responsibility l

To ove. all recovery efforts following the District management's reques*

  • assistance (non-emergency action levels) or the declara-tion of Site Area Emergency" or " General" emergency.

F. Basic Duties

1. Upon notification of -an emergency at Fort Calhoun, the primary and/or alternate Recovery Manager designate (s) will report to their assigned location listed in section B of this appendix.
2. Recovery Organization activation will be initiated by the Recovery -

Manager for a Site Area or General Emergency. Full activation for an Alert is with the concurrence of the EDO, Plant Operations Manager and Emergency Coordinator. In all cases the Recovery Manager will notify the Administrative Logistics Manager to begin activation in acco:-dance with implementing procedure EPIP-RR-1.

ISSilED P2 2-01-83 FEB 1 1983

EPIP-RR-10-3 F. Basic Duties (Continu;d)

3. Ensures that the Recovery Organization is functioning and has ab-sorbed the Emergency Team and Technical Augmentation Staff to duties within the Recovery Organization, either in their same or different capacities. '-
4. Assumes duties from the Emergency Duty Officer and terminates that position.
5. He has the overall responsibility for seeing that the Recovery Organization is in place through a personnel accountability conducted by his Recovery Management Staff.
6. The Recovery Manager has the authority with the concurrence of the Emergency Coordinator and Plant Operations Manager to tailor the Recovery Organization based on the severity of the accident. This may require him to alter key assignments within the Recovery Organization.
7. Provides approval for either upgrading or downgrading the emergency classification.
8. Reports to OPPD Corporate Management on all functions directly relat-ing to the recovery effort.
9. Holds daily meetings with the Recovery Management staff and Advisory Support Group. Here he can interface with Senior NRC, FEMA, Vendor and A/E Representatives onsite. ,
10. Provides approval and assures transmittal of any recommendations to state and local governments regarding protective and/or evacuation measures.
11. Maintain exchange of non-technical infonnation with state and local EOC's in order to keep them appraised of general actions in progress.
12. Ensures that accurate and timely plant status information is pro-vided through the EOF Information Specialist to the Media Release Center for distribution to the public.
13. Coordinates with the Media Release Center Director to make himself available for press conferences to address technical questions and provides information on official judgements made with regard to powar plant recovery operations.
14. Provides authorization for onsite and offsite re-entry into ,

previously evacuated areas in concurrence with the Emergency Coordinator.

~

ISSilED FEB 1 1983 R2 2-01-83

k EPIP-RR-10-4 F. Basic Duties (Continu2d)

15. Provides final approval for the use of fifty (50) emergency purchase orders (FCE 201 through FCE 250) allotted to the Recovery Organization during the. initial phase of their operation. (Materials Management's " Emergency Purchase Procedure for Fort Calhoun Nuclear Station" is contained in Attachment 1 of this procedure.)
16. Develops a long term recovery plan and schedule in cooperation .

with the Advisory' Support Group and the Recovery Organization Managers / Coordinators.

17. Requests additional purchase orders as required from th; Admini-stration Logistics Manager in accordance with implementing procedure EPIP-RR-9.
18. Requests Federal assistance to provide additional resources as deemed necessary.
19. Provide final approval with the concurrence of Plant Operations Manager and Emergency Coordinator regarding relaxation / curtailment of Recovery Organization duties.

~

l ISSllED FEB 1 1983 R2 2-01-83

. EPIP-RR-10-5 As  !

OM AH A PUBLIC POWER DISTRICT DATE: June 27,1980 FMw Wayne Steele _e---

To. Bill Jones qhfiII i f l l l

ylt? l s ] . , ,, ,

ATTACHMENT 1 RE: Materials Management's Emergency Purchasing Procedure for Fort Calhoun Nuclear Station A. Materials Management has designated a special block of 50 purchase order numbers (attached) to be used during official declared emergencies.

B. Recommend these purchase order numbers be safeguarded at Fort Calhoun for use by the Recovery Organization. Re-sponsibility for their use resides with the recovery mana-ger or his designated representative.

r C. The Recovery Organization must notify purchasing, by second normal duty day, after the issuance of special order numbers.

The following information is required:

' ~

1. Order number used 2.. Requisition number assigned to Purchase Order
3. Vendor name and address
4. Material or service required
5. Quoted oi estimated dollar amount expended E. Additional emergency order numbers will be authorized upon re-quest fron. recovery manager.
  • /

ba u WS:md -

Attachment ISSUED FEB 1 1983 R2 2-01-83

. EPZP-RR-10-6 FORT CALHOUN EMERGENCY RECOVERY PURCHASE ORDER REGISTER THESE ORDERS ARE TO BE USED ONLY DURING A DECLARED PLANT EMERGENCY ,

PURCHASE ORDER No. ISSUED DATE AUTHORIZED BY VENDOR NAME FCE 201 '

FCE 202 FCE 203 FCE 204 FCE 205 -

FCE 206 FCE 207 FCE 208 -

FCE 209 FCE 210 FCE 211 FCE 212 FCE 213 FCE 214 FCE 215 FCE 216 FCE 217 FCE__218 FCE 219 FCE 220 ISSUED FEB 1 1983 R2 2-01-83

EPIP-RR-10-7 FORT CALHOUN EMERGENCY RECOVERY PURCHASE ORDER REGISTER THESE ORDERS ARE TO BE USED ONLY DURING A DECLARED PLANT EMERGENCY -

PURCHASE ORDER No. ISSUED DATE AUTHORIZED BY VENDOR NAME FCE 221 FCE 222 FCE 223 FCE 224 FCE 225 FCE 226 FCE 227 FCE 228 FCE 229 FCE 230 FCE 231 FCE 232 FCE 233 FCE 234 FCE 235 -

FCE 236 -

ISSUED FEB 1 1983 R2 2-01-83

EPIP-RR-10-8 FORT CALHOUN EMERGENCY RECOVERY PURCHASE ORDER REGISTER THESE ORDERS ARE TO BE USED ONLY DURING A DECLARED PLANT EMERGENCY PURCHASE ORDER No. ISSUED DATE AUTHORIZED BY VENDOR NAME FCE 237 '

FCE 238 FCE 239 FCE 240 FCE 241 FCE 242 FCE 243 FCE 244 FCE 245 FCE 246 -

FCE 247 FCE 248 -

FCE 249 FCE 250 ISSUED FEB 1 1983 R2 2-01-83

EPZP-RR-11-1 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure EPIP-RR-11 RECOVERY ORGANIZATION'S TECHNICAL SUPPORT MANAGER ,

I. PURPOSE The purpose of this procedure is to detail assignment and responsi-bilities of personnel in the Recovery Organization filling the ~

position of Technical Support Manager.

II. PREREQUISITE Both primary and alternate individuals filling the position of Technical Support Manager have been fully trained and are aware of their duties.and responsibilities.

III. PRECAUTIONS None I

V. PROCEDURE

( _

Upon activation of the Recovery Organization, those individuals assigned to the position of Technical Support Manager shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

S ISSUED FEB 11983 R1 2-01-83

EPIP-RR-11-2 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure EPIP-RR-11 APPENDIX 1 TECHNICAL SUPPORT MANAGER A. Personnel As'signment Primary (Job Title)

Section Manager - Technical Services Alternate (Job Title)

Manager - Reactor and Computer Technical Services B. Reporting Location Technical Support Center C. Reports To Recovery Manager D. Supervises / Coordinates

1. Licensing Administrator
2. Core Physics Coordinator
3. Systems Analysis / Procedure Support Coordinator
4. Shift Support Coordinator
5. Instrument and Control Support Coordinator
6. Security and Technical Support Administrative Supervisor ,

E. Primary Responsibility

1. To analyze and develop plans and procedures necessary to support operations personnel in performing a safe plant shutdown with minimal effects on the public health and safety.
2. To provide a central facility for the collection, retention and transmittal of plant and local environmental parameters.

F. Basic Duties

~

1. Upon notification of Recovery Organization activation, the primary and/or alternate Technical Support Manager designate (s) will report to the assigned location listed in section B of this appendix.

ISSUED FEB 1 1983 R1 2-01-83

EPIP-RR-11-3 i

F. Basic Duties (Continued)

2. Prior to or upon reporting to the assigned location, he shall notify both the primary and alternate designate (s) for the Recovery Organi-

. zation positions listed in section D of this appendix. He shall inform these individuals of the emergency action 'evel and either keep them in standby or have them report to their assigned locations. Notification of Recovery Organization personnel is accomplished in accordance with implementing procedure EPIP-RR-1.

3. He is responsible for ensuring that the Technical Support Group is fully activated through personnel accountability. He in turn will inform the Recovery Manager of the manpower available to the Technical Support Group. Accountability is accomplished by either performing a roll . call or maintaining a sign in log. l

~

4. Upon discussion with the Recovery Manager, the Technical Support Manager will determine to what extent his group's involvement will be and establish a schedule of working hours to support the recovery effort.
5. He will provide support to the Recovery Organization by exercising his control in the following areas:
a. Provides for the timely collection, retention and transmittal l

. of plant informt. tion to the Emergency Response Organization.

b. Provides for the timely resolution of NRC questions regarding abnormal operation and/or changes to Technical Specifications and FSAR's in accordance with implementing procedure EPIP-RR-5.
c. Assures the development of emergency plans and procedures regarding abnormal systems or equipment operations.
d. Assures adequate technical and clerical personnel are available to support the Technical Support and Plant Operations Group.
e. Oversees instrument and control modification and ensure adequate core surveillance and protection is available.
f. Ensures adequate office space, equipment, supplies, and communications equipment are readily availab'e to the Technical Support Group.
6. Coordinates with the Recovery Manager and Emergency Coordinator '

regarding the relaxation / curtailment of Recovery Organization l duties.

l l

ISSUED FEB 1 1983 R1 2-01-83

EPIP-ER-12-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-12 REC 0VERY ORGANIZATION'S LICENSING ADMINISTRATOR I. PURPOSE .

The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Licensing Administrator.

II. PREREQUISITE Both primary and alternate individuals filling the position of Licensing Administrator have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE Upon activation of the Recovery Organization, those individuals assigned to the position of Licensing Administrator shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

ISSUED FEB 1 1983 R1 2-01-83

EPZP-RR-12-2 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-12 APPENDIX 1 LICENSING ADMINISTRATOR A. Personnel Assignment Primary (Job Title)

Licensing Administrator Alternate (Job Title)

Licensing Engineer B. Reporting Location Emergency Operations Facility ,,

C. Reports To Technical Support Manager D. Supervises / Coordinates N/A E. Primary Responsibility l

Resolves as necessary with NRC representatives questions regarding l

Technical Specifications, FSAR's, abnormal operating modes and other licensing requirements.

F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate Licensing Administrator designate (s) will report to their assigned location listed in Section B of this Appendix and inform the Technical Support Manager of their/his presence.
2. If required, be prepared to provide around-the-clock support.
3. He will coordinate with NRC representatives to resolve questions in a timely manner concerning FSAR and Technical Specification -

l amendments with regard to existing plant conditions in accordance l with the implementing procedure EPIP-RR-5.

4. Coordinate with NRC representatives to resolve in a timely manner, license requirements associated with proposed abnormal operating i modes or plant modifications in accordance with implementing pro-l cedure EPIP-RR-4.

I SUUwbw R1 2-01-83 FEB 1 1983 l

l l

, e .

s EPZP-RR-12-3

5. Perform safety analysis to support licensing submittals.
6. Will respond to non-compliances discovered through flRC inspection of i the utilities nuclear facility. I s

ISSUED R1 2-01-83 FEB 1 1983

EPIP-RR-13-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Precedure EPIP-RR-13 RECOVERY ORGANIZATION'S CORE PHYSICS COORDINATOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Core Physics Coordinator.

II. PREREOUISITE Both primary and alternate individuals filling the position of Core Physics Coordinator have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE Upon activation of the Recovery Organization, those individuals assigned to the position of Core Physics Coordinator shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

ISSUED FEB 1 583 R1 2-01-83

EPIP-RR-13-2 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-13 APPENDIX 1 CORE PHYSICS C0ORDINATOR A. ' Personnel Assianment

- Primary (Job Title)

Reactor Engineer Alternate (Job Title)

Supervisor - Reactor Physics B. Reporting Location Technical Support Center C. Report To Technical Support Manager D. Supervises / Coordinates Reactor and Computer Technical Services Department E. Primary Responsibility Analyzes core paramete'rs and develop guidance for plant operations personnel with regard to core protection.

F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate Core Physics Coordinator designate (s) will report i to their assigned location listed in Section B of this appendix and l inform the Technical Support Manager of their/his presence.

l 2. Call out his staff detailed in Section D of this appendix and have I them report to their normally assigned department to support his on-site activities.

3. Organizes staff personnel and establishes a schedule of working hours to support around-the-clock operations. -
4. Report the department's manpower status to the Technical Support j Manager.

1 ISSUED FEB 1 393 R1 2-01-83

m EPIP-RR-13-3 F. Basic Duties (Continued)

5. Coordinates all activities of the Reactor and Computer Technical Services Department needed to support the recovery operation and ensures safe core conditions.
6. Analyzes core parameters and provides an update on t.he condition of the core
7. Review proposed nomal and out-of-nomal plant operations to determine possible changes in core conditions.
8. Develops and proposes recommendations to plant operations that would ensure safer core conditions.

I .

i l

r i ISSl!ED l

FEB 11983 R1 2-01-83

_~ __ . _ _ _ _ . . . _ . _ - . _ - _ _ _ __..____ __ __ - . . _ . . - _ _ .

EPIP-RR-14-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-14 RECOVERY ORGANIZATION'S SYSTEMS ANALYSIS / PROCEDURE SUPPORT C0ORDINATOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Systems Analysis / Procedure Sa'pport Coordinator.

II. PRERE0VISITE Both primary and alternate individuals filling the position of' Systems Analysis / Procedure Support Coordinator have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS

~

None IV. PROCEDURE Upon activation of the Recovery Organization, those individuals assigned to the position of Systems Analysis / Procedure Support

. Coordinator shall carry out .this assignment as detailed in Appendix 1 of this implementing procedure.

[

ISSUED FEB 1 1983 R1 2-01-83

s EPIP-RR-14-2

- Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-14 APPENDIX 1 SYSTEMS ANALYSIS / PROCEDURE JJPPORT COORDINATOR Personnel Assignment A.

Primary (Job Title)

Manager - Operations and Technical Services Alternate (Job Title)

Plant Engineer - Fort Calhoun B. Reporting Location Technical Support Center -

C. Reports To .

Technical Support Manager D. Supervises / Coordinates ,

Operations Technical Suppcrt Services Department

~

E. Primary Responsibility Coordinates the Operations Technical Support personnel in analyzing system problems and developing out-of-normal plans and procedures to support system operation.

F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate Systems Analysis / Procedure Support Coordinator designate (s) will report to their assigned location listed in Section B of this appendix and ir. form the Technical Support Manager of their/his presence.
2. Organizes the staff detailed in Section 0 of this appendix and have them report to their normally ast.igned department in order to support on-site activities.
3. Organizes staff personnel and establishes a schedule of working hours to support around-the-clock operation. -
4. Report the department's manpower status to the Technical Support Manager.

ISSUED FEB 11983 R1 2-01-83

~ ~

F. Basic Duties (Continued)

5. Analyze problems involving degraded plant systems and equipm'ent to determine if modifications or additional equipment may be in order.
6. Interface with plant operations and develops out-of-nomal plans and l procedures to support any system modifications or equipment additions that were made.

l l

l l

ISSUED FEB 1 1983 R1 2-01-83

. s EPIP-RR-15-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure  !

EPIP-RR-15 REC 0VERY ORGANIZATION'S SHIFT SUPPORT COORDINATOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Shift Support Coordinator.

II. PREREQUISITE Both primary and alternate individuals filling the position of Shift Support Coordinator have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE I Upon activation of the Recovery Organization, those individuals assigned to the position of Shift Support Coordinator shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

l88 LIP FEB u

1 1983 R1 2-01-83

EPIP-RR-15-2  :

Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure EPIP-RR-15 APPENDIX 1 SHIFT SUPPORT C0ORDINATOR A. Personnel Assignment Primary (Job Title)

(Off) Shift Technical Advisor Alternate (Job Title)

(Off) Shift Technical Advisor B. Reoorting location Technical Support Center C. Reports To_

Technical Support Manager D. Supervises / Coordinates All support personnel assigned to the plant operations group.

E. Primary Responsibility Coo.dinates with the Operations Shift Supervisor for the effective utilization of (off) shift support personnel as assigned to the Plant Operations Group.

.F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate Shift Support Coordinator designate (s) will report to their assigned location listed in Section B of this appendix and inform the Technical Support Manager of their/his presence.
2. Organizes staff personnel and establishes a schedule of working hours to support around-the-clock operations.
3. Report the department's manpower status to the Technical Support Manager.
4. Provides assostance for system valve alignment and equipment operations.

ISSUED R1 2-01-83 FEB 1 3993

EPIP-RR-15-3 F. Basic Duties (Continued) ,

5. Support the plant operations group by assisting other members of the Recovery Organization.

. 6. Provides interface with the Technical Support Group and other members of the Emergency Response Organization.

7. Assimilates and provide plant information required by the personnel assigned as data collectors.
8. Provide the necessary support to the plant operations group for moaitoring plant parametcrs and analysis of plant conditions.

9 ISSUED FEB 119g3 R1 2-01-83

EPIP-RR-16-1 Fort Calhoun Station Unit No. 1 Emerg:ncy Plan Implementing Procedure EPIP-RR-16 RECOVERY. ORGANIZATION'S INSTRUMENT AND CONTROL SUPPORT COORDINATOR I. PURPOSE The purpose of this procedure is to detail assignment and rasponsibilities of personnel in the Recovery Organization filling the position of Instrument and Control Support Coordinator.

II. PREREQUISITE Both primary and alternate individuals filling the position of Instrument and Control Support Coordinator have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE Upon activation of the Recovery Organization, those individuals assigned to the position of Instrument and Control Support-Coordinator shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

{

(

i l lSSUED FEB 1 1983 R1 2-01-83

EPIP-RR-16-2 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure EPIP-RR-16 APPENDIX 1 INSTRUMENT AND CONTROL SUPP0RT C0ORDINATOR A. Personnel Assignment Primary (Job Title)

Supervisor - I and C and Electrical Technical Services Alternate (Job Title)

Manager - GSE Electrical Engineering l B. Reporting Location Technical Support Center C. Reports To Technical Support Manager D. Supervises / Coordinates Operations Technical Support Services Department E. Primary Responsibilities

1. Analyzes instrument and control probias and develops onssible ,

solutions.

2. Designs and coordinates any modifications to existing instrument and control systems.

F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate Instrument and Control Support Coordinator designate (s) will report to their assigned location listed in Section B of this appendix and inform the Technical Support Manager of their/his presence.
2. Calls out his staff detailed in Section D of this appendix and have l

them report to their normally assigned deportment in order to support on-site activities. ,

3. Organizes staff personnel and establishes a schedule of working hours to support around-the-clock operations.

!SSUED

m- -

EPIP-RR-16-3 F. Basic Duties (Continu:d)

4. Reports the manpower status to the Technical Support Manager.
5. Coordinates all activities of the I and C and Electrical Engineers needed to support the recovery effort. -l
6. Oversees the investigation of all instrument and control problems I and review problem solving alternatives developed by his department as to their adequacy and workability.
7. Develops and proposes to the plant operations group, an alternative l means of monitoring and controlling plant parameters.
8. Oversees the design of'and coordinate any modifications to existing l facilities and provide the technical support for startup services to ensure continued control and monitoring of plant parameters.
9. Coordinates with the Design and Construction Manager where major l

instrument and control modifications are required.

10. Provides the technical expertise in the I and C and electrical engineering field for response to questions and inquiries from various regulatory agencies.

ISSUED FEB 1 1983

'31 2-01-?3

EPIP-RR-17-1 l Fort Calhoun Station Unit No. 1 i Emergency Plan Implementing Procedure '

EPIP-RR-17 REC 0VERY ORGANIZATION'S SECURITY AND TECHNICAL SUPPORT ADMINISTRATIVE SUPERVISOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Security and Technical Support Administrative Supervisor.

II. PREREQUISITE Both primary and alternate individuals filling the position of Security and Technical Support Administrative Supervisor have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE

~

Upon activation of the Recovery Organization, those individuals

(

assigned to the position of Security and Technical Support Administrative Supervisor shall carry out this assignment as detailed in App =ndix 1 of this implementing procedure.

~

e ISSilED FEB 1 1983 R1 2-01-83

6 EF IP-RR-17-2 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-17 .

APPENDIX 1 SECURITY AND-TECHNICAL SUPPORT ADMINISTRATIVE SUPERVISOR

. A. Personnel Assignment Primary (Job Title)

Supervisor - Fort Calhoun Station Administrative and Security Services l Alternate (Job Title)

Training Coordinator B. Reporting Location Technical Support Center C. Reports To Technical Support Manager D. Supervises / Coordinates

, 1. Security and Administrative personnel

! 2. Members of the Emergency Team Tag Nos.17 and 22 E. Primary Responsibilities

1. Data Coordinator
2. Security Coordinator
3. Administrative Coordinator F. Basic Duties l

l 1. Upon notification of Recoveiy Organization activation, the primary I and/or alternate Security and Technical Support Administrative Supervisor designate (s) will report to their assigned location listed in Section B of this appendix and inform the Technical Support Manager of their/his presence.

I

2. Call out his staff detailed in Section D of this appendix and have them report to their nomally assigned department in order to support on-site activites. ,

! ISSUED FEB 1 1983 R1 2-01-83

o EPlP-RR-17-3 F. Basic Duties (Continued)

3. Organizes staff personnel and establishes a schedule of working hours to support around-the-clock operations.
4. Reports the manpower status to the Technical Support Manager.
5. Coordinate Emergency Team personnel assigned Tags 17 and 22, and incorporate these individuals into Recovery Organization. ,
6. Assign personnel to control the accumulation, retention and retrieval of plant environmental parameters in cooperation with the l Shift Support Coordinator and Emergency Coordinator.

l 7. Provides automatically and upon request, infomation needed by members of the emergency response organization.

l

8. Will serve as single point interface for the aquisition of plant data to ensure minimum interference with shift operations personnel.

This is accomplished through interfacing with the Shift Support Coordinator.

9. ' Directs nomal in-plant security personnel in maintaining the plant security system in support of the recovery effort.

I

10. Provides in-plant security personnel at various locations to support j the recovery effort.
11. Provides clerical support (e.g. typing, filing, office equipment operation) to all areas within the Technical and Operation Support l Groups.

1

12. Coordinates with the Administrative Logistics Group in order to l obtain skilled personnel needed to support the various Technical and l

Operations Support Group functions.

l l

13. Coordinates with the Administrative Logistics Group in order to

! obtain additional work space, office supplies, communications and office equipment.

14. Maintains accountability of plant personnel.

ar l lSSUED FEB 11983 R1 2-01-83

EPIP-RR-18-1 Fort Calhoun Station Unit No.1 Energency Plan Implementing Procedure '

EPIP-RR-18 RECOVERY ORGANIZATION'S l

PLANT OPERATIONS MANAGER l

l I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the ' Recovery Organization filling the position of Plant Operations Manager.

II. PREREQUISITE Both primary and alternate individuals filling the position of Plant Operations Manager have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None sIV . PROCEDURE Upon activation of the Recovery Organization, those individuals

,- assigned to the position of Plant Operations Manager shall carry out

( this assignment as detailed in Appendix 1 of this implementing procedure.

ISSUED FEB 1 1983 R1 2-01-83

EPIP-RR-16-2 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-18.

APPENDIX 1 PLANT OPERATIONS MANAGER A. Personnel Assignment .

Primary (Job Title)

Manager - Fort Calhoun Station Alternate (Job Title)

Section Manager - Operations B. Reporting Location Operations Support Center C. Reports To Recovery Manager D. Supervises / Coordinates

1. Shift Operations Supervisor
2. Instrument and Control Supervisor
3. Maintenance / Quality Control Supervisor
4. Health Physics / Chemistry Supervisor
5. Procedure / Training Supervisor ~

E. Primary Responsibility Implements the in-plant recovery activites with tha objective of taking the plant to a safe shutdown condition in a manner which minimizes the effect to the health and safety of the public.

F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate Plant Operations Manager designate (s) will report to the assigned location listed in Section B of this appendix.
2. Prior to or upon reporting to the assigned location he shall notify both the primary and alternate designate (s) for the Recovery Organi- -

zation positions listed in Section D of this appendix. He shall j infonn these individuals of the emergency action level declared and i either keep them in standby or have them report to their assigned l ocations . Activation is accanplished in accordance with imple-menting procedure EPIP-RR-1.

ISSUED FEB 1 1983 R1 2-01-83

't EPIP-RR-18-3 F. Basic Duties (Continued)

3. Is responsible for ensuri.ng that th r Operations Support Group is l fully activated through personnel accountability. He in turn will infom the Recovery Manager cf the manpower available to the Plant Operations Group. Accountability is accomplished by maintaining a sign-in log of reporting personnel.
4. Upon determing the extent of Operations Support Group's involvement, he will establish a schedule of working hours to support an around-the-clock effort.
5. Oversees the implementation of normal and emergency procedures l

~

needed to being the plant to a safe shutdown.

6. Oversees the in-plant maintenance and I and C activities required to l support the recovery effort.
7. Has overall responsibility for the training requirements of the Recovery Organization personnel during emergencies.
8. Decemines the need for out-of-nomal and emergency procedures, supervises the development and implementation of these procedures.
9. Has overall responsibility for all in-plant health physics l activites, including the sampling and ALARA programs.
10. Provides infomation and. recommendations to the Recovery Manager concerning future operations that could affect the plant or the l envi ronment. ,
11. Coordinates with the Administrative Logistics Manager, to request the various services that may be neede~d.
12. Provides concurrence in cooperation with the Recovery Manager and Emergency Coordinator regarding relaxation / curtailment of Recovery Organization duties.

1 I

ISSUED FEB 1 1983 R1 2-01-83

EPIP-RR-19-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-19 RECOVERY ORGANIZATION'S SHIFT OPERATIONS SUPERVISOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Shift Operations Supervisor.

II. PREREQUISITE Both primary and alternate individuals filling the position of Shift Operations Supervisor have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE

( Upon activation of the Recovery Organization, those individuals assigned to the position of Shift Operations Supervisor shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

l 1

ISSUED FEB 11983 R1 2-01-83

EPIP-RR-19-2 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure EPIP-RR-19 APPENDIX 1 SHIFT OPERATIONS SUPERVISOR A. Personnel Assignment Primary (Job Title)

Supervisor Operations - Fort Calhoun Alternate (Job Title)

Supervisor Technical - Fort Calhoun B. Reporting Location Operations Support Center C. Reports To Plant Operations Manager D. Supervises / Coordinates

1. Normal Plant Operations personnel and the Emergency Resp nse

. 2. Organization shift support personnel. -

E. Primary Responsibility Responsible for the safe operation of the plant. This will require him to implement normal and emergency procedures and instructions i to bring the plant to a safe shutdown.

F. Basic Duties l

1. Upon notification of Recovery Organization activation, the primary and/or alternate Shift Operations Supervisor designate (s) will
  • report to their assigned location listed in Section B of this appendix and inform the Plant Operations Manager of their/his presence.
2. Call out his staff detailed in Section D of this apoendix and have -

them report to the Operation Support Center in order to support on-site activities.

3. Organizes staff personnel and establishes a schedule of working hours to support around-the-clock operations.

ISSUED FEB 1 1983 R1 2-01-83

EPIP-RR-19-3 F. Basic Duties (Continued)

4. Report the manpower status to the Plant Operations Manager.
5. Direct the activities for personnel in the Operations and Emergency Response Organization.
6. Ensures that plant operations personel are in compliance witn all plant procedures, directives, technical specifications and emergency plans.
7. Responsible for monitoring plant parameters and conditions.
8. Responsible for system valve alignment and equipment operations.
9. Ensure proper interface with the Operations Group and other members l of the Emergency Response Organization in support of the recovery operation.
10. Provides information input to the Shift Support Coordinator who in turn supplies this information to the proper individuals.
11. Provides inputs to Plant Operations Manager regarding the current status of the recovery operation.

l l

l l

1 l

1 ISSUED R1 2-01-83 FEB 115EG l

yw - - - m --e " - -m

EPIP-RR-20-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure 1 EPIP-RR-20 REC 0VERY ORGANIZATION'S INSTRUMENT AND CONTROL SUPERVISOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Instrument and Control Supervisor.

II. PREREQUISITE Both primary and alternate individuals filling the position of Instranent ar.d Control Supervisor have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE ,

(- Upon activation of the Recovery Organization, those individuals assigned to the position of Instrument and Control Supervisor shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

f e

ISSE3 FEB 1 1993 R1 2-01-83

EPIP-RR-20-2 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure EPIP-RR-20 APPENDIX 1

, INSTRUMENT AND CONTROL SUPERVISOR A. Personnel Assignment Primary (Job Title) ,

Supervisor - I and C and Electrical Field Maintenance Alternate (Job Title)

Instrument and Control Engineer B. Reporting Location Technical Support Center C. Reports To Plant Operations Manager

/ D. Supervises / Coordinates

. 1. In-house Instrument and Control Technicians

2. I and C and Electrical Technical Augmentation Staff E. Primary Responsibility Responsible for the repair and installation of modifications to existing instrument and control equipment in support of the recovery effort.

F. Basic Duties I

1. Upon notification of Recovery Organization activation, the primary and/or alternate Instrument and Control Supervisor designate (s) will report to their assigned location listed in Section B of this appendix and inform the Plant Operations Manager of their/his presence.

l 2. Call out his staff detailed in Section D of this appendix and have -

i them report to their normally assigned department in order to I

support onsite activities.

3. Organizes staff personnel and establishes a schedule of working hours to support around-the-clock operations.

R1 2-01-83 l FEB 1 1983 l

~ j l

EPIP-RR-20-3 i

i F. Basic Duties (Continued)

4. Report the manpower status to the. Plant Operations Manager.
5. Coordinate the Techn'. cal Augmentation Staff's two (2) Electricians ,

and one (1) I and C Technician and incorporates these individuals '

into the Recovery Organization.

6. Direct instrument and control technicians in the repair and maintenance of existing instrument and c~ o ntrol and electrical equipment to orginal specifications in order to be in compliance .

with the Technical Specifications and support the recovery effort. I

7. Direct instrument and control personnel in the installation of modifications to existing equipment in support of the recovery effort.

l

)

1 ISSUED FEB 1 1983 R1 2-01-83 I i

l l

EPIP-RR-21-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-21 REC 0VERY ORGANIZATION'S MAINTENANCE / QUALITY CONTROL SUPERVISOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Maintenance / Quality Control Supervisor.

II. PREREQUISITE Both primary and alternate individuals filling the position of Maintenance / Quality Control Supervisor have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS s None IV. PROCEDURE -

( Upon activation of the Recovery Organization, those individuals

  • assigned to the position of Maintenance / Quality Control Supervisor shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

ISSUED FEB 1 1983 R1 2-01-83

EPIP-RR-21-1 l

. Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure EPIP-RR-21 APPENDIX 1 MAINTENANCE / QUALITY CONTROL SUPERVISOR A. Personnel Assignment Primary (Job Title)

Supervisor Maintenance - Fort Calhoun Alternate (Job Title)

Supervisor Field Maintenance - Fort Calhoun B. Reporting Location Technical Support Center C. Reports To Plant Operations Manager D. Supervises / Coordinates

(

1. Fort Calhoun Maintenance Staff l
2. Maintenance /QC Staff
3. Mechanical Maintenance Technical Augmentation Staff E. Primary Responsibility Responsible for the maintenance, repair, installation of modifications and quality control on existing equipment not under the cognizance of the Design and Construction Group.

F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate Maintenance / Quality Control Supervisor designate (s) will rep' ort to their assigned location listed in Section 8 of this I
appendix and infonn the Plant Operations Manager of their/his presence.
2. Calls out the staff detailed in Section D of this appendix and have -l them report to their normally assigned department in order to support on-site activities.

l

3. Organizes staff personnel and establishes a schedela of working j hours to support around-the-clock operations.

ISSllED FEB 1 1983 R1 2-01-83 l

EPIP-RR-21-3 F. Basic Duties (Continued)

4. Report the manpower status to the Plant Operations Manager.
5. Coordinates the Technical Augmentation Staff's one (1) Machinist and one (1) General Maintenance Technician and incorporates these individuals into the Recovery Organization.
6. Directs in-house maintenance personnel in the repair and maintenance of existing equipment to original specifications in order to be in, compliance with the Technical Specifications and support the recovery effort.
7. Ensures that documentation of all maintenance activities is maintained.
8. Direct in-house maintenance p'ersonnel in the installation of modifications to existing equipment in support of the recovery effort.
9. Assign in-house QC inspectors to provide the quality control needed to support in-house maintenance activities.

=

=

ISSilED FEB 1 1983 R1 2-01-83

l EPIP-RR-22  !

l l

Fort Calhoun Station Unit No.1 Emergency Plan Impleme'nting Procedure CPIP-RR-22 RECOVERY' ORGANIZATION' S HEALTH PHYSICS / CHEMISTRY SUPERVISOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in thn Recovery Organization filling the position of Health Physics / Chemistry Supervisor.

II. PREREQUISITE Both primary and alternate individuals filling the position of Health Physics / Chemistry Supervisor have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE Upon activation of the Recovery Organization, those individuals assigned to the position of Health Physics / Chemistry Supervisor shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

l l

l ISSUED FEB 1 1383 R1 2-01-83

EPIP-RR-22-2 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-22 APPENDIX 1 HEALTH PHYSICS / CHEMISTRY SUPERVISOR A. Personnel Assignment .

Primary (Job Title)

Supervisor - Chemistry and Radiation Protection l Alternate (Job Title)

Plant Health Physicist  !

B. Reporting Location Technical Support Center C. Reports To Plant Operations Manager D. Supervises / Coordinates

1. Emergency Re-entry Team l
2. Plant Health Physics / Chemistry personnel

. 3. Health Physics and Radiochemistry Technical Augmentation Staff -

E. Primary Responsibility l

Directs inhouse Health Physics / Chemistry personnel in collection of onsite radiation / chemical data, dose assessment, and radiation protection programs.

F. Basic Duties I

. 1. Upon notification of Recovery Organization activation, the primary l and/or alternate Health Physics / Chemistry Supervisor designate (s) l will report to their assigned location listed in Section B of this appendix and inform the Plant Operations Manager of their/his presence.

2. Calls out the staff detailed in Section D of this appendix and has them report to their normally assigned department in order to

.l support on-site activities.

3. Organizes staff personnel and establishes a schedule of working hours to support around-the-clock operations.

ISSUED FEB 119g3 R1 2-01-83

. . 8 EPIP-RR-22-3 F. Basic Duties (Continued)

4. Report tne manpower status to the Plant Operations Manager.
5. Coordinate the Technical Augmentation Staff's one (1) Access Control Technician, one (1) Radiochemistry Technician and the Emergency Team personnel. assigned to Tags 11, 12, 13, 14, 18, 19, 19A, 21, 21A, and incorporate these individuals into the Recovery Organization.
6. Ensures the Recovery Organization training in the area of radiation l and respiratory protection.
7. Provide whole body counts for reporting and terminating personnel to determine MPC body burdens.
8. Support the recovery operation by providing all necessary health physics coverage.
9. Develops plans, procedures and methods for keeping radiation l exposure of recovery personnel as low as reasonably achievable (ALARA).
10. Coordinates with the Dosimetry Coordinator and ensures personnel l TLD's are read, and an updated computer listing provided.
11. Ensures the optimum operation of all ' radiation / chemistry monitors, ,

instruments and equipment.

~ 12. Ensures that chemical group operating records are maintained. l

13. Develops, implements and performs various analyses to provide l chemical control for all plant systems.
14. Coordinates controlled releases to the environment, and ensure compliance with federal and state regulations are met.
15. Assists in discussion of Radiological assessments with the Dose Assessment Coordinator to verify radioactive release data.

ISSUED E83 R1 2-01-83

EPIP-RR-23-1 Fort C.alhoun Station Unit No. 1

, Emergency Plan Implementing Procedure

. EPIP-RR-23 REC 0VERY ORGANIZATION'S PROCEDURE / TRAINING SUPERVISOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Procedure / Training Supervisor.

II. PREREQUISITE Both primary and alternate individuals filling the position of Procedure / Training Supervisor have been fully trained and are awars of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE Upon activation of the Recovery Organization, those individuals assigned to the position of Procedure / Training Supervisor shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

ISSIED FEB 1 1983 R1 2-01-83

EPiP-RR-23-2 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure EPIP-RR APPENDIX 1 PROCEDURE / TRAINING SUPERVISOR A. Personnel Assignment Primary (Job Title)

Training Supervisor Alternate (Job Title)

Training Coordinator B. Reporting Location Technical Support Center C. Reports To Plant Operations Manager .

D. Supervises / Coordinates -

Fort Calhoun - Training Department E. Primary Responsibilities (1) Coordinates the training requirements for all inhouse and contract personnel in support of the recovery effort.

(2) Developes out-of-normal operating and emergency procedures for plant operations personnel.

F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate Procedure / Training Supervisor designate (s) will report to their assigned location listed in section B of this appendix and inform the Plant Operations Mananger of their/his presence.

Calls cut the staff detailed in section D of this appendix and 2.

has them report to their normally assigned department in order to support on-site activities.

3. Organizes staff personnel and establishes a schedule of working hours to support around-the-clock operations.
4. Report the manpower status to the Plant Operations Manager.

R1 2-01-83 FEB 1 1983

~

C e

EPZP-RR-23-3 F. Basic Duties (Continued)

6. Fomulates, prepares, directs, administers and schedules the training l programs for recovery personnel du' ring emergencies to assure they are properly trained in nomal and out-of-nomal plant operation ,

and maintenance. .

6. Ensures that the recovery personnel are aware of safety and security l systems and procedures in accordance with the Nuclear Regulatory requirements.
7. Maintains the various training records in order to document the l Recovery Organization training.
8. Provides tae training equipment and facilities to effectively support }

the plant training needs. _

9. Re-writes existing operating and emergency procedures as required to l reflect existing accident conditions. -
10. Converts recovery plans into clear, concise, out-of-nomal operating l and emergency procedures for Plant Operations personnel.

R1 2-01-83 FEB 1 ;g93

~ ~

EPIP-RR-24-1 i

Emergency Plan Implementing Procedure EPIP-RR-24 REC 0VERY ORGANIZATION'S EMERGENCY C0ORDINATOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Emergency Coordinator.

II. PRERE0VISITE Both primary and alternate ~ individuals filling the position of Emergency Coordinator have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. ' PROCEDURE I

Upon activation of the Recovery Organization, those individuals assigned to the position of Emergency Coordinator shall carry out '

this assignment as detailed in Appendix 1 of this implementing procedure.

ISSUED FEB 1 1963 R1 2-01-83

EPIP-RR-24-2 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure EPIP-RR-24 APPENDIX 1 EMERGENCY C0ORDINATOR .

A. Personnel Assignment Primary (Job Title)

Manager - Radiological Health and Emergency Planning Alternate (Job Title)

Supervisor - Technical Services, Nuclear and Chemical Services B. Reporting Location Emergency Operations Facility C. Reports To Recovery Manager D. . Supervises / Coordinates

1. Dose Assessment Coordinator
2. Environmental Surveys and Analysis Coordinator
3. Radiochemical Analysis Coordinator 2
4. Dosimetry Coordinator
5. Site Representative E. Primary Responsibility Coordinates the Fort Calhoun Station energency response for offsite radiological assessments. Interfaces with the Recovery Manager and radiological governmental agencies for evaluation of data and recommends corrective actions.

F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate Emergency Coordinator designate (s) will report to -

the assigned location listed in section B of this appendix and inform the Recovery Manager of their/his presence.

2. Calls out the staff detailed in section D of this appendix and has them report to their assigned emergency stations in order to support on site activities. Notification is conducted in accordance with implementing procedure EPIP-RR-1.

f l

- W U) y~h,y R1 2-01-83 FEB 1 1983

EPIP-RR-24-3 I

F. ' Basic Duties (Continued)

3. Organizes his staff and est'ablishes a schedule of working hours to support around-the-clock operations.
4. Report his group's manpower status to the Recovery Manager.
5. Maintains control over personnel assembled at the Emergency Operations Facility.
6. Ensures that onsite and offsite environmental and radiological monitoring l teams are dispatched.
7. Establishes communications with the Technical Support Center and Operations Support Center and obtains information on accident conditions, radiological releases and prevailing meteorological conditions 7
8. Maintaines communications with designated offsite authorities and relate accident information necessary for these authorities to implement their emergency plans.
9. Interprets all radiological data and provide updates to the Technical Support Center, Operations Support Center, and offsite authorities.

Updates should include items such as projected radiological exposures, _env.ironmental survey results, recommended protective actions.

10. Provides for additional support upon request. This may range from additional radiological evaluations and equipment to providing medical assistance.
11. Receives any responding representatives from offsite emergency agencies and assist in their information and communications needs.
12. Ensures that personnel in the Emergency Operations Facility have adequate radiation protection considerations afforded them.
13. With the concurrence of the Recovery Manager, he will provide judgement on emergency radiation exposure doses for reentry operation based on guidelines set forth in Section K.1.1 of this Plan.
14. Provides input to Recovery Manager and Plant Operations Manager regarding relaxation / curtailment of Recovery Organization duties. _
15. Keeps the Site Representative informed of changing plant status, radiological conditions and recommended protective actions.

ISSUED etB R1 2-01-83 1 3983

~

EPIP-RR-25-1 Emergency Plan Implementing Procedure EPIP-RR-25 RECOVERY ORGANIZATION'S DOSE ASSESSMENT COORDINATOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Dose Assessment Coordinator.

II. PREREQUISITE Both primary and alternate individuals filling the position of Dose Assessment Coordinator have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE Upon activation of the Recovery Organization, those individuals

( assigned to the position of Dose Assessment Coordinator shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

l l

l l

lSSi!ED RI 2-01-83 FEB 1 1983

EPIP-RR-25-2 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure EPIP-RR-25 APPENDIX 1 DOSE ASSESSMENT COORDINATOR A. Personnel Assignment Primary (Job Title) ,

Senior Engineer - Technical Services Alternate (Job Title)

Health Physicist B. Reporting Location Emergency Operations Facility C. Reports To Emergency Coordinator

( D. Supervises / Coordinates N/A

~

E. Primary Responsibility Provides an estimated whole body and/or thyroid dose to the population at any selected point of interest.

F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary I

and/or alternate Dose Assessment Coordinator designate (s) will report to the assigned location listed in section B of this appendix and inform the Emergency Coordinator of their/his presence.

2. Interfaces with Emergency Team personnel assigned to Tags 4 and 4A.

Eme.gency Team personnel will be incorporated into the Recovery Organization when formed.

~

3. Be prepared to provide around-the-clock support.

( 4. Coordinates with the Security and Technical Support Administrative Supervisor and Health Physics / Chemistry Supervisor in order to assimilate and record all radiological and meteorological data.

SSUED- R1 2-01-83 FES 11983

EPIP-RR-25-3 F. Basic Duties (Continued)

5. Perform the following assessments in accordance with implementing, procedures EPIP-RR-6 and EPIP-EOF-6.

(a) ' Estimated airborne activity (any selected point)

(b) Estimated whole body dose (any selected point)

(c) Estimated thyroid dose (any selected point)

6. Provides updated maps and charts showing dose / dose rate estimates at j various points from the site.
7. Keeps the Emergency Coordinator informed of changing events.

l l

l l

i l

l l

ISSUED R1 2-01-83 1 FEB 1 1983

EPIP-RR-26-1 Fort Calhoun Station Unit No.1 Emergency Rlan Implementing Procedure EPIP-RR-26 REC 0VERY ORGANIZATION'S ENVIRONMENTAL SURVEY and ANALYSIS COORDINATOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Environmental Survey and Analysis Coordinator.

II. PREREQUISITE Both primary and alternate individuals filling the position of Environmental Survey and Analysis Coordinator have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE -

( Upon activation of the Recovery Organization, those individuals assigned to the position of Environmental Survey and Analysis Coordinator shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

I W

ISSUED R1 2-01-83 l

. EPIP-RR-26-2 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure

.EPIP-RR-26 APPENDIX 1 ENVIRONMENTAL SURVEY and ANALYSIS C0ORDINATOR .

A. Personnel /ssignment Primary (Job Title)

Manager - Ch'emical and Environmental Technical Services Alternate (Job Title)

Supervisor - Environmental Science B. Reporting Location Emergency Operations Facility C. Reports To Emergency Coordinator D. Supervises / Coordinates

(

Chemical and Environmental Technical Services Department E. Primary Responsibility Provides for environmental sampling and testing in areas affected by radiological releases to ensure public health and safety are not jeopardized.

F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate Environmental Survey and Analysis Coordinator designate (s) will report to their assigned location listed in section 8 of this appendix and inform the Emergency Coordinator of their/his presence.
2. Calls out his staff detailed in section D of this appendix and has them report to their normally assigned department in order -

to support on site activities.

3. Organizes staff personnel and establishes a schedule of working hours to support around-the-clock operations.
4. Report the department's manpower status to the Emergency Coordinator.

l@N! mW R1 2-01-83

s EPIP-RR-26-3 F. Basic Duties (Continued)

5. Oversees the collection of environment samples in affected areas and ensures that the analyses are being performed by contractor laboratories. Normal samples obtain"d are:

(a) Air Samples (b) Milk Samples c) TLD Badges -

(d)

( Surface Water Samples

6. Determines if the sample results are out-of-normal by using l previously analyzed routine samples as baseline.
7. Log all results and provide continuous up-to-date information to Emergency Coordinator.
8. Collects all onsite and offsite environmental TLD's and ensures they are transported to the Dosimetry Coordinator or contractor -

l aboratory.

l t

R1 2-01-83

EPIP-RR-27-1 I

Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-27 RECOVERY ORGANIZATION'S RADI0 CHEMICAL ANALYSIS COORDINATOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Radiochemical Analysis Coordinator.

II. PREREQUISITE Both primary and alternate individuals filling the position of Radiochemical Analysis Coordinator have been fully trained and are aware of their dutier and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE Upon activation of the Recovery Organization, those individuals assigned to the position .of Radiochemical Analysis Coordinator shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

!SSUED FEB 1 1983 R1 2-01-83

EPIP-RR-27-2 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-27 APPENDIX 1 RADI0 CHEMICAL ANALYSIS COORDINATOR A. Personnel Assignment Primary (Job Title)

Plant Chemist - Fort Calhoun Alternate (Job Title)

Supervisor - Chemical Services B. Reporting Location Emergency Operations Facility C. Reports To Emergency Coordinator -

D. Supervises / Coordinates

(

Rad / Chem Technicians as needed

. E. Primary Responsibility Coordinates the aquisition of radiological information required by the Emergency Coordinator in order to make sound recommendations to ensure the health and safety of the public.

F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate Radiochemical Analysis Coordinator designate (s) will report to the assigned location listed in section B of this appendix and inform the Emergency Coordinator of their/his presence.
2. Ensures that all iodine and particulate airborne samples are being collected, analyzed, and documented.

18 S11 8 R1 2-01-83 FEB 1 1S83

~

EPIP-RR-27-3 F. Basic Duties (Continued)

3. Maintains complete operational status of the stationary radio-chemistry lab to ensure accurate sample analysis.
4. Provides radiological input to the Emergency Coordinator, and Dose Assessment Coordinator upon request.

f ISSUED FEB 1 1983 R1 2-01-83 1

I

EPIP-RR-28-1 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure

. EPIP-RR-28 REC 0VERY ORGANIZATION'S DOSIMETRY COORDINATOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Dosimetry Coordinator.

II. PREREQUISITE Both primary and alternate individuals filling the position of Dosimetry Coordinator have been fully trained and are aware of their ,

duties and responsibilities.

III. PRECAUTIONS None ,

IV. PROCEDURE Upon ac.tivation of the Re'covery Organization, those individuals

+

assigned to the position of Dosimetry Coordinator shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

1 ISSIE 1983 FEB 1 R1 2-01-83

4 EPIP-RR-28-2 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure EPIP-RR-28

, APPENDIX 1 D0SIMETRY COORDINATOR A. Personnel Assignment

  • Primary (Job Title)

Supervisor - Reactor Performance Analysis Alternate (Job Title)

Engineer - Reactor and Computer Technical Services B. Reoorting Location Production Operation Division Headquarters C. Reports To Emergency Coordinator D. Supervises / Coordinates TLD Analysi's Technician E. Primary Responsitility Provides timely and accurate reports of personnel radiation exposure received by members of the Recovery Organization.

F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate Dosimetry Coordinator designate (s) will report to their assigned location listed in section B of this appendix and infonn the Emergency Coordinator of their/his presence.
2. Calls out his staff detailed in section D of this appendix and has l them report to their normally assigned department in order to support on site activities.
3. Organizes staff personnel and establishes a schedule of working hours to support around-the-clock operations.
4. Reports the manpower status to the Emergency Coordinator. .

i 5. Supports the Recovery Oranization by issuing TLD's.

ISSUR R1 2-01-83 ct31 1053

l 4

EPIP-RR-23-3 F. Basic Duties (Continued)

, 6. Ensures personnel TLD's are read and exposure history files are <

updated in a timely manner. l

~

7. Ensures environment TLD's are read and accurately logged with ,

information supplied to the Dose Assessment Coordinator, Emergency Coordinator, and the Environmental Survey and Analysis Coordinator.

8. Coordinates the transportation of TLD's to and from the Production Operations Division Headquarters thru the Emergency Coordinator.

ISSUED 1 2-01-83 FEB 1 1983 4

. - - - ~ . , . - - - - - , , , -

e .

9 EPIP-RR-29-1 Fort Calhoun Station Unit No.1 Emergency-Plan Implementing Procedure EPIP-RR-29 RECOVERY ORGANIZATION'S ADMINISTRATIVE LOGISTICS MANAGER I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Administrative Logistics Manager.

II. PREREQUISITE Both primary and alternate individuals filling the position of Administrative Logistics Manager have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None

~

IV. PROCEDURE ,

Upon activation of the Recovery Organization, those individuals -

assigned to the position of Administrative Logistics Manager shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

ISSUED FEB 1 1983 R1 2-01-83

EPIP-RR-29-2 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure

.EPIP-RR-29 APPENDIX 1 ADMINISTRATIVE LOGISTICS MANAGER A. Personnel Assignment

~ Primary (Job Title)

Manager - Administrative Services Alternate (Job Title)

Division Manager - Quality Assurance and Regulatory Affairs B. Reporting Location Emergency Operations Facility C. Reports To Recovery Manager f- D. Supervises / Coordinates

1. Administrative Support Coordinator
2. Finance Coordinator
3. Accommodations Support Coordinator
4. Comissary Support Coordinator
5. Communications Support Coordinator
6. Human Resources Coordinator
7. Material Management Cocrdinator-
8. Transportation Coordinator
9. Accounting Coordinator E. Primary Responsibility
1. Initiates the Recovery Organization Call List.
2. Provides administrative, logistics, communications and personnel support for the Recovery Organization.

F. Basic Duties

1. Upon notification of Recovary Organization activation, the l primary and/or alternate Acministrative Logistics Manager l

designate (s) will make the Pecovery Organization activation calls in accordance with implementing procedure EPIP-RR-1.

2. Report to their/his assigned emergency area detailed in Section B of this appendix.

R1 2-01-83 FES 11983

EPIP-RR-29-3 F. Basic Duties (Continued)

3. Organizes his staff establishes a schedule of working hours to support round-the-clock operations.
4. Reports the group's manpower status to the Recovery Manager.
5. Oversees the smooth operation of the Administrative Logistics

. Group to ensure the following committments to the Recovery Organization.

a. Provides administrative support in areas of typing, re-production, office supplies, furniture and special services.
b. Provides for short and long-term financing.
c. Provides motel, airline, and trailer arrangements,
d. Provides food handling services.
e. Provides communications services.
f. Assists the Recovery Organization Managers / Coordinators in expediting priority items identified by them.
g. Provisions for material procurement and control in accordance with implementing procedure EPIP-RR-9. j
h. Provides transportation services.
i. Provides clerical and accounting services.

1 I

ISSllED FES 11983 i

g ' 4 EPZP-RR-30-1 Fort Calhoun Station Unit No.1 Onergency Plan Implenenting Procedure EPIP-RR-30 REC 0VERY ORGANIZATION'S ADMINISTRATIVE SUPPORT C0ORDINATOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Administrative Support Coordinator.

II. PREREQUISITE Both primary and alternate individuals filling the position of Administrative Support Coordinator have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE

( Upon activation of the Recovery Organization, those individuals assigned to the position-of Administrative Support Coordinator shall carry out this assignment as _ detailed in Appendix 1 of this implementing procedure.

1 l ISSUED FEB 1 1983 R1 2-01-83 i

EPIP-RR-30-2 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-30 APPENDIX 1

' ADMINISTRATIVE SUPPORT COORDINATOR A. Personnel Assignment Primary (Job Title)

Manager - Office Systems Alternate (Job Title)

Supervisor - Word Processing B. Reporting Location Production Operations Division Headquarters C. Reports To Administrative Logistics Manager D. Supervises / Coordinates Office Systems Departmental Personnel ,

E. Primary Responsibility

1. Provides general office support functions including typing, reproduction, office supplies and furniture.
2. Provides special items and services such as area maps and i

photography services.

l l F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary i

and/or alternate Administrative Support Coordinator designate (s) l will report to their assigned location listed in section B of this appendix and inform the Administrative Logistics Manager of their/

his (her) presence.

2. Calls out the staff detailed in section D of this appendix and has

. them report to their normally assigned department in order to l support on site activities.

f

3. Organizes staff personnel and establishes a schedule of working hours to support around-the-clock operations.

, 4. Report the manpower status to the Administrative Logistics Manager.

83 FEB 1 1993

EPIP-RR-30-3 F. Basic Duties (Continued) 1

5. Provides the typing and copying services required to support the recovery effort.
6. Fills special requests in areas such as photography services, pro-viding facility and area maps, etc. .
7. Provides office supplies, furniture and reproduction equipment to members of the Recovery Organization upon request.
8. Provides operating rec 6rds of Fort Calhoun Station for reference, as requested.

e

=

~

l l

1 ISSUE 0 1 1983 FEB R1 2-01-83

< EPIP-RR-31-1 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure EPIP-RR-31 RECOVERY ORGANIZATION'S FINANCE COORDINATOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Finance Coordinator.

II. PREREOUISITE Both primary and alternate individuals filling the position of Finance Coordinator have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS <

None IV. PROCEDURE Upon activation of the Recovery Organization, those individuals

, assigned to the position of Finance Coordinator shall carry out this

( assignuent as detailed in Appendix 1 of this implementing procedure.

l ISSUED FEB 1 1983 Ri 2-0I-83 l

EPIP-RR-31-2 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure EPIP-RR-31 APPENDIX 1 FINANCE COORDINATOR A. Personnel Assignment Primary (Job Title)

Manager - Treasury Alternate (Job Title)

Supervisor - Cash Management and Analysis B. Reporting Location Electric Building C. Reports To Administrative Logistics Manager

0. Supervises / Coordinates

( Cash Management and Analysis Department E. Primary Responsibility Develops, reviews, and administers plans and guidance for the short and long-term financing needed to support the recovery effort.

F. Basic Duties i 1. Upon notification of Recovery Organization activation, the primary and/or alternate Finance Coordinator designate (s) will report to their assigned location listed in section B

, of this appendix and inform the Administrative Logistics Manager of their/his presence.

i

2. Calls out his staff detailed in section D of this appendix and has them report to their normally assigned department in order to support on site activities.
3. Organizes staff personnel and establishes a schedule of working hours to support around-the-clock operations.

4 Reports the manpower status to the Administrative Logistics Manager. l rii- '

. I L t i

i W km FES 1 lea 3 R1 2-01-33

~ '

b '

EPIP-RR-31-3 F. Basic Duties (, Continued)

5. Assures a timely payment of financial obligations incurred by accounting and material management.
6. Initiates, maintains and upgrades petty cash funds for various .

members of the Recovery Organization. .

7. Provides for the distribution of meal drafts to designated individuals should commissary facilities not be available.

IS8t!ED R1 2-01-83 FEB 1 1983

u .

r EPfP-RR-32-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-32 RECOVERY ORGANIZATION'S ACCOMMODATIONS SUPPORT C0ORDINATOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Accommodations Support Coordinator.

II. PREREQUISITE Both primary and alternate individuals filling the position of Accommodations Support Coordinator have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None s

IV. PROCEDURE ,

, Upon activation of the Recovery Organization, those individuals .

t assigned to the position of Accommodations Support Coordinator shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

ISSUED FES 1 1993 R1 2-01-83

EPIP-RR-32-2 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-32

' APPENDIX' 1 ACCOMMODATIONS SUPPORT C0ORDINATOR A. , Personnel Assignment Pri. mary (Job Title) ,

Division Manager - Employee Relations ,

Alternate (Job Title)

Manager - Safety B. Reporting Location Electric Building C. Reports To Administrative Logistics Manager 1

0. Supervises / Coordinates '

Employee Relations Division E. Primary Responsibility Makes the necessary motel, airline and trailer arrangements for the Recovery Organization.

F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate Accommodations Support Coordinator designate (s) will report to their assigned location listed in section B of this appendix and inform the Administrative Logistics Manager of their/his presence.
2. Calls out the staff detailed in section D of this appendix and has them report to their normally assigned department in order to support on site activities. .
3. Organizes staff personnel and establishes a schedule of working hours to support around-the-clock operations.
4. Reports the depcrtment's manpower status to the Administrative Logistics Manager.

I ' ws R1 2-01-83 FEB 11983

e. -

e EPIP-RR-32-3 F. Basic Dutie's (Continued)

5. When requested by organizations supporting the recovery effort, he will make the necessary airline accommodations for both personnel and special equipment.
6. Provides motel reservations for supporting organizations e.g. , Supplier,, NRC, etc.
7. Provides for the rental and locating of trailers needed by

. various vendors and contractors.

1 e

4 6

IS8tlED R1 2-01-83 FEB 11983

EPIP-RR-33-1 Fort Calhoun Station Unit No.1 -

Emergency Plan Implementing Procedure EPIP-RR-33 REC 0VERY ORGANIZATION'S COMMISSARY SUPPORT C0ORDINATOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Commissary Support Coordinator.

II. PRERE0VISITE Beth primary and alternate individuals filling the position of Commissary Support Coordinator have been fully trained and are aware of their duties and respcnsibilities.

III. PRECAUTIONS None IV. PROCEDURE Upon activation of the Recovery Organization, those individuals assigned to the position of Commissary Support Coordinator shall carry out this assignment as detailed in Appendix 1 of this

implementing procedure.

I l

f ISSUED l

FEB 1133 l R1 2-01-83 l

m

EPIP-RR-33-2 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-33 APPENDIX 1 COMMISSARY SUPPORT COORDINATOR A. Personnel Assignment Primary (Job Title)

Division Manager - General Services l

Alternate (Job Title)

Manager - Facilities Services B. Reporting Location Electric Building )

C. Reports To .

Administrative Logistic Manager D. Supervises / Coordinates Facilities Services E. Primary Responsibility Provide the needed food handling services to support the Recovery .

Organization.

F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate Commissary Support Coordinator designate (s) will report to their assigned location listed in Section 8 of this appendix and infonn the Administrative Logistics Manager of their/his presence.
2. Calls out the staff detailed in section D of this appendix and has them report to their normally assigned department in order to support on-site activities.
3. Organizes staff personnel and establishes a schedule of working l
hours to support around-the-clock operations. .
4. Report the department's manpower status to the Administrative Logistics Manager.

ISSUED R1 2-01-83 FEB 1 1S83

4 d

EPIP-RR-33-3 F. . Basic nuties _ (Continued)

5. Detennines the best locations and establishes field kitchens to support the recovery effort.
6. Where food handling facilities are not available, provides for' food

~

deliveri es.

7. Provides adequate sanitation facili. ties including trash disposal.

9 f

)

~

1 ISSLED FEB 1 1983 91 2-01-83

EPZP-RR-34-1

Fort Calhoun Station Unit No.1 Bnergency Plan Implementing Procedure EPIP-RR-34

-RECOVERY ORGANIZATION'S COMMUNICATIONS SUPPORT C0ORDINATOR I. PURPOSE The purpose of this procedure is to detail assignment and respons1bilities of personnel in the Recovery Organization filling the position of Communications Support Coordinator.

II. PREREQUISITE Both primary and alternate individuals filling the position of Communications Support Coordinator have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS i None IV. PROCEDURE ,

Upon activation of the Recovery Organization, those individuals I

assigned to the position of Communications Support Coordinator shall carry out this assignment as detailed in Appendix 1 of this ,

implementing procedure.

l ISSUED FEB 1 2-01-83 1 1983

EPIP-RR-34-2 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-34 APPENDIX 1 COMMUNICATIONS SUPPORT COORDINATOR A. Personnel Assignment

, Primary (Job Title)

Manager - Communications Alternate (Job Title)

Field Supervisor - Communications B. Reporting location ,

Electric Operations Building C. Reports To Administrative Logistics Manager D. Supervises / Coordinates __.

Communications Department E. Primary Responsibility Meets the telephone an'd special communications requirements necessary for the Recovery Organization to function.

, F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate Communications Support Coordinator designate (s) will report to their assigned location listed in Section B'of this r

appendix and inform the Administrative Logistics Manager of I their/his presence.

2. Calls out the staff detailed in Section D of this appendix and has l them report to their normally assigned department in order to support on-site activities.
3. Organizes his staff and establishes a schedule of working hours to support around-the-clock operations.

l

4. Report the department's manpower status to the Administrative Logistics Manager.

.4 8 u ..

FES 11993 R1 2-01-83

~

EPIP-RR-34-3 F. Basic Duties (Continued) -

l

5. Provides the telephone reouirements for all members of the Recovery Organization and outside support groups.
6. Provides special communication requirements such as mobile radio systems. ,
7. Request outside assistance in the event his department is over-burdened with requests.

R1 2-01-83

.. v EPIP-RR-35-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-35 REC 0VERY ORGANIZATION'S HUMAN RESOURCES COORDINATOR ,

I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Human Resources Coordinator. ,

II. PREREQUISITE Both primary and alternate individuals filling the position of Human Resources Coordinator have been fully trained and are aware of their duties and responsibiliti,es.

III. PRECAUTIONS None .

IV. PROCEDURE ,

Upon activation of the Recovery Organization, those individuals assigned to the position of Human Resources Coordinator shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

ISSUED . R1 2-01-83 FEB 1 1983

s EPZP-RR-35-2

, Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-35 APPENDIX 1 HUMAN RESOURCES C0ORDINATOR A. Personnel Assignment Primary (Job Title)

Manager - Employment and Compensation Alterrate (Job Title)_

Supervisor - Employment B. Reporting Location Electric Building C. Reports To Administrative Logistics Manager D. Supervises / Coordinates Employment and Compensation Department E. Primary Responsibility Provide the Recovery Organization's manpower needs in the areas of clerical, technical and craft disciplines.

F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate Human Resources Coordinator designate (s) will report to their assigned location listed in Section B of this appendix and inform the Administrative Logistics Manager of their/his presence.
2. Calls out the staff detailed in Section D of this appendix and has them report to their normally assigned. department in order to support on-site activities. -
3. Organizes his staff personnel and establishes a schedule of working hours to support around-the-clock operations.
4. Reports the department's manpower status to the Administrative Logistics Manager.

R1 2-01-83 FEB 1. 1983

~

EPfP-RR-35-3

, F.- Basic Duties (Continued)

5. Provides the additional clerical, technical and craft disciplines to meet the Recovery Organization's needs.
6. Ensures compliance with all civil rights, compensation and labor relations laws.

n

)

l i

i .

9 5

]

I I

i 4

k.

4 i

R1 2-01-83 FEB  ;

1 1983 i

-~ , . . - . - - - _ _ . - - _ , - _ _ _ _ , _ _ __ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ ,, _, _ , , ___,, ._, , _ _ , _ , , . , _ _ . , _ _'

EPIP-RR-36-1 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure EPIP-RR-36 REC 0VERY ORGANIZATION'S MATERIAL MANAGEMENT COORDINATOR

. I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Reccvery Organization filling the position of Material Management Coordinator.

II. PREREQUISITE

~~

Both primary and. altern' ate individuals filling the position of Material Management Coordinator have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE 2

( Upon activation of the Recovery Organization, those individuals assigned to the position of Material Management Coordinator shall

, carry out this assignment as detailed in Appendix 1 of this implementing procedure.

ISSUED FEB 1 1983 R1 2-01-83

EPIP-RR-36-2 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-36 APPENDIX 1 MATERIAL MANAGEMENT COORDINATOR A. Personnel Assignment Primary (Job Title)

Division Manager - Material Management Alternate (Job Title)

General Stores and Supplies Specialist B. Reporting Location Electric Building C. Reports To Administrative Logistics Manager-D. Supervises / Coordinates

(

Material Management Division E. Primary Responsibility Represents the Recovery Organization as purchasing agent responsible for contract negotiations / administration and material control.

F. Basic Daties

1. Upon notification of Recovery Organization activation, the primary and/or alternate Material Management Coordinator designate (s) will report to their assigned location listed in Section B of this appendix and inform the Administrative Logistics Manager of their/his presence.
2. Calls out the staff detailed in Section D of this appendix and has them report to their normally assigned department in order to support on-site activities.
3. Mobilizes the Material Management Division to provide timely, adequate and around-the-clock support for the Recovery Organization.
4. Report the department's manpower status to the Administrative Logistics Manager.

R1 2-01-83 FEB 1 ;993

~

s EPZP-RR-36-3 F. Basic Duties (Continued)

5. Provides for material procurement at the request of the Recovery Manager in accordance with normal District procurement procedures and implementing procedure EPIP-RR-9.
6. Directs the purchasing and controls the payment authorization for all general stores, supplies, equipment and services required by ths Recovery Organization.
7. Provides additional emergency purchase orders to the.aecovery Manager or designated alternate to ensure rapid procurement of needed equipment.
8. Provides adequate cooraination of activites regarding material and construction contracts to assure compliance with state and federal statues as well as utility bidding procedures and contractual agreements.
9. Oversees the development and implementation of procedures to handle I inventory control and documentation, purchase orders, invoices, and timely delivery schedules.

l i

3 P

IS8!)ED R1 2-01-83 j

FEB 1 1333 1

l

EPfP-RR-37-1 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure EPIP-RR-37 RECOVERY ORGANIZATION'S TRANSPORTATION COORDINATOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Transportation Coordinator.

II. PREREQUISITE Both primary and alternate individuals filling the position of Transporation Coordinator have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE I Upon activation of the Recovery Organization, those individuals assigned to the position of Transportation Coordinator shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

ISSUED FEB 1 1993 R1 2-01-83

EPTP-RR-37-2 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-37 APPENDIX 1 TRANSPORTATION COORDINATOR A.- Personnel Assignment Primary (Job Title)

Manager - Transportation and Construction Equipment Alternate (Job Title)

Field Supervisor - Transportation _

B. Reporting Location Electric Operations Building C. Reports To Administrative Logistics Manager D. Supervises / Coordinates .

Transportation Department E. Primary Responsibility Provides the necessary transporation to support the Recovery Organization.

F. Basic Duties l

1. Upon notification of Recovery Organization activation, the primary and/or alternate Transportation Coordinator designate (s) will report to their a:; signed location listed in Section B of this appendix and inform the Administrative Logistics Manager of their/his presence.
2. Calls out the staff detailed in Section D of this appendix and has them report to their normally assigned department in order to support on-site activities.

( 3. Organizes his staff and establishes a schedule of working hours to i support around-the-clock operations.

4. Report the department's manpower status to the Ad.,inistrative Logistics Manager.

I ISSUED 0

1 G83 R1 2-01-83

EPTP-RR-37-3 F. Basic Duties (Continued)

5. Provides motor vehicles for the Recovery Organization.
6. Ensures that a shuttle service is maintained between Eppley Field f and surrounding motels as needed.
7. Supplies special transportation such as helicopters, buses, etc. }

needed to support the recovery effort.

8. Procures rental vehicles in the event of'a shortage of utility owned l vehicles.

2 1

V 38 e

ISSUED m, 1 ,,,,

.1 s 1.e3

EPZP-RR-38-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-38 REC 0VERY ORGANIZATION'S ACCOUNTING COORDINATOR I. PURPCSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Accounting Coordinator. .

II. PREREQUISITE Both primary and alternate 11dividuals filling the position of Accounting Coordinator have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE

( Upon activation of the Recovery Organization, those individuals assigned to the position of Accounting Coordinator shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

ll i

l

ISSUED FEB 1 jgg3 ,

R1 2-01-83

s EPIP-RR-38-2 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure )

EPIP-RR-38 i APPENDIX 1 ACCOUNTING COORDINATOR A. Personnel Assignment Primary (Job Title)

Manager - Corporate Account 1ng Alternate (Job Title)

Supervisor - Plant and Contracts B. Reporting Location Electric Building ,

C. Reports To e  %

Administrative Logistics Manager D. Supervises / Coordinates Accounting Division E. Primary Responsibility Oversees the maintenance of all accounting records necessary to support the Recovery Organization.

F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate Accounting Coordinator designate (s) will report to their assigned location listed in Section B of this appendix and inform the Administrative Logistes Manager of their/his presence.
2. Calls out the staff detailed in Section D of this appendix and has them report to their normally assigned department in order to support on-site activities.
3. Organizes staff personnel and establishes a schedule of working hours to support around-the-clock operations.
4. Report the division's manpower status to the Administrative Logistics Manager.

ISSUE 0 R1 2-01-83 gg

m. . -

EPIP-RR-38-3 I

F. Basic Duties (Continued)

5. Supports the payroll accounting function through verifying employee pay records, and payroll preparation _for all utility permanent and temporary recovery personnel in accordance with established policies and applicable state an'd federal laws.
6. Establishes and maintains expense accounts for all recovery support groups as requested.

. 7. Administers, monitors and processes for payment all vendor and con- -

struction contract invoices and billings to ass'are that payment is made in accordance with contract previsions.

/

/

i d

ISSL!ED FEB 1 1983

. R1 2-01-83

~.

EPIP-RR-39-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-39 REC 0VERY ORGANIZATION'S MEDIA RELEASE CENTER DIRECTOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Media Release Center Director.

II. PREREQUISITE Both primary and alternate individuals filling the position of Media Release Center Director have been fully trained and are awire of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE

( Upon activation of the Recovery Organization, those individuals assigned to the position of Media Release Center Director shall l carry out this assignment as detailed in Appendix 1 of this implementing procedure.

1 ISSUED FEB 1 1983 R1 2-01-83

EPIP-RR-39-2 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-39 APPENDIX 1 MEDIA RELEASE CENTER DIRECTOR l A. Personnel Assignment Primary (Job Title)

Division Manager - Public Relations Alternate (Job Title)

Media Relations Manager B. Reporting Location Media Release Center C. Reports To Recovery Manager D. Supervises / Coordinates

1. Public Information and Rumor Control Supervisor
2. Information Specialist (EOF and MRC)
3. Technical Liaison (EOF and MRC)
4. Clerical Supervisor
5. Internal Services Coordinator E. Primary Responsibility Serves as the single point interface in the area of press releases F. Basic Duties l
1. Upon notification of Recovery Organization activation, the primary .[

and/or alternate Media Release Center Coordinator designate (s) will I report to their assigned location listed in Section B of this appendix and inform the Recovery Manager of their presence.

2. Calls out his/her staff detailed in Section 0 of this appendix and has them report to their assigned emergency facility in order to -

support on-site activities.

3. Organizes staff personnel and establishes a schedule of working hours to support around-the-clock operations.
4. Report the group's manpower status to the Recovery Manager.

R1 2-01-83 FE3 11c83

s EPIP-RR-39-3 F. Basic Duties (Continued)

5. Acts as the official source of OPPD's statements to the media.
6. Ensures that all statements to the media are technically correct.
7. Under direction of the Recovery Manager, coordinates all plant-released news releases with Federal, State and local officials. -
8. Ensures that the Recovery Manager periodically attends press conferences in order to address technical questions and provide information on official recovery operation judgementi.
9. Authorizes the preparation of any taped messages that may require broadcasting. (Coordinated with State officials).
10. Ensures that no company employces make statements to the media that are not consistent with those made by the company spokesman (Rumor Control ).
11. Serves as the senior representative at the Media Release Center.

l 6

b w new FEB 1 1983 R1 2-01-83

s EPIP-RR-40-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-40 REC 0VERY ORGANIZATION'S EOF INFORMATION SPECIALIST ,

I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of EOF Information Specialist. _

II. PREREQUISITE Both primary and alternate individuals filling the position of EOF Information Specialist have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE

( Upon activation of the Recovery Organization, those individuals assigned to the position of EOF Information Specialist shall carry out this assignment as detailed in Appendix 1 of this implementing

, procedure.

1 ISSUED FEB 1 $83 R1 2-01-83

i B S

EPIP-RR-40-2 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure EPIP-RR-40 APPENDIX 1 EOF INFORMATION SPECIALIST A. Personnel Assignment .

' Primary (Job Title)

Media Relation Manager Alternate (Job Title)

Public Relations Assistant 2 .

B. Reporting Location Emergency Operations Facility C. Reports To Media Release Center Director D. Supervises / Coordinates Coordinates with State information officers and the Recovery Manager at the E0F regarding plant status information.

E. Primary Responsibility Coordinates all significant plant information for transmittal to the Media Release Center.

F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate EOF Information Specialist designate (s) will report to their assigned location listed in Section B of this appendix and inform the Media Release Center Director and the Recovery Manager his/her of presence. l
2. Be able ta support around-the-clock operation.
3. Maintain comunications with the Division Information Office and the -

Media Release Center. l

4. Coordinates activities with State Information Officers to ensure they receive prompt and accurate plant infomation.

ISSUED FEB 1 1983 R1 2-01-83

~

EPIP-RR-40-3 I

F. Basic Duties (Continued)

5. Gathers in' formation as it becomes available and evaluates its significance in conjunction with the-EOF Technical Liasion.
6. Reiews accuracy of data with the Recovery Manager and transmits significant plant information to Media Release Center for. final review and release to the mews media.
7. Serves as plant information source for the rumor control centar.
8. Maintains a written or taped time log of significant reporting
activities.
9. Performs duties assigned to the Emergency Team Member, Tag No. 23.

s i

ISSUED FEB 1 1993 R1 2-01-83

-- - -,- a n- e--._, -n , , -

.EPYP-RR-41-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-41 RECOVERY ORGANIZATION'S EOF TECHNICAL LIAIS0N

1. PURPOSE

~

The purpose of this procedure is to detail assignment and rasponsibilities of personnel in the Recovery Organization filling the position of EOF Technical Liaison.

II. PREREQUISITE Both primary and alternate individuals filling the position of EOF Technical Liaison have been fully trained and are eware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE.

Ifpod activation of the Recovery omanization, those individuals assigned to the position'of EOF Tec.nnical Liaison shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

1 ISSi]ED 1 1983 R1 2-01-83 l

l

^

' ^' ~

4 EP!P-RR-41-2 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure EPIP-RR-41

~

APPENDIX 1 EOF TECHNICAL LIAISON A. Personnel Assignment Primary (Job Title)-

Engineer - Fort Calhoun Alternate (Job Title)

Engineer - Fort Calhoun B. Reporting Location Emergency Operations Facility C. Reports To Media Release Center Director ,

D. Supervises / Coordinates N/A E. Primary Responsibility Assures the technical accuracy of all press releases prior to transmittal to the Media Release Center.

F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate EOF Technical Liaison designate (s) will report to their assigned location ' listed in Section B of this appendix and inform the Media Release Center Director and Recovery Manager of l his/her presence.
2. Be able to support around-the-clock operation.
3. Monitors status of the emergency and assists the EOF Information l Specialist in collecting and interpreting nuclear related data. ,
4. Reviews release material for technical accurancy before it is l

transmitted to the Media Release Center.

5. Assists Information Specialist in providing prompt and accurate l plant information to State and local public information personnel.
6. Perfoms duties assigned to Emergency Team Tag 24. l

! h abibd FEB L[j R1 2-01-83 1 1983 1 -_

EPZP-RR-42-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-42 RECOVERY ORGANIZATION'S MRC INFORMATION SPECIALIST I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of MRC Information Specialist.

II. PREREQUISITE Both primary and alternate individuals filling the position of MRC l Information Specialist have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE Upon activation of the Recovery Organization, those individuals assigned to the position of MRC Information Specialist shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

ISSUED P3 1 1983 R1 2-01-83

EPIP-RR-42-2 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure EPIP-RR-42 APPENDIX l' MRC INFORMATION SPECIALIST A. Personnel Assignment Primary (Job Title)

. Manager - Publications Alternate (Job Title) .

Public Relations Assistant 3 B. Reporting Location Media Release Center C. Reports To Media Release Center Director l D. Supervises / Coordinates

~

N/A .

E. Primary Responsibility Assists the Media Release Center Director in preparing news releases.

F. Basic Duties l

l 1. Upon notification of Recovery Organization activation, the primary l and/or alternate MRC Information Specialist designate (s) will report I

to their assigned location listed in Section B of this appendix and inform the Media Release Center Director of his/her presence.

2. Be prepared to provide around-the-clock operation.
3. Prepares written news releases in accordance with procedures.

Prepares audio tape broadcasts.

4.

.l S. Assists with news conferences and briefings as directed by the Media Release Center Director.

6. Makes arrangements for taping telecasts concerning the emergency.

C

t

-- 3 R1 2-01-83

- 7.:.. .a

r EPIP-RR-43-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-43 RECOVERY ORGANIZATION'S MRC TECHNICAL LIAIS0N l

I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of MRC Technical Liaison. l II. PREREQUISITE Both primary and alternate individuals filling the position of MRC l Technical Liaison have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE Upon activation of the Recovery Organization, thosa individuals assigned to the position of MRC Technical Liaison shall carry out this assignment as detailed in Appendix 1 of this implementing procedure. -

l 1

r e

e IS,zeSl!ED 1 eee l 9'. 2-01-33

EPIP-RR-43-2 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure EPIP-RR-43 -

APPENDIX 1 MRC TECHNICAL LIAIS0N A. Personnel Assignment Primary (Job Title)

Manager - Conservation Services Alternate (Job Title)

Supervisor - Nuclear Fuel Engineer B. Reporting Location Media Release Center C. Reports To Media Release Center Director D. Supervises / Coordinates '

N/A ,

E. Primary Responsibility Assures technical accuracy of press releases leaving the Media Release Center.

F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate MRC Technical Liaison designate (s) will report to their assigned location listed in Section B of this appendix and inform the Media Release Center Director of his/her presence.
2. Be prepared to provide around-the-clock operation.
3. Assists the District's designated spokesman in the interpretation l and evaluation of nuclear related information.

Assists the Media Release Center Director and Information Specialist 4.

in checking releases for technical accuracy.

5. Maintains communications with the E0F Technical Liaison.
6. Participates in technical briefings for media as directed.
7. Serves as technical information source for the Rumor Control Center. I

- i R1 2-01-83 M 'i '. ??3

EPZP-RR-44-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Frocedure EPIP-RR-44 RECOVERY ORGANIZATION'S PUBLIC INFORMATION and RUMOR CONTROL SUPERVISOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Public Information and Rumor Control Supervisor.

II. PREREQUISITE Both primary and alternate individuals filling the position of Public Information and Rumor Control Supervisor have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None

~

IV. PROCEDURE

(

  • Upon activation of the Recovery Organization, those individuals assigned to the position of Public Information and Rumor Control Supervisor shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

1 l

, ISSIED FEB 1 583 r _ri_q, l

EPIP-RR-44-2 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-44 APPENDIX 1 PUBLIC INFORMATION and RUMOR CONTROL SUPERVISOR A. Personnel Assignment Primary (Job Title) '

Manager - Public Information Alternate (Job Title)

Public Relations As'sistant 1 B. Reporting Location -

Media Release Center C. Reports To I

Media Release Center Director l

D. Supervises / Coordinates Public Information Specialist E. Primary Responsibility

1. Establishes a telephone center for responding to public questions with reliable, accurate, and timely information concerning the emergency.
2. Provides timely and reliable information to District enployees in a further effort to control rumors. l F. Basic Duties
1. Upon notification of Recovery Organization activation, the primary and/or alternate.Public Information and Rumor Control Supervisor designate (s) will report to their assigned location listed in l Section B of this appendix and inform the Media Release Center Director of his/her presence.

! 2. Set up and staffs Rumor Control Telephone Center and coordinates its activities with State and local information officers.

mese, I I 5 Ls FEB 1 1983 R1 2-01-83

w -g .g- y EPIP-RR-44-3 F. Basic Duties '(Continued)

3. Prepares and distributes periodic suployee information bulletins as directed-by the Media Release Center Director.
4. Assists the Media Release Center Director in keeping key public officials informed of plant developments.

5.. Provide:. personnel to man telephones and provides prompt and accurate information to citizen callers.

6. Ensures.that a record of calls is being maintained using approved l forms.

ISSUE FEB 1 1c83 21 2-01-83

s EPIP-RR-45-1 Fort Calhoun Station Unit No.1 -

Emergency Plan Implementing Procedure EPIP-RR-45 RECOVERY ORGANIZATION'S CLERICAL SUPERVISOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Clerical Supervisor.

II. PRERE0VISITE Both primary and alternate individuals filling the position of Clerical Supervisor have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE s Upon activation of the Recovery Organization, those individuals assigned to the position of Clerical Supervisor shall carry out this I- assignment as detailed in Appendix 1 of this implementing procedure.

ISSUED FEB 1 $83 R1 2-01-83

. ~

EPIP-RR-45-2 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-45 APPENDIX 1 CLERICAL SUPERVISOR l

A. Personnel Assignment Primary (Job Title) 1 Secretary 2 Alternate (Job Title)

Stenographer 1  ;

B. Reporting Location Media Release Center C. Reports To Media Release Center Director D. Supervises / Coordinates Clerical Staff E. Primary Responsibility Provide clerical services for the Media Release Center l

F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary l

and/or alternate Clerical Supervisor designate (s) will report to l their assigned location listed in Section B of this appendix and l infonn the Media Release Center Director of his/her presence.

2. Be prepared to provide around-the-clock operation.
3. Contacts the Administrative Logistics Manager for providing a court i reporter as well as clerical and security personnel.

I

4. Sets up the clerical center and supervises staffing and equipping.
5. Arranges for recording, transcribing, reproducing and distributing ,l

! of all official news briefings and news conferences.

6. Supervises final reproduction and distribution of written news l releases and employee information bulletins.
7. Maintains a complete file, including time and date, of all information processed through the clerical center.

l ISSE gg3 ,

.m_ . ,

R1 2-01-83

EPIP-RR-46-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-46 RECOVERY ORGANIZATION'S INTERNAL SERVICES COORDINATOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Internal Services Coordinator. -

II. PREREQUISITE Both primary and alternate individuals filling the position of Internal Services Coordinator have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE Upon activation of the Recovery Organization, those individuals issigned to the position of Internal Services Coordinator shall canry out this assignment as detailed in Appendix 1 of this i

implementing procedure.

!SSl!E R1 2-01-83

A l EPIP-RR-46-2 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure.

EPIP-RR-46

- APPENDIX 1 I INTERNAL SERVICES COORDINATOR l A. Personnel Assignment Primary (Job Title)

Manager - Printing Services  ;

1 Alternate (Job Title)

Senior Print Machine Technician B. Reporting Location Media Release Center C. Reports To Media Release Center Director D. Supervises / Coordinates ,

l Security and Messenger Personnel E. Primary Responsibility Coordinates with the Administrative Logistics Manager to provide equipment and services to support the Media Release Center.

F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate Internal Services Coordinator designate (s) will i report to their assigned location listed in Section B of this l appendix and inform the Media Release Center Director of his/her l presence.
2. Be prepared to provide around-the-clock operation.
3. Coordinates with the Administrative Logistics Manager to obtain such services as additional communications equipment, security and messenger personnel, office equipment and supplies.

Supertises activities of security and messenger personnel.

4.

1 l

ISSIB R1 2-01-83

~ ' ' '

EP!P-RR-47-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing P'rocedure EPIP-RR-47 REC 0VERY ORGANIZATION'S DESIGN AND CONSTRUCTION MANAGER I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Design and Construction Manager.

II. PREREQUISITE Both primary and alternate individuals filling the position of

, Design and Construction Manager have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE Upon activation of the Recovery Organization, those individuals assigned to the position of Design and Construction Manager shall carry out this assignment as detailed in Appendix 1 of this

~

implementing procedure.

l 18811 8 R1 2-01-83

EPIP-RR-47-2 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-47 APPENDIX 1 DESIGN AND CONSTRUCTION MANAGER A. Personnel Assignment Primary (Job Title)

Division Manager - Engineering Alternate (Job Title)

Section Manager - Generating Station Engineering B. Reporting Location Production Operations Division Headquarters at Jones Street C. Reports To Recovery Manager D. Supervises / Coordinates

1. Utility Engineering Director
2. Architect Engineering Director -
3. Director of Nuclear Steam Supply System
4. Director of Construction
5. Construction Quality Assurance Director E. Primary Responsibility Coordinates the design and construction activites of the Utility, Architect Engineer, NSS Supplier, construction forces and vendors needed to support- the recovery effort.

F. Basic Duties i 1. Upon notification of Recovery Organization activation, the primary and/or alternate Design and Construction Manager designate (s) will report to their assigned location listed in Section B of this appendix and inform the Recovery Manager of his/her presence. -

l 2. Calls out the staff detailed in Section D of this appendix and have l them report to their assigned location. Notification is accomplished in accordance with the implementing procedure EPIP-RR-1.

3. Organizes his/her staff and establishes a schedule of working hours to support around-the-clock operations.

R1 2-01-83 FEB 1 mg3

EPIP-RR-47-3 F. Basic Duties (Continued) 1

4. Reports the group's manpower status to the Recovery Manager..
5. Provides the direct contact between OPPD Architect, Engineer, NSSS Supplier and constructor on modification and design matters.
6. Coordinates the necessity for providing engineering and technical specialists to the Technical Support, Plant Operations, Waste Management and Emergency Coordination Response Groups if requested.

Prepares to provide additional support as needed.

7. Assures that the design and construction activities are adequately staffed and equipped, which may require this position to coordinate.

with the Administrative Logistics Manager to ensure proper facilities and equipment are available to support the Design and Construction Group.

8. Directs, coordinates and approves outside engineering design and construction activities so as to conform to OPPD formal require-ments, including compliance with normal quality assurance procedures.
9. Prepares to provide the necessary engineering and construction

~

activities to support any emergency modification requests.

O l

1 FEB 11983 R1 2-01-83

EPIP-RR-48-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-48 REC 0VERY ORGANIZATION'S UTILITY ENGINEERING DIRECTOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Utility Engineering Director.

II. PREREQUISITE Both primary and alternate individuals filling the position of Utility Engineering Director have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None I

V. PROCEDURE

Upon activation of the Recovery Organization, those individuals assigned to the position of Utility Engineering Director shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

356%d R1 2-01-83

EPIP-RR-48-2 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-48 ~

APPENDIX 1 UTILITY ENGINEERING DIRECTOR ,

A. Personnel Assignment Primary (Job Title)

Manager - Mechanical Engineering Alternate (Job Title) -

Manager - Nuclear Engineering B. Reportina Location Production Operations Di'lision Headquarters at Jones Street C. Reports To Design and Construction Manager D. Supervises / Coordinates GSE Engineering Staff E. Primary Responsibility Coordinates the GSE Enginsering Staff not having recovery assignments in performing such engineering and design functions that may be necessary to 1

support the recovery operation.

I F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate Utility Engineering Director designate (s) will report to their assigned location listed in Section B of this appendix and inform the Design and Construction Manager of his/her presence.
2. Calls out his/her staff detailed in Section D of this appendix and l has them report to their normally assigned department in order to _

support on-site activities.

3. Organizes his/her staff and establishes a schedule of working hours to support around-the-clock operations.
4. Reports the manpower status to the Design and Construction Manager, a

R1 2-01-83 l-

6 4 -

EPIP-RR-48-3 F. Basic Duties (Continued)

5. Responsible for the conceptual design of systems and equipment to support waste processing needs in order to reduce plant and offsite dose rates.
6. Establishes for the Design and Construction Manager which outside engindering, design and construction activities, if any, shall conform to OPPD formal technical requirements. He will accomplish this by interfacing his OPPD staff with those of the Architect

. Engineering Director, Director of Nuclear Steam Supply System and Director of Construction and the members of the Advisory Support Group.

7. Coordinates with the Administrative Logistics Manager in order to support vendor manpower and equipment requirements.
8. Provides engineering support as required.

O O

l l ISSUED R1 2-01-83

EPIP-RR-49-1 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure

-EPIP-RR-49 REC 0VERY ORGANIZATION'S ARCHITECT ENGINEERING DIRECTOR I. PURPOSE The purpose of this procedure is to detail. assignment and responsibilities of personnel in the Recovery Organization filling the position of Architect Engineering Director.

II. PREREQUISITE.

Both primary and alternate individuals filling the position of Architect Engineering Director have met the training requirements and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE Upon activation of the Recovery Organization, those in11viduals assigned to the position of Architect Engineering Director shall carry out this assignment as detailed in Appendix 1 of this

! implementing procedure.

  • HeDOD R1 2-01-83 FB 1 1923

EPIP-RR-49-2 Fort Calhoun Station Unit No.1-Emergency Plan Implementing Procedure EPIP-RR-49 APPENDIX 1 ARCHITECT ENGINEERING DIRECTOR A. Personnel Assignment Primary (Job Title)

Project Manager - Stone and Webster (or Stone and Webster Designee)

Alternate (Job Title)

Project Engineer - Stone and Webster (or Stone and Webster Designee)

8. Reporting Location Production Operations Division Headquarters (upon request)

Emergency Operations Facility for Advisory Support Group meetings C. Reports To Design'and Construction Manager

(

D. Supervises / Coordinates Architect Engineering Staff E. Primary Resoonsibility Directs and administratively controls the Architect Engineer's staff to support the requirements of the recovery operation.

F. Basic Duties

1. Following the Recovery Organization activation and upon request, the primary and/or alternate Architect Engineering Director designate (s) will report to their assigned location listed in Section B of this appendix as soon as possible. Upon reporting he/she will inform the Design and Construction Manager of his/her presence.
2. Provides the contact between the Architect Engineer and OPPD on technical and administrative matters. -
3. Acts as a member of the Advisory Support Group.
4. Prepares to provide engineering and technical specialists to various groups within the Recovery Organization.

FE5 1 iSS3 R1 2-01-83

( 6 4-g

~ ~

F. -Basic Duties (Continued)

5. Ensures both onsite and home-office engineering and design functions are adequately staffed to provide timely support.
6. Directs, coordinates, and approves, engineering'and design tasks assigned by the _ Design and Construction Manager.  !
7. Coordinates the work of suppliers providing components and services in support of the recovery effort. ,

J

)

i i

} q, i R1 2-01-83 3i]O G L y FEB 1 1983

EPIP-RR-50-1 Fort C~alhoun Station Unit.No.1 Onergency Plan Implenenting Procedure EPIP-RR-50 RECOVERY ORGANIZATION'S DIRECTOR OF NUCLEAR STEAM SUPPLY SYSTEM I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Director of Nuclear Steam Supply System.

II. PREREQUISITE Both primary and alternate individuals filling the position of Director of Nuclear Steam Supply System have met the training requirements and are fully aware of their duties and responsi-bilities.

III. PRECAUTIONS None IV. PROCEDURE Upon activation of the Recovery Organization those individuals assigned to the position of Director of Nuclear Steam Supply System shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

ISSUED FEB 1 83 1 1983

w EPIP-RR-50-2 Fort Calhoun Station Unit No. 1 I Emergency Plan Implementing Procedure EPIP-RR-50 APPENDIX 1 DIRECTOR OF NUCLEAR STEAM SUPPLY SYSTEM A. Personnel Assignment Primary (Job Title)

Project Manager - Combustion Engineering, Inc. (or C.E. Designee)  !

Alternate (Job Title)

Project Engineer - Combustion Engineering, Inc. (or C.E. Designee)

B. Reporting Location Production Operations Division Headquarters (upon request)

Emergency Operations Facility for Advisory Support Group meetings.

C. Reports To Design and Construction Manager D. Supervises / Coordinates NSSS Supplier's Staff -

E. Primary Responsibility Directs and administratively controls the NSSS Supplier's staff to support the requirements of the recovery operation.

F. Basic Duties

! 1. Following the Recovery Organization activation and upon request, the primary and/or alternate Director of Nuclear Steam Supply System designate (s) will report to their assigned location listed in Section B of this appendix as soon as possible. Upon reporting he/she will inform the Design and Construction Manager of his/her l l presence.

2. Provides the contact between the NSSS Supplier and OPPD on technical and administrative matters.

-l

3. Acts as a member of the Advisory Support Group as primary Advisory Support Coordinator. ,
4. Prepares to provide engineering and technical specialists to various l groups in the Recovery Organization.

1 R1 2-01-83 l FES 1 1933

s, EPIP-RR-50-3 F. Basic Duties (Continued)

5. Ensures both onsite and home-office engineering and design functions l are adequately staffed to provide timely support. -
6. Directs, coordinates and approves engineering and design tasks assigned by the Design and Construction Manager.
7. Coordinates the work of suppliers providing components and services for the NSSS Organization.

e I

/

I SU D R1 2-01-83 FEB 1 1983

EPIP-RR-51-1 Fort Calhoun Station Unit No.1

. Emergency Plan Implementing Procedure EPIP-RR-51 RECOVERY ORGANIZATION'S-DIRECTOR OF CONS.TRUCTION I. PURPOSE The purpose of this p 1cedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Director of Construction.

II. PREREQUISITE, Both primary and alternate individuals filling the position of Director of Construction have been fully trained and are aware of their duties and. responsibilities.

III. PRECAUTIONS None IV. PROCEDURE Upon activation of the Recovery Organization, those individuals assigned to the position of Director of Construction shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

i l

l -

lSS!jED l

R1 2-01-83

s EPIP-RR-51-2 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-61 APPENDIX 1 DIRECTOR OF CONSTRUCTION A. Personnel Assignment Primary (Job Title)

Maiager - Construction Management Alternate (Job Title)

Manager - Civil Engineering B. Reporting Location Production Operations Division Headquarters at Jones Street C. Reports To Design and Construction Manager ,

D. Supervises / Coordinates Construction Forces E. Primary Responsibiiity Directs and administratively controls all construction forces and their subcontractors performing such construction tasks to meet the l requirements of the Recovery Organization.

l F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate Director of Construction designate (s) will report to their assigned location listed in Section B of this appendix and inform the Design and Construction Manager of his/her presence. l
2. Provides direct contact between OPPD and the Constructor on all l administrative and construction matters.
3. Directs, coordinates and approves all construction tasks assigned by l the Design and Construction Manager.
4. Assures that all construction forces are adequately manned and equipped to provide timely construction support.

l R1 2-01-83

. EPIP-RR-51-3 ,

1 F. Basic Duties (Continued)

5. Coordinates the work of suppliers and/or subconstractors providing construction materials and/or services.

. 6. Coordinates with Administrative Logistics Group in areas of material <

procurement, human resources, etc.

l I

e l.

l f

188llEB RI 2-01-83 l

I l

i

EPfP-RR-52-1 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure .

EPIP-RR-52 REC'0VERY ORGANIZATION'S CONSTRUCTION QUALITY ASSURANCE DIRECTOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Construction Quality Assurance Director.

II. PREREQUISITE Both primary and alternatY individuals filling the position of Construction Quality Assurance Director have been fuily trained and are aware of their duties and responsi-bilities.

III. PRECAUTIONS None

~

IV. PROCEDURE

' ~

Upon activation of the Recovery Organization, those individuals assigned to the position of Construction Quality Assurance Director shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

4 i

i l

l88GED R1 2-01-83

a EPIP-RR-52-2 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure EPIP-RR-52 APPENDIX 1-CONSTRUCTION QUALITY-ASSURANCE DIRECTOR A. Personnel Assignment '

Primary (Job Title)

Supervisor - Procurement Quality Assurance Alternate (Dob Title)

Supervisor - Operations Quality Assurance j B. Reporting Location Production Operations Division Headquarters at Jones Street C. Reports To Design and Construction Manager D. Supervises / Coordinates Quality Assurance Inspectors E. Primary Responsibility

~

Provides direction and administrative control of the Construction Quality Assurance Inspection Staff and the contractor QA/QC program for such construction tasks as the Design and Construction Manager may direct to meet the requirements of the recovery operation.

F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate Construction Quality Assurance Director designate (s) will report to their assigned location listed in Section B of this appendix and inform the Design and Construction Manager of his/her presence. l l 2. Calls out the staff detailed in Section D of this appendix and has -

l them report to their normally assigned department in order to l

support onsite activities.

3. Organizes his/her staff and establishs a schedule to support around-the-clock operations.

NL:.,)y R1 2-01-83

- s .

. j i

EPIP-RR-52-3 i

F. Basic Duties (Continued) ,

4. Reports the manpower status to the Design and Construction Manager.

i

5. Provides the direct contact between OPPD's Quality Assurance Management and the Contractor QA/QC Staff on all administrative and technical matters.
6. Assures that the Contractor QA/QC activity is adequately staffed and equipped to provide timely support.
7. Directs and coordinates the implementation of the Contractor QA/QC program for approved construction tasks.
8. Provides all quality assurance guidance during emergency conditions which may not be soley construction functions.

=

/

l l

l R1 2-01-83 l

s EPIP-RR-53-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-53 REC 0VERY ORGANIZATION'S MANAGER OF WASTE MANAGEMENT I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Manager of Waste Management.

II. PREREQUISITE Both primary and alternate individuals filling the position of Manager of Waste Management have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS

~

None IV. PROCEDURE

( Upon activation of the Recovery Organization, those individuals assigned to the position of Manager of Waste Management shall carry out this assi'gnment as detailed in Appendix 1 of this implementing procedure.

l l

l 1

l l

ISSUED FE3 R1 2-01-83 G83

EPIP-RR-53-2 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure EPIP-RR-53

. APPENDIX 1 MANAGER OF WASTE MANAGEMENT A. ' Personnel Assignment Primary (Job Title)

Supervisor - Mechanical Technical Services Alternate (Job Title)

Engineer - Fort Calhoun B. Reporting Location Technical Support Center C. Reports To Recovery Manager D. Supervises / Coordinates

(

Radwaste/ Technical Support Coordinator E. Primary Responsibility l Oversees the development of plans and procedures to process and control liquid, gaseous and solid wastes in a manner consistent with the Recovery Organization objectives and to minimize the

, effects on the health and safety of the public.

F. Basic Duties

1. Upon notification of Recovery OrJanization activation, the primary and/or alternate Manager of Wasta Management designate (s) will report to their assigned location listed in Section 3 of this appendix and inform the Recovery Manager of his/her presence. l l 2. Calls out the staff detailed in Section D of this appendix and has l them report to their assigned location. Notification shall be made in accordance with implementing procedure EPIP-RR-1.
3. Organizes staff and establishes a schedule of working hours to support around-the-clock operations.

1

@ Li ' - R1 2-01-33 RB 1 ggg3

EP!P-RR-53-3 F. Basic Duties (Continued)

4. Reports the group's manpower status to the Recovery Manager.  !
5. In conjunction with the Systems Analysis / Procedure Support f Coordinator, develops plans and. procedures for sampling and processing liquid, gaseous, and solid wastes.
6. Coordinates with the Design and Construction Manager on the  !

development of modifications to plant waste systems and the conceptual designs of new systems and equipment.

7. Approves schedules and priorities for tasks assigned to the Waste l Management Group.
8. Coordinates plans and schedules for tasks affecting other managers / coordinators in the Recovery Organization.
9. Provides information and recomendations to the Recovery Manager l concerning future operations that could affect the plant or the environment.
10. Evaluates the need for temporary storage facilities, mobile waste l processing units, specialized shipping containers, and makes recomendations to the Recovery Manager.
11. Ensures all waste shipments are fully authorized and documented. i
12. Coordinates with the Health Physics / Chemistry Supervisor concerning l health physics coverage during radwaste operations.

i NOTE: The Manager of Waste Management may perform other emergency functions as determined by the nature of the emergency l condition.

l l

l g

MS 1 1383 R1 2-01-83

EPZP-RR-54-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-54 REC 0VERY'0RGANIZATION'S RADWASTE/ TECHNICAL SUPPORT COORDINATOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Radwaste/ Technical Support Coordinator.

II. PREREQUISITE Both primary and alternate individuals filling the position of Radwaste/ Technical Support Coordinator have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE Upon activation of the Recovery Organization, those individuals assigned to the position of Radwaste/ Technical Support Coordinator shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

Dd s< :

S 3C"D FEB ImbS 1 1983 R1 2-01-83

EPIP-RR-54-2 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure EPIP-RR-54 APPENDIX 1 RADWASTE/ TECHNICAL SUPPORT COORDINATOR A. Personnel Assignment 3rimary (Job Titlei a

Engineer - Technical Services Alternate (Job Title)

Engineer - Technical Services B. Reporting Location Technical Support Center C. Reports To Manager of Waste Management D. Supervises / Coordinates i

Technical Services Personnel

~

E. Primary Responsibility Develops a conceptual design into plans and procedures needed to process liquid, gaseous and solid wastes in order to minimize onsite and offsite dose rates.

o F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate Radwaste/ Technical Support Coordinator designate (s) will report to their assigned location listed in Section B of this appendix and inform the Manager of Waste Management of his/her l presence.
2. Calls out the staff detailed in Section 0 of this appendix as  !

required and has them report to their normally assigned department .

in order to support onsite activites.

3. Organizes his/her staff and establishes a schedule of working hours to support around-the-clock operations.

1881H FEB 1 1963 R1 2-01-83

~

EP!P-RR-54-3 F. Basic Duties (Continued)

4. Reports the group's manpower status to the Manager of Waste i Management.
5. Coordinates with Health Physics / Chemistry Supervisor and develops decontamination plans to support the recovery effort in accordance with implementing procedure EPIP-RR-7.
6. Develops long and short term plans and procedures to reduce liquid, l gaseous, and solid waste levels to near normal status.
7. Maintains an updated status of liquid storage tank volumes, gas and J solid wastes system volumes.
8. Recommends equipment for use in accomplishing waste processing and l monitoring activities.

~

9. Advises the Design and Construction Group on radwaste system additions and modifications.

NOTE: The Radwaste/ Technical Support Coordinator may perform other emergency functions when this position is not required by the nature of the emergency condition.

ISSUE FEB 1 1983 R1 2-01-83

EPIP-RR-55-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-55 RECOVERY ORGANIZATION'S SCHEDULING / PLANNING MANAGER ,

I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Scheduling / Planning Manager.

II. PREREGUISITE Both primary and alternate individuals filling the position of Scheduling / Planning Manager have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE Upon activation of the Recovery Organization, those individuals assigned to the position of Scheduling / Planning Manager shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

I i

U(01 OI5,".

as g a Widi QS Em l R1 2-01-83 I

l ._ -_ .-. - _ - _ .

EPIP-RR-55-2 Fort Calhoun Station Unit No.1 ,

Emergency Plan Implementing Procedure EPIP-RR-55 APPENDIX 1 SCHEDULING / PLANNING MANAGER -

A. Personnel Assignment Primary (Job Title)

Section Manager - Engineering Services Alternatie (Job Title)

Manager - Scheduling and Budgets B. Reporting Location Emergency Operations Facility C. Reports To Recovery Manager D. Supervises / Coordinates Scheduling and Budgets Department E. Primary Responsibility Provides the requisite scheduling and cost control services for planning, engineering, design, construction and system modifications needed to support the recovery operation.

F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate Scheduling / Planning Manager designate (s) will report to their assigned location listed in Section B of this appendix and inform the Recovery Manager of his/her presence. l
2. Calls out the staff detailed in Section D of this appendix and has l l them report to their normally assigned department in order to support onsite activities.

l

3. Organizes his/her staff and establishes a schedule of working hours to support around-the-clock operations. -
4. Reports the group's manpower status to the Recovery Manager.

%i

'i '.\ E-il2d o R1 2-01-83

' ~

EPTP-RR-55-3 F. Casic Duties (Continued)

5. Develops the agenda for recovery staff meetings and followups with expeditious scheduling and budget revisions to support plans developed at these meetings.
6. Assists the Recovery Manager in short-term planning and scheduling l to expedite the recovery operation. This will require the optimization of all available materials, equipment, manpower and captial resources.

7.. Monitors consultant scheduling where outside utility assistance is l being provided.

8. Coordinates with the Systems Analysis / Procedure Support Coordinator, I-and C Support Coordinator, Materials Management Coordinator and members of the Design and Construction Group to obtain information so as to regularly update the schedule and cost control data, inputting current data to produce a revised schedule and cost control information using digital computer programs and ' services.
9. Post updated . plans, schedules, and cost control data in an area that l 1s readily available to the recovery staff.

~

=

9

+

f. ,.3.

.g R1 2-01-83

s EPlP-RR-56-1 Fort Calhoun Station Unit No.1 Bnergency Plan Implementing Procedure EPIP-RR-56 RECOVERY ORGANIZATION'S ADVISORY SUPPORT COORDINATOR I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Advisory Support Coordinator.

II. PREREQUISITE Both primary and alternate individuals filling the position of Advisory Support Coordinator have been fully trained and are aware

- of their duties and responsibilities.

III. PRECAUTIONS None ~

IV. PROCEDURE Upon activation of the Recovery Organization, those individuals assigned to the position of Advisory Support Coordinator shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

l l

l 1  !=

3.

. i. R1 2-01-83

EPIP-RR-56-2 Fort Calhoun Station Unit No.1-Emergency Plan Implementing Procedure EPIP-RR-56 APPENDIX 1 ADVISORY SUPPORT C0ORDINATOR A. Personnel Assignment Primary (Job Title) -

t Project Manager - Combustion Engineering, Inc.

Alternate (Job Title)

Vice President - Gibbs and Hill, Inc.

B. Reporting Location Emergency Operations Facility (upon request)

C. Reports To Recovery Manager D. Supervises / Coordinates

1. NRC and FEMA Representatives
2. Nuclear Fuel Supplier Representative (Combustion Engineering, Inc)
3. Architect Engineering Representative (Gibbs and Hill) i
4. Architect Engineering Representative (Pickard, Lowe and Garrick)
5. Architect Engineering Representative (Stone and Webster)
6. Nuclear Steam Supply System Director (Combustion Engineering, Inc.)
7. Dose Assessment Representative (Pickard, Lowe and Garrick)

E. Primary Responsibility Coordinates the activites of Senior Management personnel responding to the recovery effort who have the authority to represent their respective organizations and ensure that technical issues and resource commitments are resolved. .

F. Basic Duties t

l 1. Following the Recovery Organization activation and upon request, the -

primary and/or alternate Advisory Support Coordinator will report.to their assigned location listed in Section B of this appendix as rapidly as possible. Upon reporting he/she will inform the Recovery l Manager of his/her presence. i

' R1 2-01-83 l

l t

EPIP-RR-56-3 F. Basic Duties (Continued)

2. Coordinates the Advisory Support Group and determine what assistance 1 is required and who will provide the expertise.
3. Provides space for these representatives at the Emergency Operations l Facility.
4. Coordinates with the Administrative Logistics Manager to provide any administration that may be required.-
5. If required, incorporate members of the Advisory Support Group into -

other recovery organizational functions to which their expertise would be invaluable.

9 6

ISSUED R1 2-01-83 e

EPIP-RR-57-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-57 REC 0VERY ORGANIZATION'S NUCLEAR FUEL SUPPLIER REPRESENTATIVE I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Nuclear Fuel Supplier Representative.

II. PREREQUISITE Both primary and alternate individuals filling the position of Nuclear Fuel Supplier Representative have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE Upon activation of the Recovery Organization, those individuals assigned to the position of Nuclear Fuel Supplier Representative shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

ISSUED R1 2-01-83

--y--w- - w , ,y e -e - v- - - -, m ---+e- , ~ - - - - - . , .e

-- w -n - -r-- -- 9 y

EP!P-RR-57-2 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-57 APPENDIX 1 NUCLEAR FUEL SUPPLIER REPRESENTATIVE Personnel Assignment A.

Primary (Job Title)

Senior Engineer'- Combustion Engineering, Inc. l Alternate (Job Title)

Senior Engineer - Combustion Engineering, Inc.

B. Reporting Location Emergency Operations Facility (upon request) l C. Reports.To Advisory Support Coordinator D. Supervises / Coordinates Nuclear Fuel Supplier's Staff E. Primary Responsibility Provides support to the Recovery Manager and his staff in areas of organizational comitment and resolution of technical issues.

F. Basic Duties

1. Following the Recovery Organization activation and upon request, the primary and/or alternate Nuclear Fuel Supplier Representative will report to the assigned location listed in Section B of this appendix as soon as possible. Upon reporting he/she will inform the Advisory Support Coordinator of his/her presence.
2. Attends Advisory Support meetings to act as the nuclear fuel supplier's contact on technical and administrative matters.
3. Be prepared to commit his company's engineering, technical and manufacturing resources in order to support a recovery effort.
4. Coordinates his company's onsite support activities. l i 65 l

h W$m R1 2-01-83

e EPIP-RR-58-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-58 REC 0VERY ORGANIZATION'S ARCHITECT ENGINEERING REPRESENTATIVE (Gibbs and Hill)

I. PURPOSE The purpose of this procedure is to detail. assignment and responsibilities of personnel in the Recovery Organization filling the position cf Architect Engineering Representative for Gibbs and Hill.

II. PREREQUISITE Both primary and alternate individuals filling the. position of Architect Engineering Representative have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None

/

IV. PROCEDURE Upon activation of the Recovery Organization, those individuals assigned to the position of Architect Engineering Representative (Gibbs and Hil'l) shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

e ISSUED FEB 11993 R1 2-01-83 i

v .

EPlP-RR-58-2 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure EPIP-RR-58 APPENDIX 1 ARCHITECT ENGINEERING REPRESENTATIVE (Gibbs and Hill)

A. Personnel Assignment Primary (Job Title)

Vice President Alternate (Job Title)

Senior Engineer B. Reporting Location Emergency Operations Facility (upon request)

C. Reports To Advisory Support Coordinator D. Supervises / Coordinates Gibbs and Hill's Support Services Staff E. Primary Responsibility Provides support to the Recovery Manager and his staff in areas of l organizational commitment and resolution of technical issues.

F. Basic Duties "

l l 1. Following the Recovery Organization Activation and upon request, the primary and/or alternate Gibbs and Hill Representative will report to the assigned location listed in Section B of this appendix as i rapidly as possible. Upon reporting he/she will inform the Advisory l Support Coordinator of his/her presence.

2. Attends Advisory Support meetings to act as the Gibbs and Hill  !

contact regarding technical and administrative matters. ,

3. Be prepared to commit his company's engineering and technical i

resources in order to support the recovery effort.

4. Coordinates his company's onsite activities.
5. Acts as alternate for the position of Advisory Support Coordinator.

ISSUED E8 1 1983 R1 2-01-83

EPIP-RR-59-1 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure ,

EPIP-RR-59 RECOVERY ORGANIZATION'S ARCHITECT ENGINEERING REPRESENTATIVE I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Architect Engineering Representative.

g II. PREREQUISITE Both primary and alternate individuals filling the position of Architect Engineering Representative have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE

'i Upon activation of the Recovery Organization, those individuals assigned to the position of Architect Engineering Representative g shall carry out this assignment as detailed in Appendix 1 of this '

implementing procedure.

l l

1 IdB R1 2-01-83

~

EPZP-RR-59-2 Fort Calhoun Station Unit No. 1 Emergency Plan Implementing Procedure EPIP-RR-59 APPENDIX 1 ARCHITECT ENGINEERING REPRESENTATIVE A. Personnel Assignment Primary (Job Title)

SeniorEngineer Alternate (Job Title)

Senior Engineer B. Reporting Location Emergency Operations Facility (upon request)

C. Reports To Advisory Support Coordinator D. Supervises / Coordinates l N/A E. Primary Responsibility Provide support to the Recovery Manager and his staff in areas of organizational commitment and resolution of technical issues.

F. Basic Duties l

1. Following the Recovery Organization activation and upon request, the primary and/or alternate Representative will report to the assigned location listed in Section B of this appendix as rapidly as possible. Upon reporting he/she will inform the Advisory Support i Coordinator of his/her presence.
2. Attend Recovery Organization Staff meetings to act as company's contact regarding technical and administrative matters.
3. Be prepared to commit his company's engineering and technical .

resources in order to support the recovery effort.

4. Coordinates his company's onsite activities.

L R1 2-01-83

EPIP-RR-60-I Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-60 REC 0VERY ORGANIZATION'S RADIOLOGICAL ASSESSMENT REPRESENTATIVE I. PURPOSE The~ purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Radiological Assessment Representative.

II. PREREQUISITE Both primary and alternate individuals filling the position of Radiological Assessment Representative have been fully trained and are aware of their duties and responsibilities. ,

III. PRECAUTIONS None IV. PROCEDURE Upon activation of the Recovery Organization, those individuals assigned to the position of Radiqlogical Assessment Representative shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

i t

ISSUEB FEB 1 1983 R1 2-01-83

i EPIP-RR-60-2 1

Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure

. EPIP-RR-60 i APPENDIX 1 i RADIOLOGICAL ASSESSMENT REPRESENTATIVE l A. Personnel Assignment

- Primary (Job Title)

Senior Consultant - Pickard, Lowe and Garrick Alternate (Job Title)

Consultant - Pickard, Lowe and Garrick B. Reporting Location Emergency Operations Facility (upon request)

C. Reports To s Emnergency Coordinator

'. D. Supervises / Coordinates N/A E. Primary Responsibility Acts in an advisory function in analyzing and assessing meteorological and radiological data and making recomendations to the Emergency Coordinator regarding public health and safety.

F. Basic Duties

1. Following the Recovery Organization activation and upon request, the primary and/or alternate Radiological Assessment Representative will report to the assigned location listed in Section B of this appendix
as rapidly as possible. Upon reporting he/she will inform the
Emergency Coordinator of his/her presence.
2. Be prepared to provide around-the-clock support. .
3. Provides dose assessment for licensing support activities.
4. Assists in detennining fuel cladding integrity by comparing the concentration of noble gas released to the total theoretical concentration of noble gas for that specific core burnup.
5. Makes recommendations to the Emergency Coordinator regarding a controlled release of fission product gases necessary to purge 3 e containment.

'%-[ 'm;i FEB f R1 2-01-83

EPEP-RR-60-3 I

F. Basic Duties (Continued)

6. Analyzes and assists the Dose Assessment Coordinator in determining l doses and dose rates to the surrounding public and make recommen-

'dations to the Emergency Coordinator regarding sheltering or evacuation requirements.

4

\ -

a e m B [ l n (i tz ss R1 2-01-83 l FEB 1 1983 i

l 1

1

EPIP-RR-61-1 1 i

Fort Calhoun Sta' tion Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-61 REC 0VERY ORGANIZATION'S SITE REPRESENTATIVE I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of personnel in the Recovery Organization filling the position of Site Representative.

II. PREREQUISITE Both primary and alternate individuals filling the position of Site Representative have been fully trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE Upon activation of the Recovery Organization, those personnel assigned to the position of Site Representative shall carry out this assignment as detailed in Appendix 1 of this implementing procedure.

l ISS!!ED R1 2-01-83 4

n 1 EPfP-RR-61-2 Fort Calhoun Station Unit No.1 l Emergency Plan Implementing Procedure EPIP-RR-61 APPENDIX 1 -

. SITE REPRESENTATIVE l

A. Personnel Assignment  ;

Primary (Job Title)

QA Engineer Alternate (Job Title) i QA Engineer B. Reporting Location Iowa EOC at Logan, Iowa C. Reports To 2

Emergency Coordinator by telephone communication. -

l -D. Supervises / Coordinates Coordinates with the Governor's EOC Representative E. Primary Responsibility Assures technical accuracy and interpretation of information l

j transmitted from OPPD EOF to the State E0C.

F. Basic Duties

1. Upon notification of Recovery Organization activation, the primary and/or alternate Site Representative designate (s) will report to l

< their assigned location listed in Section B of this appendix and inform the Emergency Coordinator of his/her presence.

2. Be able to support around-the-clock operation.
3. Maintains communications with the Emergency Coordinator at the EOF. l
4. Requests infomation regarding plant status, radiological releases, .

and protective actions taken.

5. Assures technical accuracy of information received from the E0F prior to release of this information to the State E0C Representative.

1 0 R1 2-01-83

~

EPIP-RR-62-1 Fort Calhoun Station Unit No.1 Emergency P1an Implementing Procedure EPIP-RR-62 REC 0VERY ORGANIZATION'S NRC and FEMA REPRESENTATIVES' I. PURPOSE The purpose of this procedure is to detail assignment and responsibilities of the NRC and FEMA Representatives and how they interface with the Utility's Recovery Organization.

II. PREREQUISITE It is assumed that personnel have been trained and are aware of their duties and responsibilities.

III. PRECAUTIONS None IV. PROCEDURE Upon activation of the Recovery Organization, those personnel delegated to the NRC and FEMA Emergency Response Team shall carry out their functions as detailed in Appendix 1 of this implementing procedure. -

ISSUED FEB 1 1983 R1 2-01-83

EPIP-RR-62-2 Fort Calhoun Station Unit No.1 Emergency Plan Implementing Procedure EPIP-RR-62 APPENDIX 1 NRC and FEMA REPRESENTATIVES A. Personnel Assignment 14 - NRC Representatives 1 - FEMA Representative B. Reporting Location

~

Emergency 0perations Facility - 9 NRC Representatives Emergency Operations Facility - 1 FEMA Representative Technical Support Center - 5 NRC Representatives Information regarding the NRC and FEMA's interface with OPPD will be provided upon receipt of fully developed Emergency Response plans from both of the agencies.

ISSUEB FEB 1 1983 R1 2-01-83

.