Final Deficiency Rept 135 Re Reactor Auxiliary Bldg Controlled Ventilation Area Wiring.Initially Reported on 831207.Wiring Corrected by Test Engineers & Sys Satisfactorily Tested.Control Wiring Diagrams Updated
ML20079J917
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/11/1984
From: Gerrets T
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
135, W3K84-0063, W3K84-63, NUDOCS 8401240453
Download: ML20079J917 (2)


Text

_ _ _ _ _ _ _

s.

j..

4 l OUISIANA 242 oeLAnoNoe S1nter P O W E R & L i G H T! P. O BOX 3008

. (504) 366-234570174 EuSYS SYS January 11, 1984 W3K84-0063 Q-3-A35.07.

Mr. John T. Collins Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

REFERENCE:

Telecon C. Hooper (LP&L) and D. Hunnicut (NRC IV) on December 7, 1983 7 ,__

Dear Mr. Collins:

fI hb: e

. ~ . .

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 i N l7l$4 Potentially Reportable Deficiency No. 13) [ I g "RAB Controlled Ventilatior Area" "j

_j Final Report On December 7, 1983 a problem with the RAB-Controlled Ventilation Area wiring was reported as Potentially Reportable Deficiency No. 135. Further evaluation of the previously described condition indicates this condition is not considered reportable pursuant to the requirements of 10CFR50.55(e) .

EVALUATION During the preoperational testing of the controlled ventilation area exhaust fans E23 (SA) and E23 (SB), it was noticed that the differential pressure indicating switches (DPIS-HV5257AS and DPIS-HV5257BS) were wired wrong. This error occured since the control wiring diagrams (CWD's) were showing wrong pig-tails from the DPIS as black and green, whereas white and green pig-tails were to be used for proper operation. Wiring was corrected by the test engineers and the system was satisfactorily tested. CWD's were updated to correct the design error under DCN-IC-1776 and issued on 11/29/83. For these reasons this PRD is considered not reportable.

Very truly yours, T. F. Gerrets Quality Assurance Manager TFG:CNH:JC l 8401240453 840311 PDR ADOCK 05000382 S PDR 1I( k -

n i;

i- g Mr. J. T. Collins January 11, 1984 W3K84- 0063 Page 2 cc: Director Office of Inspection & Enforcement U.-S. Nuclear Regulatory Commission Washington, D.C. 20555 (15 copies)

Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. E. L. Blake Shaw, Pittman, Potts, & Trowbridge 1800 M Street, N.W.

Washington, D.C. 20036 Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building

-New Orleans, Louisiana 70130 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Cec gia 30339

- - _ _ _ _ - _ - _ _ _ _ _ _