ML20079H664

From kanterella
Revision as of 00:54, 23 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Final Deficiency Rept 137 Re Controlled Ventilation Area Sys Doors.Deficiency Did Not Involve Inadequate or Unapproved Matl.Incident Not Considered Reportable Per 10CFR50.55(e)
ML20079H664
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/10/1984
From: Gerrets T
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
137, W3K84-0051, W3K84-51, NUDOCS 8401230530
Download: ML20079H664 (2)


Text

_ - _ _ _ _ _ . _ _.

w i 4 .

  • h L.0U1SIANA i42 OuAnOnoe sinter POWER & L1GHT P O BOX 6008 + NEW ORLEANS. LOUISIANA 70174 . (504) 366-2345 sus $SEsS$

January 10, 1984 W3K84-0051 Q-3-A35.07 3 Y _ -. -

Mr. John T. Collins !7 Regional Administrator, Region IV U. S. Nuclear Regulatory Commission j

! bg 611 Ryan Plaza Drive, Suite 1000  !" d:. ,

Arlington, Texas 76012 ,

REFERENCE:

Telecon C. N. Hooper (LP&L) and W. Crossman (NRC IV) on December 8, 1983

Dear Mr. Collins:

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Potentially Reportable Deficiency No. 137

! " Controlled Ventilation Area System (CVAS) Doors" Final Report On December 8, 1983, a problem with the Controlled Ventilation Area System (CVAS) Doors was reported as Potentially Reportable Deficiency No. 137.

Further evaluation of the previously described condition indicates this condition is not considered reportable pursuant to the requirements of 10CFR50.55(e).

Evaluation The reported deficiencies were discovered during planned inspections and tests, and did not involve inadequate or unapproved material, and the Control Room Leak Rate Test (SPO-46B-002) has subsequently been performed satisfactorily. In this instance, there was no chance that the design basis would not be met because of the planned inspection and testing, prior to transferring the area from the construction organization, and the design itself proved adequate. For the foregoing reasons PRD No. 137 is not considered reportable.

Very truly yours, l VV M

! T. F. Gerrets

! Quality Assurance Manager 1

TFG:CNH:VBR 8401230530 840110 9

'l A PDR ADOCK 05000382 IU S PDR

Mr. John T. Collins January 10,,1984 W3K84-0051 Page 2 cc:. Director

-Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 (15 copies)

Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. E. L. Blake Shaw, Pittman, Potts, & Trowbridge 1800 M Street, N.W.